Loading...
HomeMy WebLinkAboutSW6200802_2020-10-14 Sheffield Farms Five Submittal Documents_20201015ENGINEERING - SURVEYING - DESIGNING - DRAFTING Larry King & Associates, R.L.S., P.A. P.O. Box 53787 1333 Morganton Road, Suite 201 Fayetteville, North Carolina 28305 P. (910) 483-4300 F. (910) 483-4052 www.LKandA.com TRANSMITTAL Corey Anen, PE 512 N. Salisbury Street 9t' Floor (Raleigh, NC 27604 '1612 Mail Service Center Raleiqh, NC 27699-1612 0/14/2020 Div. of Energy, Mineral and Land heffield Farms Section 5 We are ❑ HAND DELIVERY ® OVERNIGHT ❑ US MAIL ❑ PICKUP AT OUR sending Via: DELIVERY OFFICE ❑ SURVEY DRAWING(S) ❑ PLOT PLAN(S) ❑ CHANGE ORDER ❑ The following: CONCEPTUAL PRELIMINARY FINAL ❑ DRAWING(S) ® CONSTRUCTION ❑ CONSTRUCTION ® OTHER DRAWINGS DRAWING(S) For your: ® REVIEW ❑ COMMENTS ❑ SIGNATURE OTHER COPIES DATE NO. DESCRIPTION 2 Revised Sheet C-08 1 Revised SMP Application Form Sheets 3-4 1 Revised Supplement EZ Form 1 Revised Pond Calculations Pages SC1,2,4,6 1 lRevised Pond Routing Calculations Notes: From: Jeffrey N tales, PE Please notify us at once if any items are missing. SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 1 Project Name Sheffield Farms -Section 5 2 Project Area ac 3 Coastal Wetland Area (ac) 0 0 4 Surface Water Area ac 5 Is this project H' h or Low Density? High 6 Does this project use an off -site SCM? No COMPLIANCE WITH 021-11.1003 i 7 Width of vegetated setbacks rovided feet 8 Will the vegetated setback remain vegetated? 9 Is BUA other that as listed in .1 0034 c-d out of the setback? 10 Is streambank stabilization proposed on this project? NUMBER AND TYPE OF SCM*- 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 1 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-F5 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 1 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 ea Iter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: _ _ Jeffrey A. Nobles, PE 28 0 anization: Lany King & Associates, RLS, PA 29 Street address: 1333 Moroanton Road, Suite 201 Fayetteville, NC 28305 30 City, State, Zip: 31 Phone numbers) Email: 910-483-4300 32 jnobles@lkanda.com Certification Statement i certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. 1`V%-41 ,tom°,'y' _ SEAL _= 31459 10. iy"7_0 Date DRAINAGE AREAS 1 Is this a high density project? yes 2 If so, number of drainage areas/SCMs 1 3 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire SIN 1 4 Type of SCM Wet Pond 5 Total BUA In project (sq ft 203606 sf 193113 sf 6 New BUA on subdivided lots (subject to permitting) s ft 144000 sf 144000 sf 7permitting) New BUA outside of subdivided lots (subject to s 55616 sf 52113 sf 8 Offsite - total area (sq ft 9 Offsite BUA 1 Breakdown of new BUA outside subdivided lots: Parking (sq ft 10 Sidewalk (sq ft Roof (sq ft Roadway s ft 55616 sf 52113 sf Future ft Other, please specify in the comment box below (sq ft 11 New infiltrating permeable pavement on subdivided lots (sq ft sf 12 New infiltrating permeable pavement outside of subdivided lots (sq ft sf 13permitting) Exisitng BUA that will remain (not subject to sq ft sf 14 Existing BUA that is already permitted Jsq ft sf 15 Existing BUA that will be removed (sq ft sf 16 Percent BUA 17 Design storm inches 1 in 18 Design volume of SCM cu ft 16374 cf 19 1 Calculation method for design volume ADDITIONAL INFORMATION ase use this space to provide any additional information about the 20 aree(s): F]drinage Simple Method WET POND 1 ❑rainage area number 2 Design volume of SCM (cu ft) GENERAL MD4 FROM 02H .lOSQ _ 1 �15024 C 3' Is the SCM sized to treat the SW from all surfaces at build -out? Is the SCM located away from contaminated sails? What are the side slopes of the SCM (H:V)7 Fes Yes 4 5 1 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered-` side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? Yes 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 1$ Is there an O&M Plan that complies with General MDC (12)7 Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed professional? Yes r rumu 18 mu7- rrcum vArl .ivas Method used SAIDA 19 Has a stagelstorage table been provided in the calculations? Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl) Yes 20 162.00 21 Elevation of the main pool bottom -(top of sediment removal) (fmsl) 163.00 22 Elevation of the bottom of the vegetated shelf (fmsl) 167.00 23 Elevation of the permanent pool (fmsl) 167,50 24 Elevation of the top of the vegetated shelf (fmsl) 168.00 25 Elevation of the temporary pool (fmsl) 169.10 26 Surface area of the main permanent pool (square feet) 6969:1 27 Volume of the main permanent pool (cubic feet) 22856 cf 28 Average depth of the main pool (feet) 3.91 It 29 Average depth equation used f Equation; 30 If using equation 3,, main pool perimeter (feet) If using equation 3, width of submerged veg. shelf (feet) 393.0 ft 31 3.0 ft 32 Volume of the forebay (cubic feet) 3335 cf 33 Is this 15-20% of the volume in the main pool? Yes 34 Clean -out depth for forebay (inches) 42 in 35 Design volume of SCM (cu ft) 15024 cf 36 Is the outlet an orifice or a weir? Orifice 37 If orifice, orifice diameter (inches) 2 in 38 If weir, weir height (inches) 39 If weir, weir length (inches) 40 Drawdown time for the temporary pool (days) 2.53 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? Yes 42 Are berms or baffles provided to improve the flow path? No 43 Depth of forebay at entrance (inches) 60 in 44 Depth of forebay at exit (inches) 48 in 45 Does water flow out of the forebay in a non -erosive manner? Yes 46 Width of the vegetated shelf (feet) 6 It 47 Slope of vegetated shelf (H:V) 6:1 48 Does the orifice drawdown from below the top surface of the permanent pool? Yes 49 Does the pond minimize impacts to the receiving channel from the 1- yr, 24-hr storm? Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC(9) is met.. Is a trash rack or other device provided to protect the outlet system? Are the dam and embankment planted in non -clumping turf grass? No 51 Yes 52 Yes 53 Species of turf that will be used on the dam and embankment Bermuda 54 as a planting plan been provided far the vegetated shelf? Yes )ITIONAL INFORMATION (Please use this space to provide any additional information about the 55 wetDond[s) Wet Pond 1 10:42 AM 10/14/2020 STORMWATER NARRATIVE This project is the phase five expansion of an existing single-family subdivision including a 15.65 acre parcel on Scenic Pines Drive in Cumberland County. This phase of development will create 36 new single-family lots. Stormwater runoff will be collected and conveyed via pipe to one of two wet detention basins. Each phase of construction is divided to include the construction of one of the wet detention basins. Basin 1 Drainage Area to Pond: 10.42 ac (453,839 sf) Total Proposed Impervious Area: 4.02 ac (196,113 sf) Impervious Area (Streets): 52,113 sf Impervious Area (Lots): 144,000 sf Qio=24.47 cfs (Entering Basin) Qio=14.68 cfs (Exiting Basin) A stormwater access easement is provided for maintenance access to the wet detention basin. Supplemental calculations are attached. SC-1 Project Name: Outlet: FE ENGINEERING - SURVEYING - DESIGNING - DRAFTING wJ Larry King & Associates, R.L.S., P.A. P. (910) 483-4300 www.LKandA.com F. (910) 483-4052 Stormwater Wet Pond Design Criteria P03-189 Sheffield Farms N.-Section 5 1 Calculate Runoff Coefficient A= 10.42 acres Ai= 4.43 acres la= 0.43 Rv=0.05+0.9*la Rv= 0.43 453,839 sf Watershed area 193,113 sf Impervious area Imperious fraction Runoff Coefficient Calculate Runoff Volume Required to be Controlled Rd= 1 in Design storm rainfall depth (typically 1" or 1.5") V=3630*Rd*Rv*A WQV= 16,374 cf Volume of runoff that must be 4.61 Ac in controlled for specified design storm Calculate Required Pond Surface Area for Permanent Pool Elevation SA/DA= 1.51 Based 3 Avg. Perm. Pool Depth **See Table 10-1,10-2,10-3 for SAIDA SA= 0.157 Ac 6,853 sf Required Surface Area @ Perm Pool SC-2 Project Name: Outlet: Pond Storage= Pond Depth(h)= Drawdown Time= Cid= 9= The Orifice Equation FE ENGINEERING - SURVEYING - DESIGNING - DRAFTING � Larry King & Associates, R.L.S., P.A. P. (910) 483-4300 www.LKandA.com F. (910) 483-4052 Drawdown Orifice Sizing Calculations P03-189 Sheffield Farms N.-Section 5 1 16,738 cf Water Quality Volume 0.53 ft HO=H/3 2.5 days 2-5 days 0.6 Coefficient of Discharge (typical 0.6) 32.2 ft/sec^2 Gravity Q= Cd A Sgrt(2 g h) Rearrange to solve for A, the minimum orifice area needed to meet drawdown requirements Q= 0.08 cfs Based on pond volume and desired drawdown time A= 0.02211 sf 3.18 si Number of Orifices= 1 Minimum diameter to meet area d= Use: Check Outflow time Q= Cd A Sgrt(2 g h) Q= Drawdown time= 2.01 inch diameter orifice 2 '' diameter orifice 0.0218 sf 0.08 cfs 2.53 days OK SC-4 70 ENGINEERING - SURVEYING - DESIGNING - DRAFTING uj Larry King & Associates, R.L.S., P.A. P. (910) 483-4300 www.LKandA.com F. (910) 483-4052 Pond Volume Calculations Permanent Pool Volume (Main Pool Only) ev, contour ACCUM. Stage Diff Area Incr. Vol. Vol. fft} (ft} (sf) (cf} (cf) 162 0.0 2,196 0 0 163 1.0 2,860 2,528 2,528 164 1.0 3,551 3,206 5,734 165 1.0 4,267 3.909 9,643 166 1.0 5,008 4,638 14,280 167 1.0 5,773 5,391 19,671 167.5 0.5 6,969 3,186 1 22,856 Forebay Only Volume Stage ev, Diff on our Area Incr. Vol. Accum. Vol. (ft) (ft) (sf) (cf) (cf) 164 0.0 578 0 0 165 1.0 774 676 676 166 1.0 996 885 1,561 167 1.0 1243 1.120 2,681 167.5 0.5 1376 655 3,335 Temporary Pool Volume ev. Contour ccum. Stage Diff Area Incr. Vol. Vol. (ft) (s ) (c) (c ) 167.5 0.0 8,395 0 0 168 0.5 10,141 4,634 4,634 169.1 1.1 11,866 12,104 16,738 Skimmer Basin Volume ev. contour Accurn. Stage Diff Area Incr. Vol. Vol. (ft) (ft) (sf) (cf) (cf) 163 0.0 2,860 0 0 164 1.0 3,551 3,206 3,206 165 1.0 4,267 3,909 7,11 5 166 1.0 5,008 4,638 11,752 167 1.0 5,773 5,391 17,143 167.5 0.5 8,395 3,542 20,685 168 0.5 10.141 4.634 25,319 169 5.0 11,707 54,620 57,826 170 5.0 13,328 62,588 69.702 170.5 4.5 14,160 61,848 73,600 Perm Pool Elev. 15% -Tg-,3T4F cf Perm Pool Elev. Temp Pool Elev. Skimmer Elev. SC-6 7. The planting plan proposed shrubs on the vegetated shelf. However, Wet Pond MDC 11 requires that the vegetated shelf be planted with herbaceous, native vegetation. Shrubs are not anywhere on the vegetated shelf or embankment of the wet pond. Plantings list updated. 8. Provide pdfs of all revisions, 2 hardcopies of revised plan sheets, and 1 hardcopy of other documents. Pdfs must be uploaded using the form at: https://edocs.deg.nc.gov/Forms/SW Project Submittal Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to October 9, 2020, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. Please reference the State assigned project number SW6200802 on all correspondence. If you need additional time to submit the information, please submit your request for a time extension to the Division at the contact below. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. If you have any questions concerning this matter please feel free to contact me at Corey Anen(gncdenr. ov or (919) 707-3649. Please note that due to the ongoing Covid-19 pandemic, I will be teleworking and will be most easily reached by email. Sincerely, Gt a41 4-- Corey Anen, PE Environmental Engineer Stormwater Program cc: Fayetteville Regional Office III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/ Organization: iSl Development Company, LLC Signing Official & Titlejayson S. Tohnson, Member Manager b. Contact information for person listed in item 1a above: Street Address:1135 Robeson Street City:Fayetteville State:NC Zip:28305 Mailing Address (if applicable):same City: State: Zip: Phone: ( ) Fax: ( ) Email: c. Please check the appropriate box. The applicant listed above is: ❑ The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ® Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/ Organization: GRRF, LLP Signing Official & Title:Charles Gore, Registered Agent b. Contact information for person listed in item 2a above: Street Address:5135 Morganton Road City:Fayetteville State:NC Zip:28314 Mailing Address (if applicable):same City: Phone: Email: State: Fax: L Zip: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & Title: b. Contact information for person listed in item 3a above: Mailing Address: City: State: Zip: Phone: ( ) Fax: (_) Email: 4. Local jurisdiction for building permits: Cumberland County Point of Contact:Michael Naylor Phone #: 910 ) 321-6657 Form SWU-101 Version Oct. 31, 2013 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater runoff is collected by curb inlets and carried via pipe to a proposed wet detention basin. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PU1.) Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW - 1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Cape Fear 4. Total Property Area: 15.65 acres River basin. 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:15.65 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHVV) line or Mean High Water (MHM line, and coastal wetlands landward from the NHW (or MH V) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MH V) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 28.77 % 9. How many drainage areas does the project have?1 (For High density, count 1 for each proposed engineered Stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area _ Draina e Area Drainage Area Receiving Stream Name Rockfish Creek Stream Class * B Stream Index Number * 18-31-(18) Total Drainage Area (sf) 453839 On -site Drainage Area (so 453839 Off -site Drainage Area (so Proposed Impervious Area** (sf) 196113 Impervious Area** total 43.21 Impervious" Surface Area Drainage Area 1 Drainage Area Drainage Area _ Drainage Area _ On -site Buildings/Lots (so 144,000 On -site Streets (sf) 52113 On -site Parking (sf) On -site Sidewalks (sf) Other on -site (sf) Future (sf) Off -site (sf) Existing BUA*** (sf) Total (so: 196113 * Stream Class and Index Number can be determined at: littp:llportal.itedtitr.org/u?ebAvq&s/csci/t-l�isstf[catioris Im envious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidpcwalks, gravel areas, etc. Form SWU-101 Version Oct. 31, 2013 Page 3 of 6 ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Acting Director Jeffrey A. Nobles, PE Larry King & Assoc., RLS, PA 1333 Morganton Road, Suite 201 Fayetteville, NC 28305 NORTH CAROLINA Environmental Quality September 9, 2020 Subject: Request for Additional Information Stormwater Permit No. SW6200802 Sheffield Farms — Section Five Cumberland County Dear Mr. Nobles: The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application for the subject project on August 17, 2020. A review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please add the contact information for the local jurisdiction for building permits to the SWU-101 application form. Information Added 2. The application form and stormwater narrative state that the project area is 15.65 acres. This seems much larger than the property boundaries shown on Sheet C-01. Please revise or explain the discrepancy. the parcel for this phase is 15.( 3. The plans show that there are 36 proposed lots, while the stormwater narrative states that there are 35. Please revise or explain the discrepancy. should he 36 lots. Narrative has been revised. 4. The deed restriction form lists the maximum BUA on each lot as 4000 sf. At 35 lots, this is a total of 140,000 sf of BUA. However, the wet pond is only designed for 123,000 sf of BUA. All BUA on the site must be treated in a primary SCM. BUA has been updated to 400 sf for 36 lots. Total of 144,000. Volume talcs adjusted accordingly. Temp Vol. Elevation revised from 169->169.10 5. The calculations show that the depth from the temporary pool to the permanent pool is 1.5 feet. However, the drawdown calculations use an h/3 value of 0.33 feet. Please revise the calculations and, if necessary, the design to use the proper head. Revised with proper head and revised volumes. No chance to orifice size. 6. The slope of the vegetated shelf on the SCM details and in the Supplement EZ form is 10:1, rather than the 6:1 slope proposed on the plans and calculations. Ez changed to 6.1 North Carolina Department of Environmental Quality Division of Energy. Mineral and Land Resources 512 North Salisbury Street 1 1612 Mall Service Center I Raleigh. North Carolina 27699 1612 w - 919,707.9200 Table of Contents Sheffield Farms5.gpw Hydraflow Hydrographs by Intelisolve Wednesday, Oct 14 2020, 12:58 PM Hydrograph Return Period Recap...................................................................... 1 1 -Year SummaryReport................................................................................................................. 2 HydrographReports........................................................................................................... 3 Hydrograph No. 1, Rational, Post..................................................................................... 3 Hydrograph No. 2, Reservoir, Post -Pond 1...................................................................... 4 Hydrograph No. 3, Rational, PRE-.................................................................................... 5 10 -Year SummaryReport................................................................................................................. 6 HydrographReports........................................................................................................... 7 Hydrograph No. 1, Rational, Post..................................................................................... 7 Hydrograph No. 2, Reservoir, Post -Pond 1...................................................................... 8 Hydrograph No. 3, Rational, PRE-.................................................................................... 9 25 - Year SummaryReport............................................................................................................... 10 HydrographReports......................................................................................................... 11 Hydrograph No. 1, Rational, Post................................................................................... 11 Hydrograph No. 2, Reservoir, Post -Pond 1.................................................................... 12 Hydrograph No. 3, Rational, PRE-.................................................................................. 13 100 - Year SummaryReport............................................................................................................... 14 HydrographReports......................................................................................................... 15 Hydrograph No. 1, Rational, Post................................................................................... 15 Hydrograph No. 2, Reservoir, Post -Pond 1.................................................................... 16 Hydrograph No. 3, Rational, PRE-.................................................................................. 17 CAS o S = r - 31459 "z.c w zeJ l R'ySer OJ-1'e+ 'Ciro+rn e bev. . t &9 ­-.0' 1 (.5.10) Hydrograph Return Period Recap Hyd. No. Hydrograph type Inflow Hyd(s) Peak Outflow (cfs) Hydrograph description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr Rational ------- 14.46 ------- ------- ------- 22.90 25.86 ------- 30.20 1 Post 2 Reservoir i 1 9.56 ------- ------- ------- 14.68 16.79 ------- 18.98 Post -Pond 1 3 Rational ------- 16.15 ------- ------- ------- 24.74 27.75 ------- 32.19 PRE- Proj. file: Sheffield Farms 5.gpw Wednesday, Oct 14 2020, 12:58 PM Hydraflow Hydrographs by Intelisolve Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cuft) Inflow hyd(s) Maximum elevation (ft) ------ Maximum storage (cuft) ------ Hydrograph description Post 1 Rational 14.46 1 48 55,228 ---- 2 Reservoir 9.56 1 75 51,866 1 169.90 26,792 Post -Pond 1 3 Rational 16.15 1 5 4,845 ---- ------ ------ PRE- - i Farms 5.gpw Return Period: 1 Sheffield Year Wednesday, Oct 14 2020, 12:58 PM Hydraflow Hydrographs by Intelisolve 3 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Post Hydrograph type = Rational Storm frequency = 1 yrs Drainage area = 10.420 ac Intensity = 3.468 in/hr IDF Curve = River Bluff.IDF Q (cfs) 15.00 12.00 • 01 3.00 0.00 0.0 0.2 0.3 0.5 0.7 0.8 — Hyd No. 1 Wednesday, Oct 14 2020, 12:58 PM Peak discharge = 14.46 cfs Time interval = 1 min Runoff coeff. = 0.4 Tc by User = 15.00 min Asc/Rec limb fact = 3.18/5.31 Post Hyd No. 1 -- 1 Yr 1.0 1.2 1.3 1.5 1.7 Hydrograph Volume = 55,228 cuft Q (cfs) 15.00 12.00 M M 3.00 0.00 1.8 2.0 2.2 Time (hrs) Hydrograph Plot t! Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Post -Pond 1 Hydrograph type = Reservoir Storm frequency = 1 yrs Inflow hyd. No. = 1 Reservoir name = Pond 1 Storage Indication method used 12.00 • M 1 �, 3.00 2.2 4.3 6.5 8.7 Hyd No. 2 Hyd No. 1 Post -Pond 1 Hyd. No. 2 -- 1 Yr Wednesday, Oct 14 2020, 12:58 PM Peak discharge = 9.56 cfs Time interval = 1 min Max. Elevation = 169.90 ft Max. Storage = 26,792 cuft Hydrograph Volume = 51,866 cuft Q (cfs) 15.00 12.00 • e Q 3.00 0.00 10.8 13.0 15.2 17.3 19.5 21.7 23.8 Time (hrs) Hydrograph Plot 5 Hydraflow Hydrographs by Intelisolve Hyd. No. 3 PRE- Hydrograph type = Rational Storm frequency = 1 yrs Drainage area = 10.420 ac Intensity = 5.166 in/hr IDF Curve = River Bluff.IDF 15.00 12.00 • 11 we] 3.00 Hyd No. 3 PRE- Hyd. No. 3 -- 1 Yr 0.1 Wednesday, Oct 14 2020, 12:58 PM Peak discharge = 16.15 cfs Time interval = 1 min Runoff coeff. = 0.3 Tc by User = 5.00 min Asc/Rec limb fact = 1/1 Hydrograph Volume = 4,845 cuft Q (cfs) 18.00 15.00 12.00 • 11 . 11 i 11 _ 0.00 0.2 Time (hrs) Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description Post 1 Rational 22.90 1 48 87,490 ---- ------ ------ 2 Reservoir 14.68 1 76 83,753 1 170.66 37,388 Post -Pond 1 3 Rational 24.74 1 5 7,423 ---- ------ ------ PRE - Sheffield Farms 5.gpw Return Period: 10 Year Wednesday, Oct 14 2020, 12:58 PM Hydraflow Hydrographs by Intelisolve Hydrograph Plot 7 Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Post Hydrograph type = Rational Storm frequency = 10 yrs Drainage area = 10.420 ac Intensity = 5.494 in/hr OF Curve = River Bluff.IDF Q (cfs) 24.00 NME 11Mile] 12.00 M 4.00 0.00 0.0 0.2 0.3 05 0.7 0.8 Hyd No. 1 Wednesday, Oct 14 2020, 12:58 PM Peak discharge = 22.90 cfs Time interval = 1 min Runoff coeff. = 0.4 Tc by User = 15.00 min Asc/Rec limb fact = 3.18/5.31 Post Hyd. No. 1 -- 10 Yr 1.0 1.2 1.3 1.5 1.7 Hydrograph Volume = 87,490 cuft Q (cfs) 24.00 20.00 16.00 12.00 M 4.00 0.00 1.8 2.0 2.2 Time (hrs) Hydrograph Plot 8 Hydraflow Hydrographs by Intelisolve Wednesday, Oct 14 2020, 12:58 PM Hyd. No. 2 Post -Pond 1 Hydrograph type = Reservoir Peak discharge = 14.68 cfs Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 1 Max. Elevation = 170.66 ft Reservoir name = Pond 1 Max. Storage = 37,388 cuft Storage Indication method used. Hydrograph Volume = 83,753 cuft Q (cfs) 24.00 12.00 1H 4.00 Post -Pond 1 Hyd. No. 2 -- 10 Yr Q (cfs) 24.00 20.00 16.00 12.00 4.00 0.00 I L _� _ _ 1 _. 0.00 0.0 0.3 0.7 1.0 1.3 1.7 2.0 2.3 2.7 3.0 3.3 3.7 4.0 Hyd No. 2 — Hyd No. 1 Time (hrs) 9 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 3 PRE- Hydrograph type = Rational Storm frequency = 10 yrs Drainage area = 10.420 ac Intensity = 7.915 in/hr OF Curve = River Bluff.IDF Q (cfs) 28.00 — 24.00 20.00 16.00 12.00 8.00 4.00 0.00 0.0 Hyd No. 3 Wednesday, Oct 14 2020, 12:58 PM Peak discharge = 24.74 cfs Time interval = 1 min Runoff coeff. = 0.3 Tc by User = 5.00 min Asc/Rec limb fact = 1/1 PRE- Hyd. No. 3 -- 10 Yr 0.1 Hydrograph Volume = 7,423 cuft Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0.00 0.2 Time (hrs) 10 Hydrograph Summary Report Hyd. Hydrograph AID, type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 Rational. 25.86 1 48 98,798 ---- ------ ------ Post 2 Reservoir 16,79 1 76 94,929 1 170.91 40,946 Post -Pond 1 3 Rational 27.75 1 5 8,326 ---- ------ ------ PRE - Sheffield Farms 5.gpw Return Period: 25 Year Wednesday, Oct 14 2020, 12:58 PM Hydraflow Hydrographs by Intelisolve Hydrograph Plot 11 Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Post Hydrograph type = Rational Storm frequency = 25 yrs Drainage area = 10.420 ac Intensity = 6.204 in/hr OF Curve = River Bluff.IDF Post Hyd. No. 1 -- 25 Yr 24.00 20.00 16.00 12.00 MM 4.00 Wednesday, Oct 14 2020, 12:58 PM Peak discharge = 25.86 cfs Time interval = 1 min Runoff coeff. = 0.4 Tc by User = 15.00 min Asc/Rec limb fact = 3.18/5.31 Hydrograph Volume = 98,798 cuft Q (cfs) 28.00 24.00 20.00 16.00 12.00 iM 4.00 0.00 l 1.. I 0.00 0.0 0.2 0.3 0.5 0.7 0.8 1.0 1.2 1.3 1.5 1.7 1.8 2.0 2.2 Hyd No. 1 Time (hrs) Hydrograph Plot 12 Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Post -Pond 1 Hydrograph type = Reservoir Storm frequency = 25 yrs Inflow hyd. No. = 1 Reservoir name = Pond 1 Storage Indication method used Post -Pond 1 Hyd. No. 2 -- 25 Yr 24.00 20.00 16.00 12.00 M 4.00 Wednesday, Oct 14 2020, 12:58 PM Peak discharge = 16.79 cfs Time interval = 1 min Max. Elevation = 170.91 ft Max. Storage = 40,946 cuft Hydrograph Volume = 94,929 cuft Q (cfs) 28.00 24.00 20.00 16.00 12.00 mm 0.00 � ' _/ I I I =j 0.00 0.0 0.3 0.7 1.0 1.3 1.7 2.0 2.3 2.7 3.0 3.3 3.7 4.0 Hyd No. 2 Hyd No. 1 Time (hrs) 13 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 3 PRE- Hydrograph type = Rational Storm frequency = 25 yrs Drainage area = 10.420 ac Intensity = 8.879 in/hr IDF Curve = River Bluff.IDF Q (cfs) 28.00 24.00 20.00 16.00 12.00 we 4.00 Hyd No. 3 PRE- Hyd. No. 3 -- 25 Yr 0.1 Wednesday, Oct 14 2020, 12:58 PM Peak discharge = 27.75 cfs Time interval = 1 min Runoff coeff. = 0.3 Tc by User = 5.00 min Asc/Rec limb fact = 1/1 Hydrograph Volume = 8,326 cuft Q (cfs) 28.00 24.00 20.00 16.00 12.00 M OUR 0.00 0.2 Time (hrs) 14 Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description Post 1 Rational 30.20 1 48 115,382 ---- ------ ------ 2 Reservoir 18.98 1 77 111,322 1 171.30 46,962 Post -Pond 1 3 Rational 32.19 1 5 9,656 ---- ------ ------ PRE - Sheffield Farms 5.gpw Return Period: 100 Year Wednesday, Oct 14 2020, 12:58 PM Hydraflow Hydrographs by Intelisolve Hydrograph Plot 15 Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Post Hydrograph type = Rational Storm frequency = 100 yrs Drainage area = 10.420 ac Intensity = 7.246 in/hr IDF Curve = River Bluff.IDF Q (cfs) 35.00 30.00 25.00 4 8I, 15.00 10.00 5.00 Post Hyd. No. 1 -- 100 Yr Wednesday, Oct 14 2020, 12:58 PM Peak discharge = 30.20 cfs Time interval = 1 min Runoff coeff. = 0.4 Tc by User = 15.00 min Asc/Rec limb fact = 3.18/5.31 Hydrograph Volume = 115,382 cuft Q (cfs) 35.00 30.00 25.00 15.00 10.00 5.00 0.00 11 1 1 \ I- 0.00 0.0 0.2 0.3 0.5 0.7 0.8 1.0 1.2 1.3 1.5 1.7 1.8 2.0 2.2 Hyd No. 1 Time (hrs) Hydrograph Plot 16 Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Post -Pond 1 Hydrograph type = Reservoir Storm frequency = 100 yrs Inflow hyd. No. = 1 Reservoir name = Pond 1 Storage Indication method used 30.00 25.00 20.00 15.00 10.00 5.00 Wednesday, Oct 14 2020, 12:58 PM Peak discharge = 18.98 cfs Time interval = 1 min Max. Elevation = 171.30 ft Max. Storage = 46,962 cuft Post -Pond 1 Hyd. No. 2 -- 100 Yr Hydrograph Volume = 111,322 cuft Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 11 1� 1 1 _I i - I- 0.00 0.0 0.3 0.7 1.0 1.3 1.7 2.0 2.3 2.7 3.0 3.3 3.7 4.0 Hyd No. 2 Hyd No. 1 Time (hrs) 17 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 3 PRE- Hydrograph type = Rational Storm frequency = 100 yrs Drainage area = 10.420 ac Intensity = 10.297 in/hr IDF Curve = River Bluff.IDF 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0.0 Hyd No. 3 Wednesday, Oct 14 2020, 12:58 PM Peak discharge = 32.19 cfs Time interval = 1 min Runoff coeff. = 0.3 Tc by User = 5.00 min Asc/Rec limb fact = 1/1 PRE- Hyd. No. 3 -- 100 Yr 0.1 Hydrograph Volume = 9,656 cuft Q (cfs) 35.00 30.00 25.00 NM 15.00 10.00 5.00 0.00 0.2 Time (hrs)