Loading...
HomeMy WebLinkAbout20030426 Ver 1_More Info Received_20050304Dewberry March 2, 2005 Mr. Danny Smith NC Department of Water Quality 2321 Crabtree Blvd., Suite 250 Raleigh, NC 27607 2301 Rexwoods Drive 919 881 9939 Suite 200 919 881 9923 fax Raleigh, North Carolina 27607-3366 www.dewberryxom Reference: City of Raleigh, North Carolina Beaverdam Creek Sewer Line - Permit Extension Request Dewberry Project No. 02052.01, DWQ Project # 03-0426 Dear Mr. Smith: MAR 0 4 2005 SET"'t?",t? GUAI 17Y ?SAJVDS, Rg?WATERBRANCH The City of Raleigh received a NWP #32 and WQC #3376 for the construction of the Beaverdam Creek Sewer Line project. The permitted project is a restoration plan to mitigate damages to impacted wetlands, stream, and riparian buffers that resulted from the construction of an access road and stream stabilization/relocation during an emergency sewer repair. The permitted project includes removing fill placed during construction of the road, providing stream restoration techniques to restore impacted streams, and a planting plan for all disturbed areas, including riparian buffers and wetlands. The NWP #32 was issued May 27, 2003 and expires May 27, 2005. The WQC approval expires when the NWP expires on May 27, 2005. With the permit expiration date approaching, the City of Raleigh requests an extension of the NWP#32 for this project. Several property and easement issues have arisen as the City attempted to acquire easements in able to construct the project. Because the easements have not yet been obtained, the City has not been able to begin construction of this project. The City is planning to recommend the properties with outstanding easement acquisition issues for condemnation at the next Council meeting on March 15, 2005. Once the condemnation requests are approved by the City Council, the attorneys will file suit and the City will be able to enter the properties to begin construction of this project. Given this process, it is expected the earliest that construction will be able to begin will be in May 2005, provided no other legal issues arise. It is the City's goal to begin construction prior to the May 27, 2005 permit expiration date. We respectfully request an extension to the existing permit for this project. Attached for your review is the approved NWP #32 and WQC #3376 for this project. Please contact me with any questions or concerns you have regarding this request. Sincerely, Dewberry & Davis, Inc. She' S. Reeves, PE Project Manager Dewberry & Davis, Inc. Mr. John Thomas February 17, 2005 Page 2 Attachments Cc: Donna Jackson - City of Raleigh John Thomas - US COE P:\73183900\Kyle Drive\Permit Extension Cover letter USACOE.doe Dewberry