March 2, 2010
DWQ# 10-0127
Mecklenburg County
Mr. Mike Harrell
Beacon Partners
9335 Harris Corners Parkway, Ste. 250
Charlotte, NC 28269
Subject: Husqvarna Headquarters, Statesville Rd.
APPROVAL of 401 Water Quality Certification with Additional Conditions
Dear Mr. Harrell:
You have our approval, in accordance with the general certification and those conditions listed below,
to impact 0.19 acre of wetland and 148 linear feet (If) of unnamed stream to Long Creek in order to construct
the referenced project in Mecklenburg County, as described in your application received by the Division of
Water Quality (DWQ) on February 17, 20100. After reviewing your application, we have determined that this
project is covered by Water Quality General Certification Number 3705, which can be viewed on our web site
at http://Portal.ncdnr.org/web/wq/ws. The General Certification allows you to use Nationwide Permit Number
39 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other
federal, state or local permits before proceeding with your project, including those required by (but not limited
to) Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations.
The above noted Certification will expire when the associated 404 permit expires unless otherwise
specified in the General Certification. This approval is only valid for the purpose and design that you described
in your application. If you change your project, you must notify us in writing, and you may be required to send
us a new application for a new certification. If the property is sold, the new owner must be given a copy of the
Certification and approval letter; and is thereby responsible for complying with all conditions.
In addition to the requirements of the certification, you must also comply with the following conditions:
r
1. The Mooresville Regional Office shall be notified in writing once construction at the approved impact areas
has commenced.
2. Existing stream dimensions (including the cross section dimensions, pattern, and longitudinal profile) must be
maintained (or restored via constructed benches) above and below locations of each culvert. If any of the
existing pipes are or become perched, the appropriate stream grade shall be re-established or, if the pipes
installed in a perched manner, the pipes shall be removed and re-installed correctly.
3. The headwater hydrology for the stream segment below the wetland shall be maintained either through
French drains or other measures.
Mooresville Regional Office One
Location: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 NorthCarolina
Phone: (704) 663-1699\Fax: (704) 663-6040\ Customer Service: 1-877-623-6748
a
An 1=--I (lnnnrhnn if,,/Affirm -ti„o Ar4inn 9:-1- n._- 5r01
Rervrlari/1 (lo/__Pnc1 r'-?ncnmcr_P?ner
Internet: http://portal.ncdenr.org/web/w ?gtllral?l?
4. The discharge from the irrigation pond shall not be allowed to discharge to the storm water pond and shall not
cause erosion or scouring of the upland topography.
5. Use of native vegetation and other soft stream bank stabilization techniques must be used where practicable
instead of riprap or other bank hardening methods.
6. Storm water discharge structures at this site shall be constructed in a manner such that the potential
receiving streams (of the discharge) will not be impacted due to sediment accumulations, scouring or erosion
of the stream banks.
7. A final, written storm water management plan (including a signed and notarized Operation and
Maintenance Agreement) shall be submitted to the 401 Oversight and Express Permitting Unit (2321
Crabtree Blvd., Suite 250, Raleigh, NC, 27604) within 60 days of the issuance of the 401 Water Quality
Certification. The storm water management plans shall be approved in writing by this Office (or local
approved delegated authority) before the impacts specified in this Certification occur. You have the option
of using the Express Review Program for expedited approval of these plans. If you propose to use the
Express Review Program, remember to include the appropriate fee with the plan. The storm water
management plan must include construction plans, specifications, storm water BMP worksheets, and
supporting calculations. The storm water best management practices are required to be appropriate for the
surface water classification and designed to remove at least 85% TSS according to the most recent version
of the NC DENR Storm water Best Management Practices Manual. These facilities must be designed to
treat the runoff from the entire project, unless otherwise explicitly approved by the Division of Water Quality
(or local delegated authority). Also, before any permanent building is occupied at the subject site, the
facilities shall be constructed and operational, and the storm water management plan shall be
implemented. The structural storm water practices as approved as well as drainage patterns must be
maintained in perpetuity. No changes to the structural storm water practices shall be made without written
authorization from the Division of Water Quality.
8. Sediment and erosion control measures shall not be placed in wetlands or waters without prior approval from
DWQ. If approved, they shall be removed and the natural grade restored within two months of the date of
the close out/stabilization of the given drainage area.
9. Upon completion of the project, the applicant shall complete and return the enclosed "Certificate of
Completion" form to the 401iWetlands Unit of the NC Division of Water Quality.
10. Continuing Compliance. The applicant (Beacon Partners, Mike Harrell) shall conduct all activities in a
manner so as not to contravene any state water quality standard (including any requirements for compliance
with section 303(d) of the Clean Water Act) and any other appropriate requirements of state and federal law.
If DWQ determines that such standards or laws are not being met (including the failure to sustain a
designated or achieved use) or that state or federal law is being violated, or that further conditions are
necessary to assure compliance, DWQ may reevaluate and modify this certification to include conditions
appropriate to assure compliance with such standards and requirements in accordance with 15 A NCAC
2H.0507(d). Before codifying the certification, DWQ shall notify the applicant and the US Army Corps of
Engineers, provide public notice in accordance with 15A NCAC 2H.0503, and provide opportunity for public
hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to the
applicant in writing, shall be provided to the United States Army Corps of Engineers for reference in any
permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404
Permit for the project.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing.
You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written
petition that conforms to Chapter 1506 of the North Carolina General Statutes to the Office of Administrative
Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final
and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act.
If you have any questions, please telephone Mr. Alan Johnson in the Mooresville Regional Office at 704-663-
1699 or Ms. Cyndi Karoly in the Central Office in Raleigh 919-733-9721.
Sincerely,
for Coleen H. Sullins