Loading...
HomeMy WebLinkAbout20091126 Ver 1_Stormwater Info_20100301OR - k a-to JAMESTOWN ENGINEERING GROUP, INC. CIVIL ENGINEERS & SURVEYORS LAND PLANNING • MUNICIPAL CONSULTING L r inc. 117 East Main Street • P.O. Box 365 • Jamestown, N.C. 27282 Telephone (336) 886-5523 Fax (336) 886-5478 www.jamestownengineering.com February 24, 2010 Re: Creekside Park Entrance 09-1126 Stormwater Management Plan Annette Lucas, PE NC Division of Water Quality - 401 Oversight/Express Unit 2321 Crabtree Boulevard, Suite 250 Raleigh, North Carolina 27604 Dear Ms. Lucas: With regard to the above referenced project, we offer the following plan as requested in the Conditionally Approved 401 Certification. Site improvements will result in 27,265 sf of impervious surface. During construction, 18,001 sf of impervious surface will be removed. This will result in a net addition of 9,264 sf of impervious surface. The enclosed plan includes a bioretention cell that is designed to treat 14,080 sf of impervious surface from the site. Supporting documentation enclosed in this packet: - Stormwater Management Permit application - Soils Report - $505 Review fee - Deed of property - Bioretention Cell Plan - Bioretention Cell Supplement and O&M Agreement - Soils Report - Required Items Checklist - Supporting Calculations MAR '"' 2010 DENR - WATER QUALITY WEPLAWS AND STOMATER BRANCH Should you need have any questions or need any additional information, please feel free to contact me at 336.886.5523 or rglover@jamestownengineering.com. Sincerely, Thomas R. (Rich) Glover, Jr., PE Jamestown Engineering Group, Inc. " DWQ USE ONLY Date Received Fee Paid Permit Number Applicable Rules: ,/ Coastal SW -1995 ,/ Coastal SW - 2008 Ph II - Post Construction (select all that apply) ? Non-Coastal SW- HQW/ORW Waters ,/ Universal Stormwater Management Plan Other WQ M t Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION F M ?Lt This form may be photocopied for use as an original MAR 0 2C 10 1. GENERAL INFORMATION DEW-VATEt2i:1kl"' 1NETLS AND STORWIXIe bfkfk#geH 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): CREEKSIDE PARK ENTRANCE - CITY OF ARCHDALE 2. Location of Project (street address): 214 PARK DRIVE City:ARCHDALE County:RANDOLPH Zip:27263 3. Directions to project (from nearest major intersection): FROM THE INTERSECTION OF I-85 AND US HWY 311 GO SOUTH APPROX. 1 MILE - SITE WILL BE ON THE LEFT 4. Latitude:35° 53'31" N Longitude: 79' 56' 13" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ?Modification b. If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: ?Not Started ?Partially Completed* ? Completed* *provide a designer's certification Specify the type of project (check one): ?Low Density ®High Density ?Drains to an Offsite Stormwater System ?Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, 09-1126 and the previous name of the project, if different than currently proposed, CREEKSIDE PARK SUBBASIN 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ?CAMA Major ®Sedimentation/Erosion Control: 2.5 ac of Disturbed Area ?NPDES Industrial Stormwater ®404/401 Permit: Proposed Impacts 72 LF INT. STREAM b. If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit:S/EC 11/09/09 #RANDO 2010-006 401 02/22/10 DWO# 09-1126 Form SWU-101 Version 07July2009 Page 1 of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:CITY OF ARCHDALE Signing Official & Title:TERRY YARBOROUGH CITY MANAGER b. Contact information for person listed in item 1a above: Street Address:307 BALFOUR DRIVE City:ARCHDALE State:NC Zip:27263 Mailing Address (if applicable):PO BOX 14068 City:ARCHDALE State:NC Zip:27263 Phone: (336 ) 431-9141 Fax: (336 ) 431-2130 Email: c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ? Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ? Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/ Organization: Signing Official & Title: b. Contact information for person listed in item 2a above: Street Address: City: State: Mailing Address (if applicable): Zip: City: State: Zip: Phone: ( Fax: ( ) Email: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/ Organization: RICH GLOVER /JAMESTOWN ENGINEERING GROUP. INC. Signing Official & Title:PROTECT ENGINEER b. Contact information for person listed in item 3a above: Mailing Address:PO BOX 365 City:]AMESTOWN State:NC Zip:27282 Phone: (336 ) 886-5523 Fax: (336 ) 886-5478 Email:RGLOVER®IAMESTOWNENGINEERING.COM 4. Local jurisdiction for building permits: RANDOPLH COUNTY Point of Contact: Phone #: IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. ISA IN EXCESS OF THE AMOUNT OF THE NET INCRREASE IN IAS WILL BE TREATED WITH A BIORETENTION CELL THEN DISCHARGED INTO AN EXISTING STORMWATER SYSTEM 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: Approval of a Site Specific Development Plan or PUD Approval Date: ? Valid Building Permit Issued Date: ? Other: Date: b. Identify the regulation(s) the project has been designed in accordance with: ? Coastal SW -1995 ? Ph II - Post Construction 3. Stormwater runoff from this project drains to the DEEP River basin. 4. Total Property Area: 96 acres 5. Total Coastal Wetlands Area: acres 6. Total Surface Water Area: 1.3 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:94.7 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal ?H?i gh Water HW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or Nm line. The resultant project area is used to calculate overall percent built upon area (BUA). Non-coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 6 % 9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area Drainage Area _ Drainage Area _ Receiving Stream Name MUDDY CREEK Stream Class * Stream Index Number Total Drainage Area (so 20,900 On-site Drainage Area (so 20,900 Off-site Drainage Area (so 0 Proposed Impervious Area** s 14,080 % Impervious Area** total 67% Impervious" Surface Area Drainage Area 1 Drainage Area Drainage Area _ Drainage Area _ On-site Buildings/Lots (so 0 On-site Streets (so 2835 On-site Parking (so 10,030 On-site Sidewalks (so 1215 Other on-site (so 0 Future (so 0 Off-site (so 0 Existing BUA*** (so Total (sf): 14,080 * Stream Class and Index Number can be determined at: http://h2o.enr.state.nc.us/bims/reports/rMortsWB.html Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. **" Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is fn Trv rommrvd and 7nhirh mill ho ronlnrad h,l nv71? R1 TA 11. How was the off-site impervious area listed above determined? Provide documentation. N/A _ Proiects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded fromhgp•//h2o.enr.state.nc.us/su/bmp forms.htm. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from hft://h2o.enr.state.nc.us/su/bmp forms.htm. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at hft://h2o.enr.state.nc.us/su/msi maps.htm.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from h!W://h2o.enr.state.nc.us/su/bmp forms.htm. 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to htlp-/ /www.envhelp.org/pageE/onestoMxpress.ht3nl for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/ managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/ Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/ project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off-site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). I fK6 9.. Copy of any applicable soils report with the associated SHWT elevations (Please identify P_ elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5 x11„ copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: 1483 Page No: 1027 1161-- 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC "y Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1a, 2a, and/or 3a per NCAC 21-1.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. htW://www.secretaKy.state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built-upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from httl2://h2o.enr.state.nc.us/su/bml2 forms htm#deed restrictions. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:THOMAS R (RICH) GLOVER, IR PE Consulting Firm:1AMESTOWN ENGINEERING GROUP, INC. Mailing Address:PO BOX 365 CityJAMESTOWN State:NC Zip:27282 Phone: (336 ) 886-5523 Fax: (336 886-5478 Email:RGLOVER@IAMESTOWNENGINEERING.COM IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item la) with (print or type name of organization listed in Contact Information, item 1b) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days, otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,00 per day, pursuant to NCGS 143-215.6. Date'zFeea0A0 ! yz. -Z010 ' v ? A, a Notary Public for the State oW ? a , )GZ County of do hereby certify that a ,r personally appeared before me this QJ- day of 1?0 r a 0-,a 10 , and a knowl7-<j- a stormwater permit. Witness my hand and official seal, Patsy =dueex lion of the application for Dougherty Notary Public Randolph County, North Carolina My commission expires Aug. 14, 2012 X. APPLICANT'S CERTIFICATION SEAL My commission expires W, I, (print or type name of person listed in Contact Information, item 2) JERRY YARBOROUGH certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 21-1.1000, SL 2006-246 (Ph. H - Post Construction) or SL 2008-211. Signature: Date: A e-,F3agAa--( ZZ 2010 1, a Notary Public for the State of P)V (4N Q d ll 'fie, County of -ZICJI I p do hereby certify that Cv) i r fir) Sr u "24 personally appeared before me this day of rel, e- « 1 0 i O , and Zorlednttthhe due xec lion of the application for a stormwater permit. Witness my hand and official seal, Patsy Dougherty Notary Public Randolph County, North Carolina My commission expires Aug. 14, 2012 SEAL My commission expires le! ?cS I ?' Permit Number: (to be provided by DWQ) Drainage Area Number: Bioretention Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important operation and maintenance procedures: - Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). - Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. - Heavy equipment will NEVER be driven over the bioretention cell. - Special care will be taken to prevent sediment from entering the bioretention cell. - Once a year, a soil test of the soil media will be conducted. After the bioretention cell is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problems: How I will remediate the problem: The entire BMP Trash/debris is resent. Remove the trash/ debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to bioretention cell erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe, The pipe is clogged (if Unclog the pipe. Dispose of the stone verge or swale applicable). sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and clogged covered in sediment (if stone and replace with clean stone. applicable). n.,,.o 1 ..f 7 r--m c111nM nP.Wf D-.,'2 BMP element: Potential problems: How I will remediate the problem: The pretreatment area Flow is bypassing Regrade if necessary to route all pretreatment area and/or flow to the pretreatment area. gullies have formed. Restabilize the area after grading. Sediment has accumulated to Search for the source of the a depth greater than three sediment and remedy the problem if inches. possible. Remove the sediment and restabilize the pretreatment area. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. The bioretention cell: Best professional practices Prune according to best professional vegetation show that pruning is needed practices. to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Tree stakes/wires are present Remove tree stake/ wires (which six months after planting. can kill the tree if not removed). The bioretention cell: Mulch is breaking down or Spot mulch if there are only random soils and mulch has floated away. void areas. Replace whole mulch layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of three inches. Soils and/or mulch are Determine the extent of the clogging clogged with sediment. - remove and replace either just the top layers or the entire media as needed. Dispose of the spoil in an appropriate off-site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible. An annual soil test shows that Dolomitic lime shall be applied as pH has dropped or heavy recommended per the soil test and metals have accumulated in toxic soils shall be removed, the soil media. disposed of properly and replaced with new lantin media. BMP element: Potential problems: How I will remediate the problem: The underdrain system Clogging has occurred. Wash out the underdrain system. if applicable) The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off-site. The drop inlet is damaged Repair or replace the drop inlet. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. L'-- C\77Ani /1D.AA Do.. 2 D--- Z -f'7 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Ceekside Park Entrance-City of Archdale BMP drainage area number: Print name: J CR R,( ?AtZ PJb2oc.?l? Title: C i-r--( ?AAu Aj:t=-2 Address: ?toZ PbAt ?¢- ?'o4a It lac?kpAl.E f K?- C. 27Lto3 Phone: C3? 4'?A - 74(.0 Date: CIO Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, ? <a 00 ?? C?t , a Notary Public for the State of c?- , County of do hereby certify that personally appeared before me this day of { , ) o I ()_, and acknowledge the due execution of the forgoing bioretention maintenance requirements. Witness my hand and official seal, patsy Dougherty Notary Public Randolph County, North Carolina My commission expires Aug. 14,201', SEAL My commission expires ??tiS I a ?? - Form SW401-Bioretention I&M-Rev. 2 Page 4 of 4 WATERSHED DEVELOPMENT / STORM WATER PLAN HYDRAULIC CALCULATIONS FOR CREEKSIDE PARK ENTRANCE DEVELOPED BY.• CITY OF ARCHDALE FEBRUARY, 2010 ,On,\N . CAf?o • '•ESSIp?• ?y9 JAMESTOWN ENGINEERING GROUP, INC. 117 EAST MAIN STREET P. 0. BOX 365 JAMESTOWN, NC 27282 (336) 886-5523 Bioretention Sizing Note to User: Yellow Cells Require User Input Watershed Size Soil Type CN ;Blue Cells Have Been Previously Determined 0.48 acres Pink Cells are Calculations within this Spreadsheet Percent Impervious 67 % 92 Selected Curve Number Water Quality Storm Breakdown of Runoff 1 in Q. 0.40 in/area 0.19 ac-in First Flush Runoff 0.19 ac-in equation: based off SCS CN Method. Average Depth 9 in Surface Area 0.02 ac equation: Volume/ Depth 935 sf Fill Soil Choice Nitrogen Removal - Sandy Loam K= 1 in/hr Soil Type: 12% Fines (Silt+Clay), 82-85% Sand, 3-6% Organic Other Pollutant Removal - Loamy Sand K= 2 in/hr Soil Type: 8% Fines (Silt+Clay), 86-90% Sand, 2-4% Organic Il 1.5 in/hr Underdrains Minimum Flow equation. Q = 2.3E-5 * K * A 0.03 cfs Factor of Safety (range between 2 and 10) 8 Design Flow 0.26 cfs Manning's Roughness Coefficient 0.011 smooth wall 0.015 corrugated wall 0.011 n Internal Slope (recommended minimum 0.5%) 0.5 % Pipe(s) Diameter(s) 4.79 inches equation: D = 16 * (Q * n * s^0.5)^(3/8) # of 4" diam. # of 6" diam. calculations assume n=0.011 Underdrains Underdrains 2 2 Note: A minimum of 2 underdrains recommended Formulating Pre- & Post- Development Hydrographs utilize small watershed method & center-weighted storm (Malcom) Return Period 2 year RDU data 1= 4.60 in/hr Cpre 0.63 (standard wood Rational C) Cpost 0 8 (apartment Rational C see Adjoi ning Table) A= acre A= 20908.8 sf Rainfall 2.88 in (6 hr Depth assoc. with 10 yr GSO storm) Qp= 1.4 cfs PRE CN 89 1 S= 1.24 Q*= 1.79 in Qpost= 1.8 cfs POST CN 1 11 921 S= 0.87 Q*= 2.05 in Vol - Pre 3122 cf 1.985075 Vol - Post 3568 cf Tpre 27 min Time of Concentration (Kirpich Tc Equation) Tpost 24 min Predevelopment L 100 ft (Length of Overland Flow) Time Step 1 min S 0.01 ft/ft (average overland slope) tc 1.59 min bare soil Time Q- pre Q-post tc 3.19 min grassed min cfs cfs 0 0.00 0.00 Post Development 1 0.00 0.01 L 100: ft (Length of Overland Flow) 2 0.02 0.03 S 0.01 ft/ft (average overland slope) 3 0.04 0.07 tc 1.59 min bare soil 4 0.07 0.12 tc 3.19 min asphalt/concrete 5 0.12 0.18 6 0.16 0.25 Note: Compare this to a 5 minute minimum. 7 0.22 0.34 8 0.28 0.43 9 0.35 0.54 10 0.42 0.64 11 0.50 0.76 12 0.58 0.87 13 0.66 0.98 14 0.74 1.10 15 0.82 1.21 16 0.90 1.31 17 0.98 1.41 18 1.05 1.49 19 1.11 1.57 20 1.18 1.64 21 1.23 1.69 22 1.28 1.73 23 1.32 1.76 24 1.35 1.77 25 1.37 1.76 26 1.39 1.74 27 1.39 1.71 28 1.39 1.66 29 1.37 1.60 30 1.35 1.53 31 1.31 1.45 32 1.27 1.38 33 1.22 1.30 34 1.17 1.24 35 1.11 1.17 36 1.06 1.11 37 1.01 1.05 38 0.96 1.00 39 0.92 0.95 40 0.87 0.90 41 0.83 0.85 42 0.79 0.80 43 0.76 0.76 44 0.72 0.72 45 0.69 0.69 46 0.65 0.65 47 0.62 0.62 48 0.59 0.58 49 0.57 0.55 50 0.54 0.52 51 0.51 0.50 52 0.49 0.47 53 0.47 0.45 54 0.44 0.42 55 0.42 0.40 56 0.40 0.38 57 0.38 0.36 58 0.37 0.34 59 0.35 0.32 60 0.33 0.31 61 0.32 0.29 62 0.30 0.28 63 0.29 0.26 64 0.27 0.25 65 0.26 0.23 66 0.25 0.22 67 0.24 0.21 68 0.23 0.20 69 0.22 0.19 70 0.21 0.18 71 0.20 0.17 72 0.19 0.16 73 0.18 0.15 74 0.17 0.14 75 0.16 0.14 76 0.15 0.13 77 0.15 0.12 78 0.14 0.12 79 0.13 0.11 80 0.13 0.10 81 0.12 0.10 82 0.11 0.09 83 0.11 0.09 84 0.10 0.08 85 0.10 0.08 86 0.09 0.08 87 0.09 0.07 88 0.09 0.07 89 0.08 0.06 90 0.08 0.06 91 0.07 0.06 92 0.07 0.05 93 0.07 0.05 94 0.06 0.05 95 0.06 0.05 96 0.06 0.04 97 0.06 0.04 98 0.05 0.04 99 0.05 0.04 100 0.05 0.04 Hydrograph Routing through Bioretention Watershed Area 0.48 ac Surface Area 0.0 ac Surface Area 935 sf Average Depth 9 in Average Depth 0,75 ft Cumulative Volume 701 cf Surf. Infiltration Rate 1.5 in/hr If Sandy Loam, 1 in/hr, Loamy Sand, 2 in/hr Volume lost to InfI 117 cf/hr Bioretention Outlet Control Type Structure: Weir Dimensions length 3 ft width 3 ft Total Length 12 ft % occupied by grate 0.00% % Effective length 12 ft Height above soil 9 in Height 0.75 ft Number of Cells 1 cells Time Inflow Volume in Cum Vol in Depth Ouflow Infilt Vol Out° Notes rrVn cf4 cf cf ft cfs cf of 0 O.UU 0 0 0.00 0.00 0.00 0.00 1 0.01 0 0 0.00 0.00 0.45 0.45 2 0.03 2 2 0.00 0.00 1.77 1.77 3 0.07 4 4 0.00 0.00 1.95 1.95 4 0.12 7 9 0.01 0.00 1.95 1.95 5 0.18 11 18 0.02 0.00 1.95 1.95 6 0.25 15 31 0.03 0.00 1.95 1.95 7 0.34 20 50 0.05 0.00 1.95 1.95 8 0.43 26 74 0.08 0.00 1.95 1.95 9 0.54 32 104 0.11 0.00 1.95 1.95 10 0.64 39 141 0.15 0.00 1.95 1.95 11 0.76 45 184 0.20 0.00 1.95 1.95 12 0.87 52 234 0.25 0.00 1.95 1.95 13 0.98 59 291 0.31 0.00 1.95 1.95 14 1.10 66 355 0.38 0.00 1.95 1.95 15 1.21 72 426 0.46 0.00 1.95 1.95 16 1.31 79 502 0.54 0.00 1.95 1.95 17 1.41 84 585 0.63 0.00 1.95 1.95 18 1.49 90 673 0.72 0.00 1.95 1.95 19 1.57 94 765 0.82 0.64 1.95 40.32 20 1.64 98 823 0.88 1.69 1.95 103.22 21 1.69 101 821 0.88 1.65 1.95 100.98 22 1.73 104 824 0.88 1.71 1.95 104.49 23 1.76 105 825 0.88 1.73 1.95 105.53 24 1.77 106 825 0.88 1.74 1.95 106.07 25 1.76 106 825 0.88 1.73 1.95 105.62 26 1.74 105 824 0.88 1.71 1.95 104.32 27 1.71 103 822 0.88 1.67 1.95 102.15 28 1.66 100 820 0.88 1.62 1.95 99.18 29 1.60 96 817 0.87 1.56 1.95 95.45 30 1.53 92 813 0.87 1.48 1.95 91.03 31 1.45 87 809 0.87 1.41 1.95 86.40 32 1.38 83 805 0.86 1.33 1.95 81.95 <__= Max Ponding Depth 4" 33 1.30 78 801 0.86 1.26 1.95 77.73 34 1.24 74 798 0.85 1.20 1.95 73.73 35 1.17 70 794 0.85 1.13 1.95 69.94 36 1.11 67 791 0.85 1.07 1.95 66.35 37 1.05 63 788 0.84 1.02 1.95 62.94 38 1.00 60 785 0.84 0.96 1.95 59.70 39 0.95 57 782 0.84 0.91 1.95 56.64 40 0.90 54 779 0.83 0.86 1.95 53.73 41 0.85 51 776 0.83 0.82 1.95 50.97 42 0.80 48 773 0.83 0.77 1.95 48.36 43 0.76 46 771 0.82 0.73 1.95 45.88 44 0.72 43 768 0.82 0.69 1.95 43.53 45 0.69 41 766 0.82 0.66 1.95 41.30 46 0.65 39 764 0.82 0.62 1.95 39.18 47 0.62 37 761 0.81 0.59 1.95 37.17 48 0.58 35 759 0.81 0.56 1.95 35.27 49 0.55 33 757 0.81 0.53 1.95 33.47 50 0.52 31 755 0.81 0.50 1.95 31.76 51 0.50 30 753 0.81 0.47 1.95 30.13 52 0.47 28 751 0.80 0.44 1.95 28.59 53 0.45 27 749 0.80 0.42 1.95 27.14 54 0.42 25 748 0.80 0.40 1.95 25.75 55 0.40 24 746 0.80 0.37 1.95 24.44 56 0.38 23 744 0.80 0.35 1.95 23.19 57 0.36 22 743 0.79 0.33 1.95 22.01 58 0.34 20 741 0.79 0.32 1.95 20.89 59 0.32 19 739 0.79 0.30 1.95 19.83 60 0.31 18 738 0.79 0.28 1.95 18.82 61 0.29 17 737 0.79 0.27 1.95 17.86 62 0.28 17 735 0.79 0.25 1.95 16.96 63 0.26 16 734 0.79 0.24 1.95 16.10 64 0.25 15 733 0.78 0.22 1.95 15.28 65 0.23 14 731 0.78 0.21 1.95 14.51 66 0.22 13 730 0.78 0.20 1.95 13.77 67 0.21 13 729 0.78 0.19 1.95 13.08 68 0.20 12 728 0.78 0.17 1.95 12.42 69 0.19 11 727 0.78 0.16 1.95 11.79 70 0.18 11 726 0.78 0.15 1.95 11.19 71 0.17 10 725 0.78 0.14 1.95 10.63 72 0.16 10 724 0.77 0.14 1.95 10.10 73 0.15 9 723 0.77 0.13 1.95 9.59 74 0.14 9 722 0.77 0.12 1.95 9.11 75 0.14 8 721 0.77 0.11 1.95 8.65 76 0.13 8 720 0.77 0.10 1.95 8.22 77 0.12 7 719 0.77 0.10 1.95 7.81 78 0.12 7 719 0.77 0.09 1.95 7.42 79 0.11 7 718 0.77 0.09 1.95 7.05 80 0.10 6 717 0.77 0.08 1.95 6.70 81 0.10 6 716 0.77 0.07 1.95 6.37 82 0.09 6 716 0.77 0.07 1.95 6.05 83 0.09 5 715 0.76 0.06 1.95 5.75 84 0.08 5 714 0.76 0.06 1.95 5.47 85 0.08 5 714 0.76 0.05 1.95 5.20 86 0.08 5 713 0.76 0.05 1.95 4.95 87 0.07 4 712 0.76 0.05 1.95 4.71 88 0.07 4 712 0.76 0.04 1.95 4.48 89 0.06 4 711 0.76 0.04 1.95 4.26 90 0.06 4 710 0.76 0.04 1.95 4.06 91 0.06 3 710 0.76 0.03 1.95 3.86 92 0.05 3 709 0.76 0.03 1.95 3.68 93 0.05 3 709 0.76 0.03 1.95 3.50 94 0.05 3 708 0.76 0.02 1.95 3.34 95 0.05 3 708 0.76 0.02 1.95 3.18 96 0.04 3 707 0.76 0.02 1.95 3.04 97 0.04 3 707 0.76 0.02 1.95 2.90 98 0.04 2 706 0.76 0.01 1.95 2.77 99 0.04 2 706 0.75 0.01 1.95 2.64 100 0.04 2 705 0.75 0.01 1.95 2.53 Totals 3375.428 cf IN 2660.287 cf OUT cumulative Volume 701.2334 715.1403 JAMESTOWN ENGINEERING GROUP, INC. C 117 EAST MAIN STREET - JAMESTOWN, NC 27282 r ???. SHEET NO. PROJECT: C''-,LE >tt /'tf-tit DATE: COMPUTED BY: CHECKED BY: PROJECT NO. (3 C41- -?? z4 ?il,Ff k--krili 2,99 5 rlr?r, 4 6 C.r A C) Char-Meck Bioretention Design Guidance (Hahne, 2004) note: this is provided for you to see an alternative sizing guideline WATER QUALITY VOLUME (WQ) Rv = runoff coefficient (Runoff/Rainfall) Rv = 0.05 + 0.009( 1 ) Where "I" _ % Impervious ("Simple Method" - Schueler, 1987) NCDENR April 1999 v = 1.D"RvA 12 Fill in Values: "I" = 67 Percent Impervious of Site "A" = 0.48 Acres Answer: WQv = 0.026 Ac. Ft. 1138 Cubic Feet Required RAIN GARDEN AREA Formula: Af = (WQv) (Dfl Where: ((k) (Hf+Df) (Tf)) Af = Surface area of Rain Garden (S.F.) From Georgia Design Manual WQv = Water Quality Volume to be Captured Section 3.2.3.6 Df = Filter Bed Depth (2 feet minimum) (Based on Darcy's Law) k = permeability coefficient of filter media (use 1.0 ft/day for sandy-loam) Hf = Average height of water above filter bed (use 3 inches, which is half of 6" ponding depth) Tf = Design filter bed drain time in days (2 Days or 48 hours ) Fill in Values: "k" = 1 ft./day (1/2"/Hour) Df = 3 Feet Hf = 3 inches Tf = 2 Days Answer: Af = 525 Square Feet Required For Rain Garden 16 Width Approximate Size 32 Length ME Water Draw Through Rate: Darcy's Equation: Q = (.0000232)*K*A*( H/L) = 0.012 cfs Where: Q = Flow (Rate of Draw) through Bioretentioin Soil (cfs) K = Hydraulic Conductivity of soil ( Use 1"/Hour) A = Surface Area of Bio-Retention Area (SF) H = Height of Water above Drainage Pipe (Underdrain) L = Thickness of Soil Bed (Usually 4' ) Assume ( H/L ) -1 Time to Drawdown water from Inundation to Saturation at Surface: VolumelQ 21552 Seconds 6.0 Hours to Saturation Time to lower Water Table to 2.0 feet below surface: Assume 45% Porosity Volume = Area x 2'x 0.45 = 472.6 Cubic Feet 38793 Seconds 10.8 Hours to Lower Water 2' below surface SIZE UNDERDRAIµ As a rule of thumb, the length of underdrain is based on 10% of Af Source: (NY State Stormwater Manual) L = 8 Feet in 3' wide stone bed Required Diameter 4.1 Inches (Minimum 6 Inches) Source: (NCSU Rain Garden Design Worksheet, Bill Hunt) Or More Underdrains required '`fA ?? NCDENR Permit Number: (to be provided by DWQ) Q?oF w a rFgQ< O c STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name CREEKSIDE PARK ENTRANCE - CITY OF ARCHDALE Contact name RICH GLOVER Phone number 336-886-5523 Date February 15, 2010 Drainage area number 1 II. DESIGN INFORMATION Site Characteristics Drainage area 20,900 ft2 Impervious area 14,080 ft2 Percent impervious 67.4% % Design rainfall depth 1.0 inch Peak Flow Calculations Is pre/post control of the 1-yr, 24-hr peak flow required? N (Y or N) 1-yr, 24-hr runoff depth 2.88 in 1-yr, 24-hr intensity 0.24 in/hr Pre-development 1-yr, 24-hr peak flow 1.4 ft3lsec Post-development 1-yr, 24-hr peak flow 1.8 ft3lsec Pre/Post 1-yr, 24-hr peak control 0.4 ft3lsec Storage Volume: Non-SR Waters Design volume 1,138.0 ft3 Ponding depth of water 12 inches OK Ponding depth of water 1.00 ft Surface area of the top of the bioretention cell 1,200.0 ft2 OK Length: 20 ft OK Width: 60 ft OK -or- Radius ft Storage Volume: SR Waters 1-yr, 24-hr depth in Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 Soils Report Summary Drawdown time, ponded volume 6 hr OK Drawdown time, to 24 inches below surface 16 hr OK Drawdown time, total: 22 hr In-situ soil: Soil type CLAYEY SAND Soil permeability 0.40 in/hr Planting media soil: Soil type SANDY LOAM Soil permeability 1.50 in/hr OK Soil composition % Sand (by weight) 86% OK % Fines (by weight) 10% OK % Organic (by weight) 4% OK Form SW401-Bioretention-Rev.1 Parts I and 11. Design Summary, Page 1 of 2 Permit Number: (to be provided by DWQ) Phosphorus Index (P-Index) Basin Elevations Temporary pool elevation Planting elevation (top of the mulch) Bottom of the cell Planting depth Depth of mulch SHWT elevation Are underdrains being installed? Total: 100% 20 (unitless) OK 776 fmsl Insufficient temporary pool elevation. 775 fmsl 771.75 fmsl 3.25 ft 3 inches OK 765 fmsl OK How many clean out pipes are being installed? What factor of safety is used for sizing the underdrains? (See BMP Manual Section 12.3.6) Additional distance between the bottom of the planting media and the bottom of the cell to account for underdrains Bottom of the cell required Distance from bottom to SHWT Type of bioretention cell (answer "Y" to only one of the two following questions): Is this a grassed cell? Is this a cell with trees/shrubs? Planting Plan Number of tree species Number of shrub species Number of herbaceous groundcover species Additional Information Does volume in excess of the design volume bypass the bioretention cell? Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30 feet from surface waters (50 feet if SA waters)? Is the BMP localed at least 100 feet from water supply wells? Are the vegetated side slopes equal to or less than 3:1? Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? Inlet velocity (from treatment system) Is the area surrounding the cell likely to undergo development in the future? Are the slopes draining to the bioretention cell greater than 20%? Is the drainage area permanently stabilized? Pretreatment Used (Indicate Type Used with an "X" in the shaded cell) Gravel and grass (8'inches gravel followed by 3-5 ft of grass) Grassed swale Forebay Y (Y or N) 2 OK 5 1ft 770.75 fmsl 5.75 ft OK N (Y or N) Y (Y or N) OK media depth 5 OK 17 OK 15 OK Y (Y or N) N (Y or N) Excess volume must pass through filter. NIA ft N (Y or N) Show how flow is evenly distributed. Y (Y or N) Y (Y or N) Y (Y or N) OK Y (Y or N) OK 1 ft/sec OK N (Y or N) N (Y or N) OK Y (Y or N) OK OK X Form SW401-Bioretention-Rev.1 Parts I and II. Design Summary, Page 2 of 2 Permit No: _ (to be assigned by DWQ) Ill. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional Information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. C-1 1. Plans (1' - 50' or larger) of the entire site showing: Design at ultimate build-out, Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Cell dimensions, Pretreatment system, High flow bypass system, Maintenance access, Recorded drainage easement and public right of way (ROW), Clean out pipe locations, Overflow device, and Boundaries of drainage easement. 2. Plan details (1' = 30' or larger) for the bioretention cell showing: Cell dimensions Pretreatment system, High flow bypass system, Maintenance access, Recorded drainage easement and public right of way (ROW), Design at ultimate build-alt, Off-site drainage (if applicable), Clean out pipe locations, Overflow device, and - Boundaries of drainage easement. Indicate the P-Index between 10 and 30 3 ' ' . Section view of the bioretention cell (1 = 20 or larger) showing: Side slopes, 3:1 or louver Underdrain system (if applicable), and Bioretention cell layers [ground level and slope, pre-treatment, pondirg depth, mulch depth, fill media depth, washed sand, filter fabric (or choking stone if applicable), #57 stone, underdraars (d applicable), SHWT level(s), and overflow structure] [" t 4. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. Ali elevations shall be in feet mean sea level (hsl). Results of soils tests of both the planting soil and the in situ soil must include: Soil permeability, Soil composition (% sand, % fines, % organic), and ??1"V r P-index. 5. A detailed planting plan (1° = 2u' or larger) prepared by a qualified individual showing: A variety of suitable species, Sizes, spacing and locations of plantings, Total quantity of each type of plant specified, A planting detail, The source nursery for the plants, and Fertilizer and watering requirements to establish vegetation. 6 . An assurance that the installed system will meet design specifications upon initial operation once the proiect is complete and the entire drainage area is stabilized . A construction sequence that shows how the bioretention cell will be protected from sediment until the entire drainage area is stabilized, : c s 11r E u m - ?+- r r ! F, S_ - -::f,a?•rr u- 9 * :apt JT T. 1!7 ° 1 . d i !;? i V ,y , .. . a e '3 3r' i ^11A i - of fle f"U" '! Porm SW407-Sier_te *iun-Re'd 7 oaf* '11, pa-cie 5 v. RANDOLPH COUNTY REGISTER OF DEEDS - UNOFFICIAL RECORD End .3P"v1027 WDOUH AUNTY NC 12/31/96 $138.00 11 otE NaN %VL1INA S Reel Estate Excise Tax . z -w- Tax $138.00 I Recording Tine, Book and Page Tax Lot No. Parcel Identifier No. Verified by .. ........ ...._...... ............ . _.... County on the day of _..__ _..__. ..__ ...., 19........_.. by .... ....... ..... ........... _._..._..__.......... r Mail after recording to WilliaR.. P, Miller Roberson Haworth & Reese, P.L.L.C. Po.st_,offiQe_Box 155.0,.High Point, North Carolina 27261 This instrument was prepared by _...William I!.. Miller .. Attorney-at-Law (ssw) Brief description for the Index NORTH CAROLINA GENERAL WARRANTY DEED THIS DEED made this 3.0.th_.. day of _ _...9ECe,Lflb.e.__....... __ ......., 1996......., by and between GRANTOR ANNIS B. RUSH, By and Through Her Attorney-in-Fact, DONALD L. DAVIS Pape t of 3 GRANTEE CITY OF ARCHDALE Post Office Box 14068 Archdale, North Carolina 27263 enter Is appropriate block for eseb party: nuns, .dd-, and, if aperopriats, ehuscler of entity, e.e. corporation or psrinership. The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter ae required by context. WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in the City of Trinity Township, Randolph, _ County, North Carolina and more particularly described as follows: See attached Schedule A which is incorporated herein by reference the same as if fully set out herein. N.^C. Rw Auo.^1 ^o ryNo. 3 0 1976, R-d a 1977 -........ . a ce, iT.. b. i>t, r.eu.,w. w. e f.a65 ?V APZ" I RANDOLPH COUNTY REGISTER OF DEEDS - UNOFFICIAL RECORD Page 2 of 3 BR1483FIG 1028 The property hereinabove described was acquired by Grantor by instrument recorded in B90k...6.Q:Z.,._.At.. Page.-511... and... ac-ox ...filg.,....at.. P.asa...11.2 .................................. A map showing the above described property is recorded in Plat Book .._... z .......................... page 4 8.-1e TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever except for the exceptions hereinafter stated. Title to the property hereinabove described is subject to the following exceptions: This conveyance is made subject to all applicable right-of-ways, easements and restrictions of record, if any. IN WITNEYY WHEREOF, the Grantee bee bereuntu e --- et his hand end last. OF it , bee this instrument to ba 1 aed V Its corporate same by Its duly n first abort written. Initialized atneen and Its meet to be her-at, affixed by apput?or syol-faIN Board[ of Dlnctors, the day Al lit QM.M4.Z 1d• _____________________________________________________________ --H _. -A b (C-F.tata Nam.) a vA NIS B. U H, By and Through Z DONALD L. DAVIS, Attorney-in-Fact BY: -'____________________""---.-____----"'--------------- 7i ______________________Presidant ATTYeT: U STATE OF NORTH CAROLINA COUNTY OF GUILFORD I, a Notary Public of said county, do hereby certify that l? ?t y DONALD L. DAVIS, Attorney in Fact for ANNIS B. RUSH, personally appeared before me this day, and being by me duly sworn, says that Nra heexecuted the foregoing and annexed instrument for and in behalf foE ANNIS B. RUSH, and that his authority to execute and acknowledge N U said instrument is contained in an instrument duly executed and 1 _ acknowledged 061ce ofthe Register of Deeds 9 of Randolph County, a North Carolina, 9V in Book 1219, at Page 1204, and that this instrument was executed under and by virtue of the authority given by said instrument granting him Power of Attorneyl that the said DONALD L. DAVIS acknowledged the due execution of the foregoing and annexed ihstrument for the purposes therein expressed for and in behalf of the said ANNIS B. RUSH. 'r 'o ?• ? Stns my hand and official seal, this the 30th day of 01 A Jr Y'., December, 1996. yew .?n 1 ua G 515Q?Xili , 115. L?J?Q U B,.,kn. :dry. .' -NOF UBLIC t t t(IV My Commission Expires: March 27, 2001 - - -- The (ore(eln[ CerWicLLeG) of ----------- NORTH CAROLINA - Randolph County ........... The foregoing cernficata(s) of .......... _._........ _.._....... ........................... ........... 1 ................ ....... ................... ........... _..... ..... ........................ ............................... ..................... _......_................... ............................. ..................................... b (vet) certified to lx mrrecL Thin In[tttatnea u prpenRed for agitation and recorded in this office at Book .......... IA00.3......_......... , ?. M. i'W`.O.arl... Thu ._...3\sr day of .....T ................. -. 19 .....?P...._. At ._...?41. o'clock ............... Slu}v, AegistrrDads By . .?1..... ... ... ..... Register of Deeds N. C. Rar Auoc. Farm No. 3 i1 1976, Revised ©1977 - w anwe. a W.. iz.. eo• rn. va.?o.?w. w c. ]ros6 r,onr a saroT.m ..rcn rn, u.c a.. •„o.. -rear RANDOLPH COUNTY REGISTER OF DEEDS - UNOFFICIAL RECORD Page 3 of 3 s, 1?113 °G 1029 BEING ALL of Lots 43, 44, 45, 46, 47, 48, 49, 50, 51 and 52 of the Byerly Property as shown on Map No. 1 of the Byerly Property as recorded in Plat Book 2, at Page. 48 y in the Office of the Register of Deeds of Randolph County, North Carolina. This conveyance is made subject to all applicable right-of-ways, easements and restrictions of record, if any, and is intended to include all that property conveyed to R.L. Rush and wife, Annis B. Rush by Deeds recorded in Book 607, at Page 511 and Book 618, at Page 112, Randolph County Registry. P"A KJAr NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary Mr. Jerry Yarborough City of Archdale PO Box 14068 Archdale, NC 27263 APPROVAL of 401 Water Quality Certification with Additional Conditions Dear Mr. Yarborough: February 22, 2010 DWQ# 09-1126 Randolph County You have our approval, in accordance with. the attached conditions, to place fill and impact 72 linear feet of an unnamed tributary to Muddy Creek in order to expand Creekside Park located in Archdale, NC in Randolph County, as described in your application received by the Division on October 27, 2009, and additional information received on January 26, 2010. After reviewing your modification application, we have determined that this fill is covered by General Water Quality Certification Numbers 3705, which can be viewed on our web site at http://h2o.enr.state.nc.us/ncwetlands/rd wetlands _certifications.htm. This Certification allows you to use Nationwide Permit Number 39 when it is issued by the U.S. Army Corps of Engineers. In addition, you should secure any other applicable federal, state or local permits before you proceed with your project, including (but not limited to) those required by Sediment and Erosion. Control (including trout buffer waivers as necessary), Non-Discharge, State Stormwater, and Water Supply Watershed regulations. Also, this approval will expire when the accompanying 404 permits expire unless otherwise specified in the General Certification. This approval is valid only for the purpose and design that you have described in your application. If you change your project, you must notify us in writing, and you may be required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fill for this project (now or in the future) exceeds one acre, or total fill to perennial streams equals or exceeds 150 linear feet, additional compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the conditions listed in the attached certification, as well as the additional conditions listed below: 1. The following impacts are hereby approved as long as all other specific and general conditions of this Certification are met. No other impacts, including incidental impacts, are approved: Identifier Stream Impact length Site S 1 UT to Mudd Creek 72 feet ermanent im act Total 72 linear feet permanent impact North Carolina Division of Water Quality, Winston-Salem Regional Office Location: 585 Waughtown St. Winston-Salem, North Carolina 27107 Phone: 336-771-5000 t FAX: 336-771-46301 Customer Service: 1-877-623.6748 Internet: vivwncwaterquality.org An Equal Opportunity 1 Affirmative Action Employer NorthCarolina Naturattt, Creeksside Park Site DWQ# 09-1126 February 22, 2010 Page 2 2. A final, written stormwater managment plan (including a signed and notarized Operation and Maintenance Agreement) shall be submitted to the 401 Oversight and Express Permitting Unit (2321 Crabtree Blvd., Suite 250, Raleigh, NC, 27604) within 90 days of the issuance of this 401 Water Quality Certification. The stormwater management plan shall be approved in writing by this Office before the impacts specified in this Certification occur. The stormwater management plan must include stormwater management facilities that are designed to remove at least 85% TSS according to the most recent published version of the NC DENR Stormwater Best Management Practices Manual. The stormwater management plan must include a completed BMP Supplement Form for each proposed BMP, with all the required items. The BMP Supplement Forms are available at the following website: http://portal.ncdenr.org/web/wq/ws/su/bmp-manual. Before any permanent building is occupied at the site, the diffuse flow facilities shall be constructed and operational according to the design and specifications approved by this Office. 3. Upon finishing the project, the Applicant shall fill out and return the enclosed "Certificate of Completion" to notify NCDWQ when all work included in the 401 Certification has been completed. This certificate should be returned to the Winston-Salem Regional Office of the NCD WQ at the address listed on the form. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150E of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please contact Sue Homewood in the DWQ Winston-Salem Regional Office at 336-771-4964 or at sue.homewood@nedenr.gov. Sincerely, C:oleen H. Sullins, Director Division of Water Quality cc: John Thomas, U. S. Army Corps of Engineers, Raleigh Regulatory Field Office (via email) Ravindra Bissram, PE, Jamestown Engineering Group Inc. (via email) DWQ Winston-Salem Regional Office DWQ Wetlands/401 Creeksside Park Site DWQ# 09-1126 February 22, 2010 Page 3 DWQ Project No.: County: Applicant: Project Name: Date of Issuance of 401 Water Quality Certification: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail. Service Center, Raleigh, NC, 27699-1621. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certi ication 1, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification 1, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such. that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Engineer's Certification Partial 1` inal 1, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date 007 v4ll tea. ?? i',. Fr'? :k L'1 ?r ?' ;r? _ } z? r i s "+ v w { .. f ` N r f ,?. -,w , r 111 `? t 4 :`F 77 ?y.i_t,,???r } ? ? _ d ?? + : ' ?d2?° '7? i ?• ?y y f?? ?4 1k F 4? s `?+? .' i l ? 6 r r' ' ilk„ ?? ?- I t, '-` '..?•' f§- F 1 ....+rir i - ?1??1` fii. '' s: - r z;,Y : ??ri?F jr ?? ?•,, <"ti ? _ _ "?A ? c ??,. ?P {? l r}Y` 'rr eft 1"I.,. f i `tih.? Sf 4•y 14 SCALE (IN FEET) Y? 1000 2000 T FIGURE 1 s 2000 0 SITE LOCATION MALE REFERENCE: CREEKSIDE PARK ENTRANCE USGS TOPOGRAPHIC MAP LLP ARCHDALE, NORTH CAROLINA HIGH POINT EAST, NC QUADRANGLE CAROLINAS ECS PROJECT 09.18050 DATED-1950, PHOTOREVISED 1982 f % I 11UT, I 'T 77 REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNIC?AL ENGINEERING ANALYSIS CREEKSIDE PARK ENTRANCE ARCHDALE,_NORTH CAROLINA ECSCAROLINAS, LLP PROJECT NUMBER 09.18050 PREPARED FOR CITY OF ARCHDALE ARCHDALE, NORTH CAROLINA JIANUARY 7, 2010 ECS CAROLINAS, LILP "Setting the Standard for Service" -?LLP CARUCINA%s Geotechnical • Construction Materiels - Environmental , Facilities NC Registered Engineering Firm F-1078 January 7, 2010 City of Archdale c/o Mr. Dan Pritchett, P.E. Jamestown Engineering PO Box 365 Jamestown, North Carolina 27282 ECS Project No. 09.18050 Reference: Report of Subsurface Exploration and Geotechnical Engineering Analysis Creekside Park Entrance Archdale, North Carolina Dear Mr. Pritchett: ECS Carolinas, LLP (ECS) has completed a subsurface exploration for the subject site as authorized by acceptance of our Proposal No. 09.15660-P, dated November 16, 2009. The purposes of'this exploration were to explore the subsurface conditions at the site and to develop geotechnical recommendations to guide design and construction of the project. This report presents our evaluations and recommendations, the results of our exploration, our scope of work, and our understanding of the project information. This report is provided for the use of the: City of Archdale and Jamestown Engineering. This report is not intended to be used or relied upon in connection with other projects or by other unidentified_ third parties without the written permission of ECS. The unauthorized use of this report by any undesignated third party or parties will be at such party's sole risk and ECS disclaims liability for any such unauthorized third party use or reliance. ECS appreciates the opportunity to provide our professional services during this phase of your project. Please contact us if you have questions concerning the following report. Respectfully, ECS C OLINAS, Rv to oil# i? SEAS - r `•4t{ ...ROC,,y•,; Russell A. B ndel, P.y7 4 30 ' 1teviewed by: Da d M. Cu ss/0ti9'•? Principal Engineer U- Principal Engine egQ sFAL `'INE?• ??.?<' Licensed NC 024430 ??is?`??:'^••••••••• ??.:,•? Licensed NCV22Q89022oe9 Attachments "+?`'?• ''1j!l111tlrilt?t 4811 Koger Boulevard Greensboro, NC 27407 T. 336-856-7150 • F: 336-856-7160 - www.ecslimited.com ECS Carolinas, LLP • ECS Florida, LLC • ECS Mlid-Atlantic, LLC , ECS Southeast, LLC - ECS Texas, LLP Creekside Park Entrance Archdale, North Carolina ECS Project No 09.18050 January 7, 2010 REPORT SUMMARY We request you read the entire contents of this report. Recommendations and clarifications are contained in the body that are not in the report summary. Project Information The project consists of the construction of a new entrance to the park. The park is located on Highway 311 just west of Mose Road' in Archdale, North Carolina. The entrance will consist of an asphalt paved road. Cuts and fills on the order of 3 to 5 feet are anticipated. A parking lot will also be constructed on the east side of the entrance road. Subsurface Conditions The borings encountered topsoil underlain by fill, disturbed residual and undisturbed residual soils. Partially weathered rock was encountered in two of the ten soil test borings. Auger refusal was not encountered during our exploration. The topsoil ranged in depth from 1 to 4 inches. The fill soils generally consisted of very loose to medium dense, wet, fine to medium sand with traces of clay, silt, and gravel. Fill depths ranged from 3 to 5 feet below existing ground. The disturbed and undisturbed residual soils generally consisted of very loose to very dense, moist to wet, fine to coarse sand with trace clay and some lenses of stiff clay or silt. Partially weathered rock was encountered in soil borings B-8 and B-9 at depths of 6.5 feet and 9.5 feet, respectively. The borings were checked for the presence of groundwater at the completion of drilling. Groundwater was encountered in soil borings B-1 and B-2 at depths of 2.7 and 1.9 feet, respectively. Recommendation Summary We recommend the pavement section for the driveway consist of 1 inch NCDOT SF9.5A, 2 inches of NCDOT 119.0B, and 8 inches of ABC stone. We recommend the use of Mirafi HP270 or HP370 geotextile and 8 to 12 inches of surge stone to be placed on existing ground prior to placing the fill material. At a minimum, the geotextile section will be needed from approximately stations 0+50 to 1+70. Prior to placing fill over the surge stone, a non-woven geotextile (6 oz per square yard) or the HP270/370 should be placed over the surge stone. Also, the Mirafi HP270/HP370 could be used in other areas, in lieu of, or in conjunction with, minor undercutting, where wet soils are encountered at planned subgrade. Creekside Park Entrance Archdale, North Carolina ECS Project No 09.18050 January 7, 2010 A French drain should be installed near station 1+25 to help drain the area during and after construction. The majority of the soils planned to be cut and used as fill are wet and will require drying in order to achieve: compaction. If construction is planned during the winter and early spring, chemical drying with lime would be necessary. We do not expect ripping or rock excavation will be necessary for grading based on the anticipated construction. Deeper excavations for utility trenches may encounter some rock that may require jackhammering for removal. ii Creekside Park Entrance Archdale, North Carolina ECS Project No 09.18050 January 7, 2010 SITE CONSTRUCTION AND EARTHWORK Excavation_ Conditions Partially weathered rock and auger refusal materials were not encountered within planned excavation depths for the project (except possibly for utility trenches). It should be possible to excavate soils above partially weathered rock using conventional equipment (scrapers, loaders and bulldozers). We recommend using pneumatic hammers to make confined excavations (utility trenches) in any PWR. The site soils are OSHA Type B and C soils for the purpose of excavation support. Excavations should be constructed in compliance with current OSHA standards for excavation and trenching safety. Excavations should be observed by a "competent person", as defined by OSHA, who should evaluate the specific soil type and other conditions, which may control the excavation side slopes or the need for shoring or bracing. Groundwater Control A French drain should be installed near station 1+25 to help drain the area during and after construction. The French drain should consist of washed stone wrapped in geotextile fabric. The drain should outlet into a stormwater manhole or ditch. Permanent groundwater control is not expected to be necessary for this project beyond installation of the French drain. Groundwater control is the purposeful drawdown of groundwater below subgrades, foundations, slabs, or pavements to facilitate construction and to mitigate long term problems associated with groundwater. It is the contractor's responsibility to plan for and budget for temporary groundwater control. The means and methods of lowering the groundwater are at the contractor's discretion. Temporary groundwater control measures typically consist of gravity ditches, well points, sump pumps, pumping from gravel lined and cased sumps, or other suitable methods. Whatever method used, the groundwater control should be in place and operating continuously (around the clock) to achieve and maintain the desired drawdown in advance cf excavation, proofrolling, compaction or other construction. Permanent groundwater control measures typically consist of French drain systems and/or permanent sumps. Subcarade Preparation Site preparation should begin with stripping all vegetation, root-zone, and all other soft or unsuitable material from the proposed building and pavement areas. We expect a stripping depth of at least 4 inches based on the borings. Stripping depths will vary depending on the time of the year. During the wet seasons stripping may be deeper due to saturated soils on the surface. Following stripping and rough excavation, but prior to placing controlled fill, the exposed subgrades should be proofrolled. Unstable areas identified by proofrolling should be undercut to firm materials or stabilized. We recommend the use of Mirafi HP270 or HP370 geotextile and 8 to 12 inches of surge stone to be placed on existing'ground prior to placing the fill material. Prior to placing fill over the surge stone, a non-woven geotextile (6 oz per square yard) or the HP270/370 should be placed over the surge stone. Also, the Mirafi HP270/HP370 could be used in other, areas, in lieu of, or in conjunction with, minor Creekside Park Entrance Archdale, North Carolina ECS Project No 09.18050 January 7, 2010 undercutting, where wet soils are encountered at planned subgrade. If firm soils are not encountered within 3 feet below subgrade elevation in pavement areas, the deeper unstable materials should be evaluated by the project geotechnical engineer to determine if these materials may remain in place. Any undercut areas should be backfilled with controlled fill. Appropriate proofrolling equipment typically consists of a dump truck having a single rear axle with axle weight of at least 10 tons, or a dump truck having a tandem rear axle with axle weight of at least 20 tons. Alternate equipment, such as a fully loaded pan scraper, may be utilized with approval of the geotechnical engineer responsible for evaluating the subgrade during construction. Proofrolling consists of driving the appropriate equipment over the subgrade at a walking pace. The proofrolling equipment should make overlapping passes across the subgrade in the same direction, with the overlap not exceeding 1/2 the width of the equipment. A second set of overlapping passes should then be made in a direction perpendicular to the first set of passes. Earthwork We do not anticipate undercutting, except minor undercutting (possibly 1 foot) may be needed in areas where wet soils are at planned subgrade. If earthwork is performed during winter or after appreciable rainfall then subgrades may be unstable due to wet soil conditions, which could increase the amount of undercutting or stabilization required. We anticipate that the majority of site soils will be too wet for reuse for compaction without drying measures. Drying of wet soils, if encountered, may be accomplished by spreading and discing or by other mechanical or chemical means. The ability to dry wet soils, and therefore the ability to use them for fill, will be reduced if earthwork is performed during late winter or spring. When dry, the majority of the site soils should provide adequate subgrade support for fill placement and construction operations. When wet, the soil may degrade quickly with disturbance from construction traffic. Good site drainage should be maintained during earthwork operations to prevent ponding water on exposed subgrades. Soil subgrades should be protected from rain by "sealing" the subgrades prior to forecast precipitation. Sealing subgrades can be performed by rolling with rubber-tired equipment, but ruts should not be created, or by rolling with a smooth steel-drum roller without vibration. Subgrades that have been sealed should be scarified prior to receiving additional fill. If site soils are initially placed at planned subgrade elevations and are left exposed over a period of time, the exposed soils may become soft and wet and may become holding areas for trapped water. Even compacted fill soils left exposed for long periods of time will degrade due to exposure. The lack of confinement at the surface and cycles of wetting and drying through the seasons will soften and loosen the compacted fill, or in the case of cut subgrades the removal of overburden pressure promotes rebound and can allow the surficial soils to relax over time. The disturbance can extend as deep as 1 foot, or possibly more depending on soil types and exposure conditions. Leaving site grades high allows for a sacrificial layer of soil that can then be removed from the final subgrade at the time of .future construction to reduce the need for undercutting and replacement below planned grades. Creekside Park Entrance Archdale, North Carolina ECS Project No 09.18050 January 7, 2010 Controlled Fill The majority of site soils are too wet to use as controlled fill. Controlled fill should be compacted to at least 95 percent of the maximum dry density obtained in accordance with ASTM Specification D-698, Standard Proctor Method. Aggregate base course (ABC) stone should be compacted to 100 percent density under pavements. The maximum loose lift thickness depends upon the type of compaction equipment used: EQUIPMENT MAXIMUM LOOSE` LIFT THICKNESS, IN. Large, Self-Propelled Equipment CAT 815, etc. 6 Small, Self-Propelled or Remote Controlled Rammax, etc. _ 6 Hand Operated (Plate Tamps, Jumping Jacks, Wacker-Packers 4 Trackhoe Mounted rollers/Smooth Drum rollers 6 The moisture content at the time of compaction should be within 5 percent of the optimum moisture content determined by ASTM D698. Some soils will require a moisture content closer to optimum to facilitate compaction, while other soils can be adequately compacted at moisture contents even more than 5 percent away from optimum. For this reason, the moisture content of the fill should not be the sole reason for failing a field density test. If the density test indicates the fill is adequately compacted but the moisture content is more than 5 percent away from the optimum moisture content, the density results should be reviewed by the geotechnical engineer who should then recommend whether the fill should be accepted or rejected. Controlled fill should be soil that has less than 5 percent fibrous organic content and a liquid limit and plasticity index less than 50 and 20, respectively. Soils with Unified Soil Classification System group symbols of SP, SW, SM, SC, and ML are suitable for use as controlled fill. Soils with USCS group symbol of CL which meet the restrictions for liquid limit and plasticity index are also suitable for use as controlled fill. Soils with a liquid limit less than 70 and a plasticity index less than 35 can be used as fill deeper than 4 feet below final grade, but only if the soil can be adequately compacted. Soils with a higher liquid limit or plasticity index should not be used as controlled fill. Controlled fill should be benched into the sides of slopes steeper than 4:1 (H:V) to improve the bond between the fill and the undisturbed soils. Each bench cut into a slope should be at least 12 inches but not more than 60 inches high. The benches should be wide enough to allow operation of the compaction equipment within the benched area so that fill can be placed on the bench and over the rest of the fill in continuous layers. Creekslde Park Entrance Archdale, North Carolina ECS Project No 09.18050 January 7, 2010 We recommend that all fill operations be observed and tested by an engineering technician to determine if compaction requirements are being met. The testing agency should perform a sufficient number of tests to confirm that compaction is being achieved. For mass grading operations we recommend a minimum of one density per 300 cubic yards of fill placed or per 1 foot of fill thickness, whichever results in more tests. We recommend at least one test per 1 foot thickness of fill for every 100 linear feet of utility trench backfill. Density tests in the field should be performed using the Drive Tube Method (ASTM D2937), the Sand Cone Method (ASTM D1556), or the Nuclear Method (ASTM D2922). If the Nuclear Method is used, the moisture content determined by the nuclear density equipment should be verified by performing one moisture content test per ASTM D2216 for every five nuclear density tests. Permanent Site Slopes We recommend that permanent cut slopes less than 10 feet tall through undisturbed residual soils be constructed at 2:1 (horizontal: vertical) or flatter. Permanent fill slopes less than 20 feet tall may be constructed using controlled fill at a slope of 2.5:1 or flatter. A slope of 3:1 or flatter may be desirable to permit establishment of vegetation, safe mowing, and maintenance. The surface of all cut and fill slopes should be adequately compacted. All permanent slopes should be protected using vegetation or other means to prevent erosion. The edges of pavements placed near slopes should be located an appropriate distance from the slope. The North Carolina Building Code lists the following requirements: Pavements placed at the top of fill slopes should be placed at distance equal to at least 1/3 of the height of the slope behind the crest of the slope, but that distance need not be more than 40 feet. • Pavements near the bottom of a slope should be located at least %s of the height of the slope from the toe of the slope, but the distance need not be more than 15 feet. • Slopes with structures located closer than these limits or slopes taller than the height limits indicated, should be specifically evaluated by the geotechnical engineer and may require approval from the building code official. Fill slopes should be constructed by placing controlled fill in horizontal lifts which extend to or slightly beyond the slope face. Each lift of fill should be compacted to the specified minimum density before placing the subsequent lift. The compaction equipment should travel parallel to the slope face to ensure that fill at the face of the slope is compacted to the same level as the fill farther back from the face. If needed, tracked equipment or compaction equipment can roll up and down the slope face to compact loose surficial soils to reduce erosion, but this method should not be used to construct the slope. In some cases it may be advantageous 'to overbuild the fill slope (place fill beyond the limits of the slope face) and then cut back into the fill to leave a clean, compacted slope face exposed. Fill slopes and fill pads should not be constructed by placing fill against berms. If not prohibited by plan and specification, the grading contractor will sometimes construct berms 4 Creekside Park Entrance Archdale, North Carolina ECS Project No 09.18050 January 7, 2010 out of site strippings or unsuitable soil along the limits of fill slopes and then will place controlled fill in horizontal lifts against the berms. This practice will produce a slope constructed of uncompacted materials adjacent to a zone of compacted fill with a nearly vertical interface between the two zones of fill. Over time, sometimes after appreciable rainfall, the uncompacted slope material will settle or slough away which removes the confining pressure holding the compacted fill in place. Without the confining pressure from the slope material, the compacted fill will become unstable and will slough, slide, or push out laterally. This can create problems for pavements and structures located close to the crest of the slope. Creekside Park Entrance Archdale, North Carolina ECS Project No 09.18050 January 7, 2010 PAVEMENT CONSTRUCTION Pavements for the project will consist of light duty parking areas and heavy duty pavements in driveway areas. Based on our experience with soils similar to those encountered at the site, we recommend the following minimum pavement sections for the project provided the subgrade can be successfully proofrolled during construction: Asphalt Pavements Pavement -- Asphalt Surface Asphalt Binder Aggregate Base Type Course, In. Course, in. Course, in. NC'DOT SF9.5A NCDOT119 0B NCDOT ABC Stone Heavy Du 1 2.5 8 Light Du 2 -- 6 Concrete Pavements Pavement ' Concrete Aggregate Base Type (4,500 psi @`28---dayls) Course, In. NCDOT ABC Stone Hea Duty 6 4 The materials should be in accordance with NCDOT Standard Specifications for Roads and Structures. Stabilization of subgrades as described in previous sections will likely be necessary. An important consideration with the design and construction of pavements is surface and subsurface drainage. Where standing water develops, either on the pavement surface or within the base course layer, softening of the subgrade and other problems related to the deterioration of the pavement can be expected. Furthermore, good drainage should minimize the possibility of the subgrade materials becoming saturated over a long period of time. A French drain should be installed near station 1+25 to help drain the area during and after construction. Large, front-loading trash dumpsters frequently impose concentrated front-wheel loads on pavements during loading. This type of loading typically results in rutting of the pavement and ultimately pavement failures. We recommend that the pavement in trash pickup areas consist of an 8-inch thick concrete slab. The slab should be sized to accommodate both the dumpster and the entire truck. We recommend performing one field density test for every 10,000 square feet of ABC stone placed in pavement areas to verify compaction. The testing should be performed using the Nuclear Method (ASTM D-2922) with direct transmission using a probe depth equal to the thickness of the stone layer. After density testing and prior to placement of the asphalt concrete, the surface of the stone base course should be proofrolled. Unstable areas should be corrected prior to placement of asphalt concrete. We recommend continuous monitoring of asphalt concrete placement and compaction by an engineering technician. The temperature of the asphalt concrete should be checked prior to Creekside Park Entrance Archdale, North Carolina ECS Project No 09.18050 January 7, 2010 spreading. The thickness and percent compaction of the asphalt concrete should be checked by obtaining 6" diameter cores of the compacted asphalt. We recommend obtaining one core for every 10,000 square feet of asphalt placed per lift, with at least three cores per lift of asphalt concrete material per day. Each core should be tested to determine the bulk specific gravity (BSG) according to AASHTO T-166, and the percent compaction should be computed based on comparison of the BSG to the Rice specific gravity of the material determined by AASHTO T-209 at the asphalt plant. Creekside Park Entrance Archdale, North Carolina ECS Project No 09.18050 January 7, 2010 APPENDICES Appendix A - Exploration Results Appendix B - Exploration Procedures Appendix C - Prolect Description Appendix D - Report Qualifications Appendix IE - Illustrations Site Location Map Boring Location Plan Generalized Subsurface Profile Legend Sheet and Unified Soil Classification System Soil Test Boring Logs Appendix F - LaboratoryTeet Results Moisture Density Relationship Curve Creekside Park Entrance Archdale, North Carolina ECS Project No 09.18050 January 7, 2010 APPENDIX A -EXPLORATION RESULTS Site Conditions The site is currently an open field with a gravel parking area. Wet areas were observed across the northwestern portion of the site. A fill slope is located on the northern central portion of the site. A baseball field is located immediately east of the site. Site grades generally slope from the southeast down to the northwest with approximate 20 feet of elevation difference. We did observe evidence of prior grading at the site. Regional Geoloav The site is located in the Piedmont Physiographic province of North Carolina. The Piedmont extends generally from Alabama to southern Pennsylvania and extends from the Valley and Ridge province in the west to the Coastal Plain province to the east. The soils in the Piedmont were formed by in-place weathering of parent rock and are termed residual soils (or saprolite). The typical residual profile consists of a clayey near surface horizon, where weathering is most severe, transitioning to silts and sands with increasing depth. The materials transition to partially weathered rock (PWR), which is designated for geotechnical engineering' purposes as residual material with a Standard Penetration Test resistance in excess of 100 blows per foot. The degree of weathering typically decreases with depth until solid bedrock is encountered. Clue to differential weathering along seams and less resistant materials, it is not uncommon to encounter seams and layers of harder materials within partially weathered rock. A review of the Geologic Map of North Carolina (1985) indicates the site is underlain by metamorphosed granitic rock of the Charlotte Belt. It is important to note that the natural geology within portions of the site may have been modified in the past by the placement of fill materials. The quality of man-made fills can vary significantly, and it is often difficult to assess the engineering properties of existing fills. Furthermore, there is no specific correlation between N-values from the standard penetration test and the degree of compaction of existing fill soils; however, a qualitative assessment of existing fills can sometimes be made based on the N-values obtained and observations of the materials sampled in the test borings. Soil Conditions The borings typically encountered topsoil and fill underlain by disturbed residual, undisturbed residual soils and partially weathered rock derived from the in-place weathering of parent rock. Hard, unweathered rock was not encountered by the borings. The encountered conditions are summarized on the Generalized Subsurface Profile in Appendix E. Additional information is provided on the soil boring logs in Appendix E. The fill soils generally consisted of very loose to medium dense, wet, fine to medium sand with traces of clay, silt, and gravel. Fill depths ranged from 3 to 5 feet below existing ground Standard Penetration Test values within the fill ranged from 2 to 13 blows per foot. We consider the encountered fill to be variably compacted based on these SPT values. We did not find evidence of debris, trash, or excessive fibrous organic materials within the fill. Creekside Park Entrance Archdale, North Carolina ECS Project No 09.18050 January 7, 2010 The undisturbed residual soils generally consisted of very loose to very dense, moist to wet, fine to coarse sand with trace clay and some lenses of stiff clay or silt. The residual soils typically had SPT resistance values ranging from 1 to 75 blows per foot. Partially weathered rock was encountered in soil boring B-8 and B-9 at depths of 6.5 feet and 9.5 feet, respectively. Auger refusal materials were not encountered by the borings. Groundwater Conditions Groundwater was encountered within approximately 2 to 3 feet of existing site grades in the northwest portion of the site. Groundwater was not encountered in the remainder of the borings. In our opinion, groundwater would be encountered in deeper excavations in the northwest portion of the site. The borings caved-in at depths of 3 to 5 feet below existing grades. In this geology, the cave-in depth of a boring is often an indication of the stabilized water level although the water level may be a few feet below the cave-in depth and therefore cannot be directly observed. In general, shallow unconfined groundwater movement within the soils overlying bedrock is controlled largely by topographic gradients. Movement in this water table is generally from higher to lower elevations. Recharge occurs primarily by infiltration along higher elevations and typically discharges into streams or other surface water bodies. The elevation of the shallow water table is transient and can vary greatly with seasonal fluctuations in precipitation, surface water runoff, and other factors. Normally, the highest groundwater levels occur in the late winter and spring and the lowest groundwater levels occur in the late summer and fall. 10 Creekside Park Entrance Archdale, North Carolina ECS Project No 09.18050 January 7, 2010 APPENDIX B - EXPLORATION PROCEDURES Soil Test Borinas Ten soil test borings, denoted B-1 through B-10, were performed on December 7, 2009 at the approximate locations shown on the Boring Location Plan in Appendix E. The boring locations were selected by ECS and were staked in the field by measuring from existing site features. Boring elevations were interpolated from topographic contours shown on the site plan provided by Jamestown Engineering. Drilling was performed by a Simco 2400 track-mounted drill rig using continuous-flight hollow stem augers. Soil samples were obtained by means of the split-barrel sampling procedures in accordance with ASTM Specification D-1586. In the split-barrel sampling procedure, a 2- inch O.D., split-barrel sampler is driven into the soil a distance of 18 inches by means of a 140-pound hammer falling 30 inches. The number of blows required to drive the sampler through a 12-inch interval is termed the Standard Penetration Test (SPT) value and is indicated for each sample on the boring logs. This value can be used to provide a qualitative indication of the in-place relative density of cohesionless soils. In a less reliable way, it also indicates the consistency of cohesive soils. This indication is qualitative, since many factors can significantly affect the SPT value and prevent a direct correlation between drill crews, drill rigs, drilling procedures, and hammer-rod-sampler assemblies. Representative portions of each SPT sample were sealed in airtight containers and returned to our laboratory for classification, testing, and storage. The soil samples were visually classified in general accordance with the Unified Soil Classification System (USCS). The basic elements of the USCS are described on a legend sheet attached in Appendix E and in ASTM D2487. Additional information from each soil boring is provided on the individual soil test boring logs in Appendix E. Laboratory Testing Program Selected SPT samples from borings B-5, B-9 and B-10 were tested for natural moisture content in accordance with ASTM D2216. Results are indicated on the individual boring logs in Appendix E. 11 Creekside Park Entrance Archdale, North Carolina ECS Project No 09.18050 January 7, 2010 APPENDIX C - (PROJECT DESCRIPTION The project consists of the construction of a new entrance to the park. The park is located on Highway 311 just west of Mose Road in Archdale, North Carolina. The entrance will consist of an asphalt paved road. Cuts and fills on the order of '3 to 5 feet are anticipated. A parking lot will also be constructed on the east side of the entrana: road. Project information was provided by Mr. Dan Pritchett, P.E. of Jamestown Engineering and a visit to the site. 12 Creekside Park Entrance Archdale, North Carolina ECS Project No 09.18050 January 7, 2010 APPENDIX D - REPORT QUALIFICATIONS This report has been prepared in order to aid in the evaluation of this site and to assist the Owner and Engineer in the feasibility study of the project. The report scope is limited to the specific project and location described, and the project description represents our understanding of the significant aspects relevant to soil and foundation characteristics. The recommendations in this report have been developed using generalized subsurface conditions based on the soil test borings performed. Subsurface conditions can vary laterally and with depth, and significantly different conditions may exist at locations between the borings. Conditions different from those: encountered by the borings and described in this report may require modifications to the geotechnical recommendations for the project. The recommendations in this report were developed based on assumptions made by ECS regarding the likely pavement loads for 'the facility and the likely site earthwork. While we believe our assumptions to be reasonable based on our experience with similar projects, it is possible that specific project information may lead us to alter or modify our recommendations. We strongly recommend that we be given an opportunity to review design and construction information related to the project as soon as it becomes available so we can assess whether additional exploration or analyses may be warranted. We recommend that the construction activities be monitored by a qualified geotechnical engineering firm to provide the necessary overview and to check the suitability of the subgrade soils -for support of slabs, pavements, and footings. We would be pleased to provide these services. 13 Creekside Park Entrance Archdale, North Carolina ECS Project No 09.18050 January 7, 2010 APPEND - ILLUSTRATIONS 14 I y. Ran, AQlA ch G t J C . e ? r? ,/ ? ?? • ? lid' r ? ..rl., ` r` ? T •r '.?t. aGwM'xcc,.?,'l ??? r_.BM f • ?' , 7,60 -./! 1' , ? ?:?\? ?\•?i + ` Ivy` \? ir • 7 •. 11 ?J1 (r! 'File?felJai SCALE (IN 1000 2000 FIGURE 1 2000 0 SITE LOCATION MAP REFERENCE: CREEKSIDE PARK ENTRANCE USGS TOPOGRAPHIC MAP ARCHDALE, NORTH CAROLINA HIGH POINT EAST, NC QUADRANGLE CAROLINAS ECS PROJECT 09.18050 DATED 1950 PN0TnuPvrc?+n , nom a MCI 16 V) Q N W WW Ca o 0 G, W z W 0 CL _ Q a 0. A Ilk W 6 t ! a3aa co wL) ' ?/ N d a z oaa?e??4$a???94l? s d???p6 C)04 x s ?i ? C I t+ t le i e i iI a tI a i e M! k t 9i ? w pq zr4 L) U In u ELEVATION, FT. O O O O rn ao r- co m N A I' - EI: N IWO u ~ 1 C• A wl ?y ? X O Izl r; n ...NU14? ° ? ?q z I - 4? x o . ? w ro ?ti o (? A a I Ic1 W I W ? O O OG p 4 or, z II I o x W m Ole A n ra d A v O n. W ?0u? co 20 ao N •r A A z w I? O W p,U U O ,V I - V1 Vl Vl ? u W W I DWI \ O t? "I n IN f?? W OI 00 r` r- r'. 1A 'NOLLVAYIH REFERI°_NCE NOTES FOR BORING LOGS Drilling Sampling Symbols SS Split Spoon Sampler ST Shelby Tube Sampler RC Rock Core, NX, BX, AX PM Pressuremeter DC Dutch Cone Penetrometer RD Rock Bit Drilling BS Bulk Sample of Cuttings PA Power Auger (no sample) HSA Hollow Stem Auger WS Wash sample REC Rock Sample Recovery % ROD Rock Quality Designation % II. Correlation of Penetration Resistances to Soil Properties Standard Penetration (blows/ft) refers to the blows per foot of a 140 lb. hammer falling 30 inches on a 2-inch OD split-spoon sampler, as specified in ASTM D 1586. The blow count is commonly referred to as the N-value. A. Non-Cohesive Solis (Silt, Sand, Gravel and Combinations) Density Relative Properties Under 4 blows/ft Very Loose Adjective Form 12% to 49% 5 to 10 blows/ft Loose With 5% to 12% 11 to 30 blows/ft Medium Dense 31 to 50 blows/ft Dense Over 51 blows/ft Very Dense Particle Size Identification Boulders 8 inches or larger Cobbles 3 to 8 inches Gravel Coarse 1 to 3 inches Medium % to 1 inch Fine X to % inch Sand Coarse 2.00 mm to Y4 inch (dia. of lead pencil) Medium 0.42 to 2.00 mm (dia. of broom straw) Fine 0.074 to 0.42 mm (dia. of human hair) Silt and Clay 0.0 to 0.074 mm articles cannot be seen B. Cohesive Soils (Clay, Silt, and Combinations) Unconfined BlowslIt Consistency Comp. Strength Degree of Plasticity p Ost) Q P Plasticity Index 2 Very Soft Under 0.25 None to slight 0-4 3 to 4 Soft 0.25-0.49 Slight 5-7 5 to 8 Medium Stiff 0.50-0.99 Medium 8-22 9 to 15 Stiff 1.00-1.99 High to Very High Over 22 16 to 30 Very Stiff 2.00-3.00 31 to 50 Hard 4.00-5.00 Over 51 Ve Hard Over 8.00 Water Level Measurement Symbols WL Water Level BCR Before Casing Removal DCI Dry Cave-In WS While Sampling ACR After Casing Removal WCI Wet Cave-In WD While Drilling V Est. Groundwater Level a Est. Seasonal High GWT The water levels are those levels actually measured in the borehole at the times indicated by the symbol. The measurements are relatively reliable when augering, without adding fluids, in a granular soil. In clay and plastic silts, the accurate determination of water levels may require several days for the water level to stabilize. In such cases, additional methods of measurement are generally applied. CLIENT JOB # BORING N SHEET CITY OF ARCHDALE 09.18050 B--1 1 of 1 E E PROJECT NAME ARCHITECT-ENGINEER M LLP CREEKSIDE PARK ENTRANCE JAMESTOWN ENGINE ERING CAROLINAS SITE LOCATION -¢ CALIBRATED PEN9OKETER ARCHDALE, NORTH CAROLINA 1 2 TON99FT. 4 5+ PLASTIC WATER LIQUID LO¢T X CONTENT X LDa'f X a - DESCRIPTION OF MATERIAL ENGLISH UNITS ---- ---° R C ° w O K QUALITY DESIGNATION & RECOVERY R z BOTTOM OF CASING W- LASS OF CIRCULATION 100 o QD%-- - - REC.% s 20%-4O%-6OX-8OX-100%- - SURFACE ELEVATION STANDARD PENETRATION ® I 766.5 ? s BLOWS/FT to . 10 20 30 40 60+ 1 SS 18 16 TOPSOIL DEPTH 1" 4 2 SS 18 4 RESIDUAL: Yellowish Tan to 765 Orangish Brown and Gray, Clayey 7 Fine to Medium SAND, Wet, Very 5 3 SS 18 14 Loose to Loose, (SC) 2 Gray, Medium SAND, Trace Gravel, Clay and Roots, Saturated, Very Loose, (SP) 760 END OF BORING CP 5.0' 1 755 1 750 2 7 7 3 THE STRATIFICATION LPES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN-SITU THE TRANSITION MAY BE GRADUAL 5 Y In 3.0' WS OR ® BORING STARTED 12 - 0 7 - 09 TRL(BCR) TWgACR) - BoRDtc coIIPLLRED 12-07-09 CAVE I DEPTH • 2.9' - .. .?.........?? W...... "L 2.7' 0 EOD RIG SIM 2400DI? PRESLEY DRII].ING WITIOD HSA IE T JOB BORING CL N # # SHEET CITY OF ARCHDALE 09.18050 B-2 1 OF 1 F04 PROJECT NAME ARCI..MCT-ENGINEER QLLP CREEKSIDE PARK ENTRANCE JAMf-STOWN ENGINE ERING CAROLINAS SITE LOCATION -O- CAL MRATED PENETROMETER TON3 Irf ARCHDALE, NORTH CAROLINA 3 L 2 4 5+ PLASTIC RATER LIQUID Lam X CONTENT X L UT X v w DESCRIPTION OF MATERIAL ENGLISH UNITS 9 .. ROCK QUALITY DESTGNATTON k RECOVERY z Q BOTTOM OF CASING &- LOSS OF CIRCULATION 100% z ROD%- -- REC.% 20%-409-60X-BOX-100% a SURFACE ELEVATION ® STANDARD PENETRATION 767.0 s w BLABS/Fr. 10 20 30 40 50+ 1 SS 18 14 TOPSOIL DEPTH 2" 2 POSSIBLE RESIDUAL: Grayish Dark 76 2 SS 18 5 Tan, Fine to Medium SAND, Trace 1 Coarse Sand Clay and Roots 3 SS 18 0 , , Wet, Very Loose, (SP) 5 POSSIBLE RESIDUAL: Grayish Dark Tan, Clayey Fine to Medium SAND, Trace Roots, Saturated, 760 Very Loose, (SC) Dark Tan, Fine to Medium SAND, With Clay, Saturated, Loose, 1 (SC) END OF BORING @ 5.0' 755 15 750 20- -745 25- -740 30 - - THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN-SITU THE TRMSITION MAY BE GRADUAL 7RL 2.5' Rs oR ® BORING STARTEI) 12-07-09 T RL(BCR) : f WgACR) BORING COMPLETED '12-07-09 CAVE IN DRI TA • 2.8' TRL 1.9' 0 EOD RIG SIM 240CORMM PRESLEY DRUIMG IMMOD HSA s 4 s CLIENT JOB ;F BORING N SHEET CITY OF ARCHDALE 09.18050 B-3 1 OF 1 Ec PROJECT NAME ARCHITECT-ENGINEER q LLP CREEKSIDE P ARK ENTRANCE JAMESTOWN ENGINE ERING CAf20LINAS SITE LOCATION -0 CALIBRATED PENETROMETER ARCHDALE NORTH CAROLINA TONS/Ff. , 1 2 4 5+ PLASTIC WATER LIQUID LWT X CONTENT X LOST X _ S ? DESCRIPTION OF MATERIAL. ENGLISH UNITS 23 ? x --------- n - ° w ROCK QUALITY DESIGNAn TION k RECOVERY z BOTTOM OF CASING W LASS OF CIRCULATION 100 c ROD%- - - REC.X 20%-40X- 60X-BOX-100%- SURFACE ELEVATION 775 4 ® STANDARD PENETRATION . BLOWS/FT, 0 10 20 30 40 50+ 1 SS 18 14 TOPSOIL DEPTH 2" 3. 2 SS 18 18 DISTURBED RESIDUAL: Brown, Fine to Medium SAND, With Roots, e Trace Clay, Wei, Very Loose, 3 SS 18 18 (SC) 12 5 POSSIBLE RESIDUAL: Orangish 770 Brown, Cla ey Fine SAND, Wet, 4 SS 18 18 Loose, (SC? 11 Orangish and Grayish Brown, Silty Fine SAND„ Moist, (Medium 1 Dense, (SM) 765 END OF BORING ® 7.5' 1 2 2 3 76 755 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY L11ES BETWEEN SOIL TYPES IN-SITU THE TRANSITION MAY BE GRADUAL Y Y WL DRY 1•S OR ® BORING STARTED 12-07-09 Y V UBCR) TW14ACR) BORING COMPLETED 12 - 0 7 - 0 9 cAVS Df DEPTH • 4.9' YWL DRY 0 EOD RIG SIM 2400DRMN PRESLEY DRILIING METHOD HSA CLIENT JOB # BORING # SHEET CITY OF ARCHDALE 091.18050 B-4 1 OF 1 PROJECT NAME ARCHITECT-ENGINEER ETLLP CREEKSIDE PARK ENTRANCE JAMESTOWN ENGINEERING CAROLINAS SITE LOCATION -0- CALIBRATED Pwwmour m ARCHDALE, NORTH CAROLINA 1 2 TONS3PT. 4 6+ PLASTIC 1/ATER LIQUID Lum X CONTENT X LIMIT X W 0 5 1 1 2 3 1 SS 18 13 TOPSOIL DEPTH 4" DESCRIPTION OF MATERIAL. ENGLISH UNITS pwp. ROCK QUALITY DESIGNATION k RECOVERY °z F BOTTOM OF CASING &- LASS OF CIRCULATION 100 o RODX- - - REC.X m 20X-40X-60Xr-80X-100X- MW UTI 1 SURFACE ELEVATION 774.0 k ® STAND BBIDWS/I/FT. ON 10 20 30 40 60+ 2 SS 18 18 FILL: Dark Brown, Silty Fine to Medium SAND, With Roots, Trace Rock and Coarse Sand Moist 3 SS 18 18 , , Loose, (FILL) FILL: Grayish Dark Tan, Fine 4 SS 18 18 T, Moist, Firm;, (FILL) Dark T d C an an ray, y SILT, Moist, Very r Fine to Coarse SAND, Dry,Very Dense, (SW) END OF BORING ®, 7.5' 76 76 7 7 p THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETVEEN SOIL TYPES IM-SITU THE TRANSITION MAY BE GRADUAL 7 wL DRY WS OR ® BORING STARTED 12-07-09 III (BCR>nL(ACSI) BOLIIbIC coupIEreD 12-07-09 CAVES IN DEP77I • 4.7' DRY 0 EOD RIG SIM 240VRum PRESLEY DRLLIasc ?rIIOD HSq 75 CLIENT JOB BORING # SHEET CITY OF ARCHDALE 09.18050 B-5 1 OF 1 PROJECT NAME ARCIiITECT-ENGINEER ECT CREEKSIDE PARK ENTRANCE JAMESTOWN ENGINEERING CAROLINAS SITE LOCATION -L} CALIBRATED PMMMOMETER ARCHDALE, NORTH CAROLINA I E Toxs3 T. 4 5+ PLASTIC WATER LIQUID LD[1T X CONTENT X LDaT X 0 5 i 1 2 2 a DESCRIPTION OF MATI'sRIAL ENGLISH UNITS ROCK QUALITY DESIGNATION k RECOVERY z BOTTOM OF CASING LASS OF CIRCULATION t00x 9 o RODX- -- - REC.X 00 20%-40%-60%-80%-100X- SURFACE ELEVATION 780.0 k ® STANDARD BLOWS/IRATION 9 PT. 07 10 20 30 40 50+ 1 SS 18 15 TOPSOIL DEPTH 2" 2 SS 18 18 FILL: Gray and Ton, Clayey Medium SAND, With Coarse Sand 3 SS 18 18 and Rock Fragments, Trace Roots, Wet, Very Loose, (FILL) FILL: Grayish Tan, Fine to 4 SS 18 18 Medium SAND, Trace Clay, Moist, Medium Dense, (FILL) RESIDUAL: Grayish Tan and 5 SS 18 18 Greenish Gray, Silty Fine SAND, Trace Rock Fragments, Moist, Dense to Medium Dense„ (SM) Orangish Brown„ Fine to Coarse SAND, Moist, Very Dense, (SW) END OF BORING ® 10.0' 2 14.9 2 28;7 3 775 8.1 5 3 54 76 76 0 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN-SITU THE TRANSITION MAY BE GRADUAL Y 7 WL DRY WS OR (D BOBWG STARTED 12-07-09 Y ) TWI.(ACR) soRDTa CovrPLv= 12-07-09 CAVe Di D10'TH W 7.2' Y AWL DRY ® EOD RIG SIM 2400DRE WAN PRESLEY DRILLING 'MOD HSA CLIENT JOB BORING # SHEET CITY OF ARCHDALE 09.18050 B-6 1 OF 1 PROJECT NAME ARMITECT-ENGINEER UCLLP CREEKSIDE PARK ENTRANCE JAMESTOWN ENGINEERING C^Mcm- ^a SITE LOCATION -O- CALIBRATED PENETtI010;'PER ARCHDALE, NORTH CAROLINA 1 2 T0N93 ' 4 6+ PLASTIC WATER LIQUID LIMIT X CONTENT X I= x _ DESCRIPTION OF MATERIAL ENGLISH UNITS ROCK QUALITY DESIGNATION h RECOVERY z Q BOTTOM OF CASING LASS OF CIRCULATION 100X F ROOX- - - REC.X ry 20%-40X-607--80X-?-100X- _ SURFACE ELEVATION 1 7 78 0 10'. STANDARD PENETRATION BLO 0 . WS/rr. 10 20 30 40 60+ TOPSOIL DEPTH 2" 1 SS 18 18 5 1 2 SS 18 18 DISTURBED RESIDUAL: Dark Brown, Fine to Medium SAND, 'rracIS 5 Gravel and Clay, Wet, Very 775 3 SS 16 17 Loose, (SP) 14 RESIDUAL: Orangish Tan, Clayey Fine to Medium SAND, Wet, 4 SS 18 16 Loose, (SC) 1e Orangish Tan, Fine to Coarse 770 SAND, With Clay, Moist, Medium Dense, (SC) END OF BORING ®, 7.5' 76 1 20 75 25 5 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN-SITU THE TRANSITION MAY BE GRADUAL Y Y? DRY WS OR ® BORING 8IARTED 12-07-09 ?(B?) ,Tl(AcR> BORING curo?LSm 12-07-09 CAVE IN DEPTH . 4.7' DRY 0 EOD ?G SIM 2400 DRI + PRESLEY D>DI.IaVG 1[EItIOD HsA CLIENT JOB 1F BORING # SHEET CITY OF ARCHDALE 09„18050 B-7 1 OF 1 E M PROJECT NAME ARCFRTECP-ENGINEER c q LLP CREEKSIDE PARK ENTRANCE JAME STOWN ENGINE ERING _ CAROLINA$ SITE LOCATION -O- CALIBRATED PpmMOKETER ARCHDALE, NORTH CAROLINA 70N3/"' L 2 3 4 b+ PLASTIC WATER LIQUID LIKTr X CONTENT X MaT X _ _ DESCRIPTION OF MATERIAL ENGLISH UNITS ----------- ? v ROCK QUALITY DESIGNATION & RECOVERY BOTTOM OF CASING W-- LOSS OF CIRCULATION 100 o RQDX- - - REC.X 20X-40%-60Xr--80%-100X- _ SURFACE ELEVATION m - 782 0 s ® STANDARD PENETRATION 0 . LBW"/FT. 10 20 30 40 50+ 1 SS 18 18 TOPSOIL DEPTH 2" 4 2 SS 18 18 FILL: Dark Brown, Fine to 780 Medium SAND, With Roofs, Trace 8 Rock and Clay, Wet, Very Loose 3 SS 1B 18 to Loose, (FILL) 5 10 POSSIBLE RESIDUAL: Grayish Tan, CLAY, Wet, Stiff, (CH) 4 SS 18 18 RE SID UA L: Orangish Tan, Fine to 775 19 A oarse SAND, Trace Clay, Moist, e dium Dense, (SC) 1 END OF BORING ® 7.5' 7 1 76 20 76 7 3 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES M-SITU THE TRANSITION MAY BE GRADUAL Y1rL DRY Ws OR ® BORING FT?ARTED -07-09 WId?R> ?;WL (OCR) 13 W - cor?I.aTED - 0 7 - 0 9 cAVa IN DL?TII • 4.7' El A X12 DRY ® EOD RIO SIM 2400DREum PRESLEY DRILLING KMOD HSA CLIENT JOB 11 BORING # _ SHEET CITY OF ARCHDALE 09„18050 B-8 1 OF 1 offom M PROJECT NAME ARCHITECT-ENGINEER LLP CREEKSIDE PARK ENTR NC A E JA,MESTOWN ENGINE ERING CAROLINAS SITE LOCATION -0- CALIBRA PEN OMLTER ARCHDALE NORTH CAROLINA TONS1r , 1 2 s 4 5+ PLASTIC WATER LIQUID LWT % CONTENT X LDaT X -? b DESCRIPTION OF MATERIAL ENGLISH UNITS ROCK QUALITY DESIGNATION k RECOVERY x ? BOTTOM OF CASING W LASS OF CIRCULATION too x 0 P RQDX-- - - REC.% 20X-40%-60X-80X-100X- ° ? SURFACE ELEVATION e ® STANDARD PENETRATION 781.0 s ? BLOWS/FT 0 . 10 20 90 40 60+ 1 SS 18 18 TOPSOIL DEPTH 2° 780 2 SS 18 18 RESIDUAL: Orangish Tan„ Fine to Coarse SAND, Trace Clay and 55 55 Roots, Moist, Medium Dense, 3 SS 18 16 (SC) 'r! 31 5- - _ Brownish Tan, Fine to ' 4 SS 12 9 Coarse SAND, Moist, Very Dense 775 to Dense (SW) , PARTIALLY WEATHERED ROCK: Orangish Ton, Fine to Coarse 1 SAND, With Gravel, Dry, (WR) END OF BORING ® 7.0' 770 1 76 2 760 2 7 30-F -L -I- THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN-SITU THE TRANSITION MAY BE GRADUAL Y WL DRY RS OR (0, BORING STARTED 12-07-09 lIL(BCR) ]EOD ?L(ACR) BORIING COMPLETED _1 2 - 0 7 - 0 9 CA VS IN DEI"TH • 4.8' TWL DRY ® RIC SIM 240 PRESLEY DRatnvc YEffIOD HSA CLIENT JOB # BORING # SHEET CITY OF ARCHDALE 09.18050 B-9 1 OF 1 PROJECT NAME ARCBIITECT-ENGINEER ECTLLP CREEKSIDE PARK ENTRANCE JAMESTOWN ENGINEERING CAFZOLIf4^0 SITE LOCATION -0- CALIBRATED PEZ"FT 0Nr= ARCHDALE, NORTH CAROLINA 1 2 70NS3I? 4 6+ PLASTIC WATER LIQUID LWT X CONTENT X LIMIT X X ------ 0 5 1 1 20 DESCRIPTION OF MATERIAL ENGLISH UNITS £ -t G w v ROCK QUALITY DESIGNATION & RECOVERY x BOTTOM OF CASING LOSS OF CIRCULATION 100 RQDX- - - REC.% y? < 20X-40X-60%-80X-10O%- SURFACE ELEVATION 785.0 = ® STAND BW PENETRATION o? -- 1 SS 18 18 TOPSOIL DEPTH 3" 2 SS 18 18 FILLi Dark, Brown, Fine to Medum SND, With Roots, Trace Gravel Fragmenis Moist Loos 3 SS 18 18 , , e, (FILL) POSSIBLE FILL: Tan, Clayey Fine 4 SS 18 18 to Medium SAND, Wet, Loose, (Possible Fill) . RESIDUAL: Tan, Fine to Coarse 5 SS 17 17 SAND, Dry, Dense to Very Dense, (SW) PARTIALLY WEATHERED ROCK: Tan, Fine to Coarse SAND, Dry, (WR) END OF BORING @ 10.0' 7 76 10 20 90 40 7• 14.6 • 6.8 45 52 S THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARV LINES BETVEEN SOIL TYPES IN-SITU THE TRANSITION MAY BE GRADUAL Y YwL DRY W$ 00R ® BOMMG STARTED 12-07-09 TWI4BCR) :TWgjA:CR) BORING COIQ?LLR® 12-07- 09 cAVt DV asPTx • 6.7' T? DRY ® EOD PJG SIM 240QpPj? PRESLEY a&uIING 10STI;OD NSA CLIENT JOB 10 BORING # SHEET CITY OF ARCHDALE 09„18050 B-10 1 OF 1 PROJECT NAME ARC19TECT-ENGINEER WLLP CR SI EEK DE PARK ENTRANCE JAMESTOWN ENGINE ERING CAROLINAS SITE LOCATION -0- CALIBRATED 1'ENE90METER ARCHDALE, NORTH CAROLINA 1 z TDNS3>-I 4 6+ PLASTIC MATER LIQUID LWT X CONTENT X LWT X X *-_______ 0 i5 DESCRIPTION OF MATERIAL ENGLISH ? .. ROCK QUALITY DESIGNATION k RECOVERY R x BOTTOM OF CASING W- LASS OF CIRCULATION q100 c OD%- - - REC.X 20X-4OX-60%-80X-100%- a SURFACE ELEVATION 785.0 tq F3 ® STANDAM PENETRATION 0 IO 20 30 40 50+ 1 SS 18 18 TOPSOIL DEPTH 2" e 2 SS 18 16 F ILL: Tannish Brown, Fine to V edium SAND, With Clay, Wet, 10 • oos , (FILL) e 19:3 5 3 SS 18 9 FILL: Dark Tan, Fine to Medium 13 • SAND, With Rock Fragments, 780 22.9 Trace Clay, Wet, Loose, (FILL) 4 SS 18 18 RESIDUAL: Oran ish T Fi t 2 . g an„ ne o Coarse SAND, Dry, Medium Dense ?!i 5 SS 16 17 to Very Dense, (SW) 1 ;1.. 53 775 END OF BORING ® 10.0' 15-j 1 1 1 1 F- 7 76 25-1 1 1 1 1 F-76 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES IN-SITU THE TRANSITION MAY BE GRADUAL DRY ns OR ® BORING SrARM 12-07-09 7 WgBCR) TWUACR) BORING COHPLETBD 12-07-09 Cave IN DEI m • 7.3' Y T*L DRY 0 EOD RIG Sim 24001 PRESLEY DRIII.fNG =MOD HSA