From: Bob Zarzecki <bzarzecki@sandec.com>
Sent: Thursday, October 15, 2020 9:37 AM
To: David.E.Bailey2@usace.army.mil; Homewood, Sue
Cc: Pete Goria; Alex Elkan; Patrick Smith; Allan Hill
Subject: [External] Nationwide Permit 39 (After -the -Fact); McConnell Center - Lot 9,
McLeansville, Guilford County; SAW-2018-02038 - WETLANDS MONITORING (S&EC
13795)
Attachments: 20200902131403045.pdf, McConnell Center -Sketch Map 10-08-2020.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
David & Sue:
On behalf of the permittee, we are providing you a brief update on this project.
The permit approvals for this project included conditions that restoration work (removal of fill from the
approximately 1.58-acre area pond bottom, etc.) was to "be completed within 120 days of receipt of
all necessary federal, state and local approvals/permits".
The DWR approval was dated April 13, 2020 and the USACE approval was dated April 21, 2020. The
permitted work required a modification of the DEMLR erosion and sedimentation control (ESC) plan.
This permit modification approval was received on August 25, 2020 (copy attached).
As of today, the non -permitted fill has been removed from the pond bottom. The fill was removed to
the extent and depth of the original pond bottom which was identified in part by the evidence of
stumps, soil color, and other indicators of a drained pond bottom, along with the estimated elevation
identified within the permit documents.
The next step will be to breach the pond dam and stabilize the entire area (seed and mulch).
The project engineer is coordinating the dam breach with DEMLR staff. Any potential changes to the
breach plan provided in the permit documents will be provided to the USACE and DWR. DEMLR may
be reaching out to DWR to ensure the sequencing of the dam breach is acceptable.
We provide the follow assumptions/actions and ask for your confirmation of them.
Regarding the as -built, we understand that the USACE is looking for "...an as -built
survey to ensure that target elevations were met, including comparisons with elevations
of those areas within the pond bottom that were not filled or graded." We are assuming
that the permittee will only need to survey the approximate red boundary shown on the
attached drawing and that they don't need to survey the entire pond bed. This would
include getting topographic data roughly 10 to 15 feet outside of the limits of the fill
removal limits shown on the attached drawing. Please confirm this assumption is correct.
2. We assume that this as -built survey does not need to extend down to the dam and can be
truncated to only show the area upstream (to the west) of the dashed orange line on the
attached drawing. Please confirm that our understanding is correct.
3. The site contractor has recommended the application of a temporary seed mix
(contractor grass seed blend, e.g., rye, etc.) at the same time that the wetland seed mix is
applied and mulched. This is consistent with other wetland restoration efforts that S&EC
has done in the past to ensure a quick stabilization of the area prior to the emergence of
the wetland species. Please confirm that this is acceptable to the USACE and DWR.
Please contact me if you have any questions or would like to visit the site.
Sincerely,
BOB ZARZECKI
Wetlands Department Manager/Principal
Soil & Environmental Consultants, PA
North Quarter Office Park
8412 Falls of Neuse Road, Suite 104
Raleigh, NC 27615
Office (919) 846-5900
Direct (919) 256-4517
Mobile (919) 270-2068
WarzeckiAsandec.com
Visit us at sandec.com
This electronic communication, including all attachments, is intended only for the named addressee (s) and may contain confidential information.
This electronic communication may not have passed through our standard review/quality control process. Design data and recommendations
included herein are provided as a matter of convenience and should not be used for final design. Rely only on final, hardcopy materials bearing
the consultant's original signature and seal. If you are not the named addressee (s), any use, dissemination, distribution or copying of this
communication is prohibited. If you have received this electronic communication in error, please notify the sender by return e-mail and delete the
original communication from your system. Thank you.
APlease consider the environment before printing this email.
ROY COOPER
Governor
MICHAELS. REGAN
Secretary
BRIAN WRENN
Acting Director
NORTH CAROLINA
Environmental Quality
August 25, 2020
LETTER OF APPROVAL WITH MODIFICATIONS
Windsor Contracting, LLC
ATTN: Buddy Seymore, Manager
5603 New Garden Village Drive
Greensboro, NC 27410
RE: Project Name: McConnell Lot 1 (4743 MConnell Center Drive)
(NCDEQ GUILF-2015-013)
Acres Approved: 29.27 (24.74 previously approved, 4.53 newly approved)
Project ID: GUILF-2015-013
County: Guilford
City: Greensboro
Address: 4743 McConnell Center Drive
River Basin: Cape Fear
Stream Classification: WS-V; NSW
Submitted By: Triad Design Group
Date Received by LQS: August 11, 2020
Plan Type: Revised
Dear Mr. Seymore:
This office has reviewed the subject erosion and sedimentation control plan. We find
the plan to be acceptable and hereby issue this Letter of Approval. The enclosed
Certificate of Approval must be posted at the job site. This plan shall expire three (3)
years following the date of approval, if no land -disturbing activity has been
undertaken, as is required by Title 15A NCAC 413.0129.
As of April 1, 2019, all new construction activities are required to complete and
submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage
(COC) under the NCGO10000 Construction Stormwater General Permit.
This form MUST be submitted prior to the commencement of any land disturbing
activity on the above named project. The NOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at
Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit
a complete and correct NOI Form, a COC will be emailed to you within three business
days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit.
However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR
Stormwater Central Office staff in Raleigh.
D EQ� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Winston-Salem Regional Office ( 450 West Hanes Mill Road, Suite 3001 Winston-Salem, North Carolina 27105
^�a���Wwmaly 336.776.9800
Letter of Approval
Windsor Contracting, LLC
August 25, 2020
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: McConnell Lot 1 (4743 McConnell Center Drive) Revision
Project ID: GUILF-2015-013
County: Guilford
1. Be advised that 401/404 permits/certifications may provide authorization to work in the
areas subject to those permits/certifications, but they do not grant approval to perform this
work without the use of an approved erosion and sedimentation control plan for the activity.
Additional measures may be required to perform construction in these areas. The applicant is
responsible for the control of sediment on -site. If the approved erosion and sedimentation
control measures prove insufficient, the applicant must take those additional steps necessary
to stop sediment from leaving the limits of disturbance. [15A NCAC 4B .0115]
2. The following conditions must apply to the removal of soil and waste from the wetland area,
otherwise a mining permit is required prior to land disturbance [G.S. 74-49(7)(f)]:
a. The excavation or grading is being conducted to provide soil or other unconsolidated
material to be used without further processing either on -site or for a single off -site
construction project for which an erosion control plan has been approved in
accordance with Article 4 of Chapter 113A of the General Statutes.
b. The excavation or grading will be completed within one year.
C. The excavation or grading will not involve blasting, removal of material from
rivers or streams, the disposal of off -site waste on the affected land, or the surface
disposal of groundwater beyond the affected land.
d. The excavation or grading will not be in violation of any local ordinance.
The limits of disturbance must remain less than 5 acres.
Any noncompliance with these requirements means that the project must be permitted
under the Mining Act.
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG
010000 NPDES for Construction Activities
CERTIFICATE OF PLAN APPROVAL
The posting of this certificate certifies that an erosion and sedimentation control plan has been
approved for this project by the North Carolina Department of Environmental Quality in
accordance with North Carolina General Statute 113A — 57 (4) and 113A — 54 (d) (4) and North
Carolina Administrative Code, Title 15A, Chapter 4B.0107 (c). This certificate must be posted
at the primary entrance of the job site before construction begins and until establishment of
permanent groundcover as required by North Carolina Administrative Code, Title 15A,
Chapter 4B.0127 (b).
McConnell Lot 1 (4743 MConnell Center Drive) - Guilford County - GUILF-2015-013
Project Name and Location
August 25, 2020
Date of Plan Approval With Modifications
Certificate of Coverage Number
Assistant Regional Engineer
Fact Sheet on the New NCG01 Permit �Q A
April 2019 �,� _11. Q
Organizational Updates
The new permit:
Repeats state requirements for E&SC
Plans and organizes them with federal
construction activity requirements;
Is clearly organized by topic; and
Has less text and more tables.
Technical Updates
The new permit:
• Requires that the E&SC Plan meet
SWPPP requirements (p. 2);
• Provides a list of items that must be
included in the SWPPP, such as the
construction sequence, plans,
calculations, etc. (p. 2-4);'
• Has updated language on bypasses and
upsets that is tailored to construction
activities (p. 10);
• Puts all timeframes for inspections,
record -keeping and reporting in
"calendar days" for clarity and
consistency (p. 11-14);'
• Changes the inspection frequency
(during business hours) to at least
once per 7 calendar days and after
every storm > 1.0 inch (previously 0.5
inch);' and
• Excludes weekends, state and federal
holidays from normal business hours
unless construction activities take
place (p. 23).
This list is based on website guidance
by the DEMLR Sediment Program.
The number of calendar days was
selected to be as equivalent as
possible with the previous permit.
The intent is to provide predictability
to the inspection schedule.
Acronyms to Know
COC: Certificate of Coverage, proof of coverage under an NCG01 permit
DEMLR: NC Division of Energy, Mineral, and Land Resources
E&SC: Erosion & Sedimentation Control
e-NOL Notice of Intent, application form for the NCG01 permit
e-NOT: Notice of Termination, form for closing out the NCG01 permit
SWPPP: Stormwater Pollution Prevention Plan, required by the NCG01
The NCG01 Process
The new NCG01 applies to permits approved on or after April 1, 2019.
Permittees will no longer receive a copy of the NCG01 permit in the mail
with their E&SC Plan approvals and be considered as covered under the
permit. Federal rules require that DEMLR receive an NOI on each
construction project and issue each construction project its own COC.
Under the new NCG01 process, construction sites will continue to
receive approval for E&SC Plans from either DEMLR or the delegated
local E&SC program just like before. After receiving E&SC Plan approval,
permittees will officially obtain coverage under the NCG01 by
completing an a-NOI (available at deq.nc.gov/NCG01). The e-NCI will
only take about 20 minutes to fill out and submit on-line.
Initially, there will be no charge associated with applying for an NCG01
permit but on or around June 1, 2019, DEMLR will begin charging a $100
annual general permit fee as required per §143-215.3D.
DEMLR is working on creating a single application form that will allow an
applicant to simultaneously apply for an E&SC permit and an NCG01
COC. That effort is part of a larger Permit Transformation project at
DEMLR.
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
Energy. Mineral' TRACY DAVIS
and Land Resources Director
ENVIRONMENTAL QUALITY
Announcement of Combined Self -Monitoring and Self -Inspection Form
The Sedimentation Pollution Control Act was amended in 2006 to require that persons
responsible for land -disturbing activities inspect a project after each phase of the project
to make sure that the approved erosion and sedimentation control plan is being followed.
Rules detailing the documentation of these inspections became effective October 1, 2010.
To simplify document of Self -Inspection Reports and NPDES Self -Monitoring Reports, a
combined form is now available. The new form was developed to satisfy the requirements
of the Sedimentation Pollution Control Act and the NPDES Stormwater Permit .for
Construction Activities, NCG 010000. Beginning August 1, 2013, the Division of Energy,
Mineral, and Land Resources is responsible for administering both the SPCA and the NPDES
Stormwater Permit for Construction Activities NCG 010000. The combined form should
make it easier to comply with self -inspection requirements.
The Combined Self -Monitoring form is available as a PDF and Word document from the
Land Quality web site.
http://portal.ncdenr.org/web/Ir/erosion
If you have questions, please contact the Land Quality Section at a DEQ Regional Office
State of North Carolina ( Environmental Quality I Energy, Mineral and Land Resources
450 West Hanes Mill Road, Suite 300 1 Winston-Salem, NC 27105
336 776-9800 Phone/ 336 776-9797 FAX
1
2
3 4 5
6
E
E
811111
SCALE:=, � 60'�
L/�ROENallfl
IIK C6�16� \ rc Qzs
/, 6� /
/ O
=ate J /
�-- � ''":"- _
� �'`�'\ �- -�C�
"`
�"'• _
STREAM WITH
CONTIGOUS � .WETLAND-_
\ 417'railerParkllt
D
WETLANDS=170 LF � IMPACTq��
WETLANDS=340 SF
WI&R
a
D
\\
,,► III
� � .. ,; ,
\ 0.008 AC . ETAINING.•:;:;.;;:.::,::.....
\ \ \ WA
�
trig ddeditroup
,II..:.:o.
Triad Design Group, P.C.
4807-C Roger Boulevard
Greensboro, INC 27407
Telephone 336-218-8262
Facei m lle 336-218-8010
xnwi.' ad designgrocp.coru
OMW
NC Architecture Reg. 507N
NC Engineering Lic. G110800,
A.
` %=
0.40 AC MARCH 1 2020
POALLM WILL OF REOORO:
L ALLAII RRL, Pfi
H z
>J
0
J z o�
Lu w =
WJ w 0
J J O
V+ LLl O
O Z = 0
0 z m
-) c)w
LV
SUBMITTALS
DATE DESCRIPTION
IS
REVISIONS:
DESCRIPTION
{�.
SHEETTITLE
j OVERALL
i3 SITE PLAN
ne1e: o EN18ERzb,e
a
JMbN. CAD Chack:
Sh-tumb
EXH 1
Lco
Of
L