HomeMy WebLinkAboutNCG030376_DMR_May_20200713Prysmian
Group
July 13, 2020
Storm Water Permitting Unit
Division of Energy, Mineral, and Land Resources
Attention: Bradley Bennett
1612 Mail Service Center
Raleigh, NC 27699-1612
Re: Storm Water Discharge Monitoring Report
Draka Elevator, Inc.
2151 Church Street
Rocky Mount, NC 27804
Certificate of Coverage NCG030376
Dear Sir/Madam:
SMIAN PRY
Draka
iP General Cable
Enclosed are two copies of the Storm Water Discharge Outfall (SDO) Monitoring Report for the Draka Elevator,
Inc. facility located at 2151 North Church Street, Rocky Mount, Nash County, North Carolina.
This sampling event represents the 1st Half 2020 comprehensive monitoring event, collected in May, 2020. The
sample results were all below the BMVs for this sampling period. Outfalls CS001, CS002, & CS003 still require
tiered monitoring for zinc.
A tiered response monitoring event will be conducted during the next qualifying rain event in accordance with
Part II, Section B of the general permit. If you have any questions or concerns, please feel free to contact me at
(252) 972-6025, or our environmental consultant, Rob Duffy of Antea Group at (704) 324-7035.
Sincerely,
Wynne Ellis
Global Director of Operations
Draka Elevator, Inc.
Attachments
Draka Elevator Products, Inc.
2151 North Church Street
Rocky Mount, NC 27804
Tel. 252 446 8113
www.prysmiangroup.com
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted July 1, 2020
CERTIFICATE OF COVERAGE NO. NCG03 0 3 7 6 SAMPLE COLLECTION YEAR 2020
FACILITY NAME Draka Elevator, Inc. SAMPLE PERIOD ❑X Jan -June ❑ July -Dec
COUNTY Nash or ❑ Monthly' (month)
PERSON COLLECTING SAMPLES Charles Dickens, III DISCHARGING TO CLASS ❑ORW HQ ❑Trout ❑PNA
LABORATORY Waypoint Analytical Lab Cert. i# 402 ❑Zero -flow Water Supply [:]SA
Comments on sample collection or analysis: ❑Other
Part A: Stormwater Benchmarks and Monitoring Results
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
❑ No discharge this period?z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches'
Total Suspended Solids
pH,
Standard units
Copper
Lead
Zinc
Non -Polar O&G/Total
Total Petroleum
Hydrocarbons
Toxic
Organics
Benchmarks ===>
-
-
100 mg/L or 50 mg/L4
6.0 — 9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
CS-OF001
5/19/20
0.25
2.6
7.2
<0020
<0.010
0.065
<5.0
CS-OF002
5/19/20
0.25
<2.5
7.2
<
<0.010
0.053
<5.0
CS-OF003
5/19/20
0.25
6.5
7.2
<0.020<0.010
0.053
<5.0
CS-BG001
5/19/20
0.25
<0.020
0.064
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
Wynne Ellis
Name (Print name)
Global Director of Operations
Title (Print title
07/13/2020
(Signatu (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical
format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection
limit, reporting limit, etc, in mg/L.
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. see General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. N/A
X❑ No discharge this period?z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches s
Non -polar O&G/TPH by
EPA 1664 (SGT-HEM)
Total Suspended Solids
pH
Benchmarks ===>
_
15 mg/L
100 mg/L or 50 mg/L*
6.0 — 9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
07/ 13/2020
(Signature of PeWttee) (Date)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3