HomeMy WebLinkAbout20201293 Ver 1_Compliance Evaluation Inspection_20201014Wetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20201293
NCDOT - Bridge 73 over Foster Creek (B-6012)
Madison
NCDOT - Bridge 73 over Foster Creek (B-6012)
NC DOT Division 13
10/14/2020
Routine
Site Inspection (DOT)
Version: 1 Status:Received
Project Type:Replace bridge with bridge
Region:Asheville
Longitude:-82° 35' 44''+35° 55' 59''
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
Question Areas:
Program Areas:401 (includes isolated/non-404)
Permit (401 WQC)
Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on October 14, 2020. Brent
Hollifield with Michael Baker Engineering was present during the inspection. The following are items that need
attention before the start of the trout moratorium (October 15 - April 15).
- ~ Station L 13+85 L (Upstream Wingwall) Remove silt fence and 57 stone.
- ~ Station L 13+12 R (Downstream Right bank descending) Cover disturbed area from backfill of wingwall.
NPDES records were complete.
Inspection Summary:
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20201293
10/14/2020
Tippett, Lyndo
Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Culvert is improperly installed (not embedded). Stream is likely intermittent and not passable for fish.Comment:
page:2