HomeMy WebLinkAbout20091192 Ver 1_Approval Letter_20100204?gA
DIEM
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins
Governor Director
February 4, 2010
Wake County
NCDWQ Project No. 20091109
Northside Loop & Juniper Road
Town of Wake Forest
Dee Freeman
Secretary
APPROVAL of 401 WATER QUALITY CERTIFICATION and NEUSE BUFFER AUTHORIZATION with
ADDITIONAL CONDITIONS
Eric Keravuori, Director of Engineering
Town of Wake Forest
4011 Elm Avenue
Wake Forest, NC 27587
Dear Mr. Keravuori:
You have our approval, in accordance with the conditions listed below, for the following impacts for the purpose of
constructing the Northside Loop and realignment of Juniper Road in Wake Forest, Wake County:
Stream lm acts in the Neuse River Basin
Site Permanent Fill in Intermittent Stream
linear ft Permanent Fill in Perennial
Stream linear ft Total Stream Impact
linear ft
1 17 0 17
2 0 121 121
3 38 0 38
4 0 12 12
5 0 138 138
Total 55 271 326
Total Stream Impact for Project: 326 linear feet.
Wetland Impacts in the Neuse River Basin
Site Permanent Fill ac Total Welland Impact ac
1 <0.01 <0.01
Total <0.01 <0.01
Total Wetland Impact for Project: <0.01 acres.
Transportation Pending Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604
Phone: 919733-17861 FAX: 919-733-6893
Internet: hftp,llh2o.enr.state,nc.us/ncwetlandsl
One
hCarolina
Nort
Naturally
An Equal Opportunity 1 Afirmatlve Action Employer