Loading...
HomeMy WebLinkAboutNC0082821_CORRESPONDENCE_20071128NPDES DOCYNENT SCANNING COVER SHEET NPDES Permit: NC0082821 Statesville Fertilizer Plant Document Type: Permit Issuance Wasteload Allocation Authorization to Construct (AtC) Permit Modification Complete File - Historical Correspondence Speculative Limits Instream Assessment (67b) Environmental Assessment (EA) Permit History Document Date: November 28, 2007 This document is printed on reuae paper -ignore a.uy content on the reverae aide R r> DUNCKLEE & DUNHAM November 28, 2007 Mr Sumar Bou-Ghazale North Carolina Division of Water Quality Surface Water Protection 610 East Center Avenue, Suite 301 Mooresville, North Carolina 28115 Reference Proposed now Metering Change Southern States Cooperative, Inc Statesville Fertilizer Plant NPDES Permit NCO082821 Dear Mr Bou-Ghazale ENVIRONMENTAL CONSULTANTS 511 KE181 CR DRIVE -SUITE 102 CARY NORTH CAROLINA 27518 OFFICE (919) 858 - 9898 FACSIMILE (919) 858 - 9899 On behalf of Southern States Cooperative, Inc, (Southern States), Duncklee & Dunham, PC is requesting a change to the way flow is metered to comply with the requirements of the facility's NPDES permit Currently, the permitted ground water treatment system has an in -line flow meter for flow measurement Pursuant to the requirements of the NPDES permit, the meter is calibrated annually, a process that requires removal shipment to the manufacturer in California for calibration, and reinstallation The meter is approximately 15 years old and needs to be rebuilt or replaced at a cost of several thousand dollars We have priced equivalent type replacement meters and found them to be of similar cost and calibration requirements Therefore, we are proposing to eliminate the metered method of flow measurement and go to a batch -type measurement system A brief description of the current treatment system is presented below Two extraction wells are used to pump nitrate and ammonia -impacted ground to the treatment system for PH adjustment and discharge into the receiving stream The wells operate seasonally, between November I and March 31 The extraction wells pump ground water to a wet well adjacent to the treatment system budding Caustic soda is added to the water in the wet well to adjust the pH Once the pl-1 is adjusted to the permitted level, the water is pumped via a discharge pump to the receiving stream The in -line flow meter is installed in the discharge pipe and used to measure the total flow Duncklee & Dunham is proposing to add motor starter controllers to the extraction well pumps and a counter to the wet well discharge pump The motor starter controllers will activate and de -activate the extraction wells as the wet well fills and empties Activate and de -activate level switch controls mounted at pre-set levels within the wet well energize and de -energize the wet well discharge pump to discharge the water within the sump The counter will record the number of times the wet well discharge pump is activated Knowing the volume of the wet well that is discharged during each pump cycle and the number of times the discharge pump is activated, the total effluent flow can be calculated These mechanical changes will eliminate the need for the in -line flow meter, otherwise there would be no material changes to the system MAU No AUDRi titi - I'o51 0111c1 lion 33366 — RAI I ion NORUI C.AhOI INA 27636 A.- 6 Proposed Flow Metering Change Southern States - Statesville Fertilizer November 28, 2007 Page 2 of 2 We believe the proposed change does not change the characteristics of the permitted ground water treatment process and therefore does not require a permit modification Additionally, the change would save substantial yearly operation and maintenance costs associated with the flow meter Your assistance on this matter 1s greatly appreciated If you have any questions please do not hesitate to call me at (919) 858-9898 or email me at Tdunham@DunckleeDunham com Sincerely DUNCKLEE & DUNHAM, P C Thomas S Dunham, L G Senior Project Manager Senior Peer Review By RODAK ENGINEERING, P C Andrew M Rodak, P E Senior Engineer c Mr Vance Dann — Southern States Cooperative, Inc (2) P \Southern States\Statesvdk 1 erhhzer 50200%orms Corresp\Proposed Play Meter Chango 07184 doc L> DUN( 1,1 11 8 DUNHAM P C to /m j ogZ8Z( r�eT lJ�u � `, �NL — )2a,,V 5 AgAl PLK eiq- oC /VE �AM c5 �ia9-w6 GJ_r�A-i`�J�+'L �� �_✓i9*!r ���e� /_ZfcNo� ,lcoJ g2 6 �� NPDES Permit-NC00082821 Subject NPDES Permit-NC00082821 From 'Christopher M Fay' <chns@dunckleedunham com> Date Fri, 9 Feb 2007 07 57 40 -0500 To <susan a wilson@ncmail net> Susan, I have a compliance issue at the facility under permit number NC00082821 I talked to two people in the Mooresville regional office yesterday trying to find out who to talk to about the issue with no success I have talk to Bob Sledge in the past about the site so I called and emailed him yesterday with no response Is there somebody that I can contact and discuss the issue? Christopher M Fay Project Geologist DUNCKLEE K DUNt1AM Environmental Consultants 511 Keisler Drive, Suite 102 Cary , North Carolina 27511 919 858 9898 Office 919 858 9899 Fax 919 880 8413 Mobile email chr 5dunckleedunham com C7 c�� O�1'4f�y �, ouT 1 ��� ��� � 'Ao�1SakT b �AM,PL 1 T DO Z� bt,r' /),oPon� S i 11A 5 Mfl g1�y '2 mil Ls D2 S(' NAj CA TN R7 �q-DNS {F3uG �D �vi-iCP 1 of 1 2/9/2007 2 58 PM