Loading...
HomeMy WebLinkAbout20041739 Ver 2_Certified Return Receipt_20100217Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality DWQ Project No.: O ?/ - 17 39 Applicant: County: Fly e.r`V Project Name: uLSR 13/2 CTee Parller Roaabl Date of Issuance of 401 Water Quality Certification: hu3uSF 27, 2007 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby slate that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification Date: I, , hereby state that, to the best of my abilities, due clue and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Engineer's Certification / Partial t/ Pinal I, / /. 7-02 , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature ??%_ . 1;Z Registration No. 300/0 Date J//y/ZO/o 0 FFa (?V' 1?? D 0 Alt NorthCarolina Transportation Permitting Unit Xaturally 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX 919-73368931Internet : hip //h2o.enr.state_no us]ncwetlands An Equal OppoilunitylAflirmative Action Employer- 50% RMcled110 % Post Consumer Paper