Loading...
HomeMy WebLinkAbout20091070 Ver 1_Approval Letter_20100225If' %. i Beverly Eaves Perdue Governor NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Coleen H. Sullins Director February 25, 2010 Dr. Greg Thorpe, PhD., Manager Project Development and Environmental Analysis North Carolina Department of Transportation 1548 Mail Service Center Raleigh, North Carolina, 27699-1548 Subject: 401 Water Quality Certification Pursuant to Section 401 of the Federal Clean Water Act with ADDITIONAL CONDITIONS for Proposed Interchange additions at SR 3389 (Woody Mill Road in Guilford County, Federal Aid Project No. NHF-421 (11), State Project No. 8.149330, TIP R2612A. NCDWQ Project No. 20091070. Dear Dr. Thorpe: Attached hereto is a copy of Certification No. W00003818 issued to The North Carolina Department of Transportation (NCDOT) dated February 25, 2010 If we can be of further assistance, do not hesitate to contact us. Sincerely, ?"- een` . Sullins Director Attachments cc: Andy Williams, US Army Corps of Engineers, Raleigh Field Office Jerry Parker, Division 7 Environmental Officer Chris Militscher, Environmental Protection Agency (electronic copy only) Travis Wilson, NC Wildlife Resources Commission Beth Harmon, Ecosystem Enhancement Program NCDWQ, Wetlands/ 401 Transportation Permitting Unit File Copy Transportation Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604 Phone: 919-733-1786 \ FAX: 919-733-6893 Internet: http://h2o.enr,state.nc.usinmetlands/ Dee Freeman Secretary NorthCarolina Naturally, An Equal Opportunity \ Affirmative Action Employer \i 401 Water Quality Certification Pursuant to Section 401 of the Federal Clean Water Act with ADDITIONAL CONDITIONS THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92-500 and 95-217 of the United States and subject to the North Carolina Division of Water Quality (NCDWQ) Regulations in 15 NCAC 2H.0500. This certification authorizes the NCDOT to impact 0.47 acres of jurisdictional wetlands and 1487 linear feet ofjurisdictional streams in Guilford County. The project shall be constructed pursuant to the application dated received December 1, 2009, with additional information received January 13, 2010, and February 12, 2010. The authorized impacts are as described below: Stream Impacts in the Cape Fear River Basin Site Permanent Fill in Intermittent Stream (linear ft) Temporary Fill in Intermittent Stream (linear ft) Permanent Fill in Perennial Stream linear ft Temporary Fill in Perennial Stream (linear ft Total Stream Impact (linear ft) Stream Impacts Requiring Mitigation linear ft 1 145 0 0 0 145 0 2 0 0 88 0 88 0 3 201 0 0 0 201 0 5 0 0 856 0 856 856 6 0 0 88 0 88 0 7 0 0 109 0 109 0 Total 346 0 1141 0 1487 856 Total Stream Impact for Project: 1487 linear feet Riverine Wetland Impacts in the Cape Fear River Basin Site Fill (ac) Fill (temporary) (ac) Excavation (ac) Mechanized Clearing (ac) Total Wetland Impact (ac) 1 0.07 0 0 0.01 0.08 3 0.04 0 0 0.01 0.05 4 0.08 0 <0.005 0 0.08 5 0.21 0 0.02 0.03 0.26 Total 0.40 0 0.02 0.05 0.47 Total Wetland Impact for Project: 0.47 acres. The application provides adequate assurance that the discharge of fill material into the waters of the Cape Fear River Basin in conjunction with the proposed development will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application and conditions hereinafter set forth. This approval is only valid for the purpose and design that you submitted in your application dated received December 1, 2009, with additional information received January 13, 2010, and February 12, 2010. Should your project change, you are required to notify the NCD WQ and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If any additional wetland impacts, or stream impacts, for this project (now or in the future) exceed one acre or 150 linear feet, respectively, additional compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h) (6) and (7). Additional buffer impacts may require compensatory mitigation as described in 15A NCAC 02B.0268. For this approval to remain valid, you are required to comply with all the conditions listed below. In addition, you should obtain all other federal, state or local permits before proceeding with your project including (but not limited to) Sediment and Erosion control, Coastal Stormwater, Non-discharge and Water Supply watershed regulations. This Certification shall expire on the same day as the expiration date of the corresponding Corps of Engineers Permit. Condition(s) of Certification: Project Specific Conditions: 1. Modifications to this permit will be subject to Jordan Lake Buffer Rules as described in 15A NCAC 02B .0268 and DWQ's Intermittent Stream Policy effective October 16, 2009. 2. The NCDOT Division Environmental Officer or Environmental Assistant will conduct a pre-construction meeting with all appropriate staff to ensure that the project supervisor and essential staff understand the potential issues with stream and pipe alignment at the permitted site. NCD WQ staff shall be invited to the pre-construction meeting. 3. Compensatory mitigation for 856 linear feet of impact to streams is required. We understand that you have chosen to perform compensatory mitigation for impacts to streams through the North Carolina Ecosystem Enhancement. Program (EEP), and that the EEP has agreed to implement the mitigation for the project. EEP has indicated in a letter dated August 18, 2009 that they will assume responsibility for satisfying the federal Clean Water Act compensatory mitigation requirements for the above-referenced project, in accordance with the Tri-Party MOA signed on July 22, 2003 and the Dual-Party MOA signed on April 12, 2004. 4. All channel relocations will be constructed in a dry work area and stabilized before stream flows are diverted. Channel relocations will be completed and stabilized, and must be approved on site by NCDWQ staff, prior to diverting water into the new channel. Whenever possible, channel relocations shall be allowed to stabilize for an entire growing season. Stream banks shall be matted with coir-fiber matting, unless rip rap is approved. Rip-rap is allowed on the banks and in the stream bed for stream channel relocations at Site 1, 2, 3 and 5. Additional rip-rap may be allowed if it is necessary to maintain the physical integrity of the stream, but the applicant must provide written justification and any calculations used to determine the extent of rip-rap coverage requested. Vegetation used for bank stabilization shall be limited to native riparian vegetation, and should include establishment of a vegetated buffer on both sides of the relocated channel to the maximum extent practical. 5. Three, one-foot sills shall be placed in the culvert at approximately 200' apart at site 5. 6. Riprap shall not be placed in the active thalweg channel or placed in the streambed in a manner that precludes aquatic life passage. Any riprap placed below the normal high water mark in the channel bottom shall be keyed into the stream bed and banks. Bioengineering boulders or structures should be properly designed, sized and installed. 7. The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification. 8. The stream channel shall be excavated no deeper than the natural bed material of the stream, to the maximum extent practicable. Efforts must be made to minimize impacts to the stream banks, as well as to vegetation responsible for maintaining the stream bank stability. General Conditions: 9. Unless otherwise approved in this certification, placement of culverts and other structures in waters, streams, and wetlands shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and down stream of the above structures. The applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by NCD WQ, If this condition is unable to be met due to bedrock or other limiting features encountered during construction, please contact NCDWQ for guidance on how to proceed and to determine whether or not a permit modification will be required. 10. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. 11. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. 12. The dimension, pattern and profile of the stream above and below the crossing shall not be modified. Disturbed floodplains and streams shall be restored to natural geomorphic conditions. 13. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for approval. 14. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. No temporary impacts have been approved for dewatering. If temporary impacts are necessary, a modification to this permit will be required. 15. Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the introduction of other pollutants into the stream. 16. This approval will expire with the accompanying 404 federal permit. 17. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 18. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this certification. 19. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. 20. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. If NCD WQ determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, NCDWQ may reevaluate and modify this certification. 21. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise authorized by this certification.. 22. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and the on-site project manager. 23. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (i.e. local, state, and federal) having jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and sedimentation control requirements, etc. 24. The Permittee shall report any violations of this certification to the Division of Water Quality within 24 hours of discovery. 25. Upon completion of the project (including any impacts at associated borrow or waste sites), the NCDOT Division Engineer shall complete and return the enclosed "Certification of Completion Form" to notify NCDWQ when all work included in the 401 Certification has been completed. 26. Native riparian vegetation must be reestablished within the construction limits of the project by the end of the growing season following completion of construction. 27. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this permit without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites, be located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road construction activities. 28. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: - 29. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. a. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil), projects, including contractor-owned or leased borrow pits associated with the project. b. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. c. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. d. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this Certification. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. This Certification shall become null and void unless the above conditions are made conditions of the Federal 404 and/or Coastal Area Management Act Permit. This Certification shall expire upon the expiation of the 404 or CAMA permit. If this Certification is unacceptable to you have the right to an adjudicatory hearing upon written request within sixty (60) days following receipt of this Certification. This request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. If modifications are made to an original Certification, you have the right to an adjudicatory hearing on the modifications upon written request within sixty (60) days following receipt of the Certification. Unless such demands are made, this Certification shall be final and binding. This the 25th day of February 2010 DIVISION OF WATER QUALITY 9;z-Zd- Coleen H. Sullins Director WQCNo. 003818 J NCDWQ Project No.: Applicant: Project Name: Date of Issuance of 401 Water Quality Certification: County: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting Unit, North Carolina Division of Water quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to NCDWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification 1, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification Date: I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Engineer's Certification Date: Partial Final I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Pennittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date