HomeMy WebLinkAboutNCG030085_DMR_20200302ENGINEERING, INC.
March 2, 2020 RECEIVED
Mr. Sean Quarry MAR 2 0 2020
Daimler Trucks North America, LLC
1800 North Main Street CEN-I RAL FILES
Mount Holly, NC 28120 DWR SECTIOPI
Subject: Monthly Stormwater Sampling — February 2020
NPDES General Permit No. NCG030000
Daimler Trucks of North America LLC - Mount Holly, North Carolina
Shield Project No. 1140109-06
Dear Mr. Quarry:
According to rainfall data collected for the month of February 2020, there were no qualifying rainfall events (as
defined by General Permit No. NCG030000). As a result, no monthly stormwater samples were collected for
Stormwater Discharge Outfalls 9001 and #002 at the Daimler Trucks Mount Holly facility for the month of
February. Shield Engineering, Inc. (Shield) will continue to monitor daily weather conditions and attempt to
continue coordination of appropriate staff and resources to facilitate adequate sample collection. A partially
completed Discharge Monitoring Report form is attached to this cover letter for signature of the appropriate
authorized permittee and submittal to the State.
Daimler remains in Tier 3 at SDO #001 and SDO #002 for Zinc and Copper. Shield will continue to perform
monthly sampling per Tier 2 requirements until instructed to decrease sampling frequency by Daimler. Shield
greatly appreciates the opportunity to provide environmental services to Daimler Trucks, North America. If you
have any questions in reference to this document or require further information, please feel free to contact either
of the undersigned at (704) 394-6913.
Respectfully,
SBI LD ENG NEERING, INC
Magdaline Tzannis
Senior Project Manager
r
Melind Greene, EIT
Senior Engineer
ATTACHMENT
eRobelrtGriffin, P.
President/CEO
4301 Taggart Creek Road
Telephone 704.394 6913
Charlotte, NC 28208
www.shieldengineering.com
Fax 704.394.696868
Stormwater Discharge Monitoring Report
for North Carolina Division of Energy, Mineral and land Resources General Permit No. NCG030000
Date submitted 3=020
CERTIFICATE OF COVERAGE NO. NCG03 0 0 8 5
FACILITY NAME Daimler Trucks -Mount Holly i
COUNTY Gaston
PERSON COLLECTING SAMPLES N/A
LABORATORY N/A Lab Cert. #
Comments on sample collection or analysis:
No rain event
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR 2020
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ❑ Monthly' February (month,
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
❑Zero -flow ❑Water Supply [_]SA
QOther
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
n No discharge this nerind ?2
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Total Suspended Solids
pH,
Standard units
Total Copper
Total Lead
Total Zinc
Non -Polar O&G/Total
Total Petroleum
Hydrocarbons
Toxic
Organics$
Benchmarks
_
-
100 mg/L or 50 mg/O
6.0 — 9.0
0.010 mg/L
0.075 mg/L
0.126 mg/L
15 mg/L
1 mg/L
Parameter Code
-
46S29
COS30
00400
01119
01051
01094
1 00552
78141
SDO #001
NA
NA
NA
NA
NA
NA
NA
NA
NA
SDO #002
NA
NA
NA
NA
NA
NA
NA
NA
NA
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfali.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the Tf0 monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
MO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
J4,u
Name (Print name)
19/4nt- 07Ctn a
Title (P
0 3az z
Signat re Date
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
No discharge this period?Z
Outfall No.
Date Sample Collected'
(mo/dd/yr)
24-hour rainfall amount,
inches3
New Motor Oil or
Hydraulic Oil Usage
Non -Polar O&G/ Total
Petroleum Hydrocarbons
Total Suspended
Solids
Benchmarks
-
-
-
15 mg/L
100 mg/L or 50 mg/L°
Parameter Code
-
46529
NCOIL
00552
C0530
Footnotes from Part A also apply to Part B
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018
Page 2 of 3
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEFDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑
IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail an original copy of this DMR including al! "No Discharge" reports within 30 days of receipt of the lab results (or at end of monitoring period in the
case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that them -eke significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
Signature of
Permit Date:11/1/2018-05/31/2021
01 /Zo to
Date
SWU-245, last revised 11/1/2018
Page 3 of 3
Sean Quarry
Sr. Environmental Engineer
Daimler Trucks
1800 North Main Street
Mount Holly, NC 28120
704.822.7034 Phone
March 6, 2020
Division of Water Quality
Attn: Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
To whom it may concern:
Please find the enclosed February Stormwater Discharge Outfall (SDO) #001 and #002 forms for
the Daimler Trucks NA, LLC - Mount Holly Truck Manufacturing Plant (TMP). The February
stormwater samples were not collected during this month. According to rainfall data collected
for the month of February 2020, there was no qualifying rain event (as defined by General Permit
No. NCG030000). Shield will continue to monitor in March and attempt to collect adequate
samples.
Daimler remains in Tier 3 at SDO #001 and SDO #002 for Zinc and Copper. Shield will continue
to perform monthly sampling per Tier 2 requirements until instructed to decrease sampling
frequency by Daimler.
Should you have any questions, please contact me at 704-822-7034 or
sean.guarry@daimler.com.
Sincerely,
Daimler Trucks NA, LLC
Sean Quarry
Sr. Environmental Engineer
Enclosures — Shield Engineering, Inc. Cover Letter and DTNA signed DMR forms