Loading...
HomeMy WebLinkAboutSW8140211_Historical File_20140306WNW North Carolina Department of Environment and Natural Resources Division of Energy, Mineral, and Land Resources Stormwater Section Tracy E. Davis, PE, CPM Pat McCrory, Govemor Director John E. % aria, III, Secretary March 6, 2014 D. Logan, Member Manager Sel Property Investors, LL,C 310 North Front Street, Suite 200 Wilmington, NC 28401 Subject: State Stormwater Management Permit No. SW8 140211 Helms Port High Density Subdivision infiltration Basin Project New Hanover County Dear Mr. Logan: The Wilmington Regional Office received a complete, Stormwater Management Permit Application for Helms Port on February 28, 2014. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2008-211: We are forwarding Permit No. SW8 140211, dated March 6, 2014, for the construction, operation and maintenance of the BMP's and built -upon. areas associated with the subject project. This permit shall be effective from the date of issuance until March 6, 2022, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center; Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be firiai and binding. If you have any questions, or need additional information concerning this matter, please contact Chris Baker in the Wilmington Regional Office, at (910) 796-7215. Sin rely, 1. Z�61L(w � Tracy Davis, P. Director Division of Energy, Mineral and Land Resources GDS/csb: G:1WQS\StormwaterlPermits & Projects120141140211 HD12014 02 permit 140211 cc: Timothy Clinkscales, P. E., Paramounte Engineering, Inc. New Hanover County Inspections New Hanover Count Engineering Division of Coastal Management Wilmington Regional Office Stormwater File Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 Phone: (910) 796-7215 / Fax: (910) 350-2004 State Stormwater Management Systems Permit No. SW8 140211 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY SUBDIVISION INFILTRATION BASIN DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Sol Property Investors, LLC Helms Port 100 Aqua Vista Drive, Wilmington, New Hanover County FOR THE construction, operation and maintenance of an infiltration basin, seven (7) infiltration trenches and two (2) wet detention ponds in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter jointly and individually referred to as the "stonnwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division and considered a part of this permit. This permit shall be effective from the date of issuance until March 6, 2022 and shall be subject to the following specified conditions and limitations: 1. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.8 of this permit. The subdivision is permitted for 159 lots, each allowed a maximum amount of built -upon area as listed in Section 11.10 of this permit. 3. The total maximum amount of built -upon allowed for this project is 1,247,556 square feet, as listed in the application documents. 4. The excess design storm overflow from the infiltration basin must be directed into a 50' vegetated filter strip and level spreader, designed per Section .1008 (0 of the stormwater rules. 5. All stormwater collection and treatment systems must be located in either public rights -of -way or dedicated common areas or recorded drainage easements. The final plats for the project will be recorded showing all such required rights -of -way, common areas and easements, in accordance with the approved plans. 6. The project shall provide and maintain a 50-foot-wide buffer adjacent all surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers, and the mean high water line of tidal waters. Page 2 of 10 State Stormwater Management Systems Permit No. SW8 140211 7. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 8. The following design elements have been approved for this stormwater facility which includes two (2) wet detention ponds, one (1) infiltration basin and seven (7) infiltration trenches, and must be provided in the system at all times. Wet Detention Pond Table DA-1 DA-2 a. Drainage Area, acres: 32.2 22.0 Onsite, ft2: 1,402,632 958,320 Offsite, ft2 N/A N/A b. Total Impervious Surfaces, ft2: 611,147 457,380 Onsite, ft2: 611,147 457,380 Offsite, ft2 N/A N/A c. Design Storm, inches: 3.85 3.85 d. Average Pond Design Depth, feet: 5.5 5 e. TSS removal efficiency: 90 90 f. Permanent Pool Elevation, FMSL: 20.0 19.0 g. Permanent Pool Surface Area, ft2: 97,422 43,252 h. Permitted Storage Volume, ft3: 157,795 80,532 L Temporary Storage Elevation, FMSL: 21.5 20.65 j. Controlling Orifice, in: 3.5 3.0 k. Orifice flowrate, cfs: 0.23 0.20 i. Permitted Forebay Volume, ft3: 97,554 36,949 m. Fountain Horsepower 2 1/2 n. Receiving Stream/River Basin: Masonboro Sound / Cape Fear o. Stream Index Number: 18-87-25 . t p. Classification of Water Body: SA;ORW Infiltration Basin Table DA-H a. Drainage Area, acres: 1.95 Onsite, ft2: 84,942 Offsite, ft2 N/A b. Total Impervious Surfaces, ft2: 53,579 Onsite, ft2: 53,579 Offsite, ft2 N/A C. Basin Depth, feet: 4.0 d. Design Storm, inches: 3.85 e. Bottom Elevation, FMSL: 5.0 f. Permitted Surface Area @Bottom, ft2: 3,723 g. Permitted Storage Volume, ft3: 12,312 h. Storage/Bypass Elevation, FMSL: 7.5 L Type of Soil: Course Fine Sand j. Expected Infiltration Rate, in/hr: 10 k. Time to Draw Down, hours: 3.6 I. Seasonal High Water Table, FMSL: 1.4 m. Receiving Stream/River Basin: Masonboro Sound / Cape Fear n. Stream Index Number: 18-87-25 o. Classification of Water Body: SA;ORW Page 3 of 10 State Stormwater Management Systems Permit No. SW8 140211 Infiltration Trenc a. Drainage Area, acres: Onsite, ft2: Offsite, ft2 b. Total Impervious Surfaces, ft2-. Onsite, ft2:: Offsite, ft2 C. Design Storm, inches: d. Trench Length, feet: e. Trench Width, feet: f. Trench Depth, feet: g. Bottom Elevation, FMSL: h. Bottom Surface Area, ft2: i. Bypass Weir Elevation, FMSL: j. Perforated Pipe Diameter, in.: k. Perforated Pipe Length, ft: I. Permitted Storage Volume, ft3: M. Type of Soil: n. Expected Infiltration Rate, in/hr: o. Seasonal High Water Table, FMSL: p. Time to Draw Down, hours: q. Receiving Stream/River Basin: r. Stream Index Number: S. Classification of Water Body: Infiltration Trend a. Drainage Area, acres: Onsite, ft2: Offsite, ft2 b. Total Impervious Surfaces, ft2' Onsite, ft2: Offsite, ft2 c. Design Storm, inches: d. Trench Length, feet: e. Trench Width, feet: f. Trench Depth, feet: g. Bottom Elevation, FMSL: h. Bottom Surface Area, ft2: i. Bypass Weir Elevation, FMSL: j. Perforated Pipe Diameter, in.: k. Perforated Pipe Length, ft: I. Permitted Storage Volume, ft3: m. Type of Soil: n. Expected Infiltration Rate, in/hr: o. Seasonal High Water Table, FMSL: p. Time to Draw Down, hours: q. Receiving Stream/River Basin: r. Stream Index Number: s. Classification of Water Body: h Table #1 DA-A DA-B DA-C DA-D 0.64 0.34 0.65 0.65 27,878 16,553 28,314 28,350 N/A N/A N/A N/A 13,504 9,147 13,068 17,859 13,504 9,147 13,068 17,859 N/A N/A N/A N/A 3.85 3.85 3.85 3.85 104 90 124 134 12 12 12 12 4.5 4.5 4.5 4.5 3.5 3.5 3.5 3.5 1,248 1,080 1,488 1,474 8.5 8.5 8.5 8.5 36 36 36 36 188 160 228 248 2,930 2,534 3,495 3,778 Fine Sand 10 10 10 10 1.4 1.4 1.4 1.4 2.6 2.9 2.4 Masonboro Sound / Cape Fear 18-87-25 , S SA;ORW h Table #2 DA-E DA-F DA-G 0.45 0.58 1.79 19,600 25,265 77,972 N/A N/A N/A 12,196 16,552 43,124 12,196 16,552 43,124 N/A N/A N/A 3.85 3.85 3.85 175 128 132 6.5 12 27.5 4.5 4.5 4.5 3.5 3.5 3.5 1,137.5 1,536 3,630 8.5 8.5 8.5 36 36 36 172 236 610 2,695 3,608 8,877 Fine Sand 10 10 10 1.4 1.4 1.4 2.6 2.9 2.9 Masonboro Sound / Cape Fear 18-87-25 SA;ORW Page 4 of 10 State Stormwater Management Systems Permit No. SW8 140211 II. SCHEDULE OF COMPLIANCE 1. The permittee shall not alter any aspect or any component of the approved stormwater drainage and collection system, or pipe any ditches or swales shown on the approved plans, except for a minimum driveway pipe, unless and until the permittee shall have submitted a modification to the permit and received approval from the Division. Additionally, the permittee shall not allow any homeowner, lot owner, builder or developer to alter any aspect or any component of the approved stormwater collection system or to pipe any ditches or swales shown on the approved plans, except for minimum driveway crossings, unless and until the permittee shall have submitted a revision to the permit and received approval from the Division. 2. The permittee shall routinely monitor the project to ensure that the proposed built -upon area for the entire project including lot BUA, streets, recreation facilities and sidewalks, does not exceed the permitted maximum allowable built - upon area. Where the permittee finds a noncompliance with the permit on an individual lot, the permittee shall notify the lot owner in writing, requiring remediation of the noncompliance within a reasonable time frame, and shall follow-up to ensure that the noncompliance has been resolved. 3. The permittee is responsible for approving and monitoring all driveway pipe installation on individual lots. The permittee shall assure that all piping shall be that minimum amount and diameter necessary to adequately pass the drainage underneath the driveway, while maintaining a 3:1 side slope. 4. The permittee shall not approve any lot plan where the permitted maximum BUA limit is exceeded, or where piping of ditches or swales is proposed, or where excessive driveway piping is proposed, without first submitting a permit modification and receiving approval from the Division. 5. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 6. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited tc, those listed below: a. Any revision to the approved plans, regardless of size. b. Redesign or addition to the approved amount of built -upon area. C. Further subdivision, acquisition, or sale of all or part of the project area. d. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. e. The construction of any future BUA listed on the application. 7. The Director may determine that other revisions to the project should require a modification to the permit. 8. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. Page 5 of 10 State Stormwater Management Systems Permit No. SW8 140211 9. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. Infiltration systems should not be used as erosion control devices, due to the potential clogging. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 10. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 140211, as issued by the Division under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division. f. For the maximum built -upon area per lot see table below: Lot Numbers Allowable Built -Upon -Area, square feet PH-1 to PH-53 4,500 ES-1 to ES-74, MV-1 to MV-10 6,500 WW-1 to WW-9, M-1 to M-13 4,000 This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. All affected lots shall provide a 50-foot-wide buffer adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers, and the mean high water line of tidal waters. h. Lots within CAMA's Area of Environmental Concern may be subject to a reduction in their allowable built -upon area due to CAMA regulations. i. All runoff on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that will naturally drain into the system are not required to provide these measures. j. Built -upon area in excess of the permitted amount will require a permit modification. k. Any individual or entity found to be in noncompliance with the provisions of a storrmwater management permit or the requirements of the Stormwater rules is subject to enforcement procedures as set forth in G.S. 143 Article 21. 11. Records of maintenance activities must be kept and made available upon -equest to authorized personnel cf DENHO. The recordsindict. a the date, activity, name of person performing the work and what actions were taken. Page 6 of 10 State Stormwater Management Systems Permit No. SW8 140211 12. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, the permittee shall cause a certification from an appropriate designer for the system installed, to be submitted, certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 13. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function as designed. The approved Operation and Maintenance Agreement must be followed in its entirety and maintenance must occur at the scheduled intervals listed in the O&M Agreement. 14. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. 15. Prior transfer of the permit, the stormwater facilities must be inspected by the Division and must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 16. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. III. GENERAL CONDITIONS 1. This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed Name/Ownership Change Form, accompanied by the supporting documentation as listed on the form, to the Division at least 60 days prior to any one or more of the following events: a. An ownership change including the sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions; b. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of Session Law 2011-256; c. Bankruptcy; d. Foreclosure; e. Dissolution of the partnership or corporate entity; f. A name change of the current permittee; g. A name change of the project; h. A mailing address change of the permittee; 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. 3. Any individual or entity found to be in noncompliance with the provisions of this storrmwater management permit or the requirements of the Stormwater Rules is subject to enforcement procedures as set forth in G.S. 143 Article 21. 4. Permanent seeding requirements for the stormwater ^ontrcl must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. Page 7 of 10 State Stormwater Management Systems Permit No. SW8 140211 5. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 6. In the event that the facilities fail to perform satisfactorily the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 7. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 8. The Permittee grants permission to staff of the DENR to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 9. Approved plans, supplement forms, O&M Agreements and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of this permit, the supplement forms, the Operation and Maintenance Agreements, and the approved plans and specifications shall be maintained on file by the Permittee at all times. 10. The permittee shall submit a permit renewal application at least 180 days prior to the expiration date of this permit. The renewal application shall include the required application, appropriate application fee and documentation. Permit issued this the 6th day of March, 2014. CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION racy DaNIS, N.E., Director ivision of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 8 of 10 State Stormwater Management Systems Permit No. SW8 140211 Helms Port Stormwater Permit No. SW8 140211 New Hanover Countv Designer's Certification Page 1 of 2 I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form are a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 9 of 10 State Stormwater Management Systems Permit No. SW8 140211 Certification Requirements: Page 2 of 2 The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 8. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the level spreader / vegetated filter strip. 15. The required dimensions Of the system; are provided, per the approved plan. cc: NCDENR-DEMLR Wilmington Regional Office New. Hanover County Building Inspections Page 10 of 10 DWQ USE ONLY Date Received Fee Paid Permit Number - s so ydzll Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Helms Port 2. Location of Project (street address): 100 Aqua Vista Drive City:Wilmington County:New Hanover Zip:28409 3. Directions to project (from nearest major intersection): lust north of Masonboro Harbour subdivision at the intersection of Aqua Vista Drive and Masonboro Harbor Road 4. Latitude:34° 08' 19" N Longitude:77' 52' 58" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification ❑ Renewal w/ Modificationt tRenewals with modifications also requires SMI--102 - Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* "provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ®LAMA Major ❑Sedimentation/Erosion Control: ac of Disturbed Are, ❑NPDES Industrial Stormwater E404/401 Permit: Proposed Impacts 1692 s .ft. . b.If any of these permits have already been acquired please provide the Project Name, P rs le"c�Perx�nilµdt er, issue date and the type of each permit: , k __ 5. Is the project located within 5 miles of a public airport? ®No ❑Yes If yes, see S.L. 2012-200, Part VI: http://portal.ncdenr.org/web/wq/ws/su/stategsw/rules laws Form SW,401 Version 06Aug2012 Page I of.6. III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/ Organization: Sel Property Investors. LLC Signing Official & Title:D Logan, Member Manager b. Contact information for person listed in item 1a above: Street Address:310 North Front Street, Suite 200 City:Wilmington State:NC Zip:28401 Mailing Address (if applicable): City: Phone: Email: dlogan@loganhomes.com State: Zip: Fax: c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b. Contact information for person listed in item 2a above: Street Address: City: Mailing Address (if applicable): City: Phone: ( 1 Email: State: Zip: State: Zip: Fax: ( 1 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & Title: b. Contact information for person listed in item 3a above: Mailing Address: City: State: Phone: ) Fax: Email: 4. Local jurisdiction for building permits: Point of Contact: Phone #: Fonn SWU401 Version 06Aug2012 Page 2 of 6 Zip: . IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater runoff will be conveyed via a storm sewer system to wet detention ponds with secondary treatments of infiltration basins for the upland portions The proper along the waterway will be conveyed via a storm sewer system and treated in underground infiltration trenches 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ® Ph II - Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area: 75.2 acres 5. Total Coastal Wetlands Area:1.2 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:74.0 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHM line or Mean High Water (MHM line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 46.7 % 9. How many drainage areas does the project have?9 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area _ Drainage Area _ Drainage Area Drainage Area Receiving Stream Name See Chart _ _ Stream Class * Stream Index Number Total Drainage Area (sf) On -site Drainage Area (so Off -site Drainage Area (so Proposed Impervious Area** s Impervious Area** total Impervious" Surface Area Drainage Area Drainage Area Drainage Area Drainage Area On -site Buildings/Lots (sf) _ On -site Streets (so On -site Parking (so On -site Sidewalks (so Other on -site (sf) Future (so Off -site (so Existing BUA*** (sf) Total (sf): Stream Class and Index Number can be determined at: http.aortal.ncdenr.org/web/wq/ps/csu/classifications Form SWU-101 Version 06Aug2012 Page,3 of 6' Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. 'Report only that amount of existing B i.IA that will remain after development. Do not report any existing B UA that is to be removed and which will be replaced by new B LIA, 11. How was the off -site impervious area listed above determined? Provide documentation. Proiects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that maybe subject to more stringent stormwater requirements as per 15A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from ht!p://portal.n.cdenr.org/web/`wq/­­­ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms docs. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following re uired information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms docs. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants _I ` Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $5 6 payable to NCDENR. (For an Express review, refer to http://www.envhelp.org/12ages/"onestopexl2ress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. VG -PG —PG 7'0�G -P6G —g gc Form SWU-10.1 Version 06Aug2012 Page 4..of 6 m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). G 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: 57 Page No: a 7 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC G Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 21-1.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://www.secretary.state.nc.us/Corporations/CSearch aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from htW://portal.ncdenr.org/web/wq/ws/su/statesw/forms dots. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Tim Clinkscales Consulting Firm: Parmounte Engineering, Inc. Mailing Address:5911 Oleander Drive, Suite 201 City:Wilmington Phone: (910 ) 791-6707 Email:tchnkscales@paramounte-eng.com State:NC Zip:28403 Fax: (910 ) 791-6760 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1a) with (print or type name of organization listed in Contact Information, item 1a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 ' Version 06Aug2012 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessme%of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. a Notary Public for the State of do hereby certify that before me this _ day of Date: County of personally appeared , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item 1a) D Logan certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H .1000 and any other app ' able estate stormwater requirements. Signature: i`/e: a Notary Public for the State of tsLo vt%,-, ['cr-c Ur,.a County of -?n,rL4,nSlNl Lk do hereby certify that D - Luc, an personally appeared before me this k-V day of rt.LzAu vut , J,ql4 , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires ►��,� p It 0 Form SWU-101 . Version 06Aug2012 Page 6 of 6 High Density Residential Subdivisions Deed Restrictions & Protective Covenances In accordance with Title 15 NCAC 2H.1000 and S.L. 2006-246, the Stormwater Management Regulations, deed restrictions and protective covenants are required for High Density Residential Subdivisions where lots will be subdivided and sold and runoff will be treated in an engineered stormwater control facility. Deed restrictions and protective covenants are necessary to ensure that the development maintains a "built -upon" area consistent with the design criteria used to size the stormwater control facility. I, D Logan , acknowledge, affirm and agree by my signature below, that I will cause the following deed restrictions and covenants to be recorded prior to the sale of any lot: The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number , as/ ssued by the Division of Water Quality under the Stormwater Management Regulations. 2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the stormwater management permit. 3. These covenants are to run with the land and be binding on all persons and parties claiming under them. 4. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. 5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Water Quality. 6. The maximum allowable built -upon area per lot is square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. OR, if the proposed built -upon areas per lot will vary, please REPLACE #6 above with the following: 6. The maximum built -upon area per lot, in square feet, is as listed below: Lot # BUA Lot # BUA Lot # BUA Lot # BUA PH-1— PH-53 4500 ES-1— ES-74 6500 WW-1— WW-9 4000 MV-1-MV-10 6500 M-1-114-13 4000 This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. 7. Each lot will maintain a 30** foot wide vegetated buffer between all impervious areas and surface waters. **50 foot for projects located in the 20 coastal counties. 8. All runoff from the built -upon areas on the lot must drain into the permitted system. This may be accomplished through a variety of means including roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales to collect the lot runoff and directing them into a component of the stormwater collection system. Lots that will naturally drain into the system are not required to provide these additional measures. _ FFS I g 2014 e Form DRPC-3 Rev.2 05Nov2009 Page 1 of 2 q U BY:_ High Density Residential Subdivisions Deed Restrictions & Protective Covenances uc Signature: at �/ 7 1, Y ckff -- a Notary Public in the State of lu u�r 1-1 (Ay-L\, nr, County ofYun�(u do hereby certify that L&-40 personally appeared before me this the Ll- day of �eL�►-►�a,,�� 20\4- , and acknowledge the due execution of the foregoing instrument. Witness my hand and official seal, /�SEAL A,� Lw_ ���'1��4�\9111j1,yiraYdg00 Signature +�`��G AS ,t � °. f My Commission expires MAI tip I-L)t �NOTARY �X q3 PUBLIC �U Form DRPC-3 Rev.2 05Nov2009 Page 2 of 2 Permit No._: 7 (to be provided by DWQ) O<��F W ^ re9�G y Y NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM p 401 CERTIFICATION APPLICATION FORM INFILTRATION TRENCH SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. Project name Contact person Phone number Date Drainage area number Chris Millis, PE 910-791-6707 2/712014 G II. DESIGN INFORMATION Site Characteristics Drainage area 77,972.00 ft2 Impervious area 43,124.00 ft2 Percent impervious 55.3% % Design rainfall depth 1.5" or 1 year in Peak Flow Calculations 1-yr, 24-hr rainfall depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr discharge Post -development 1-yr, 24-hrdischarge Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Minimum volume required Volume provided Soils Report Summary Soil type Infiltration rate SHWT elevation Trench Design Parameters Drawdown time Perforated pipe diameter Perforated pipe length Number of laterals Stone type (if used) Stone void ratio Stone is free of fines? 3.85 in in/hr ft3lsec ft3/sec ft3lsec ft3 ft3 5339.00 ft3 4,180.00 ft3 12,969.00 ft3 8789.00 ft3 8,877.00 ft3 OK Coarse Fine Sand 10.00 in/hr 1.40 fmsl 0.12 days OK 36.00 in 610.00 ft 5 No. 57 40 Y (Y or N) OK Form SW401-Infiltration Trench-Rev.4 Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) Trench Elevations Bottom elevation 3.50 fmsl OK Storage/overflow elevation 8.50 fmsl Top elevation 7.50 fmsl Trench Dimensions Length (long dimension) 132.00 ft Width (short dimension) 27.50 ft Height (depth) 4.50 ft OK Additional Information Maximum volume to each inlet into the trench? 2.42 ac-in Maximum of 2 acre -inches allowed Length of vegetative filter for overflow 102.00 ft OK Number of observation wells 10 OK Distance to structure n/a ft OK Distance from surface waters 295.00 ft OK Distance from water supply well(s) n/a ft OK Separation from impervious soil layer n/a ft OK Depth of naturally occuring soil above SHWT 2.10 ft OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Proposed drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? Y (Y or N) OK Trench wrapped with geotextile fabric? Y (Y or N) OK Pretreatment device provided CB w/ Sump Form SW401-Infiltration Trench-Rev.4 Parts I. & II. Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ) �y OF W A rFA _76/ u NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM p 401 CERTIFICATION APPLICATION FORM INFILTRATION TRENCH SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part lll) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name S Contact person Chris Millis, PE Phone number 910-791-6707 Date 2I7I2014 Drainage area number F II. DESIGN INFORMATION Site Characteristics Drainage area 25,264.00 ft2 Impervious area 16,552.00 ft2 Percent impervious 65.5% % Design rainfall depth 1.5" or 1 year in Peak Flow Calculations 1-yr, 24-hr rainfall depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr discharge Post -development 1-yr, 24-hr discharge Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Minimum volume required Volume provided Soils Report Summary Soil type Infiltration rate SHWT elevation Trench Design Parameters Drawdown time Perforated pipe diameter Perforated pipe length Number of laterals Stone type (if used) Stone void ratio Stone is free of fines? 3.85 in in/hr ft3/sec ft3/sec ft3/sec 2020.00 ft3 1,354.00 ft3 4,893.00 ft3 3539.00 ft3 3,608.00 ft3 OK Clean Fine Sand 10.00 in/hr 1.40 fmsl 0.12 days OK 36.00 in 236.00 ft No. 57 40 Y (Y or N) OK a.. FF 1 a 2014 BY: Form SW401-Infiltration Trench-Rev.4 Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) Trench Elevations Bottom elevation 3.50 fmsl OK Storage/overflow elevation 8.50 fmsl Top elevation 7.50 fmsl Trench Dimensions Length (long dimension) 128.00 ft Width (short dimension) 12.00 ft Height (depth) 4.50 ft OK Additional Information Maximum volume to each inlet into the trench? 0.97 ac-in OK Length of vegetative filter for overflow 112.00 ft OK Number of observation wells 4 OK Distance to structure n/a ft OK Distance from surface waters 118.00 ft OK Distance from water supply well(s) n/a ft OK Separation from impervious soil layer n/a ft OK Depth of naturally occuring soil above SHWT 2.10 ft OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Proposed drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? Y (Y or N) OK Trench wrapped with geotextile fabric? Y (Y or N) OK Pretreatment device provided CB w/ SumD BY: Form SW401-Infiltration Trench-Rev.4 Parts I. & II. Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ) OF-C OF W A TF9 �r STORMWATER MANAGEMENT PERMIT APPLICATION FORM NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION TRENCH SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name tst-a� 4&4Qf aA Contact person Chris Millis, PE Phone number 910-791-6707 Date 217/2014 Drainage area number E II. DESIGN INFORMATION Site Characteristics Drainage area 19,602.00 ft2 Impervious area 12,196.00 ft2 Percent impervious 62.2% Design rainfall depth 1.5" or 1 year in Peak Flow Calculations 1-yr, 24-hr rainfall depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr discharge Post -development 1-yr, 24-hr discharge Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Minimum volume required Volume provided Soils Report Summary Soil type Infiltration rate SHWT elevation Trench Design Parameters Drawdown time Perforated pipe diameter Perforated pipe length Number of laterals Stone type (if used) Stone void ratio Stone is free of fines? 3.85 in in/hr ft3/sec ft3/sec ft3/sec ft3 ft3 1495.00 ft3 1,051.00 ft3 3,658.00 ft3 2607.00 ft3 2,659.00 ft3 OK Clean Fine Sand 10.00 in/hr 1.40 fmsl 0.11 days OK 36.00 in 172.00 ft 0 No. 57 40 Y (Y or N) OK FED 18 2014 BY: Form SW401-Infiltration Trench-Rev,4 Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) Trench Elevations Bottom elevation Storage/overflow elevation Top elevation Trench Dimensions Length (long dimension) Width (short dimension) Height (depth) Additional Information Maximum volume to each inlet into the trench? Length of vegetative filter for overflow Number of observation wells Distance to structure Distance from surface waters Distance from water supply well(s) Separation from impervious soil layer Depth of naturally occuring soil above SHWT Bottom covered with 4-in of clean sand? Proposed drainage easement provided? Capures all runoff at ultimate build -out? Bypass provided for larger storms? Trench wrapped with geotextile fabric? Pretreatment device provided 3.50 fmsl OK 8.50 fmsl 7.50 fmsl 175.00 ft 6.50 ft 4.50 ft OK 0.72 ac-in OK 96.00 ft OK 2 OK n/a ft OK 100.00 ft OK n/a ft OK n/a ft OK 2.10 ft OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK CB w/ Sump FEB 1 2314 BY: Form SW401-Infiltration Trench-Rev.4 Parts I. & II. Design Summary, Page 2 of 2 Permit No. f (to be provided by DWQ) OF W A TF9 AX A' STORMWATER MANAGEMENT PERMIT APPLICATION FORM NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION TRENCH SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part lll) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name g S Contact person Chris Millis, PE Phone number 910-791-6707 Date 2l7/2014 Drainage area number D II. DESIGN INFORMATION Site Characteristics Drainage area 28,314.00 ft2 Impervious area 17,859.00 ft2 Percent impervious 63.1% % Design rainfall depth 1.5" or 1 year in Peak Flow Calculations 1-yr, 24-hr rainfall depth 3.85 in 1-yr, 24-hr intensity in/hr Pre -development 1-yr, 24-hr discharge ft3/sec Post -development 1-yr, 24-hr discharge ft3/sec Pre/Post 1-yr, 24-hr peak flow control ft3/sec Storage Volume: Non -SA Waters Minimum volume required ft3 Volume provided ft3 Storage Volume: SA Waters 1.5" runoff volume 2186.00 ft3 Pre -development 1-yr, 24-hr runoff volume 1,518.00 ft3 Post -development 1-yr, 24-hr runoff volume 5,284.00 ft3 Minimum volume required 3766.00 ft3 Volume provided 3,778.00 ft3 OK Soils Report Summary Soil type Clean Fine Sand Infiltration rate 10.00 in/hr SHWT elevation 1.40 fmsl Trench Design Parameters Drawdown time 0.12 days OK Perforated pipe diameter 36.00 in Perforated pipe length 248.00 ft Number of laterals 2 Stone type (if used) No. 57 Stone void ratio 40 Stone is free of fines? Y (Y or N) OK FEB 18 2014 ICY:_ Form SW401-Infiltration Trench-Rev.4 Parts 1. & II. Design Summary, Page 1 of 2 Permit (to be provided by DWQ) Trench Elevations Bottom elevation Storage/overflow elevation Top elevation Trench Dimensions Length (long dimension) Width (short dimension) Height (depth) Additional Information Maximum volume to each inlet into the trench? Length of vegetative filter for overflow Number of observation wells Distance to structure Distance from surface waters Distance from water supply well(s) Separation from impervious soil layer Depth of naturally occuring soil above SHWT Bottom covered with 4-in of clean sand? Proposed drainage easement provided? Capures all runoff at ultimate build -out? Bypass provided for larger storms? Trench wrapped with geotextile fabric? Pretreatment device provided 3.50 fmsl OK 8.50 fmsl 7.50 fmsl 134.00 ft 12.00 ft 4.50 ft OK 1.03 ac-in OK 95.00 ft OK 4 OK n/a ft OK 100.00 ft OK n/a ft OK n/a ft OK 2.10 ft OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK CB w/ Sump �.V, , .r � 6t FF3 1 INA c BY: Form SW401-Infiltration Trench-Rev.4 Parts L & II. Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ) OF WATF9 =MA STORMWATER MANAGEMENT PERMIT APPLICATION FORM NCDENR401 CERTIFICATION APPLICATION FORM INFILTRATION TRENCH SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name Gffi farts Eanding gcgtmf ti Contact person Chris Millis, PE Phone number 910-791-6707 Date 2/7/2014 Drainage area number C IL DESIGN INFORMATION Site Characteristics Drainage area 28,314.00 ft2 Impervious area 13,068.00 ft2 Percent impervious 46.2% % Design rainfall depth 1.5" or 1 year in Peak Flow Calculations 1-yr, 24-hr rainfall depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr discharge Post -development 1-yr, 24-hr discharge Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Minimum volume required Volume provided Soils Report Summary Soil type Infiltration rate SHWT elevation Trench Design Parameters Drawdown time Perforated pipe diameter Perforated pipe length Number of laterals Stone type (if used) Stone void ratio Stone is free of fines? { x" in in/hr ft3/sec ft3/sec ft3/sec ft3 ft3 1518.00 ft3 1,324.00 ft3 4,172.00 ft3 2848.00 ft3 3,495.00 ft3 OK Clean Fine Sand 10.00 in/hr 1.40 fmsl 0.10 36.00 228.00 2 No. 57 40 Y days OK in ft (Y or N) OK FEB 18 2014 BY: Form SW401-Infiltration Trench-Rev.4 Parts I &'II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) Trench Elevations Bottom elevation 3.50 fmsl OK Storage/overflow elevation 8.50 fmsl Top elevation 7.50 fmsl Trench Dimensions Length (long dimension) 124.00 ft Width (short dimension) 12.00 ft Height (depth) 4.50 ft OK Additional Information Maximum volume to each inlet into the trench? 0.78 ac-in OK Length of vegetative filter for overflow 132.00 ft OK Number of observation wells 4 OK Distance to structure n/a ft OK Distance from surface waters 136.00 ft OK Distance from water supply well(s) n/a ft OK Separation from impervious soil layer n/a ft OK Depth of naturally occuring soil above SHWT 2.10 ft OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Proposed drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? Y (Y or N) OK Trench wrapped with geotextile fabric? Y (Y or N) OK Pretreatment device provided CB w/ Sump L`I K FED 1 g 2014 BY: Form SW401-Infiltration Trench-Rev.4 Parts1 & ll. Design Summary, Page 2 of 2 Permit No. _5':1tJ S7/Z1_Z1__L__1j/ (to be provided by DWQ) ��� of wATFp NC ENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM INFILTRATION TRENCH SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 1/1) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name �gj 2 Contact person Chris Millis, PE Phone number 910-791-6707 Date 2[712014 Drainage area number B II. DESIGN INFORMATION Site Characteristics Drainage area 16,552.00 ft2 Impervious area 9,147.00 ft2 Percent impervious 55.3% % Design rainfall depth 1.5" or 1 year in Peak Flow Calculations 1-yr, 24-hr rainfall depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr discharge Post -development 1-yr, 24-hr discharge Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Minimum volume required Volume provided Soils Report Summary Soil type Infiltration rate SHWT elevation Trench Design Parameters Drawdown time Perforated pipe diameter Perforated pipe length Number of laterals Stone type (if used) Stone void ratio Stone is free of fines? Form SW401-1 Infiltration Trench-Rev.A; J.db in in/hr ft3/sec ft3/sec ft3/sec ft3 ft3 1133.00 ft3 887.00 ft3 2,753.00 ft3 1866.00 ft3 2,534.00 ft3 Clean Fine Sand 10.00 in/hr 1.40 fms] 0.12 days 36.00 in 160.00 ft 2 Nn ,7 OK Nil 4U Y (Y or N) OK r t. FEB 18 2014 BY: Parts I. & II. Design Summary, Page 1'of 2 Permit No (to be provided by DWQ) Trench Elevations Bottom elevation Storage/overflow elevation Top elevation Trench Dimensions Length (long dimension) Width (short dimension) Height (depth) Additional Information Maximum volume to each inlet into the trench? Length of vegetative filter for overflow Number of observation wells Distance to structure Distance from surface waters Distance from water supply well(s) Separation from impervious soil layer Depth of naturally occuring soil above SHWT Bottom covered with 4-in of clean sand? Proposed drainage easement provided? Capures all runoff at ultimate build -out? Bypass provided for larger storms? Trench wrapped with geotextile fabric? Pretreatment device provided Form SW401-Infiltration Trench-Rev.4 3.50 fmsl OK 8.50 fmsl 7.50 fmsl 90.00 ft 12.00 ft 4.50 ft OK 0.51 ac-in OK 76.00 ft OK 4 OK n/a ft OK 80.00 ft OK n/a ft OK n/a ft OK 2.10 ft OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK CB w/ Sump V FEB IS 2014 BY: Parts I. & II. Design Summary, 'Page2 of 2 Permit No. r�tr(to be provided by DINS EJJA q MCNR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM INFILTRATION TRENCH SUPPLEMENT This fort must be filled out, printed and submitted. The Required Items Checklist (Part W) must be printed, filled out and submitted along with all of the required infomtation. Project name Contact person Phone number Date Drainage area number Chris M!llis, PE 910-791.6707 2/7/2014 A III. DESIGN INFORMkTG1�1 _ Site Characteristics Drainage area 27,878,00 ft2 Impervious area 13,504.00 ftz Percent impervious 48.4% % Design rainfall depth 1.5" or 1 year in Peak Flow Calculations 1-yr, 24-hr rainfall depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr discharge Post -development 1-yr, 24-hr discharge Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Minimum volume required Volume provided Soils Report Summary Soil type Infiltration rate SHWT elevation Trench Design Parameters Drawdown time Perforated pipe diameter Perforated pipe length Number of laterals Stone type (it used) Stone void ratio Stone is free of fines? 3.85 in in/hr ft3/sec ft3/sec ft3/sec ft3 ft3 1693,00 ft3 1,494.00 ft3 4,108.00 ft3 2614.00 ft3 2,930.00 ft3 OK Clean Fine Sand 10,00 in/hr 1.40 fmsi 0.11 days OK 36.00 in 188.00 ft No 57 40 Y (Y or N) OK FEB 18 2014 BY: Form SW401-Infiltration Trench-Rev.4 Parts I. & II. Design Summary Page 1 of•2 Permit No. (to be provided by DWQ) Trench Elevations Bottom elevation 3.50 fmsl OK Storage/overflow elevation 8.50 fmsl Top elevation 7.50 fmsl Trench Dimensions Length (long dimension) 104,00 ft Width (short dimension) 12.00 ft Height (depth) 450 ft OK Additional Information Maximum volume to each inlet into the trench? 0.74 ac-in OK Length of vegetative filter for overflow 95.00 ft OK Number of observation wells 4 OK Distance to structure n/a ft OK Distance from surface waters 98.00 ft OK Distance from water supply well(s) n/a ft OK Separation from impervious soil layer n/a ft OK Depth of naturally occuring soil above SHWT 2.10 ft OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Proposed drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? Y (Y or N) OK Trench wrapped with geotextile fabric? Y (Y or N) OK Pretreatment device provided CB w/ Sump Oil . FEB 18 2014 BY: Form SW401-Infiltration Trench-Rev.4 r • Parts L &I1.:DesigmSummary; Paget of2 Pat McCrory Governor MEMORANDUM A � irn 14C EIN North Carolina Department of Environment and Natural Resources Division of Coastal Management TO: Jonathan Howell, DCM Major ermit Assistant Coordinator, Morehead City FROM: Robb Mairs DCM Field presentative, Wilmington THRU: Debra D. Wilsongo DCM District Manager, Wilmington DATE: August 26, 2014 SUBJECT: Modification request Permit No 24-81 SEL Property Investors, John E. Skvarla, III Secretary �v, 1 w� fps F Mr. Steve Morrison with Land Management Group, Inc. and acting agent for SEL perty Investors, LLC has submitted a request to modify State Permit No. 24-81. Mr. Maurice Emmart, Jr. was originally issued State Permit No. 24-81 on February 20, 1981 for maintenance excavation of an existing boat basin and access channel to the AIWW/Masonboro Sound to a final project depth of -6' @ mean low water (MLW). State Permit No. 24-81 also authorized the placement of the excavated material to be located on the Emmart property on the northwestern side of the boat basin. State Permit No. 24-81 Fifth renewal was on December 5, 2008 and was due to expire on December 31, 2013; however, was subject to extension by the Session Law 2009-406, and as amended by Session Law 2010-177, the Permit Extension Act. State Permit No. 24-81 is due to expire on December 31, 2017. State Permit No. 24-81 was transferred to SEL Property Investors, LLC on December 13, 2013. The applicant recently received a Major Modification to State Permit No. 24-81 to develop a new residential subdivision and associated upland marina adjacent to Masonboro Sound. LLC c/o Mr. D Logan Mr. Morrison is also requesting a modification to State Permit No. 24-81, which includes an alternative site for the hydraulic dredging portion of the project. The permit currently authorized the use of an existing spoil site on the property, which the dike walls have recently been removed for the upland development currently underway. Mr. Morrison states that the applicant proposes to hydraulically pump the excavated material from the existing access channel and boat basin into the upland marina basin currently under construction, which was authorized to a final project depth of -6.0' @ mean low water (MLW), with the corners of the basin tapered to -5.0' @ MLW to facilitate flushing. Mr. Morrison states that the upland basin would be mechanically over excavated, which the drawing indicates a final project depth of -13.9' @ MLW, to accommodate the volume of 9,400 cubic yards (CY) of material. Mr. Morrison states that the final project depth of the dredging area and new basin would remain at -6' @ MLW once the basin is de -watered. -Mr. Morrison states that a 75' long section (earthen plug) between the existing Emmart basin and the new marina channel would remain unexcavated during this period. Mr. Morrison also states per the dredging contractor, that the pumped material -to -water ratio for this project would be 30/70 to 40160 based on previous maintenanceevents at this location. 127 Cardinal Drive Ext., Wilmington, NC 28405 Phone: 910-796-72151 FAX: 910-395-3964 Internet: www.nccoastaimanagement.net An Equal Opportunity t Aifimmadve Aotlon Employer Minor Modification Request SEL Property Investors, LLC c/o Mr. D Logan Page 2 Mr. Morrison states that the water level within the basin would be closely monitored during the dredging process and that the water level would not be allowed to rise above an elevation of 2' below the lowest point of the marina bulkhead; Further, if it does reach this level the operation would be suspended and that a minimum 24 hr. period would pass prior to drawing off the immediate (clarified) surface layer of water with available portable pumps and directed to the existing constructed sediment pond adjacent to the basin. Mr. Morrison also states that the groundwater level/table within the basin currently under constructed are being controlled by the use of well points and that this method could be available during the dredging operation. Mr. Morrison has also included a supplemental letter dated received on August 25, 2014, which pertains to proposed hydraulic maintenance excavation method and its consistency with 16A NCAC 07H .0208(b)(2)(A through H) SPECIFIC USE STANDARDS FOR HYDRAULIC DREDGING. Mr. Morrison requests a modification to State Permit No. 24-81 to allow for the reallocation of the available imperious areas within the created 75' AEC around the new upland marina basin. The total area of impervious surfaces to equal 30% of this 75' AEC is 0.88 acres. Currently the authorized amenity area impervious areas, roads and sidewalks consists of a 0.17 acre area, leaving an area of 0.71 acres of impervious area within the 75' AEC to be allocated throughout the 13 planned lots around the marina basin. The applicant is assigning a total area of impervious surface with the 75' AEC to each of the 13 lots, which together would total 30,550 sq. ft. or 0.70 acres with the AEC. Further, Mr. Morrison states that as the lots are recorded, they would have deed restrictions with these limitations (Please See Narrative, Sheets 1 and 2 of 2, Dredging Contractor Letter and Use Standards). The agent has submitted a check (check No: 44356) in the amount of $100 for the modification request. It is the staffs recommendation that the proposed upland development is CONSISTENT with the Rules of 15 NCAC 7H.0209; However, this office has concerns on the proposed hydraulic dredging methodology in this modification request since this method of dewatering the dredged material is not traditionally requested. As stated above, the agent has submitted a supplemental letter pertaining to this method to demonstrate that it continues to meet the spirit and intent of 16A NCAC 07H .0208(b)(2)(A through H). If the project is determined to be consistent with 15 NCAC 7H.0209 and 15A NCAC 07H .0208(b)(2)(A through H), provided it is consistent with all other state and federal permitting requirements, this office recommends a post construction survey of the marina boat basin to ensure that the project depths of -6' @ MLW with the corners of the basin tapered to -5.0' @ MLW to facilitate flushing. have been obtained. By copy of this memo, DCM is- requesting that the USACE, DWR and DCM/Fisheries Resource Specialist, DMF/Shellfish Sanitation, provide any comment that your agency may have on the proposed project to Jonathan Howell of DCM's Morehead City office within.10 days of receipt of this memo. Enclosures cc: Ronnie Smith, USACE Jeremy Humphrey, Shellfish Chad Coburn DWR ssi Baker, DCM Linda Lewis, DEMLR Linda Painter, LPO r LMG WLAND MANAGEMENT GROUP n�c. 21!U7 Environmental Consultants 8/25/14 Robb 1VMairs Division of Coastal Management 127 North Cardinal Drive Wilmington, N.C. 28405-3845 Re, Use standards compatibility, minor modification, CAMA Permit. Number 24-81, -SEL Property Investors, LLC, New Hanover County Dear Robb, As discussed by phone recently, I am addressing the compatibility of the proposed use of the permitted marina basin for the disposal of hydraulic dredge material (prior to its connection with open waters) in relation to the Fstuarine System Use Standards. The methodology for this basin usage is described in my 8/18/14 minor modification request letter. General and Specific Use Standards for the Estuarine System are contained within the NC Administrative Code (15A NCAC 07H .0208). The proposed usage of the basin for dredge material disposal is consistent with all of the listed General Use Standards (a). Under the listed Specific Use Standards (b)(2)(A-H) for Hydraulic Dredging, the proposed basin usage as described in my request letter is indeed compatible and in keeping with the spirit and intent of these rules.. The following addresses those standards: (A) The terminal end of the dredge pipeline shall be positioned at a distance sufficient to preclude erosion of the containment dike and a maximum distance from spillways to allow settlement of suspended solids. The bulkheaded marina basin provides a large, secure containment area for. dredge material placement and settling. No earthen dike will be constructed and subject to possible erosion. The. end of the dredge pipeline will be placed within the basin away from the bulkhead to allow for suspended solids settlement within the central over -excavated portion of the basin. (B) Dredged material shall be either confined on high ground by retaining structures or deposited on beaches for the purpose of rewurishment, if'the material is suitable...... The dredged material will -be confined to within the bulkheaded marina basin constructed in high ground. The bulkhead and surrounding high ground are the retaining structures. www.lrngroup.net # info@lmgroup.net • Phone: 910.452.0.001 • Fax: 910.452.0060 3805 Wrightsville Ave., Suite 16, Wilmington, NC 28403 9 P.Q. Box 2522, Wilmington, FCC 28402 (C) Confinement of excavated materials shall be landward of all coastal wetlands and shall employ soil stabilization measures to prevent entry of sediments into the adjacent water bodies or coastal wetlands. The usage of the marina basin moves the disposal site more than 500' inland and away from the coastal wetland present along the Masonboro Sound shoreline. As described in the modification request, "The dredging contractor has stated that the expected pumped material -to -water ratio for this work is 30/70 to 40/60 (See attached letter). Regardless of the exact ratio, the water level within the marina basin will be closely monitored and will not be allowed to rise above an elevation 2' below the lowest point of the marina bulkhead. If the water level reaches that level, the dredging will immediately be suspended. Following any such dredging suspension, a minimum. of 24 hours will pass prior to drawing off the immediate (clarified) surface layer of water with a portable pump. Providing an additional level of treatment, the pumped water will be directed into the existing constructed sediment pond adjacent to the basin. Once the water level in the marina basin subsides through this pumping and on -going lateral soil infiltration through the bulkhead, dredging will resume. Well point pumping is currently being used to lower the water table in the basin mechanical excavation and bulkhead. construction area. This same capability will be available to help draw down groundwater levels just outside the basin during the hydraulic dredging. This will enhance the lateral water infiltration rate through the bulkhead and therefore help to keep water levels within the basin lowered during the dredging operation." It should be noted that the existing sediment pond that would accept the clarified. water during any basin pump -down event as described has a water control structure in place that again skims off the surface water and directs that outflow to an additional sediment trap before flowing out a pipe to the existing open water tidal ditch. This methodology provides for redundant sediment settling stages prior to the water being returned to the sound. (D) Effluent from diked areas receiving disposal from hydraulic dredging operations shall be contained by pipe, trough, or similar device to a point waterward of emergent vegetation or, where local conditions require, below normal low water or normal water level Any effluent from a described basin pump -down event would be contained by the pump piping, the existing sediment pond, sediment trap and underground piping to the open water of the existingtidal ditch. There is no emergent vegetation below the existing outlet pipe. (E) When possible, effluent from diked disposal areas shall be returned to the area being dredged. Any effluent will be returned to the area being dredged as described.. (F) A water control structure shall be installed at the intake end of the effluent pipe: For any basin pump -down event necessary, the portable pumping system will deliver water. to the existing sediment pond which has a constructed water control structure in place. _ .. ,�1 r? m G www.imgroup.net • info@lmgroup.net • Phone: 910.462.0001 • Fax: 910.462.0060 3806 Wrightsville Ave., Suite 15, Wilmington, NC 28403 • P.O. Box 2622, Wilmington, NC 28402 (G) Publicly funded projects shall be considered by review agencies on a case -by -case basis with respect to dredging methods and dredged material disposal in accordance with Subparagraph (a) (3) of this Rule, and This is a privately funded project. (ii9 Dredged material from closed shelljr'sn waters and effluent from diked disposal areas used when dredging in closed shel ash waters shall be returned to the closed shellfish waters. The dredged material is from open shellfish waters and the effluent will be returned to open shellfish waters. Please contact me with any questions regarding this assessment. Thank you for your assistance, Sincerely, Steve 1 Environmental Consultant Cc SEL Property Investors, LLC www3nigroup.net • info@imgroup.net • Phone: 910A52.0001 Fax: 910.452.0060 3805 Wrightsville Ave., Suite 15, Wilmington, NC 28403 • P.O. Box 2522, Wilmington, NC 28402. ± I �LMG .1111111111 LAND MANAGEMENT GROUP nqc. W Environmental Consulta,hts �e 8/18/14 Robb Mairs Division of Coastal Management 127 North Cardinal Drive Wilmington, N.C. 28405-3845 AUS .0 11 2o14 Re: Minor Modification Request, CAMA Permit Number 24-81, SEL Property Investors, LLC, New Hanover County Dear Robb, On behalf of SEL Property Investors, LLC, I am requesting the minor modification of their CAMA Permit Number 24-81 to authorize an alternative site for their project's hydraulic dredge material disposal and to designate impervious surface square footage totals for the 75' AEC portions of the residential lots around the community marina basin. Dredge Material Disposal Site The currently authorized dredge disposal site is in the location of an old previously -utilized dike adjacent to the coastal wetlands along the Masonboro Sound shoreline. This disposal site had been used for the placement of material during dredging maintenance of the neighboring Emmart basin and navigation channel to the AIWW channel as well as for the disposal of dredged material from nearby dredging projects. In order to take advantage of the community marina basin excavation activity along with the benefits of moving the disposal site inland over 500' away from the coastal wetlands, the applicant proposes to over -excavate the central portion of the then-bulkheaded marina basin, creating the volume to accept the planned 9,400 cubic yards of dredge material from the permitted dredging area. The finish depths of the dredging areas and the marina will remain unchanged at -6' mean low water with the rear basin corners at -5' mean low water. The new marina channel will not be connected to the open water of the Emmart basin until the disposal activity is completed and sediment settling has taken place. In order to maintain basin water isolation until this takes place, a minimum 75' long segment of the new channel will remain un- excavated during this period. DCM RECEIVED ON, NO www.lmgroup.net • info@lmgroup.net • Phone: 910.452.0001 • Fax: 910.452.0060='�UG 201- 3805 Wrightsville Ave., Suite 15, Wilmington, NC 28403 • P.O. Box 2522, Wilmington, NC 28402 The dredging contractor has stated that the expected pumped material -to -water ratio for this work is 30/70 to 40/60 (See attached letter). Regardless of the exact ratio, the water level within the marina basin will be closely monitored and will not be allowed to rise above an elevation 2' below the lowest point of the marina bulkhead. If the water level reaches that level, the dredging will immediately be suspended. Following any such dredging suspension, a minimum of 24 hours will pass prior to drawing off the immediate (clarified) surface layer of water with a portable pump. Providing an additional level of treatment, the pumped water will be directed into the existing constructed sediment pond adjacent to the basin. Once the water level in the marina basin subsides through this pumping and on -going lateral soil infiltration through the bulkhead, dredging will resume. Well point pumping is currently being used to lower the water table in the basin mechanical excavation and bulkhead construction area. This same capability will be available to help draw down groundwater levels just outside the basin during the hydraulic dredging. This will enhance the lateral water infiltration rate through the bulkhead and therefore help to keep water levels within the basin lowered during the dredging operation. Marina Basin AEC Impervious Surface Allocation The total area of the 75' AEC around the marina basin out to the landward extent of the ORW AEC is 2.92 acres. The total area of impervious surfaces to equal 30% of this 75' AEC is 0.88 acres. The amenity area impervious areas, roads and sidewalks consist of a 0.17 acre area, leaving an area of 0.71 acres of impervious area within the 75' AEC to be allocated throughout the 13 planned lots around the marina. basin. The applicant is assigning the square footage of impervious surface within the 75' AEC as follows: Lot Square footage in 75' AEC 10 2925 11 2400 12 2400 13 2400 14 2400 15 2400 16 2400 17 2400 18 1225 19 2400 20 2400 21 2400 21 2400 Total 30,550 sf = .70 acres As the lots are recorded, they will have deed restrictions placed on them limiting the total area of impervious surface within the 75' AEC to the assigned square footage. Please contact me if there are any questions regarding this modification request. Thank you for your assistance. RECEIVED DC WILMINGTON, NO www.lmgroup.netnfo@lmgroup.net Phone:910.. 4520001 Fax:910.. 4520 7f . i� rah-f 3806 Wrightsville Ave., Suite 15, Wilmington, NC 28403 • P.O. Box 2522, Wilmington, NC 28402 Sincerely, --f Steve Morrison Environmental Consultant Encl: Drawings $100 minor modification fee check to NCDENR Cc: Linda Painter, New Hanover County RECEIVED DCM WILMINGTON, NC www.imgroup.net • info@lmgroup.net • Phone: 910.452.0001 • Fax: 910.452.0060 3805 Wrightsville Ave., Suite 15, Wilmington, NC 28403 • P.O. Box 2522, Wilmington, NC 28402 JUIN 2 I0rt G. & G. Dredging, Inc. Trucking - Dredging 952 Holden Beach Rd. S.W. Shallotie, N.C. 29470 0° Gene Evans, Owner F�nPhone: (910) 754-4480 June 23, 2014 Logan Homes 60 Gregory Rd. Ste 1 Belville, NC 28451 To Whom It May Concern: RE: Channel at Helms Point Having done maintenance dredging of the channel for Mr. Maurice Emmert for the past 14 to 15 years, I found that during dredging, the material was 30 to 40% and the water was 60 to 70%. If I can be of further help or you have any questions, please, give me a call at 910 754-4480 or 910 520-7774. Sincerely, Gene G. Evans VED DCM WI ILM NGTON, NC. ✓S 4.3 — �� HICH : q,37 FEET z MHHW - 1.77 FEET 1.5 _ MHW - 1.43 FEET 1 .3 0 — NAVD88 OAO FEEF � MrL —0.48 FEET —.8 —� MSL —0.40 FEET _2 MLW —2-38 FEET _.— MLLW - —2.53 FEET none cFlaar -8.38' NAVD88 = -6' MLW 20 BOTTOM ELEVATION OF MARINA DESIGNED BY OTHERS_ HORIZONTAL SCALE: 1"=100' II BULKHEAD (DESIGN BY OTHERS). I LOWEST ELEVATION OF TOP = 6.0. I REFER TO PLANS BY ANDREW { CONSULTING ENGINEERS, P.C. i I ' SHEETPILE RETAINING WALL (DESIGN BY OTHERS). REFER TO PLANS BY ANDREW CONSULTING ENGINEERS, P.C. i PROPOSED MARINA BOTTOM (ELEV.-8.38+/-) bar : ' .4?�•i ' w,m} �1 k�"`'' ° `' - i � j,.p.t �i1f� k i �W 4L "y� J'w+S•K •'•'•1sh� .• •��L y:• y�y1 , D1T7IM SGgV —iG 00 d ry51 RS at5.11 N $ arq �� {: 1 9- 10+00 11+00 12+00 13+00 14+00 A - A' MARINA CROSS SECTION HORIZONTAL SCALE: 1"=100' VERTICAL SCALE: 1"=10' GRAPHIC SCALE 0 56 100 200 300 SCALE: 1 "=100' SHEETPILE RETAINING WALL (DESIGN BY OTHERS). REFERTO PLANS BY ANDREW CONSULTING ENGINEERS, P.C. O T P D E VIER EXCAVATE MARINA BOTTOM O ELEVATION-12.9+1- AS SHOWN IN THE PLAN VIEW ABOVE TO ROVIDE FOR 9,400 CY OF REDGED MATERIAL FROM THE XISTING CHANNEL. Pja%'L. . Helms Fort Community Marina e:Modification CAMA Permit # 24-81 Open Water Dredge Disposal Details z O U cn z O U P; O w Q w w Ey O z rz� V W LMG Q u"u".weceaatrcwcr:�. 3805 Wrightsville Ave., Suite 15 `C Mmington, North Carolina 28403 Telephone:910-452-0001 Date: 8/18/2014 Scale: varies Figure: 2 of 2 rr 9T?9 ?� Q'Sp o '9C 0 so 100 200 All location of Impervious Cover in the 75' Coastal Shoreline AEC (to extent of the ORW AEC) Total 75' AEC Area, Marina Basin = 2.92 ac 30% of AEC Area = 0.88 ac Amenity Area Impervious Cover = 0.17 ac Lots 10-22 Impervious Cover = 0.70 ac Lot 10 = 2925 sf Lot 11 = 2400 sf Lot 12 = 2400 sf Lot 13 = 2400 sf Lot 14 = 2400 sf Lot 15 = 2400 sf Lot 16 = 2400 sf Lot 17 = 2400 sf Lot 18 = 1225 sf Lot 19 = 2400 sf Lot 20 = 2400 sf Lot 21 = 2400 sf Lot 22 = 2400 sf Total = 30,550 sf or 0.70 ac Total Allocated Impervious Cover= 0.87 ac Un-Allocated Impervious Cover= 0.01 ac Site Plan and Base Survey Provided by: Paramounte Engineering, Wilmington, NC For Environmental Permitting Only Not for Construction RECEIVED DCM WILMINGTON, k„�i.�g "71MB1 i_ Nl . 9 LMG uao MAwxsumar euoue .: Fnvtrvnmemal Cnn,vrronn 3805 Wrightsville Ave., Suite 15 Wilmington, North Carolina 28403 Telephone: 910-452-0001 Project Helms Port Uate: 8118/2014 revision uaw. Community Marina Scale: Job Number: Title: Modification CAMA Permit # 24-81 1 "=100' 02-13-096 Impervious Allocations in 75' AEC Figure: 1 of 2 Drawn By: SOSID: 1368453 Date Filed: 3/20/2014 2:02:00 PM Elaine F. Marshall North Carolina Secretary of State ARTICLES OF INCORPORATION C2014 079 01187 OF HELMS PORT MASTER ASSOCIATION, INC. A NON-PROFIT CORPORATION In compliance with the requirements of Chapter 55A of the General Statutes of North Carolina, the undersigned being of the age of eighteen years or more, does hereby make and acknowledge these Articles of Incorporation for the purpose of forming a corporation not for profit and does hereby certify: ARTICLE I1 NAME The name of the Corporation is Helms Port Master Association, Inc., hereinafter called the Corporation or the Association. ARTICLE 2 DURATION The period of duration of the Corporation shall be perpetual. ARTICLE 3 REGISTERED OFFICE AND AGENT, PRINCIPAL OFFICE The initial registered office and the principal office of the Association is located at 60 Gregory Road, Suite 1, Belville, Brunswick County, North Carolina, 28451; the mailing address of the registered office and of the principal office is 60 Gregory Road, Suite 1, Belville, North Carolina 28451, and the name of the initial registered agent of the Corporation at such address is D 1. Logan. ARTICLE 4 DEFINITIONS Except as otherwise provided herein, all capitalized words contained herein, shall be as defined in that certain Master Declaration of Covenants, Conditions and Restrictions for Helms Port, as amended, recorded or to be recorded in the Register. of Deeds of New Hanover County, North Carolina (the "Declaration"). ARTICLE 5 PURPOSES AND POWERS This Association does not contemplate pecuniary gain or profit to the Members thereof. No part of the net income of the Association shall inure to the benefit of any officer, director or Member of the Association. The Association is formed for the purpose of providing for the maintenance, management, regulation architectural control and preservation of the Units, the Common Area and any Area of Common Responsibility within that certain property known as Helms Port as more particularly described in the Declaration, and any additions thereto that may be brought within the Jurisdiction of the Association (hereafter the "Development"), and promoting the health, safety and welfare of residents and Owners of property in the Development. For said purposes and for any other purpose and objective as may be established by or provided in the Declaration, the Association shall be authorized as follows: (a) To exercise all of the powers and privileges and to perform all of the duties and obligations of the Association as set forth in the Declaration as the same may be amended from time to time as therein provided, said Declaration being incorporated herein as if set forth at length; (b) To fix, levy, collect and enforce payment by any lawful means, all charges or assessments pursuant to the terms of the Declaration; to pay all expenses in connection therewith and all other expenses incident to the conduct of the business of the Association, including all licenses, taxes or governmental charges levied or imposed against the property of the Association; (c) To acquire (by gift, purchase or otherwise), own hold, improve, build upon, operate, maintain, convey, sell, lease, transfer, dedicate for public use or otherwise dispose of real or personal property in connection with the affairs of the Association; (d) To borrow money, and, with the asseni of eighty percent (80%) of each class of Members, mortgage, pledge, deed in trust, or hypothecate any or all of its real or personal property as security for money borrowed or debts incurred; (e) To fix, levy, collect and enforce against members payment of assessments as provided by the Declaration; (f) To have and exercise any and all powers, right and privileges which a corporation organized under the nonprofit corporation law of the State of North Carolina may now or hereafter have or exercise. (g) To have an exercise any and all powers, rights and privileges provided by the North Carolina Planned Community Act. Adopt and amend bylaws and rules and regulations. ARTICLE 6 MEMBERSHIP Each Owner of a Unit which is subject to assessment by the Association, as provided in the Declaration, including contract sellers, shall be a Member of the Association during the period such Owner holds its fee simple interest. The foregoing is not intended to include Persons who hold an interest merely as security for the performance of an obligation. Membership shall be appurtenant to and may not be separated from ownership of any Unit. The rights and obligations of the Members shall otherwise be as set out in the Declaration or the Bylaws of the Association. ARTICLE 7 VOTING RIGHTS OF MEMBERS The voting rights of the members of the Association shall be as provided in the Declaration and the Bylaws of the Association. ARTICLE 8 BOARD OF DIRECTORS Initially, the affairs of the Association shall be governed by a Board of Directors who need not be Members of the Association. Until successors are otherwise selected and qualified as provided in the Bylaws, there shall be one (1) Director whose name and address is as follows: D I. Logan 60 Gregory Road, Suite 1 Belville, North Carolina 28451 The number, qualifications and method of election of the Board of Directors shall otherwise be fixed by the Declarations and the Bylaws. ARTICLE 9 DISSOLUTION The Association may be dissolved with the assent given in writing and signed by not less than eighty percent (801/6) of the Members of each class. Upon dissolution of the Association, other than incident to a merger or consolidation, after all of this liabilities and obligations have been discharged or adequate provision made therefore, the assets of the Association may be dedicated to an appropriate public agency to be used for purposes similar to those for which this Association was created, or such assets may be granted or conveyed and assigned to any nonprofit corporation, association, trust or other organization to be used for purposes similar to those for which this Association was created , or be distributed as provided by the North Carolina Planned Community Act. ARTICLE 10 AMENDMENT These Articles of Incorporation may be amended as provided in Section 55A-10-01 of the North Carolina General Statutes. ARTICLE 11 TAX STATUS Notwithstanding any other provision of these Articles, this Association hereby elects tax- exempt status under Section 528 of the Internal Revenue Code of 1986 or any corresponding sections or provisions of any future United States Internal Revenue Law (the "Code"). This Association shall not carry on any activities prohibited by a corporation electing tax-exempt status under Section 528. It is further provided that no distributions of income of the Association are to be made to members, directors or officers of the Association, except that members of the Association may receive a rebate of any excess dues and assessments previously paid to the extent permitted by the Code and applicable law. ARTICLE 12 1NDEMNlF'ICATION Subject to and consistent with the requirements and procedures for such indemnification under the applicable provisions of the North Carolina Statutes, the Association shall defend, indemnify and hold harmless any person who was or is a party or is threatened to be made a party to any threatened, pending, or contemplated action, suit or proceeding (other than an action by or in the right of the Association), whether civil, criminal, administrative or investigative, by reason of the fact that he is or was a director, employee, officer, committee member, Member or agent of the Association, from and against any and all liabilities, expenses (including attorneys' and paralegals' fees and for all stages prior to and in connection with any such action, suit or proceeding, including all appellate proceedings), judgments, fines and amounts paid in settlement as long as actually and reasonably incurred by him in connection with such action, suit or proceeding, including any appeal thereof, if he acted in good faith and in a manner he reasonably believed to be in, or not opposed to, the best interest of the Association and, with respect to any criminal action or proceeding, had no reasonable cause to believe the alleged conduct was unlawful, except that no indemnification shall be made in respect of any claim, issue or matter as to which such person shall have been adjudged to be liable for gross negligence or misfeasance or malfeasance in the performance of his duty to the Association, unless and only to the extent that the court in which such action or suit was brought shall determine upon application that despite the adjudication of liability, but in view of all of the circumstances of the case, such person is fairly and reasonably entitled to indemnity for such expenses which such court shall deem proper. The termination of any. action, suit or proceedings by judgment, order, settlement, conviction or upon a plea of nolo contendere or its equivalent shall not, of itself, create a presumption that the person did not act in good faith and in a manner which he reasonably believed to be in or not opposed to the best interest of the Association, and with respect to any criminal action or proceeding, had reasonable cause to believe that his conduct was unlawful. ARTICLE 13 INCORPORATOR The name and address of the incorporator of this Association is: Jeffrey P. Keeter Block, Crouch, Keeter, Behm & Sayed, LLP 30 North Front Street, Suite 200 Wilmington, NC 28401 IN WITNESS WHEREOF, for the purpose of forming this Association under the laws of the State of North Carolina, I, the undersigned, being the incorporator of this Corporation, have executed these Articles of Incorporation this the jy Lday of �f6� , 2014. Je a eeter In o rator MEMORY TRANSMISSION REPORT TIME :03-10-2014 09:38 FAX NO 1 NAME FILE NO. 953 DATE 03.10 09:35 TO : 97916760 DOCUMENT PAGES 11 START TIME 03.10 09:36 END TIME 03.10 09:38 PAGES SENT 11 STATUS OK `SUCCESSFUL TX NOTICE'•' Siam of North Carolina I)epartmrlat of Environment and PYatural Rasourca Wilsinston Re�lonal d![lce pagt McGYoryy Ga.ernar FAX CQv�R �xTs'-FT JoIYs� E.4hvarla I!l Sarel-etary No. Pages (exol. cover: �O To: �/ I'm GAG: �/j�sc /sG�^.ems From: SoSeixeFmsi' Co:/G l'hona: (41Qa 796-7336 Fax: —% ��/� — .00, %0�4-:9 Fax: C91O1 350-2004 127 Caadlnal Drive l4xtens[on, Wllmingbon. NC 294p3 . [919) 796-7213 .,An 8qual Opporiupity witirmwiive Aotioaa 8snploya State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Pat McCrory, Governor FAX COVER SHEET John E Avarla III, Secretary Date: To: / / rJ7 �Li iI/j 5c QL�S Co: No. Pages (excl. cover): /D From: Jo Casmer Phone: (910) 796-7336 Fax: 1/7l —or -i4-1 Fax: (910) 350-2004 Re: f kIIN 5 /- —n5 P140 1,11"9Q / ' C, 127 Cardinal Drive Extension, Wilmington, NC 28405 • (910) 796-7215 • An Equal Opportunity Affirmative Action Employer PARAMOUNTE E N C3 1 N E E FR 1 N G. 1 N G 5 9 1 1 1 O L E A N D E R D R I V E, SUIT E 2 0 1 W I L M I N G T O N, N C 2 8 4 0 3 9 1 0- 7 9 1- 6 7 0 7( O) 9 1 0- 7 9 1- 6 7 6 0 ( F) L E T T E R n F T R A N 9 M T T T A i To: NCDENR-Land Quality Section Date 2/17/14 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Helms Port Express Review Submittal Cameron Weaver/Chris Baker Ptoleg No. E 13 (1(6• 15 e are seams . ® Originals ® Prints ❑ Shop Drawings ❑ Calculations ❑ Correspondence ® Plans ❑ Specifications ® Other as listed below lre itetu Quantity Date Dwg. No. Description 2 2/17/14 Plans (Final Design — Not Released For Construction) 1 Stormwater Narrative 1 Check (34000.00) 2 Stormwater Permit Application Form 1 Wet Detention Pond Supplement/Infiltration Trench/ Basin Supplement 1 Wet Detention O&M/Infiltration Trench/Basin Supplement ssue statusl ® For Approval ❑ As Requested ❑ Construction ❑ Bid ❑ For Your Use ❑ For Review and Comment ❑ Approved as Noted ❑ See Remarks Lion Take ❑ No Exceptions Taken ❑ Make Corrections Noted ❑ Amend & Resubmit ❑ Rejected - See Remarks ❑ Approved as Submitted ❑ Other Re�arics: Pat McCrory Governor February 24, 2014 MEMORANDUM: +•• CDEIR North Carolina Department of Environment and Natural Resources Division of Coastal Management Braxton C. Davis TO: Georgette Scott Stormwater Section DEMLR - WiRO Sj John E. Skvada, III Secretary FROM: Jonathan Howell, NC DENR-DCM Assistant Major Permits Coordinator 400 Commerce Ave., Morehead City, NC 28557 (Courier 11-12-09) SUBJECT: CAMA / D&F Major Permit Application Review Applicant: SEL Property Investors, LLC c/o Mr. D.'Logan Project Location: 100 Aqua Vista (Emmart's Landing S/D), adjacent to Mason boro Sound, in NH Co. Proposed Project: to develop a new residers al subdivision -and associated community marina Please indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howell at the address above by March 17, 2014. If you have any questions regarding the proposed project, contact Robb Mairs at (910) 796-7423, when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. 5 P� This agency approves of the project only if the recommended changes are Incorporated. See attached. �(/e,�S 2 .s i'✓ .�--mi This agency objects to the project for reas s described in the attached comments. SIGNED DATE 3— 5�J4 127 Cardinal Drive Fact., Wilmington, NC 28405 Phone: 910-796-72151 FAX: 910-395-3964 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Adon.Employer DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: SEL Property Investors, LLC c/o Mr. D. Logan 2. LOCATION OF PROJECT SITE: 100 Aqua Vista Drive (Aqua Vista Farms), adjacent to Masonboro Sound, in New Hanover County. Photo Index — 2006: 22-74181A 5-7 2000: 22-267: L-X, 5-9 1996: 22-249: J-X, 19-22 State Plane Coordinates - X: 2342948 Y: 142761 GPS - 0-090412A Latitude: 34008'12.70435UN Longitude: 77052'00.35454"W 3. INVESTIGATION TYPE: CAMA/D&F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 09/04/2013 and 02/06/0214 Was Applicant Present — Yes, agent and owner 5. PROCESSING PROCEDURE: Application Received — 02/24/2014 (completed) Office — Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Wilmington/New Hanover Co. Land Classification From LUP - Resource Protection (B) AEC(s) Involved: CW, ES, ORW, EW, PT Water Dependent: Yes (D) Intended Use: Community/Residential (E) Wastewater Treatment: Existing - Septic Planned - Municipal (F) Type of Structures: Existing —Boat basin, access channel, upland spoil site, private docking facility and boat -ramp. Planned — Expansion of an upland boat basin, shoreline stabilization, 75- slip community marina, new boat -ramp, break water, solid sheet pile jetties. with dolphins, and associated infrastructure for a new 159-lot subdivision (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands 1,800 sq. ft. 1,684 sq. ft. (coastal and §404 wetlands) Coastal §404 wetlands (B) Non -Vegetated Wetlands (Open water) 36,200 sq. ft. 600 sq. ft. sq. ft. Existing and created open water 12,120 sq. ft. (C) Other (Highground) 91,500 sq. ft.. 87,120 sq. ft. 640,332 sq. ft. Within AECs Outside AECs (D) Total Area Disturbed:—871,356 sq. ft. (-20 acres) (E) Primary Nursery Area: Yes (F) Water Classification: SA-ORW (Masonboro Sound) Open: Yes (Masonboro Sound) (G) Estimated Annual Rate of Erosion: N/A Source - N/A 8. PROJECT SUMMARY: The applicant proposes to develop a new residential subdivision and associated marina adjacent to Masonboro Sound. SEL Property Investors, LLC c/o Mr. D. Logan Page 2 9. PROJECT DESCRIPTION: The project site is located at 100 Aqua Vista Drive, off Masonboro Loop Road in New Hanover County. The property is adjacent to the Atlantic Intracoastal Waterway (AIWW)/Masonboro Sound and is the location of the Aqua Vista Farms previously owned and operated by the Emmart family. The project site is bordered to the north by residential properties and UNCW's Center For Marine Science, and to the south by Masonboro Harbour Subdivision. To locate the property traveling south on College Road, take a left onto Mohican Trail and travel east approximately 1.3 miles. Turn right onto Masonboro Loop Road and travel south for approximately 0.8 miles until you reach the entrance of the old Aqua Vista Christmas Tree Farm that will be located on the left. Continue to travel east on Aqua Vista Drive for approximately 0.5 miles until it terminates at the property of interest. The high ground property is approximately 75.17 acres and the elevation of the property is approximately 25' above mean high water (MHW). Existing highground development on the property includes storage buildings associated with the old Aqua Vista Farm. Along the eastern end of the property are an existing boat basin and an access channel to the AIWW and a concrete boat ramp located on the northwestern portion of the existing basin. There is also an existing docking facility on the southern portion of the basin, which consists of an uncovered platform, access ramp, floating docks and boatlift, which currently accommodates up to three (3) slips especially for the Emmart family. Located at the northeastern end of the existing boat basin is the location where marine contractors have accessed the high spoil site via the use of barges to unload excavated material. This is also the location of an existing culvert under the earthen driveway which connects to a tidally influenced ditch approximately 600' in length located on the northern side of the basin. There appears to be an existing berm on the eastern side of the ditch, which appears to be constructed from the spoil material when the ditch was originally excavated. There is also a culvert within the western end of the basin underthe gravel driveway to the Emmart residence, which connects to another tidally influenced drainage ditch towards the west. Highground vegetation consists of hardwoods and other woody species including: Oak, Pines, Cedar and Dogwood. Vegetation bordering the northern highground area of the property and the ditch consists primarily of high marsh and low marsh species, which supports §404 and coastal wetlands vegetation including: Wax Myrtle (Myrica cerifera L.), Marsh -elder (Iva frutescens), Grounsel-bush (Baccharis halimifolia), Sea Oxeye (Borrichia frutescensl, Salt Meadow Grass (Spartina patens) and Smooth Cordgrass (Spartina altemiflora). The vegetation within the existing boat basin and ditch on the western end of the boat basin consists of a narrow fringe of coastal wetlands, which consists primarily of Salt Meadow Grass (Spartina patens) and Smooth Cordgrass (Spartina altemiflora). The vegetation along the shoreline east of the existing boat basin and the access channel to the AIM consists of highground vegetation, primarily Oak trees, which transitions to coastal wetlands consisting primarily of Salt Meadow Grass (Spartina patens) and Smooth Cordgrass (Spartina altemiflora). The U.S. Army Corps of Engineers (USAGE) has issued a Jurisdictional Determination (JD) on December2, 2013 forthe existing §404 wetlands on -site. The N.C. Division of Coastal Management (NCDCM) has verified the coastal wetlands boundary and the normal high water (NHW) boundary on September 4, 2013 (See Sheets 1 and 2 of 26 and JD). Permit History: Mr. Maurice Emmart, Jr. was issued State Permit No. 24-81 on February 20, 1981 for maintenance excavation of an existing boat basin and access channel to the AIWW/Masonboro Sound to a final project depth of -6' @ mean low water (MLW). State Permit No. 24-81 also authorized the placement of the excavated material to be located on the Emmart property on the northwestern side of the boat basin. State Permit No. 24-81 Fifth renewal was on December 5, 2008 and was due to expire on December 31, 2013; however, was subject to extension by the Session Law 2009-406, and as amended by Session Law 2010-177, the Permit Extension Act State Permit No. 24-81 was recently transferred to SEL Property Investors, LLC on December 13, 2013 and is due to expire on December 31, 2017. The Emmart family still maintains the southern portion of the boat basin and an existing private docking facility within it through an easement agreement with the applicant. The applicant recently received a Special Use Permit (SUP) for the proposed community marina on January 9, 2014 from the New Hanover County Board of Commissioners (See Project Narrative). SIEL Properly Investors, LLC c/o Mr. D. Logan Page 3 The City of Wilmington and New Hanover County 2006 Land Use Plan Update classifies the adjacent waters as Conservation, and the adjacent high ground portion of the project area as Resource Protection. In the project area, the waters of Masonboro Sound are classified as SA-ORW by the NC Division of Water Quality, and they are OPEN to the harvest of shellfish. These waters ARE designated as a Primary Nursery Area (PNA), by the Division of Marine Fisheries. PROPOSED PROJECT: The applicant proposes to develop a new residential subdivision and associated marina adjacent to Masonboro Sound. The applicant is requesting a major modification to their existing State Permit No. 24-81 to allow for the expansion of the existing marina basin into highground with associated bulkhead, floating docks, boat ramp and clubhouse to accommodate a Plan Use Development (PUD) for a 159 single- family residential subdivision (Emmart's Landing). An inter -agency scoping meeting with the applicant and agents was held at the Wilmington Regional Office (WiRO) on November 14, 2013. Excavation: The application states that for the construction of the new boat ramp and access channel to the proposed marina, the existing highground area on the northwest corner of the existing marina basin would be excavated in an area measuring approximately 160' in length by 120' in width to a final project depth of -6' @ MLW. The application states the proposed excavation in this area would impact approximately 1,788 sq. ft. (0.041 acres) of volunteer fringing coastal wetlands. The application states that the expansion of the marina would incorporate the undeveloped western portion of the property adjacent to the existing spoil site. A new access channel, measuring approximately 505' in length by 40' in width to a final project depth of -6' @ MLW would be excavated towards the west into highground area from the north end portion of the existing boat basin. The access channel would lead into a new marina boat basin, measuring approximately 338' in length by 245' in width to a final project depth of -6' at MLW. The application states that the dredging limits to the four comers of the new basin would taper to a -5' @ MLW contour to help promote flushing of the basin and access channel. The final project depth would be —6'@ MLW, which would combine into the existing basin and access channel to the AIWW existing waterdepth of -6' @ MLW. The application states that predicted dissolved oxygen (D.O.) for the new basin would meet the 5.0 mg/L standard based on the tidal amplitude in this area. The application states that a total of approximately 88,314 cubic yards (cy) of material would be removed and placed within the existing spoil location with an area of approximately 2 acres on the western end of the existing basin area (See Sheets 5 through 13 of 26 and Project Narrative). Shoreline Stabilization: The shoreline of the proposed access channel and marina basin would be stabilized with approximately 2,173 linear feet (LF) of new sheetpile bulkhead. The application also states that the existing basin would be stabilized with approximately 432 LF of sheetpile bulkhead and approximately 588 LF total of breakwater along the eastern and southern end of the basin. The proposed breakwater along the eastern shoreline of the existing basin would be located approximately 5' waterward to allow tidal flushing into the significant fringe of Smooth Cordgrass (Spartina alterniflora), aforementioned. The breakwaters would then lead into two (2) freestanding jetties constructed of solid sheet piles would be located on each end of the 50' in width entrance channel to boat basin, each measuring approximately 100 LF. Each jetty would have a cluster of dolphin pilings located at the terminal end of the structure towards Masonboro Sound. A new boat -ramp, measuring approximately 60' in length by 20' in width would be located on the western end of the proposed expanded basin to replace the existing boat -ramp. An associated 20' in length by 6' in width launching pierwould be located on the northern side of the new boat - ramp (See Sheets 8, 12, 13, 14, and 15 of 26 and Project Narrative). Marina: An access ramp would lead onto a floating dock (A -Dock) measuring approximately 191' in length by 6' in width would be located along the face of the new bulkhead on the most southern end of the new basin. Three (3) finger piers, each measuring approximately 40' in length by 3.5' in width would extend from A -Dock running perpendicular to the shoreline. A -Dock would then turn 90° and tie into anew floating dock (B-Dock) located along the face of the new bulkhead along the most western end of the new basin, measuring approximately 356' in length by 6' in width. SEL Property Investors, LLC c/o Mr. D. Logan Page 4 Ten (10) finger piers, each measuring from approximately 30' to 40' in length by 3.5' to 4.5' in width and approximately 30' apart would extend perpendicular from the shoreline towards the basin. The area located between A -Dock and B-Dock in the southwest corner of the new basin would be designated for a kayak launch area, which would include a 40' in length floating slip divider and two (2) floating finger piers, each measuring approximately 8' in length by 2' in width with aluminum grab bars (See Sheet 6 of 26). An access ramp from the northern end of the basin would lead onto a new floating dock system (C-Dock), measuring approximately 245' in length by 8' in width, which would terminate onto a floating dock, measuring approximately 73' in length by 6' in width, creating a "T-head" configuration. Fifteen (15) finger piers would extend from this floating dock, each measuring from approximately 30' to 40' in length by 3.5' in width. These finger pier piers would be approximately 26'-30' apart. Another access ramp from the northeast comer of the new marina basin would lead onto a floating dock (D-Dock) located on the face of the new bulkhead along the most eastern end of the basin, measuring approximately 288' in length by 6' in width. Ten (10) finger piers, each measuring from approximately 25' to 30' in length by 3.5' in width and approximately 28' apart would extend perpendicular from the shoreline towards the basin. The application states that a pump -out facility would be located along Dock A. The proposed floating dock system would accommodate up.to 75 formalized slips. The applicant also proposes to install two (2) buoys and one (1) cluster of dolphin pilings within the central portion of the existing boat basin to designate the location of the proposed entrance channel and boat -ramp, aforementioned (See Sheets 5, 6 and 12 of 26 and Project Narrative). Upland Development: The applicant proposes to develop a 159 lot subdivision and associated community amenities adjacent to the western portion of the new marina facility. The application states that the approximately 75 acre tract would be subdivided into 159 detached single-family lots with integrated mix of active and passive open areas, approximately 2.12 units per acre. A network of infrastructure including sewer and water supply, private roads with a dedicated pedestrian path along the main collector road, boardwalk around the proposed marina and associated amenities and gazebo would be provided to the residents of the subdivision. The easternmost portion of the site is located within the 575' ORW Area of Environmental Concern (AEC), which the application states that approximately 1 % of the AEC would be covered with impervious surfaces associated with the new infrastructure. No dwellings are proposed at this time, only proposed footprints for each lot. The proposed access channel and marina basin would create a future 75' Coastal Shoreline AEC and the associated 30' buffer. The application states that the proposed impervious area within the future 75' Coastal Shoreline AEC would be approximately 4.5%, which consists primarily of the amenity buildings along the western end of the proposed marina and infrastructure. The property owners would be required to obtain individual permits from the local level for individual dwellings. The application states that a State Stormwater Permit and a Sedimentation and Erosion Control Plan would be submitted to the N.C. Division of Energy, Mineral and Land Resources (NCDEMLR). The application states that sewer and water supply services would be provided by the Cape Fear Public Utility Authority (CFPUA) (See Sheets 3, 4, and 18 through 26 of 26 and Project Narrative). Mitigation: The application states that approximately 1,800 sq. ft. of coastal wetlands would be impacted for the expansion of the existing basin, consisting primarily of Smooth Cordgrass (Spartina altemiflora) and Salt Meadow Grass (Spartina patens). The application also states that the proposed road crossings would impact approximately 1,684 sq, ft. of §404 wetlands (RPWs). The applicant proposes on -site mitigation for the above impacts. The elevation of the existing berm adjacent to the tidally influenced ditch would be lowered to the same elevation as the surrounding coastal wetlands. The application states that the use of land excavators and timber matting would be utilized. The application states that Smooth Cordgrass (Spartina altemiflora) would then be planted approximately 2' apart for restoration. The application states that approximately 4,050 sq. ft. (0.09 acres) of coastal wetlands restoration area would be created, which would provide a 2.27:1 restoration area. The application also states that an existing small freshwater pond would be enlarged by approximately 1,684 sq. ft., which would match the adjacent depths to provide a 1:1 replacement of impacted RPWs, aforementioned (See Sheet 16 and 17 of 26 and Project Narrative). SI:L Property Investors, LLC c% Mr. D. Logan Page 5 10. ANTICIPATED IMPACTS: The proposed maintenance excavation of the existing access channel from the existing boat basin would impact approximately 36,200 sq. ft. of shallow bottom area, previously impacted under State Permit No. 24-81. The proposed new basin expansions and access channel with associated bulkhead, boardwalk and boat ramp would disturb approximately 91,500 sq. ft. (2.1 acres) of an upland area. This would result in the removal of approximately 5,466 cy of material from the existing access channel and approximately 88,314 cy of highground material, which would be placed within the existing spoil site area on the project site, in an area of approximately 87,120 sq. ft. (2.0 acres). The proposed excavation within the existing basin area would impact approximately 1,800 sq. ft. (0.041 acres) of coastal wetlands, which consists primarily of Salt Meadow Grass (Spartina patens) and Smooth Cordgrass (Spartina altemiflora). Approximately 4,000 sq. ft. (0.09 acres) of upland area would be converted to low marsh associated with lowering the elevation to the surrounding coastal wetlands to provide a 2.27:1 restoration area. Approximately 1,684 sq. ft. of §404 wetlands (RPWs) would be impacted associated with the construction of the proposed access roads, which the application states that the existing small freshwater pond would be enlarged by approximately 1,684 sq. ft., which would match the adjacent depths to provide a 1:1 replacement of impacted RPWs. The proposed floating structures for the basin would incorporate approximately 12,120 sq. ft. of newly created Estuarine Waters and Public Trust Area. As proposed, the proposed marina configuration would accommodate up to 75 permanent vessels. The application indicates that the shellfish closure associated with the new marina would extend approximately 325' into the proposed access channel. The proposed breakwater along the eastern and southern end of the basin and the two (2) freestanding jetties on each end of the 50' in width entrance channel with associated dolphins would incorporate approximately 600 sq. ft. of Estuarine Waters and Public Trust Area. The proposed upland development would disturb approximately 20 acres of highground, of which approximately 4.55 acres are within the Estuarine Shoreline AEC. According to the site drawings, the nine lots along the eastern portion of the new subdivision, portions of the 15' access easement, the cul-de-sac and stormwater infiltration system would be partially located within the 575' AEC.. The application indicates that approximately 1 % of the SA-ORW shoreline would be covered by built upon area and that the proposed impervious area within the future 75' Coastal Shoreline AEC would be approximately 4.5%. The 75 acre tract would be subdivided into 159 single-family lots, approximately 2.12 units per acre. No dwellings are proposed at this time, only proposed footprints; however, the individual property owners would be required to obtain individual permits from the local level. Minor turbidity increases may be expected during the construction process. Submitted by: Robb L. Mairs Date: 02/25/2014 Office: Wilmington Project Narrative Emmarts Landing Subdivision and Residential Marina Aqua Vista Drive New Hanover County, N.C. SEL Property Investors, LLC, Applicant SEL Property Investors, LLC (Applicant) is planning to develop a residential subdivision and associated marina on their 75.17-acre tract located on Aqua Vista Drive in New Hanover County. The Applicant recently purchased the property from the Emmart family who have retained approximately 15 acres of their original ± 90 acre holdings for future use. The Applicant's property extends to an existing man-made basin (Emmart basin) which in turn connects to the AIWW channel to the southeast. Maurice Emmart has transferred his existing CAMA Major Permit Number 24-81 to the Applicant. That permit provides for maintenance dredging (to -6' mean low water) of the basin and its connecting channel to the AIWW channel. The applicant is proposing a major modification of this permit to construct an upland basin residential marina connecting to the permitted dredged basin. The proposed marina (also excavated to -6' mean low water) will have 75 permanent boat slips and a kayak launch area for use by subdivision property owners. No commercial services such as fueling, haul out or boat repair and maintenance will be offered. An adjacent amenity area will feature a community clubhouse and pool and shared parking for both marina and associated amenities will be dispersed around the marina. A 40'-wide channel will extend from the marina to the Emmart basin. The marina and connecting channel will feature vertical bulkheading with an appropriate tie -back system. The Applicant, in cooperation (and under an executed easement) with the Emmart family, also proposes to excavate the northwestern corner of the Emmart basin, construct a boat ramp and a bulkhead on the western and southern sides of the basin, install vertical breakwater structures and sheet pile jetties to help stabilize the remainder of the basin/outer channel and limit the on -going shoreline erosion on the Emmart property. The existing outer channel markers will also be replaced and fitted with reflectors. The water quality classification for the open water between the barrier islands and the mainland in this portion of Masonboro Sound is SA/ORW. Class SA waters best usages are listed as "shellfishing for market purposes and any other usage specified by the SB and SC classification". ORW are Outstanding Resource Waters "which are unique and special waters of exceptional state or national recreational or ecological significance which require special protection to maintain existing uses". RECEIVED DCM WILMINOTON, NC FEB 17 M4 The 404 wetlands have been delineated and approved on site with the Corps of Engineers Regulatory staff. The Coastal Wetland line was delineated and then reviewed by DCM staff. The Normal High Water line was delineated with DCM staff. The Mean High Water line was determined by the surveyor. All of these lines have been located by survey and have been platted. For the marina entrance channel, basin corner excavation and boat ramp construction, impacts to the volunteer fringing coastal wetlands within the man-made Emmart basin will total 1,788 square feet (0.041 ac.). Impacts to relatively permanent waterbodies (RPWs) within existing ditches on the property are associated with the construction of roads/lot development and total 1,692 square feet (0.04 acres). Mitigation for the above impacts is planned on -site. A 4,051 square foot upland berm that extends through the coastal wetlands has been identified for removal to match adjacent wetland substrate elevations. Excavation equipment will operate from timber matting where necessary to protect existing coastal wetland. The leveled area will be planted with Spartina alterniflora at a two foot spacing. This will provide for a 2.27:1 coastal wetland restoration area. The existing small freshwater pond will be enlarged by 1,692 square feet, matching adjacent depths to provide for a 1:1 replacement of impacted RPWs. In addition, the existing culverted driveway ditch crossing will be removed, restoring a 171 square feet area of RPW. This parcel, New Hanover County ID number: R07600-003-014-000, is zoned R-15 and will be developed under the R-15 performance residential zoning with an allowable density is 2.5 units/acre. Current plans for the community include 159 detached single family units with an integrated mix of active and passive open space. A network of private roads with a dedicated pedestrian path along the main collector and boardwalk around the marina will provide access to the marina, parking areas, and associated amenities. Stormwater for the project will be treated on site. All treatment systems will be permitted and installed in compliance with all local, state, and federal rules and regulations. The COD resource line on the site is the flagged and surveyed coastal wetland line as reviewed and approved by DCM staff, All non -water dependent components of the development will be built in compliance with the required 75' setback from the COD resource line. A Special Use Permit application to allow the community boating facility was submitted to the New Hanover County Planning Department on October 10, 2013. On January .9, 2014, the County Planning Board voted to approve the Special Use Permit. The County Commissioners voted to approve the Special Use Permit on February 3, 2014. By granting the permit, the County is allowing the developer to construct the private community boating facility for use by the residents of the proposed subdivision. On November 14, 2013, an inter -agency scoping meeting was held at the NCDENR Wilmington office. Following input and comments from the various agencies during the meeting and further consultation with DCM, the Applicant made revisions to the pp1RECEIVED DCK4 WILMINGTON, NC FEB 7 2014 that are included with this submittal. The three areas of concern that were addressed are summarized below: Coastal Wetlands The original area of coastal wetland impacts resulting from the new upland basin entrance channel and shoreline stabilization was 3,151 s.f. (0.07 ac.). The final revised plan has avoided impacts to coastal wetlands on two sides of the Emmart basin by moving the planned southern bulkhead landward and by moving the planned eastern breakwater waterward of the coastal wetland fringe. The resulting area of coastal wetland impacts has been reduced to 1,788 s.f. (0.041 ac.), which is a 43% reduction. The coastal wetlands which have volunteered around the inside of the existing man-made Emmart basin are fringing and intermittent in nature. Two coastal wetland fringe segments of limited functional value are to be impacted. The segment to be excavated for the marina entrance channel and boat ramp area totals 1,284 s.f. and is composed primarily of a narrow Spartina altern flora fringe on a steep bank. The 504 s:f segment to be excavated in front of the proposed western bulkhead features a narrow fringe of Spartina altern flora on a steep bank with a mixture of Spartina patens and Borrichia frutescens primarily in the upper portions of the steep bank in the southern portion of the segment. The substrate at the toe of the bank is largely covered with historic fill consisting of bricks and other masonry materials. Riprap Groin The riprap groin along the northern side of the existing entrance channel was proposed in order to minimize sediment accumulation within the channel and to reduce wave energy across the channel. The footprint of the proposed groin was 3,768 s.f. (0.087 ac.). The groin has been eliminated on the revised plan and replaced with a vertical sheet pile jetty wall. As a result there will be no riprap coverage of the Primary Nursery Area (PNA) bottom. Basin Flushing The southern coastline of North Carolina experiences much greater tidal amplitudes than central or northern coastlines. The tidal range in the vicinity of the proposed marina is approximately 4 feet. In accordance with DCM rules, the marina basin will be excavated to depths no deeper than connecting waters. In order to maximize water exchange and support dissolved oxygen levels within the proposed marina basin, the plans have been revised to show water depths tapering from -6' mlw to -5' mlw in the corners of the basin. The new entrance channel depths to the proposed marina basin and the authorized dredging depths within the existing Emmart basin and channel to the AIWW are -6' mlw. The depth of the connecting AIWW channel in this location is approximately -14' mlw. In order to maintain basin flushing, the management entity (developer or .future marina owner association) will require that maintenance dredging be performed when measured water depths anywhere within the authorized dredging area reach 4' mlw or shallower. RECEIVED DCM WILMINGTON, NC FEB '4"42014 DOM MP-1 APPLICATION for Major Development (last revised 12127/06) North Carolina DIVISION OF COASTAL MANAGEMENT 9. Primary Applicant/ Landowner Information Business Name Sal Property Investors, Lic Project Name (if applicable) Emmart's Landing Community Marina Applicant 1: First Name Mr. D. MI Last Name Logan Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address 60 Gregory Road, Suite 1 PO Box City Belville State NC ZIP 28451 Country USA Phone No. - - ext. FAX No. - - Street Address (if different from above) same as above City State ZIP _ Email 2. Agent/Contractor Information Business Name Land Management Group Inc. Agent/ Contractor 1: First Name MI Last Name Steve Morrison Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State 3805 Wrightsville Ave., Suite 15 Wilmington NC ZIP Phone No. 1 Phone No. 2 28403 910 - 452 - 0001 ext. - - ext. FAX No. Contractor # 910 452 0060 Street Address (if different from above) City State ZIP same as above _ Email smordson@lmgroup.net <Form continues on back> REGEIVt_U DOM WILMINGTON, NO FEB I 'Y 2014 232-808-2806 :: 1-688.4113COAST :: www.nccoastaImanagemont.not Form DCM MP-1 (Page 2 of 5) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # New Hanover Aqua Vista Drive Subdivision Name City State Zip Emmart's Landing Wilmington NC 28409 - Phone No. Lot No.(s) (if many, attach additional page with list) N/A - - ext. 159 lots proposed, , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project C -A (Y- 69A k Masonboro Sound / AIWW c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ®Manmade ❑Unknown Masonboro Sound / AIWW e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed []Yes ®No work falls within. New Hanover County (outside City limits) 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (scl t.) 2,188-Ift along MHW / approx. 2,314-Ift along NHW 75.17-acres c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or median range 0.2-acre to 0.3-acre, NWL (normal water level) (if many lot sizes, please attach additional page with a list) ranges from MHW to —25' MHW ❑NHW or ❑NWL e. Vegetation on tract Vegetation along the waterfront includes typical salt marsh vegetation. Inland portions of the property are wooded and contain typical upland species. Portions of the tract are mowed or planted with crops, including a pecan grove. f. Man-made features and uses now on tract A diked spoil disposal area along the waterfront, dirt access roads, formerly occupied homes, barn and accessory buildings. g. Identify and describe the existing land uses adiacent to the proposed project site. Residential h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? Residential (Attach zoning compliance certificate, if applicable) ®Yes ❑No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> Ktl:tlVLU DCM WILMINGTON, NC FEB '. "/ 2014 252-808-2808 :: 1-888-4RCOAST :: wrww.nccoastalmanagement.net Form DCM MP-1 (Page 3 of 5) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ®Yes []No (ii) Are there coastal wetlands on the site? ®Yes ❑No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ®Yes []No ,Attach documentation, if available) n. Describe existing wastewater treatment facilities. Any former homesites on the property utilized on -site septic systems. Future wastewater treatment will be provided by Cape Fear Water and Sewer Authority. o. Describe existing drinking water supply source. Community system, also Cape Fear Water and Sewer Authority. p. Describe existing storm water management or treatment systems. No existing stormwater management features or treatment. systems exist on site. 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Government EPdvate/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The proposed upland basin marina will serve residents of the Emmarts Landing community and their guests. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Typical construction equipment including excavators, pile drivers, dump trucks. Equipment will be stored on upland portions of property when not in use. d. List all development activities you propose. Excavation of an upland basin and entrance channel for a 75-slip community marina. Maintenance dredging within the an existing basin to the south and its existing open water channel, through which access will be provided to Masonboro Sound and the AIWW. Installation of new bulkhead, breakwaters, jettys and boat ramp within the adjacent, existing basin to the south. Work within the AEC will also include future lots and house pads, installation of subdivision roads, a clubhouse pool, poolhouse, and accessory buildings (canoe storage and a gazebo) and stormwater management features on proposed waterfront lots. e. Are the proposed activities maintenance of an existing project, new work, or both? New f. What is the approximate total disturbed land area resulting from the proposed project? —20 to be finalized by engineer and SEC Plan ❑Sq.Ft or E Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ENo ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. No direct discharges to waters of the state exist, and none are proposed. I. Will wastewater or stormwater be discharged into a wetland? ❑Yes ENo ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ENA J. Is there any mitigation proposed? ®Yes []No ❑NbCM WILMING U If yes, attach a mitigation proposal. NC 252-508.2800.:: 1.888.4RCOAST :: www.nccoastalmanagernent.net Form DCM MP-1 (Page 4 of 5) APPLICATION for Major Development Permit <Form continues on back> 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the applicauon package to be complete. Items (a) — (f) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Adjacent to South (beyond Emmarts property): Masonboro Harbour HOA Phone No. Address 5248 Masonboro Harbour Drive, Wilmington, NC 28409 Name Adjacent to North: UNCW Center for Marine Science Phone No. Address 5600 Marvin K Moss Lane, Wilmington, NC 28409-3621 Name Adjacent to North: Mathias Hunoval Phone No. Address 5330 Holt Road, Wilmington; NC 28409 g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. CAMA Permit # 24-81, SEL Property Investors, LLC. 12/13/2013 h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 1 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the innffojrmation provided in this application is truthful to the best of my knowledge. Date �v Print Name �tI Signature Please indicate application attachments pertaining to your proposed project. VED ®DCM MP-2 Excavation and Fill Information ®DCM MP-5 Bridges and Culverts DCM WI M N'GTON, NC ®DCM MP-3 Upland Development ®DCM MP-4 Structures Information FED ` 7014, 252-808-2808 .. 1.888-4RCOAST :: www.nccoastallmanagement.net Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for LAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel (NLW or Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater (excluding shoreline NWL) stabilization) Ex Channel: Upland Jetties (2) sound to Entrance Upland 100' Length mouth of ex Channel to Marina Basin 60 Coastal basin upland basin 338 Marsh 724 505 Mitigation area 348' Jetties (2) 2' Coastal Width 50 40 245 20 Marsh Mitigation area 12' Avg. Existing Depth -4 MLW +8 MLW +16.5 MLW +6.5 MLW NA NA -4 MLW Final Project Depth -6 MLW -6 MLW .-6 MLW -6 MLW NA NA -6 M LW 1. EXCAVATION ❑This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. From maintenance dredging- mixed sand and finer silts. - 5,466 cy c. (i) Does the area to be excavated include coastal wetlandsimarsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ®CW 1,788 soft ❑SAV ❑SB EIWL ❑None (ii) Describe the purpose of the excavation in these areas: A sparse and narrow rmastal marsh fringe along the existing basin will be partially impacted from excavation of adjacent upland to install new bulkheading and a new boat ramp. d. High -ground excavation in cubic yards. -82,826 cy for new upland basin and upland entrance channel -6,098 cy upland excavation on property to south - 300 cy for excavation of coastal marsh mitigation area 91,314 cy total F. DISPOSAL OF EXCAVATED MATERIAL ❑ This section not applicable a. Location of disposal area. b. Dimensions of disposal area. Wet material will be placed in existing, diked spoil disposal on site. Dry material will be stored on site, and suitable material will be used for grading and subdivision development. Existing on -site spoil disposal area is approx. 2acres. c. (i) Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance? ®Yes []No ❑NA ❑Yes ' ®No ❑NA RECEIVED (ii) If no, attach a letter granting permission from the owner. (ii) If yes, where? DCM WILMINGTON, NC 252-808-2808 :: 1-888.4RCOAST :: www.ncconstsin:anaoen:ent.net revised: 12/26/06 Form ®CM MP-2 (Excavation and Fill, Page 2 of 3) e. (i) Does the disposal area Include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ®None (ii) Describe the purpose of disposal in these areas: f. (i) Does the disposal include any area in the water? ❑Yes ®No ❑NA (ii) If yes, how much water area is affected? 3. SHORELINE STABILIZATION ❑This section not applicable (if development is a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization: ®Bulkhead ❑Riprap ®Breakwater/Sill ❑Other: Breakwaters serving as shoreline stabilization with flow -through design. c. Average distance waterward of NHW or NWL: All new bulkhead for upland basin and existing basin will be installed above NHW. New bulkhead in existing basin will vary from 2' around existing open water basin to 113' landward of NHW at area of upland excavation for new basin at boat ramp. Average distance landward —10'. e. Type of stabilization material: Steel, concrete, wood or vinyl bulkhead and breakwaters. g. Number of square feet of fill to be placed below water level. Bulkhead ball None Riprap Breakwater/Sill No backfill. Other_ i. Source of fill material. Per contractor. b. Lengin: New DUIKneaa in existng Dasin = vac in. rvew breakwater in existing basin = 588 Ift. Bulkhead for new upland basin and upland entrance channel = 2,173 Ift. Width: 2' d. Maximum distance waterward of NHW or NWL: Breakwaters will average about 5' waterward of NHW, with a maximum distance of approximately 28' waterward of NHW at the mouth of the existing basin. f. (i) Has there been shoreline erosion during preceding 12 months? ®Yes ❑No ❑NA (ii) If yes, state amount of erosion and source of erosion amount information. unknown amount h. Type of fill material. Clean fill sand for new bulkhead. 4. OTHER FILL ACTIVITIES ❑This section not applicable (Excluding Shoreline Stabilization) a. M Will fill material be brought to the site? ❑Yes ®No ❑NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, (ii) Amount of material to be placed in the water None (iii) Dimensions of fill area N/A (iv) Purpose of fill N/A submerged aquatic vegetation (SAV), shell bottom (St3), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL 1,692 s ❑None (ii) Describe the purpose of the fill in these areas: Waters of the US will be filled for road development and installation of stormwater management features. Waters of US to be filled are ditch -like features that are jurisdictional RPWs. 252-808-2808 :: 1-888.4RCOAST :: www.nccoastaimanpgoment.net revised: 12/26/06 Form DCM MP-2 (Excavation and Fill, Page 3 of 3) 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? Measures per a state -approved Sedimentation and Erosion Control Plan to be developed by project engineers. Excavators, backhoe, dumptruck, barge mounted excavator for maintenance dredging. Timber matting and bobcats for coastal marsh restoration/mitigation area. c. (i) Will navigational aids be required as a result of the project? d. (i) Will wetlands be crossed in transporting equipment to project ®Yes []No ❑NA site? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented_ (ii) If yes, explain steps that will be taken to avoid or minimize Reflectors will be placed on the proposed jetties and channel environmental impacts. markers for navigation safety. z/,- " Date Emmarts Landing Community Marina Project Name SEL Property Investors, LLC Applicant Name Applicant Signature RECEIVED DCM WILMINGTON, NC 2014 252.808.2808 c 1.888.4RCOAST :: www.nccoastelmananement.net revised: 12/26/06 Form DCM MP-3 UPLAND DEVELPIEN (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND DEVELOPMENT a.. Type and number of buildings, facilities, units or structures proposed. 1 clubhouse building, pool with decking, 1 poolhouse/restroom building, 1 accessory building or covered gazebo, 1 building for pump station. c. Density (give the number of residential units and the units per acre). 159 lots/75 acres = 2.12 units/acre e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land -disturbing activity begins. (1) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? []Yes ®No ❑NA If yes, list the date submitted: will be submitted by Paramounte Engineering, project engineers g. Give the percentage of the tract within the coastal shoreline AEC to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. Less than 1 % in the 575' AEC;.4.5% in the future 75' AEC 6. `Give the percentage of the entire tract.to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. —15 % for subdivision infrastructure. Describe proposed method of sewage disposal. Disposal will be provided by the Cape Fear Water and Sewer Authority. A pump station will be constructed to pump wastewater from the subdivision to the existing sewer mains. Describe location and type of proposed discharges to waters of the state (e.g., surface runoff, sanitary wastewater, industrial/ commercial effluent, "wash down" and residential discharges). No direct discharges to waters of the state are proposed. b. Number of lots or parcels. 159 single-family lots d.. Size of area to be graded, filled, or disturbed including roads, ditches, etc. - 20 acres, to be determined by project engineers and sedimentation and erosion control plan. E List the materials (such as marl, paver stone, asphalt, or concrete) to be used for impervious surfaces.. Subdivision roads will be asphalt. k.. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification,. (i) Has a site development plan been submitted to the Division of Water Quality for review? ®Yes []No ❑NA (h) If yes, list the date submitted: Submitted by Paramounte Engineering, project engineers k. Have the facilities described in Item (1) received state or local approval? ®Yes MNo ❑NA If yes, attach appropriate documentation. R CEIV2 , ,"'114 "IfI I ING TON, rn. Does the proposed project include an innovative�ston latpr q design? []Yes ®No ❑PIA If yes, attach appropriate documentation. 252-808-28082 ,: 1-888-4RCOAST n www:nccoastalmenagernent.net revised, 12/26/06 Form QCM MP-3 (upland Development, Page 2 of 2) Starmwater runoff will be managed through measures described in state -approved stormwa ter management plan. m. Oesedbee-proposed drinidng water supply source (e.g., well, community, Oublic system, etc.) Public system -Cape Fear Water and Sewer Authority n, (1) Will water be, impounded? OYes ®No ❑ NA (IQ If yes, how many acres? ., When was the lot(s).plafted and recorded? p. If propo%W deVelopment.is :a subdivision,.wil additional uNkies be NIA - not an oceanfront parcel. installed for this upland development? ®Yes pNo ❑NA 252-806-2808 :: 4-088.4RCO.AST n v_wvw neccsataimana0e0t t:rlet revised: 1"2/26/06 Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1" DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ❑Commercial ❑Public/Government ®Private/Community c. (i) Dock(s) and/or piers) (ii) Number 4 (Dock A. Dock B. Dock C. Dock D) (iii) Length Please see MP-4 supplement (iv) Width Please see MP-4 supplement (v) Floating ®Yes []No e. (i) Are Platforms included? []Yes ®No If yes: (ii) Number (iii) Length (iv) Width (v) Floating ❑Yes []NO Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed 75 (ii) Number of slips existing 0 i. Check the proposed type of siting: N Land cut and access channel ❑Open water; dredging for basin and/or channel ❑Open water; no dredging required ❑Other, please describe: k• Typical boat length: 30' m. (i) Will the facility have tie pilings? ®Yes ❑No (ii) If yes number of tie pilings? 76 [I This section not applicable b. (i) Will the facility be open to the general public? ❑Yes ®No d. (i) Are Finger Piers included? ®Yes []No If yes: (ii) Number Please see MP-4 supplement (iii) Length Please see MP-4 supplement (iv) Width Please see MP-4 supplement (v) Floating ®Yes []No f. (i) Are Boatlifts included? []Yes ®No If yes: (ii) Number (iii) Length (iv) Width h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ® Dockage ("wet slips") only, number of slips: 75 ❑ Dry storage; number of boats: ® Boat ramp(s); number of boat ramps: 1 ❑ Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). mixed types I. (i) Will the facility be open to the general public? []Yes ®No DCM WILM NGTON, NC :a. 1 2014 252-608-2808 :: 1-888-4RC®AST :: www.nccoastaimanagament.net revised: 12/27/06 F®rm DCM IliliPA (Structures, Page 2 of 4) 2. DOCKING FACIUMMARINA OPERATIONS 0This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project ❑ Office Toilets ® Toilets for patrons; Number: 2, Location: Clubhouse ® Showers ® Boatholding tank pumpout; Give type and location: Dock A, eastern end. Fixed station. b. Describe treatment type and disposal location for all sanitary wastewater. Public sewer- Cape Fear Water and Sewer Authority for associated bathrooms. Stationary pump out on Dock A. No overboard discharge policy enforced by dockowners association. c. Describe the disposal of solid waste, fish offal and trash. Trash bins and dumpsters at various locations d. How will overboard discharge of sewage from boats be controlled? No overboard discharge policy e. (i) Give the location and number of "No Sewage Discharge" signs proposed. One sign located adjacent to marina pumpout (Dock A) (ii) Give the location and number of "Pumpout Available' signs proposed. One sign located adjacent to marina pumpout (Dock A) f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. No maintenance activities g. Where will residue from vessel maintenance be disposed of? No maintenance activities h• Give the number of channel markers and "No Wake" signs proposed. None I. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. No fuel service will be provided j. What will be the marina policy on overnight and live -aboard dockage? No live -aboard policy k. Describe design measures that promote boat basin. flushing? The corners of the proposed basin will be excavated to a -5' MLW depth. The center of the basin and the connecting entrance channel will excavated to a -6' MLW depth to promote flushing. I_ If this project is an expansion of an existing marina, what types of services are currently provided? RECEIVED NIA- Existing Everett family basin is adjacent but off -property to the south. DCM WILMINGTON, NC 21114 252-808-2808 a 1-888-4RCOAST :: www.nccoastalmanegernent.net revised: 12/27/06 Form DCM NIP-4 (Structures, Page 3 of 4) m. Is the marina/docking facility proposed within a primary or secondary nursery area? ❑Yes ®No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ®Yes ❑No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ®CW Within existing basin to south-1,788 soft. ❑SAV ❑SB ❑WL []None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ®No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. I BOATHOUSE (including covered lifts) ®This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑Public/Government ❑Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpde, etc. !f a rock groin, use MP-2, Excavabon and Fill) [I This section not applicable a. (i) Number 2- sheetpile ietties (ii) Length 100, (iii) Width 2' 5. BREAKWATER (e.g., wood, sheetpile, etc.) ❑This section not applicable a. Length 588-Ift (new breakwater in existing basin to south) b. Average distance from NHW, NWL, or wetlands Average 5' waterward of NHW. c. Maximum distance beyond NHW, NWL or wetlands ^-28' at mouth of existing basin at intersection with proposed jetties. 6. MOORING PILINGS and BUOYS ❑This section not applicable a. Is the structure(s): ❑Commercial ❑PubliclGovernment ❑Private/Community C. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present b. Number d. Description of buoy (color, inscription, size, anchor, etc.) A dolphin and two buoys are proposed in the exisitng Emmart's basin adjacent the south. These structures are intended for navigation/ purposes only and will not be used for mooring. e. Arc of the swing ). 7 2014 252-808-2808 :: 1-888-4RCOAST :: www.nccoasta1mena9ement.net revised: 12/27/06 Form DCM MP-4 (Structures, (Page 4 of 4) 7. GENERAL a. Proximity of structure(s) to adjacent riparian property lines Jettys approximately 1,000 ft to adjacent property to north and 150 ft to south. Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body > 1000' e. (i) Will navigational aids be required as a result of the project? ®Yes []No ❑NA (ii) If yes, explain what type and how they will be implemented. Reflectors will be located on the proposed jetties along the 100' sections and on channel markers. b. Proximity of structure(s) to adjacent docking facilities. More than 1,000 ft to north and 150 ft to south. d. Water depth at waterward end of structure at NLW or NWL -3' MLW 8. OTHER ❑This section not applicable a. Give complete description: 1�'tZAK Date Emmarfs Landing Community Marina Project Name SEL Property Investors, LLC Applicant Name T Applicant Signature DCM WILM NIGTON, NC 7-014 252.808.2808 :: 1-888-41MCOAST - www.nccoastalmanagenrent-net revised- 12/27/06 Emmarts Landing DCM-MP4 Supplement 12/13/2013 1. Docking Facility/Marina Characteristics c. Dock(s) and/or Pier(s) Structure Length ft Width (ft Dock A 185' 6' Dock B 355' 9" 6' Dock C 237' 8' Ton Dock C 73' 6' Dock D 287' 6" 6' See Figure 6 for labeling. d. Are Finger Piers included? Quantity Len th (ft)l Width(ft) Dock A 3 40' 47 2 8' 2' also 40' long oating slipdivider w anchors ud Dock B 2 30' 31611 6 34' 3' 6" 1 34' 4'6" 1 40' 4'6" Dock C .2 30' 31611 5 34' 306" 2 25' 3' 6" 6 29' 3' 6" Dock D 2 201611 21611 8 25' 2' 6" See Figure 6 for labeling. kayak launch docks (between Docks A and B' RECEIVED DCM WILMINGTON, NC -j: ' nq fwmIglFb BRIDGES and CULVERTS Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. BRIDGES This section not applicable a. Is the proposed bridge: ❑Commercial ❑Public(Government ❑Private/Community C. Type of bridge (construction material): e. (i) Will proposed bridge replace an existing bridge? []Yes []No If yes, (ii) Length of existing bridge: (ii) Width of existing bridge: (iv) Navigation clearance underneath existing bridge: (v) Will all, or a part of, the existing bridge be removed? (Explain) 9• Length of proposed bridge: b. Water body to be crossed by bridge: d. Water depth at the proposed crossing at NLW or NWL: f. (i) Will proposed bridge replace an existing culvert? []Yes []No If yes, (ii) Length of existing culvert: (Ili) Width of existing culvert: (iv) Height of the top of the existing culvert above the NHW or NWL: (v) Will all, or a part of, the existing culvert be removed? (Explain) h- Width of proposed bridge: 1. Will the proposed bridge affect existing water flow? []Yes ❑No J. Will the proposed bridge affect navigation by reducing or If yes, explain: increasing the existing navigable opening? []Yes []No If yes, explain: k. Navigation clearance underneath proposed bridge: I. Have you contacted the U.S. Coast Guam concerning their approval? ❑Yes []No If yes, explain: m. Will the proposed bridge cross wetlands containing no navigable n. Height of proposed bridge above wetlands: waters? ❑Yes ❑No If yes, explain: 2. CULVERTS ❑This section not applicable a. Number of culverts proposed: 3 Total - 2 replacement culverts b. at existing basin to south and 1 new culvert for RPW crossing Water body in which the culvert is to be placed: New culvert will be installed in an un-named relatively permanent water (RPW). Replacement culverts will be along existing basin to the south which connects to Masonboro Sound. RECEIVED 252-8084808 n 1-888.4RCOAST :: www.ncconstalmanagement.net revised: 10/26/06 For(tBti DCM MP-5 (Sridaes and Culverts, Page 2 of 4) < Form continues on backs c. Type of culvert (construction material): All three pipes will be reinforced concrete. d. (i) Will proposed culvert replace an existing bridge? ❑Yes ®No If yes, (ii) Length of existing bridge: (iii) Width of existing bridge: (iv) Navigation clearance underneath existing bridge: _ (v) Will all, or a part of, the existing bridge be removed? (Explain) f• Length of proposed culvert: New culvert proposed.in RPW = 70' long h. Height of the top of the proposed culvert above the NHW or NWL. New culvert proposed in RPW, at an elevation approximately 15' above NHW. j. Will the proposed culvert affect navigation by reducing or increasing the existing navigable opening? ❑Yes ®No If yes, explain: e. (i) Will proposed culvert replace an existing culvert? ®Yes []No If yes, (ii) Length of existing culvert(s): Existing culvert at north end of existing basin is approx. 36' Existing culvert at western side of basin is approx. 30'. (iii) Width of existing culvert(s): Existing culvert at north end of existing basin is approx. 15". Existing culvert at western side of basin is approx. 15". (iv) Height of the top of the existing culvert above the NHW or NWL: Replacement culvert at north end of existing basin will be at 1.42 MHW. Replacement culvert at western end of existing basin will be at 1.42 MHW. (v) Will all, or a part of, the existing culvert be removed? (Explain) Both existing culverts will be removed. 9• Width of proposed culvert: New culvert proposed in RPW = 18" wide Depth of culvert to be buried below existing bottom contour. New culvert proposed in RPW. minimum l' below road r9 ode. k. Will the proposed culvert affect existing water flow? If yes, explain: ❑Yes ®No 3. EXCAVATION and FILL [I This section not applicable a. (1) Will the placement of the proposed bridge or culvert require any excavation below the NHW or NWL? [--]Yes ®No If yes, (ii) Avg. length of area to be excavated: Both replacement culverts at the existing basin will be placed above MHW with center of culvert at elevation 1.42 MHW. (iii) Avg. width of area to be excavated: N/A (iv) Avg. depth of area to be excavated: N/A (v) Amount of material to be excavated in cubic yards: N/A b. (i) Will the placement of the proposed bridge or culvert require any excavation within coastal wetlands/marsh (CW), submerged aquatic vegetation (SA1n, shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑sAV ❑SB OWL 253 []None (ii) Describe the purpose of the excavation in these areas: The proposed (new) culvert to be placed in an RPW will impact 253 sq.ft. of the RPW to provide a road crossing for new roads within the subdivision. RECEIVED DGM WII h4lbJ TnN, NC 252-808-2808 :: 9-688-4RCo&ST :: wwrw.nccoastalrnanagement.net revised: 10/26/06 Form DCM MP-5 (Bridges and Cuivertts, Page S of 4) c. (1) Will the placement of the proposed bridge or culvert require any high -ground excavation? []Yes ®No If yes, (ii) Avg. length of area to be excavated: N/A (iii) Avg. width of area to be excavated: N/A (iv) Avg. depth of area to be excavated: N/A (v) Amount of material to be excavated in cubic yards: N/A d. If the placement of the bridge or culvert involves any excavation, please complete the following: (1) Location of the spoil disposal area: WA e. 9- (ii) Dimensions of the spoil disposal area: (iii) Do you claim title to the disposal area? []Yes []No (/f no, attach a letter granting permission from the owner.) (iv) Will the disposal area be available for future maintenance? ❑Yes ❑No (v) Does the disposal area include any coastal wetlandshnarsh (CW), submerged aquatic vegetation (SAVs), other wetlands (WL), or shell bottom (SB)? ❑CW ❑SAV OWL ❑SB ❑None If any boxes are checked, give dimensions if different from (ii) above. (vi) Does the disposal area include any area below the NHW or NWL? ? []Yes If yes, give dimensions if different from (ii) above. (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed below NHW or NWL? ❑Yes ®No If yes, (ii) Avg. length of area to be filled: WA (iii) Avg. width of area to be filled: WA (iv) Purpose of fill: WA (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed on high -ground? ❑Yes ❑No If yes, (ii) Avg. length of area to be filled: (iii) Avg. width of area to be filled: (iv) Purpose of fill: 4. GENERAL a. Will the proposed project require the relocation of any existing utility lines? ❑Yes ®No If yes, explain: ❑ No f. (i) Will the placement of the proposed bridge or culvert result in any fill (other than excavated material described in Item d above) to be placed within coastal wetlands/marsh (CM, submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ®None (ii) Describe the purpose of the excavation in these areas: Excavation within RPW described in 3.b.(i). b. Will the proposed project require the construction of any temporary detour structures? ❑Yes ®No If yes, explain: RECEIVED DCM WILMINGTON, NC 252-805.2808 :: 1-888.4RCOAST :: www.nccoastalmanagennant.net revlssd: 10/26/06 FOFM DCM MP-5 (Bridges and Culverts, Page 4 of 4) If this portion of the proposed project has already received approval from local authorities, please attach a copy of the approval or certification_ < Form continues on back> c. Will the proposed project require any work channels? d. How will excavated or fill material be kept on site and erosion []Yes ®No controlled? If yes, complete Form DCM-MP-2. Installation of the replacement and new culverts will follow all applicable measures outlined within the state approved in the sedimentation and erosion control plan. e. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? Backhoe for installation of culverts. g. Will the placement of the proposed bridge or culvert require any shoreline stabilization? []Yes ®No If yes, complete form MP-2, Section 3 for Shoreline Stabilization onty. /?/a '�v/� Date Emmart's Landing Community Marina Project Name SEL Property Investors, LLC Applicant me Of App. cant Signature f V . f. Will wetlands be crossed in transporting equipment to project site? j]Yes ®No If yes, explain steps that will be taken to avoid or minimize environmental impacts. DCM WECEIVED ILMINGTON, NC 262-808-2608 :: 1-888.4RCO ABT :: wwwr.nccoestalmanagernent.n revised: 10126/06 i a 9: � a F•v4wP ..7 T ice' F is } r _ ' t d� ,�4, t ` e 7` u AL AA .71 AL AF '. yr l' yy } y 7.1 RECEIVED DCM WILMINGTON, NC FFEB ?.IT20A *Boundaries are approximate and are not meant to be absolute. Map Source: USGS VViImington/Wrightsville Beach quads U air � Ir .may � •�-- _ 3 r SCALE 1" = 600' (printed at 11X17") 0 SA e4" SITE 39fi -n .SL �,�.. ad c� is�'i►5. �L"e` �i' � �� ^i �i 'A-,.+ • f a Y v ��� t ...,,•'�'a 1 ` '� � 2 `�a� {�!k, `` a� z �i�n-'�9 b� .n �- 'ts y*}�irss, } r"!' F S •! .� 1 _,{cam _ 4 „; -tl� Y. Y � i � a i•� ,� � iT �qkS•., i .: ' f, "a ` �j1s{ s r �. 9 - ate+.•. rs s� s a 'xDJ j k i s i - x m �5 Ja T vA, t• 5 Is — a:.. LMG LAKD MAKAGEMM GROUP ati Fnrlranmentat Cnnwhant, " wNw.LMGroup.net Phone: 910.452.0001 •1.865.1-MG.1078 Fax 910.452.0060 3805 Wrightsville Avenue Wilmington, NC 28403 CAMA Major Permit Application Emmart's Landing Community Marina New Hanover County, NC Figure 2 of 26 Vicinity Map Date: 12/13/2013 a a► pp � p d MIN 3 Proposed Impact "Waters of US" / RPW Legend oS Property Line "Waters of the US"- 404 Wetlands "Waters of the US" - Coastal Marsh WET WET Ex. Coastal Shoreline AEC Limit — — — Normal High Water "W— Upland Excavation (on -site) Upland Excavation (adj property to S) Maintenance Excavation -�- For Environmental Permitting Only. Site Plan and Base Survey Provided by: Not for construction. Paramounte Engineering, Wilmington, NC Proposed Poolhottse %�� V Proposed 75-sip I Upland Marirlia Basin (2-ac) Proposed Impact Proposed Upland Coastal Marsh / 'k9sp Entrance Channel t W" . Ex. Basin andEnwmd (40' wide x 505') otea �; M„,� Entrance Channel Adjacent to Souf .- Aqua Vista Farms LLC and Propos / h, • " Maudce S. Emmert Jr. Trustee � Ad'acentto �*. Mainte ante Dredging � Masonboro wET HarbourHOA RECEIVED DCM WILMINGTON, NC FEE Project: Date: Revision Date: LMG CAMA Major Permit Application 12/13/2013 2/11/2014 LA"MAtUOMIMCAOUP- Emmart's Landing Community Marina Scale: � Job Number: 0 150 300 600 � nr Elro—ta/Consultant. Title: 1"=300' Ave., 8ufte 15 Overview Proposed 02-13-096 3805 Wrightsville Drawn By: Wilmington, North Carolina 284M Telephone:910-452-0001 Subdivision and Docking Facility Figure: 3of26 !7 �� ?> §!� . § \ §k / / to CIS per" < a\§7 11 /� a§§\\ §\ �k -a - § CD6 � 2E E,k§L:w \ $ m5 0| % - § 2 ~ ' ( a«- k § § ) #§ƒ 0 / §LU k/ >p n §f ƒk w k k 11 ))LL \ 0 0 - §\ k�4 w }��:1 q<< �[\§§ rpm <==E< (D o0)(Di( <&§ <000 o0\ ma0to < ƒ))�0 �/.0 % G|tb Ett jfƒ/ƒ L , . � } § / U) k k \ w k 2 / k S / # % « a w I E # 0 k / 2 c k / § I � m � § octs U== a)\ ° 5 5 o n « = 7 0 c a a > I ■ o■ U£ / k 2 m 0 U k 7 o a I I°@° 5@ o o Q n CL 2\ / k 0 U- k w U-± W _©ca C,3 D a>20 m7 0� kECIS �co w0 a @ . � Esau MV z ro'v� � � F ure 30' Coas Mv� E horeline Buffer Woo&An n ESQ Boardwall(� G Coastal Shoreline AEC Limit Bulkhead (NCDENR ORW Limit) Future 75' Co I Shoreline AEC Limit � M.g Ex. Spoil / W - Disposal Area a dgedepth) W o , (see Sheets 9-11) 101 w� Clubhouse (MLW a t / d"e Q 8 depth) Mv� i O O Pool ,a � i ► �� i o Deck „ O My j` OF Pool Ouse/ 8 Re Oorris ., 0 OMir 1 Wooden - Boardwalk O n Sheets 23-26 for a Club h and:Poolho O -6' O , M"g Elevations Woad Deck d�a� Q , - 41W SidewalklPatio l � Building _ 1 Legend - • - Property Line - 4 4� ROAD "Waters of the US"- 404 Wetlands "Waters of the US" - Coastal Marsh" " "' ° oaxamt, ` ` a w Hanover Co. Conservation Proposed. ,~ Q - ,»""— . "if�r New coo Upland Basin X v / 6, � Resource Setback (Marsh) (2,173-I1t) / � MLw Ex. Coastal Shoreline 575' AEC Limit — — — Shellfish Closure Limit ��,`"�`�,t� (325) � Future Coastal Shoreline 75' AEC Limit —•••—•••— �W,, /1, i - Normal High Water KW— Site Plan and Base Survey Provided by: / Paramounts Engineering, Wilmington, NC Project: Emmart'S LandingDate Ex. 30' Coastal Shoreline Buffer For Environmental Permitting Only. LL4NDMG GROW - Community Marina scai Future 30' Coastal Shoreline Buffer - - - Not for construction. Title: 0 50 100 200 3805Wrightsville Ave.,6uge15 Proposed Upland Drav L Wilmington, North Carolina 284M Telephone:910-452.0001 Marina Basin and Channel L:\CAMA\2013 CAMA FILES102-13-096 — Emmarts Landing, D LoganWCAD1CAMA Master_2_2014_Resubmittal.dwg NHW at Existing Basin RECEIVED DCM WIL M NG ON, NC 12/13/2013 2/11/2014 Job Number: 1 "=100' 02-13-096 By: Figure: 5 of 26 N Future 30'toastal if Shoreline Buffer ~ — — Wooden - - — Boardwalk S'Ite Plan and Base Survey Provided by: DCM WILIvn1I" I UN, Upland Excavation (on -site) 2.48-ac .„� Paramounts Engineering, Wilmington, NC "��"�' •�_�• For Environmental Permitting Only. FEB J 0 sn 120 240 Upland Excavation (adj property to S) 0.3-ac Not for construction. _ --- ON BELOW NHW Proposed Maintenance Excavation 1.69-ac Final Depth of -6' MLW Note: Elevations below NHW relative to MLLW. Final dredge depth will be -6' MLW. MLW is 0.15' Project: Emmart's Landing Date: 12/13/2013 Revision Date: 2/11 /2014 =yLMG GROUP Community Marina �: Envlronmentaf consultantr Scale: Job Number: ri41v 1" = 120' 02-13-096 Wilmington, PropWrightsville Posed Excavation Drawn By: Figure: Wilmington, North Carolina 28403 p 7 of 26 Telephone: 910-452-0001 --------------- —El - '����-------- ��� 1 11 1 1 12 10 6 6 J 4 J 2 0 _2 Future 30' Coastal Shoreline Buffer Proposed Bulkhead (Height and depth to be determined by contractor) Cross'section B - B' Upland Excavation Existing Basin and Maintenance Dredging NHW Coastal (Ex. Basin) r Marsh Excavation Proposed Bottom J Upland Excavation - 6' MLW Hatched Area RECEIVED DCM WILMINGTON, NC FTB T-. 7 40.E?1 1+50 For Environmental Permitting Only. • 0 1.5 50 Not an engineered or surveyed drawing. Not for construction. L:ICAMA12013 CAMA FILES102-13-096 -- Emmarts Landing, D L Maintenance Dredging Cross Hatched Area !�LMGem Z LA►+.weNr AGeNOgoue,a< Envlronmmtol Consultants 3805 Wrightsville Ave., Suite 15 Wilmington, North Carolina 28403 Telephone:910-452-0001 Proposed Breakwater (Height and depth to be determined by contractor) Wooden Boardwalk (elevation and depth to be determined by contractor) 30' Coastal Shoreline Buffer 1 20 16 16 14 N 12 r_ 10 e Z 6 4 p 2 0 00 4 -6 L Final Grade Beyond Bulkhead per Proposed Bottom and Erosion and Erosion Control Plan - 6' MLW Tie -back system not shown. Coastal Marsh (to remain) NHW (Ex. Basin) or Proposed Bottom -6'MLW Emmart's Landing Community Marina Title: Excavation Cross Sections Tie -back system not shown. 12/13/2013 2/11 /2014 Scale: Job Number: 1 "=25' 02-13-096 Drawn By: Figure: 8 of 26 S ri Costar Services, Inc. P.O. Saar 1110M Mfihzfk % NUMM Y19.S1AAM Ernmart's Landing Disposal Area Reconstruction New Hanover County, North Carolina Disposal Area Capacity Calculation and Design February 4, 2014 %asonrbvr Disposal Area Atlantic Intercoastal Waterway This cross section was provided by TI Coastal Services Inc. for the. purposes of CAMA permitting only and is not for construction. RECEIVED DCM WILMINGTON, NC F L- ' LJ!7 CMS +,. r. ' y, is x` : ^ �! 4�`l`- # y{ r� . . nw, �' i, yf�y",} `.:h=5•'' z•>"i.' §r.} �S:�- I •:'� W. „ Disposal Area Capaci#y ti r: Elevation Cubic Yards s, F 01-7 y700 Eieva dons are mfefflen ed �, Dike rest _ i CiVeu "" :r �11it�##z: i�' ri its Day[ic�h� J. - cavatectL li �1� ; 6r ��xe Gan !rrsc3tiq WA}yy ���---yyy�.n 0. 2" Wide 5pii1wa Y ;, - With 24" 0ikharge Pipe, r ' bate.Symto 1 Date: it 42-13-096 _ - - _ �. -•• . _...... - . ... n-�Ite.,Spoll QjSPoz61__ ±� �3i nin Figure I _ �t Claasiai �t! 1��� - - - - - - - E%�l/ifc'7//'t Landing N1 H 1. Hori2onlal 6uWm: NC SWLe Plare-Zurre3200,NA090, Feat RECEC/�CR/� 2. Var llcal Oetmn: NAVM `D 3. Da lapmvided WTICoasWlin Fobruary20/4ard LoadbdxlermimcaMilyultra n a s a l XM WILMINGTON NC Coev rsiaf New Hanover County, NC . G►e hlrc Scale D6pusul ArwarddaxgnasullbHrldlkasysiamrordradyedkgp al. vaaa p 4. Suundinga are nxRrnsead In bulard 6arfVrs. P n a• far 5. 2010 Aefial or New Hanover County downkmMfmm Do New HaramuCourty US TAIA CDND�` ON =SURVEY - February 2014 = r . - ? j ' Srals: - 5P wabp,�, TI Coastal Selvice-% Inc. DWG MIME Dike Leyord dag P.O. Hex 17Q% Wdaarfpdeq NC744M Dike Design and Layout DWG D4rZ Fehr Y 4 2Dy4 SDRVEY DATE: FebfuaryZD'►4 VIASIZmm SCALE: ? a5D Slown2OFs ;a 7.5 STA 3+50.00 17. 1 8ram -s 15 15 2.5 12. Max Disposal FBI: 12' NAVD88 10 1Q Excavatianfor Dike Constwiion 7.5 7.5 -T —175 —150 —125 —100 —75 — 0 — 5 0 2P 50 75 1 0 1 150 175 Scala: 1' - 50' Hartz_ 1' - 5' Vert. Datum: NAVDBS 7,5 STA 2+50.00 17. 15 15 2.5 12. 1. Max Disposal Fill: l2' NAVD88 10 10 Excavaticnfix Dike Construction 7.5 7.5 —175 —150 -1 —100 — 5 — 0 — 5 5 50 75 1 0 5 1 0 175 Seals: 1' = W-- Hariz_ 1' = 5' Vert. Datum: NAVD88 7.5 STA 1+50.00 17. 15 15 2.5 12. Max Disposal FlII: It NAVD88 10 10 7.5 7.5 —175 —150 —125 —100 —75 —5 —25 5 50 75 100 12 1 0 175 SaalW 1' = 50' Nariz 1' = 5' Vert_ Datum: NAVDISV TI ,�e�oastal �1 i/ Coastal h7c. R0. Soar111105d IarSOraSb7a} IVCANAM S96C59Z.31Pi�S Ver"fiarmishaer Caewraft ,wlrass NGVDVB Scala 1' = 50' Horiz. 1' - 5' Vsrt. New Hanover CoantK NC C+'t �"JrJ N SURVEY - February 2Of4 Dike Design'ane Layout Project: - CAMA Major Permit Application Emmart's Landing Community Marina Date:.. 2/11/2014 Revision Date: Scale: Job Number: 02-13-096 Title On -Site Spoil Disposal Area Cross Sections Drawn By: I TI Coastal Figure: 1110. 11 of26"1 Datum: NAVD88 ampida SCab Naha: /� RECEIVED RECEIVED 1. Hurl null Datum: NC Slate Plsm-2bMaMD,NAMFwt marizasm 2.V."WO NiurmNAWN DCM WILMINGTON, NC 3. Data Provided WTI Coastal In February 211114ruiduadlodalarmirouapa*orew a. Ar mr ao, Dism"l Area and design a suribiaridbasyslem for dredge disposal. Seams'-sJW 4. Soundings are.xpn@%%Wln6Wadknf . 2010 Aartel or Now Hanover County dowalosid Earn 0n New HralowrCaunV 313 wabPaW. FEB5. B 1 2014 d Vertiol a• T s km DWG N.aIME Dirt a Lryrrwd &w Sae/e: SWG DATE Febmary 4 Z[H4 SURVEY DArEr rwer"awau" SCALE, AF Shown ShWT. 30F3 I N 411 + � 0 VS CL N CL# # 9 # PROjO�S� REq� +w 7�i r. va E= to N N r co oir 0 co CL be a o om !im am 0 0 0 L In 0 •+ ��• Q 00.o m Lo > 20 je 2N # a a LD/ co a T N 7 CL m / 0 a (D o oco �,/ 4' 0d - CL0 U, It 2Ym o ay a� m � i 12 m o• m a 20 E m s i ^ I a N ' a N T U ro o �• r 0 w m # N rA o L 0 0. C o 0-0 j , # µ!me cl) O M � a 0 p II � 0 u) T m 0 U a c L O Q_ a ao a) 00 �,m a a) a TiK ^ y C ` � 'a �o m CL 0 (D o aLi v) . C • N o v_ a v E m E o U W U L 'w��y_ ;� •Yx� rJ iW�' W 1 y0+ O m m 0o It N d Y m C m N m v RECEIVED 0 � DCM WILMINGTON, NC .c - a:' rn CD 3 i =rk No0 m L Q� U Z 49 L Z 0 m �' `O E 0 rn U m m a T r c 2 a� o� j m `m o a (D fn o =-rn w` o 0 a? € U o 0. mo a E a m w o JZ ccn a- =-'m `oo _ (no- I- Z �J 1 1 1 t I T-0a CONCRETE BOAT RAMP w/ FIBRE GRIP EPDXY COATING (INSTALLED TO MLLW ELEVATION). CONTRACTOR TO PROVIDE COLOR SAMPLES FOR OWNER APPROVAL. MHVi = 1.433' NAVD88 NAVD88 = 0.0' —\,MSL = —0.49' NAVD88 — 1 n i MLW = —2.38' NAVD88 6 g j 11 j II jl 111 11 If ,I I II 111 II II ! 1! j. II It II ,1 { II �� � i i , I 1, I II II 1 II II II , II , ,I t II II I „ It , I i i ELEV. _ —5.49 NAVD88 1 1 j I t I 1 11 If 1 1! 1 1 I 1 1 1! II I I 11 1 l l I t► I+ II 11 1 Il 11 11 1 1 1 I I I II II I t + 1 (ELEV. _ —5.0' MSQ , II II , 11 II 1 I II 11 II I II 1 11 II , II ,1 1 II It 1 I+ I , ,+ tl , II II 11 Ir 1 11 II ! II kl CUT SHEET PILE 11 , II ,+ 1 1 1 , I I I I I II 11 I II I I 1 1 I I I YI , II ,+ 1 11 II I I , 1 1 ,► 1 1 1 1 1 I t+ II , 11 I t l I I I I I II 1 II 1i 1 II !I I II I I I I I I + I 1 I I t l I t l t l TO TOP OF BOAT RAMP II , I , 111 II I I Ir , I I II II I t 11 , I , 1 II It 1 1 II 1 1 I I AFTER INSTALLATION OF RAMP IS COMPLETE Il , II ,I I II II 1 II 11 , II ,► 1 II I+ I II II , !I ,l t II 11 t 11 II 111 II I II 11 CMI UC-50 COMPOSITE SHEET PILE BOAT RAMP SECTION w/ 8'-0" EMBEDMENT 1/4" = 1'-0" BDS-01 This cross section was provided by Andrew Consulting Engineers for the purposes of CAMA permitting only and is not for construction. DCM WILM NGTON MOJ@Ct. vaw. r%enswn uaua. LMG CAMA Major Permit Application 2/11/2014 �g 2014 LM MAKAGERM GROUP w Emmart's Landing Community Marina Scale: Job Number: ,. [nrlronmental Consultants Title: 02-13-096 3805 WAghtsvilleAve., Suite 15 Proposed Boat Ramp Drawn By: Figure: Wilmington, North Carolina 28403 Telephone:910-452-0001 Cross Section Andrew Consulting PE 13 Of 26 9 V m t5 ^ 8 V Z c� a • c) J m t— x Zg OE— : ZWC O>v 0-9 H Z LLI Z ° �s a.oW.�a �irll.— U � ? <J:x —J$ Olwm— m i%i i'.i ` a a O IL 4 W o` • ra 0. Z. Mo F- c UJ z C Zas V q E Q A �2 mE z Y � LU at 'j —U 9Y N r� N N U- Yl > Q T. Z z 0 d5 N LL Z U z rto LinU- f a N N OD O C `" aa +K r 4 u BREq TER NVMER TA le SNlFF.T PRE --- e9l . i MW069 __ tELEV. - MS• ,EDQ� Y,RI -+1A3' MWON roeoee . as v OUPOWD: PEST PEE ELEV. - -e.3e' WOW (f1EAL - -0'0et!RNIIRIP�1 ti BREAKWATER A SECTION n ,/r - 1,-D• S4 1i NA OYX. CNRE-� O ERO Q JRIY TSYl \ 3 FT RE 0.1DfBR �� • W OF JLTR �YIIl Z CN, OC-SD— =_ OPIFOSeE SIeEr PEE _ PT"WALUM ENLARGED CLUSTER PILE FRAMING PLAN n ,�2• _ ,•-0• s4 a PgOte. li ,sa @ALY. ]eWIPe TA. RLE m•. - KqY NEvOeB --- -- _--- - 10Fa UN ro EACH WE x 'e- / AM . 0 Ex O FIO OF JETIT RN1S RNOE PPC GPI ALE G JEsI'r 1TA118 NANONM .......,... ....•-.. T.O. SHEEP ARE ELEV. - +190 NAMM CIII IIC-SOS. COYP0911E SNEEr POE '+,, I nm - Off A f TODEe 7— EJEY. - -OM N U TYPICAL 3 PILE CLUSTER DETAIL �1 1/r - 1•_0• $4 4 Sl` .'..-` TA AE I •� eRERt lm ,IMRER- TO. eRNMNONFR lemo I ! IlN11PR F W. WEET PDE toEN. - , DT miiu ON uc-n CMWONIE SHEET POE N,IN . +Tse' IINLVB � i j NWOBB . 0.7 A LLR - -IM —00 I , Et3]L -e_tl' NNDroe ((eEtl. tteEv. ast'% 1 BREAKWATER B SECTION n ,r2• - ,•-o- sa —PT LB CAP cm M Lam Tq. SHEET PRe r ElflL - +LSO' NNON �ti N.a ON.V. TRW-SOLM r/ OVERSRm Nq. OALY. v``WASXE% ! NUTS O 2'-.W OA CW es BORON) -W W-50 CONPOID,E SHEET RPM TYPICAL JETTY WALL TIMBER CAP TO SHEET PILE DETAIL %3) , I ff - rD•-54 TA PEE ATTACH SW!( B�ORRD TO ALE 1 4. . P B.A BOLTS TA eRSY1R'ATEe 14Vtl1ER SCO111UL SPF EFFEOT •1 FIW SERaS nD X BY 3N I' 1,-B• /-,�2i��re• PT PRE • 30' REQUIRED TYPICAL BREAKWATER MARKER DETAIL/-41 11r - 1'-0• S4 These details were provided by Andrew Consulting Engineers for the purposes of CAMA permitting but are not for construction. x> nE we W AT ENO1 PRE NONO JEt,Y'.1 s Ta PRE ELEV. - ♦9-W NAWee -. T.O. SUM PDE - 1 .W NLOIOee �0®IPW-10 SfB7 PRE .Am - Dff A_ f am go. - -am MOOeD KW - -2-w NYNee DUU NlLamtlD1. 9Er. - W awPE2 F1cv. - RPss r (tLEv. - -toq' NLTQ NORTH JETTY WALL SECTION n RECEIVED DCM WILMINGTON, Tq. R E L1EV.. w.so' Naaw Tq. WM ALE FLEV. - l430' NAYOL� CID UC-50 C016051E SSEEf R1E NAVDGi . OO' O fV- N eA SHM ALE s . - +1-W N NLN - -1-V WAOEe E.M NOACORK Em.. -V oPJEe e2v. • NwET r' LMG rROUPDK �j . Envlranmentp/ConsulfOnts 3805 Wrightsville Ave., Suite 15 Wilmington, North Carolina 2W3 Telephone: 910-452-0001 SOUTH JETTY WALL SECTION rp"N 1jr - 1•-0• S4 Emmart's Landing Community Marina Typical Jetty Details 12/13/2013 2/11/2014 Scale: Job Number: scale reduced 1:3 02-13-096 Drawn By: Figure: Andrew Consulting PE 14 of 26 WHITE PVC CAP F AT BREAKWATER MARKERS BREAKWATER MARKER � m __-- T.O. PILE Z J 19 J Rid I 04 >- V) L rz W a T.O. BREAKWATER O M Ge MARKER a W p ailT.O. SHEET PILE I m ° I i0 > > V o ELEV. = +1.93' NAVD88 o e - I J (ELEV. _ +0.5' MHW) -1-----1 T.O. SHEET PILE W r Z z W MHW = +1.43' NAVD88 ® ® All O O Z p HW�O �--r NAVD88 = 0.0' g t WJ:2_j eQ I I I I ELEV = -1.38' NAVD88 1 1 1 I I! Q I 1 @ I I I I Q r ;€� t I I© l i ®i i I!@ I t (ELEV. _ +1.4' MLW) L1 I Q MLW = -2.38' NAVD88 1 L"0 CLASS "B" I Ile) Q PT PILE x 30' lid I I CMI UC--50 o 2 COMPOSITE SHEET PILE ! I E I I S I I g N a PT 2x6 CONTINUOUS i W G z Wry w/ 5/8-0 H.D. GALV. BOLTS �' a °' w/ OVERSIZED OGEE 4 .� WASHERS & NUTS a N W z3 u � I o v z M u Z J ELEV. _ -8.38 NAVD88 & ' I I Q 1 1 Q I I I I Q I I ----- -- - U, 0 1= EV. _ -6.4' MLW) \ j\ \ _--' ; -�- \ff �, � / 'U a N o W REV._ -9.81' MNW) \ i i f \/ \/ RECEIVED DCM WILMINGTON, O Q rn U Z ' U. NC Q w v r �14 N a o Pl � Z a ELEVATION A Pro) Date: 2/11 i1014 Revision Date: � N CAMA Major Permit Application This cross section was provided by Andrew Consulting Engineers for the 1 /2° - 1'-O°p DS,O� Emmart's Landing Community Marina scale: o Number: ' of CAMA permitting only and is not for construction. purposes p g y Title: Proposed Breakwater 02-13-096 Drawn By: Figure: Cross Section Andrew Consulting PE 16 of 26 zz �m W + +�� —jam ca 00 I ' '�"�M„_'•I:1. \tea v o J •rr.l. + ANNA i , I:I:I:1. . 4w 10 3 Q C a O A EL m c"v U> U � N W cr v 0 A-- � p O..r-O m + + + i + M + + 1 + i + Ci RECEIVED DCM WILMINGTON, NC �G+ /o' • � f CO J F Q Y a m J + + i O�r m c co o v N t co) co) m coU F] 14 �A ♦- u CO � O CC ++ c U + i 5 C co w ° o CE c U a Q a Lo o a ��o y Q 5 � o V C LZO C Uf N 1U J 5;'z m Ip CL E Q Z 2, W U a) a Coco N f2 Q W o f O m r 3 m cm U� ti a>i c0 *+ O U c c N o ' c ® E a O O O m o m ci m >p L _� m W N 7 a N U) U = N c a> in m 2 ig c m O c ° o a m 31°n m m t U aE =o J UUMyWozW z c w� oU a. ina0 ILz 0 v � � a a� O o I 0 V WE I 0 a oc U Q 0 O cp W w N co Op0 �c c-O m-I 9 I r� RECEIVED DCM WILMINGTON, NC d 8 N � M N nN �40 0 �4• L R E c �a coo 0JLf%� N -J Fn Fcro p L N O d +-� -,0 15 O o a� ~ E N Q N N N aitsi a i- �� 1N� > o ui E �z 0 O Z) N L (L 4 0)O C Io L UR 2 LU C C O 21 '= U c O N O Q3 2 O 5 a L C= m CL a: w N m a m � J a` E2 pro Woo 'SS aE w2 .@m o� co am LLz Y • A;' • .o•STORAGE RO OSED I II IA E STORAGE COMMUNITY — — I' BOATING FACILITY n �I SE SHEET 2 1 FORTYPICAL I j z ICROS E TION Io IG _ _ c� _ — —� _ _� PROPOSED PUMP If IZ I y I STATION LOCATION 0 0 I ;I (SEE FIG-2 FOR DETAIL) 'r 0 m 4 .1 v I i>0 a ; a I_ 30' CAMJ5 �aETBACK D I I I + m i PROPOSED 12' X 24' GAZEBO �•� � I r r ' 3 1 �g L—_J S A' , CD 1 ....�� r wti f LEGEND: —w w-- PROPOSED Wj rm- n l r I Lt �. 4.! O PROPOSEDFC �wET ter / —FM—FM— PROPOSEDSE wEr weer wEr/ A I r r --4o PA - wer i, P et. AM ajor Pe atio Date: t' /21/9,b14 Revision Date: Emma Lauding Community Marina. scale: Job Number. 02-13-096 Title: UtiiitieS Overview Drawn By: Figure: Paramounte PE 16 of 26 GRAPHIC SCALE 0 50 100 200 SCALE: 1 "=100' AD FENCE a� CON ROL P'AN L LL VALVE ' :s W. VAULT Jry �. GENERATOR 60' PUMP STATION LAYOUT SCALE: 1"=40' & HIGH CHAIN LINK FENCE (SEE DETAIL BELOW) J w z ate. J 0 Z LL W VALVE U w VAULT WETWELL I - 60' — RECEIVED SECTION " DCM WILMINGTON, NC NOT TO SCALE r ED . 7 2014 72" L 36' SEE SITE PLAN � i 10' MAX •---- ----•- ALL POSTS TO BE SET IN CONCRETE 10" TYPICAL QFM LWK Fa CE NOT TO SCALE NOTE: ADD 3 STRANDS OF BARB WIRE ALONG THE TOP OF FENCE (SEE SPECS) 14' MINIMUM SEE SITE PLAN WIRE FABRIC 45 FT R/W 3' 4 2.6 2' 22' PAVEMENT WIDTH 2' 9.5' I I SLOPES= 3:1 Project: CAMA Major Permit Application Emmart's Landing Community Marina Date: 2111/2014 Revision Date: Scale: Job Number: 02-13-096 It e: PumpStation and Utilities raven y: Paramounts PE Figure: 19 of 26 1/4" PER FT 1/4" PER FT I I 1%2° TRUSSES SLOPES= 3:1 MAINQ / 04" FORCEMAIN LLEY CURB J O 8" SANITARY SEWER 1.5"-SF9.5A SURFACEJ MAIN (DEPTH VARIES) 4" STONE 6"4325.08 BASE UNDER CURBING TYPICAL ROAD CROSS SECTION 1M71" I UILm a NOT TO SCALE 0 z W �N� m �C E U z ate. O QO� w '_00 PQ A zz 0@ w C � SE& 2 of 2 PEIJDBM 1314BPE PROPOSED EXISITNG RPW DI EXISTING RPW DITCH BOTTOM —� EXISITNG RPW DI A' PROPOSED 18" (70' LENGTH) PROPOSED RIGHT OF WAY TCH 1" = 20' 0 10 20 40 80 ROAD A QFK= SECTION WITH CULVERT (A - A') NOT TO SCALE RECEIVED DCM WILMINGTON, NC FEB . A' P NGTF" LEGEND: ® PRCPOSED RCP PIPE Project: CAMA Major Permit Application Date: 2/11/2014 Revision Date: Emmart's Landing Community Marina Scale: Job Number: 02-13-096 Title: Fill in Waters of US - RPW Cross Section Drawn By: I Paramounte PE Figure: 20 of 26 O .g 0 U z 8�# a z � a � a i3 V z xz Q Q w � �Qo w I �z Z� 0 E ll z SS U Z SE& 1 of 3 PENOBY: 13148.PE I. BEGINNING OF WETLANDS EXISTING GROUND A MEAN HIGH WATER ELEV. (1.42') MEAN LOWER LOW WATER ELEV. (-2.50') 0 5" r Y BULK HEAD RTY LINE WE PLAN (A -A') GRAPHIC SCALE 1' = 20' 0 10 20 40 80 SCALE: 111=20' 'MINIMUM SEPERATION CROSS SECTIOiiI MTH OVERT (A — A') NOT TO SCALE LEGEND: PROPOSED RCP PIPE BULK HEAD EXISTING -GRAVEL DRIVE 15"RCP PIPE���l�J'_-_' (30-LENGTH) Project: CAMA Major Permit Application Emmart's Landing Community Marina Date: 2/21/2014 Revision ate: Scale: Job Number: 02-13-096 Title: Utility Cross Section Drawn By. Paramounte PE Figure; 21 of 26 1 -;7-:a a: Mix 0 s c zI_ G7 U z A�o x P4 O w v; H z e1 g34L Z 2 of 3 PO OM 181181E W ` 30' CAMA BUFFER I PROPOSED WALK WAY -� OPOSED LK HEAD 'RCP PIP 13 (36 LENGTH) a� 'sue PROPOSED BULK HEAD 0 MEAN HIGH WATER ELEV. (1.421 Project: Date: 2l11/2014 Revision Date: CAMA Major Permit Application Emmart's Landing Community Marina scale: o um er: Title: 02-13-096 Utility Cross Section Drawn By: Figure: Paramounte PE 22 of 26 1" = 20' 0 10 20 40 80 I SCALE: 1 "=20' EXISTING GROUND CAMA BUF ROPOSED WOODEN BOARDWALK \ 15" RCP PIPE �(36' LENGTH) i A' MEAN HIGH WATER ELEV. (1.42'; MEAN LOWER LOW WATER MEAN LOWER LOW WATER ELEV. (-2.50') CROSS SECTION WITH CULVERT (A - A') ELEV. (-2.50') NOT TO SCALE LEGEND: RECEIVED ® PROPOSED RCP PIPE DCM WILMINGTON, NC F E.R .¢ Z0`i4 z 0 aj z W � z zs�s a0 U z xz Q0U �DU,' o p w az o� w z Z� a CL I I io ah SEAL 3 of 3 PEIJOBQ 18146.PE 1 I I I I F----------------- L------------------------- 00() � I i 01 lit ` ---I L — o /— �` ffU 0 NCI 0 00 0 II II II II i % IN II II II L— — — — — — — — — — — — — — — — — — 4=—______��_—---------------- I II II Il II IN II II II I I II � II II II Il II II I III II II cJ=# FLOOR PLAN PC O T H R A N H A R R I S EMMAIiT°B LAN111i CLUGHOUSE 7 A R C H I T E C T U R E 5725 OLMAND9R DRIVE✓, SUrJ E-i SCALS: t"=10' X. WILMINGTON, NC 28403 JAMUARY 15, 2014 c K 8 This cross section was provided by Cothran Harris Architecture for the purposes of CAMA permitting only and is not for construction. LMG —11ANA11—T 0-- sc = Environmental Consultants 3805 Wrightsville Ave., Suite 15 Wilmington, North Carolina 28403 Telephone: 910-452-0001 RECEIVED DCM WILMINGTON, NC I B ,..• ` f,l7 �EI CAMA Major Permit Application 1 2/11/2014 Emmart's Landing Community Marina scale: 02-13-096 Proposed Clubhouse Drawn By: Figure: Floor Plan I Cothran Harris Arch. 23 of 26 This cross section was provided by Cothran Harris Architecture for the purposes of CAMA permitting only and is not for construction. �iZLMG LAND MANA(1UONT OAOUP me '� Environmental Consuhants 3W5 Wrightsville Ave., Suite 15 Wilmington, North Carolina 28403 Telephone: 910-452-0001 Project CAMA Major Permit Application Emmart's Landing Community Marina Title: Proposed Clubhouse Elevations RECEIVED DCM WILMINGTON, NC F EP, .. s 7-0,14 2/11/2014 02-13-096 Cothran Harris Arch. V 24 of 26 v w v N to Z- I% COTHRAN HARRIS A R C H I T S C T U R E 5725 OLt ANDrR D.RIve, Surm E-1 �j WILMINGTON, NC 28403 c 33'-4 34' 28'-0" 16-4 3/4" II �--4, \ Women's l II III III Pool . ly II I Equip. �' \♦ P Ien's j • 1 u Ft Ir Outdoor Kitchen \\\ IIII IIII I I IIII IIII I I =Q__ IIII Ilil I I II III u u T-11" 1 12'-2" 1 T-11" 5'-4 3/4" 3.3'-4 3X' F?,OnR PLAN This cross section was provided by Cothran Hams Architecture for the purposes of CAMA permitting only and is not for construction. i� LMG LAND IdANAGSMHN'C GROUP o,c ---� Environmental Con ww", 3805 Wrightsville Ave., Suite 15 Wilmington, North Carolina 28403 Telephone: 910-452-00 01 EMMAirrs LANDING- POOL HOUSE s CALE: 1 R=10' JANUARY 15, 2013 CAMA Major Permit Application Emmart's Landing Community Marina itle: Proposed Poolhouse Floor Plan RECEIVED DCM WILMINGTON, NC 2/11 /2014 02-13-096 awn By: Figure: Cothran Harris Arch. 1 25 of 26 - �"'gy _ . 1BIC .1 MIL IT! . . . . . I L I J -L M 11 II II =11 II 11 I I - L I.tL j1`r1 r,-I�I lr 1 r *'7Tr I`-�T I '_i.' i I "LiA i L I I I I 1 I ELEYA'rIONS (—% C O T H R A N H A R R I S EMMAFrr5LANDING- EOOLHOUSE ARCHITECTURE RECEIVED � 5725 OLSANDBR DRIPS, SUITS E-i scALB: 1 rr= o' DCM WILMINGTON, NC EQ WILMINGTON, NC 28403 JANUARY i5, 20i� ER : ` Z014 ., Project Date: 2/11/2014 Revision Date: �I~ This cross section was provided by Cothran Harris Architecture for the L M G CAMA Major Permit Application ;- LAND MANAGEMENT GROUP— Emmart's Landing Community Marina Scale: Job Number: purposes of CAMA permitting only and is not for construction. EnrlronmrritalConsultants Tile. 02-13-096 3805 Wrightsville Ave.. Sufte 15 Proposed Poolhouse Drawn By: Figure: Wilmington, North Carolina 28403 Elevations Cothran Harris Arch. 26 of 26 Telephone: 910-452.OD01 r UNCW PROPERTY GRAPHIC SCALE - SCALE: .1 "=300' SURVEYORS CERTIFICATION- pygr I, DAVID M. EDWARDS, PLS HEREBY CERTIFY THAT THE WETLAND AREAS SHOWN ON THIS '�A 1 MAP WERE SURVEYED AND PLOTTED FROM WETLAND LOCATIONS MARKED IN THE FIELD BY OTHER PARTIES. THIS CERTIFICATION. EXTENDS ONLY TO THE LOCATION OF " USACOE CERTIFICATION . 'THIS CERTIFIES THAT THIS COPY OF THIS PLAT ACCURATELY DEPICTS THE BOUNDARY OF THE JURISDICTION OF SECTION 404 OF THE CLEAN WATER ACT AS DETERMINED BY THE UNDERSIGNED ON THIS DATE. UNLESS, THERE IS A CHANGE IN THE LAW OR OUR PUBLISHED REGULATIONS. THIS DETERMINATION OF SECTION 404 JURISDICTION MAY BE RELIED UPON FOR A PERIOD MOTTO EXCEED FIVF�.Yj .$ FROM THIS DATE. THIS DETERMINATION WAS MADE-UTILIIlNG THE REGIONAL SUPPLEMENT TO. THE 1987 CORPS OF EN Gli W i �-1�A MANUAL" REGULATORY OFFICIAL ' TITTLE ; :.. LINE 133IyCz__ DISTANCE LINE----BItiARING __ DIS.TANCE L265 `: 4.46' 8" 13 7 ; L277 = N7,5'48'S8' E...: 1 B.1 T . _. L266. - 3 'W' 0"E. — 170.W' a278 Q .. 52.34' 9. E L2.S$.. S1.1•�4'10 -: .. _16 ::._:: ..- _�L8Q__. - F�� -S 1. L269 r _y . _.... N24 754E - 150.65 L281 r...;, ..._. 3'1.5 53•• Z4. 2....... .:.......... . . Lz7b'-°.: :.._. -... 16'16'14"E� 7. -= .5 ,:. 2R2' _ S25' 6'57"W . :1..02.$B':.:..::: L27 ' 20' ... L283....__.:.._...: ` 0.60' .... S14'3 '0TW 302 75` . L284 .. „ 130.41' L273 N69 2 `06"E WETLANDS r ..._ L274 :. _._ . " _ . AREA IN -ACRES.. w ¢ L275 _ G.. 5 _ .:. 7 N16'S1 0 I:_ 44..75' _. - TOTAL TRACT AREA: "404 $:9 $3:. w v~i °D _L276. _- D AREA: 5.43 > I-- -TOTAL' RPW AREA. 0:11 Z Z Z UQ 0 L UPLANDS AREA: _ .-.------------ - - TOTAL RPW` LENGTH: 1419 FT 1� = O STA-M.OF NORTH , a.. Z a. DB " Po 0665. "r r O LLI r7 PRIVA A. .�.. :. EMDOWMENT OF UNCW STATE OF NORTH CAROLiNA" De 5326 Pc 1737 Dix eas _.. W DB .Aso Po IW7 SHEET 2 h o. 00 bz ENV z RPW LENGTH. 5 '. ;;"'$� } z P SEL PROPERTY INVESTORS LLC D8 5785 PC 2974 - -_ ....w. cn �r O ... a 0 .:. o Z ., �4 0 58538'09'E 640.91 : V z �• ...... -_ "mow � ,� Fo AQUA VISTA FARMS, LLC ' DB SNS PC 2812 MAURICE S, DO 3W+ PC 24P .. 58531'41'E - - 1504.90' - g 77 ♦tigN84RCJ H. ARBOUR' ` sut a : BOAT BASINS . ORO k1C%.R-I#Y.,, INDEX RECEIVED DCM WILMINGTON, NC DEC 17 2013 LINE TABLE..... LINE.: BEARING pISTANC.E... L2 S70 2T43"E-_-- 31- -p21.. L3 . S40'12'33"E 12 23'. L4. S33 41.`.07w.. 33 09' . L5 31'17'19 YV L6 SO4`4810' W L7 ... S39'19'58' E. 42-i e L8 S 3' 19.66' L9.. "W 50 5' L11 .. .. N71'OS' 4"W . 40.53' L72... N74.7736"W 53.42' L13.. h1..4... sag ' . L15 NOW 9" . 1' L16._ 6 L17... _...... .NI.6'27.52".E .. ' L18 . 8T 2"E . 45.2 L19. 2410'2 '' _ L2Q 60 42'24"W 4 L21 N8109 29_ W,:. - . 7: 2: L22 S83 55'37"W- . 2 8 i L23 N10 34 0 bW 27 72' L24 a�72'09'24''28. 48' 125 �r�4' 7':.:.. 2' L2fi N71'4 'iT`E 6, 80' L27 63"19'28"E 35.00' L28 0' 0 301.51' L29 Sl_2' . '44"W. r: 2.6.80' L30 . S27'4 '35" 7.38' L31.... .. _ S79'41'6S.. L32._. .. ..... S75'1.0'S9 L33 LINE TABLE ljNE BEARING.... AISTEINCE. ,. L.34 . S30'3T3.5" 34.9. ' 05 0 '30'11"W ;. ___23.4.0' L3G S ,59" .... _.40,13' L38 S22'21'02"E 24 .. ' L39 N7 _'54'30" 7 b95'..... L40 N79'11'14" W ..:-3:9.18� L41 6 06'44"W 74.97. L42 :... .. T10'`IN:.. 49...45' ..... _ ...143 1.44 N1 '13 9g..w 90 06' L45 4' 3 . E a i tm STATE OF NORTH CAROLINA U) o DB 3688 PG 0555 z z z U0 N69'57'15"W � � � zo 46.90' - --� -- a o (TIE B,+'T L28 & L29) 'rPRIVATE RIGHT o z - - � d z� ENDOWMENT OF UNCW a d b, DB 5080 PG 1387 + n�if N70'27'43" NV ..:... t' (TIE R/T L1 & L2) - 702.62' v 713 243"W iav - 404. WETLANDS.:(-+ D H ' .... rq08 A F jgeor 4 a o i m �3 z rn N ' o- UPLANDS..:., SEL PROPERTY INVESTORS, LLC DB 5768 PG 2974 R g L47 L55 .,, 1.56 L57 S: L58 S L59 L6D • L61 S L62 ; L63 L64 ,S S L65 S :Lsr ... .. ,$ L68 L69. L70 N L ` I MATHIAS P. t t HUNOVAL N7116'59V� - STATE OF NORTH CAROLINA DB 5589 PG 633 DB 5326 PG 1737 (TIE B/T L118 & L46) - — — .i.# L120 TIVELY PERMANENT WATERBODY AT ORDINARY': HIGH WATER MARK .; J ' N70'27'43"W' . 1.98, i n >.' PROPERTY LINE ALONG INSET A MEAN HIGH WATER TABLE L1^a Al21NG.. DISTANCE : Z RELATIVELY PERMANEN:.- 45'Qg"E 43,80' m WATERBODY AT ORDINARY »yv 34 tom-., HIGH WATER MARK z0'Sf"W x ,o `2" 5819"E 31 2 ' N UPLANDS 15'.:427)M J rrl SEL PROPERTY INVESTORS. LLC 4 '3 "E 7.90' DB 5768 PG 2974 - 2 " 1 g a. '4 LINE TABLE ' NE ...... .... I DISTANCE BEARING! L53 li ': ---- _ _ " . m L84 0. 1'44"E - .20 24' , s9'5:4"W .: 6 70 LBO as N L86 J"W Z22. i' 6 65' L87 1 '0 . 6 L88 0„W -- ... Lag J1. '1T59"W .......... 3, - - E S1:5 47' .."W ' _.. J `i L.91 -- ...55 2 5..3 is .. ..... 32 45 E 4 .90.... L:'95 ... , .. » 27..06' ... :. 1'56"W. 28.52' L94 3 _- .7. . 16.13E 19] E97 22'22 0•_E 58'O4"W 50.701 L98 S76'57'45"E 22 D8' 32'03"E i 5.70' L99 N51 6' "E 40.9 . ..: [cn Ld LU NN F ZZ 0 K. 0 I.- . 0 0�.Z3 0�,: N, � zo �U f o RZ 4� sr U. P. J ( Q 60 A y3o P4 O Q Z 0OO k ' r 32.88' :.. ti00 -S.-'S'`.. 9'4. zs.15' ' MATCH:LINE...TO. SHEET,.4 ._ - :.. MATCH LINE TO SHEET 4 - usa RCP 1"'..; _ -1� GRAPHIC SCALE UPLANDS..., . �tFB't�5' ` � _ 1 1"=100'' .. _..... . `: :. y.... SCALE. iPF OF REC WED 1 tf -AQUA VISTA FARMS. LLC DCM WILM I . GTbN, NC 08 5746 PG 2812 '05-,,, 29...27' ._.. L101.._._. SIB- �'0 47.28' ......... -SEAL 2 of 4 36 6 L102 513 56�:9.7 S7' '. _. 47 9 ' L103 S11.5 g W 1Q 5 "s �.-:.». s 7' L1 1 8 :6 w 3' » L119 5"W 8, �:.. ��. ,� .... L12 :.. » ._ .. aal7 3.. ] ,-..: 4 . :: 3 a . 3' 4 , L121 ... 02 L122 _._:_.. _ :...: at �.._8� 5. 4.39 .. _"..... _..... .[ ....... .... . . ..... . ...... .... . ....... L INE TABLE AJ.NE' -1 ..SEARING Ll 55' 15=6 Li L175 L178' U 79 Ll 87 Ll 88 Q 8§ Lloo L191 L192 Lm L194 . 7 7 . . ... ..... 215 L216 . ...... 2' L217 -0 N-&3_5'06-W'-_ -Ul 8 T -39;;w -77! Ali Ftl' 7" N50110 a i'. Rl �lwm wwwm_ SEL PROPERTY INVESTORS, LLC DB 5768 PG 2974 l. ANCE INSET B tse N79MW39" UPLANDS- 75A9' �MATCWQNE MEAN HIGH S3. 51 IE WATER � ELEV. (NAVD 4. • (AUGUST 22013) INSET'q�--' • WATERS OF THE U.S .—/ N.: AQUA VISTA FARMS, LLC DB 5746 PG 2812 T7 UPLANDSJ LA --hit-AN. HOW RCP 15* N86'01'43" MAURICE S. do26.38' PATRICIA EMMART DS 5004 PG 2620 D9 1090 PG 273 —49W—j IRF TO SHEET 2 LINE TABLE LINE. BEARING DISTANCE Ll 04 a2_0'-O9'3,97W.. L105 ''S,1,2'O2'4_4jf... N7,4722!05"tl . 21 A2 Ll.07—. .4.4 *Z 22.37' gm 36.LO', L109 S17.'46-09N. -LI-I 0 --__;tJ06'2,6.'567E.. Lill L 112 N 1 X.2. 2! 5 CIE 37-97- -'E Ll 4 L115- -N 641K.W... 61 , S46*40'13'0��,--rj f vw. ,.---..INSET C. UPLANDSJ W TER N 863*01 E 26.38' L115 u X1 f ....,GRAPHIC SCALE SCALE: i '=100' cif of �: uJ U) V) 04 F- C-) z Z 0 0 U- Z 0 W-i w 0 CL wz �o ir 0 0- z o LLJ Zn Rl A A 4 Uge o 0 > 14, z 4of4 Helms Port Masonboro Loop Road NEW HANOVER COUNTY, NC STORMWATER NARRATIVE61 .. � Prepared for: SEL Property Ines#ors, L,L,C 310 North Front Street Wilmington NC 28401 Prepared by: PA�-�►l�IOLJNTE B N 10 1 N E E F2 t 5911 Oleander Drive, Suite 201 Wilmington, NC 28403 NC License #: C-2846 Project #13146.PE February 2014 NC _ ` � • EA C L 1 1A�,,���' rrrhrnunwu��U„� Helms Port Masonboro Loop Road NEW HANOVER, NORTH CAROLINA Project #13146.PE Table of Contents Design Narrative Proposed Improvements Maintenance Erosion and Sedimentation Control Specification New Hanover County Soils Map USGS Map Secretary of State Documents Deed Stormwater Calculations-1-YR 24 HR Results Stormwater Calculations - BMP Results Wetland Approval Letter Soils Report Page i DESIGN NARRATIVE SEL property Investors, LLC proposes to construct a 159 lot residential neighborhood with amenity area and community boating facility off of Masonboro T op Road just north of Masonboro Harbor Drive in New Hanover County, NC. As a result, please find this design narrative, plans, and supporting calculations. The address of the property is 100 Aqua Vista Drive, Wilmington, NC with a latitude and longitude of 34°08'24"N, 77°52'33"W (Deed Book 5768, page 2974). Soils consist mainly of Leon sand, Lynn Haven fine sand, Seagate.fine sand, Tidal marsh, Torhunta loamy fine sand, and Wakulla sand, with small amounts of various other soil types as shown on the enclosed soils map. In the calculations, the total stormwater boundary is 75.2 acres with 1.2 acres of coastal wetlands. The amount of area that drains to the BMP's based on location of impervious area is 61.2 acres, this is reflected in the calculations, the RA-1-3 drainage areas represent the area that does not drain to the BMP because of absence of impervious area. The portion of the project within the 575' ORW line set by CAMA is 3.06 acres, with an impervious coverage in this area of 0.54 acres which equates to 17.6% below the 25% threshold. All stormwater runoff will be directed by way of a storm sewer system to an adequately designed stormwater BMP. The stormwater BMPs across the site include wet detention ponds, infiltration trench systems, and an infiltration basin. All BMPs have been designed to meet the State's stormwater quality requirements, as well as, New Hanover County quantity (pre/post) demands. Since the project discharges to SA waters, please find that the wet detention pond draw -down orifices are routed to secondary treatment infiltration basins that will discharge the water quality design storm into the subsoil. In regard to the infiltration trenches, please find that each trench has been individual sized to store the design storm and then discharge additional flow through a bypass structure. Please find all supported calculations within the following pages of the report. MAINTENANCE Contractors shall be responsible for periodic inspection and maintenance of all indicated erosion control devices in accordance with the plans and specifications. In addition, inspection and any necessary maintenance will be required immediately following any significant storm event. Sediment will need to be removed from behind silt fencing as described on the Erosion Control Plan. Vegetative cover will be fertilized and reapplied as necessary to promote a vigorous stand. Page 1 EROSION AND SEDIMENTATION CONTROL SPECIFICATION PART 1-GENERAL 1.1 RELATED DOCUMENT A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 WORK INCLUDED A. Contractor shall take every reasonable precaution throughout construction to prevent the erosion of soil and the sedimentation of streams, lakes, reservoirs, other water impoundments, ground surfaces, or other property as required by State and Local regulations. B. Contractor shall, upon suspension or completion of land -disturbing activities, provide protection covering for disturbed areas. Permanent vegetation shall be established at the earliest practicable time. Temporary and permanent erosion control measures shall be coordinated to assure economical, effective, and continuous erosion and sediment control throughout the construction and post construction period. 1.3 RELATED SECTIONS A. Related Sections — The following Sections contain requirements that relate to this Section: 1. 01011— Existing Underground Utilities 2. 01015 — Special Conditions for this Contract 3. 01070 — Shop Drawings, Project Data & Samples 4. 02200 — Earthwork, Excavation Trenching, and Backfilling 5. 02230 — Site Clearing 6. 02240 — Dewatering 7. 02485 — Seeding General Areas 1.4 REGULATORY REQUIREMENTS A. Contractor shall be responsible for prevention of damage to properties outside the construction limits from siltation due to construction of the project. The Contractor will assume all responsibilities to the affected property owners for correction of damages that may occur. Erosion control measures shall be performed by the Contractor, conforming to the requirements of, and in accordance with plans approved by applicable state and local agencies and as per the erosion control portion of the construction drawings and these specifications. The Contractor shall not allow mud and debris to accumulate in the streets. Should the Contractor pump water from trenches during construction; appropriate siltation preventative measures shall be taken prior to discharge of pumped water into any storm drain or stream. Page 1 PART 2 - PRODUCTS 2.1 Open mesh biodegradable mulching cloth. 2.2 Fertilizer shall be 10-10-10 grade or equivalent. 2.3 Lime shall be dolomitic agricultural ground 1 limestone containing not less than 10 percent magnesium oxide. 2.4 Phosphate shall be 20 percent super phosphate or equivalent. 2.5 Provide grass seed mixture as shown on the plans. 2.6 Silt fence shall consist of non -biodegradable filter fabric (Trevira, Mirafi, etc.) wired to galvanized wire mesh fencing and supported by wood or metal posts. 2.7 NCDOT Class B stone for erosion control. PART 3 - EXECUTION 3.1 CLEARING A. Clearing and grubbing shall be scheduled and performed in such a manner that subsequent grading operation and erosion control practices can follow immediately thereafter. Excavation, borrow, and embankment operations will be conducted such that continuous operation. All construction areas not otherwise protected shall be planted with permanent vegetative cover within 15 working days after completion of active construction. All slopes shall be planted within 21 calendar days after completion of such activity. 3.2 STABILIZING A. The angle for graded slopes and fills shall be no greater than the angle that can be retained by vegetative cover or other adequate erosion control devices or structures. All disturbed areas not to be paved and left exposed will, within 21 calendar days of completion of any phase of grading, be planted or otherwise provided with either temporary or permanent ground cover, devices, or structures sufficient to restrain erosion. All slopes steeper than 3:1 shall be planted or otherwise provided with either temporary or permanent ground cover, devices, or structures sufficient to restrain erosion within 21 calendar days. 3.3 REGULATORY REQUIREMENTS A. Whenever land disturbing activity is undertaken on a tract, a ground cover sufficient to restrain erosion must be planted or otherwise provided within 15 calendar days on that portion of the tract upon which further active construction is to being undertaken. B. If any earthwork is to be suspended for any reason whatsoever for longer than 15 calendar days, the areas involved shall be seeded with vegetative cover or otherwise protected against excessive erosion during the suspension period. Suspension of work in any area of operation does not relieve the Contractor of the responsibility for the control of erosion in that area. Page 2 PART 4 - CONSTRUCTION PHASE 4.1 PRACTICES A. Avoid dumping soil or sediment into any streambed or watercourse. Backfill for stream crossings shall be placed dry and compacted to minimize siltation of the watercourse, where applicable. B. Maintain an undisturbed vegetative buffer where possible between a natural watercourse and trenching and grading operations. C. Avoid equipment crossings of streams, creeks, and ditches where practicable. PART 5 - SEDIMENT CONTROL FEATURES 5.1 GENERAL A. All devices (silt fences, retention areas, etc.), for sediment control shall be constructed at the locations indicated prior to beginning excavation on the site. All devices shall be properly maintained in place until a structure or paving makes the device unnecessary or until directed to permanently remove the device. 5.2 DESIGN APPLICATIONS A. Mulch shall be used for temporary stabilization of areas subject to excessive erosion, and for protection of seed beds after planting where required. 1. Jute, mesh, etc. should be installed as per manufacturer's instructions. B. Silt fences shall be used at the base of slopes and in drainage swales to restrict movement of sediment from the site. Straw bales may be required for reinforcement. C. Riprap shall be used at the proposed outfall pipes as indicated on plans. D. Establish vegetative cover on all unpaved areas disturbed by the work. 1. Preparation of Seedbed. Areas to be seeded shall be scarified a depth of 6 inches until a firm, well -pulverized, uniform seedbed is prepared. Lime, phosphorous, and fertilizer shall be applied during the scarification process in accordance with the following rates. a. Lime — 2 ton per acre b. Nitrogen —100 pounds per acre C. P2O5 — 200 pounds per acre 2. Seeding. Disturbed areas along roads and ditches shall be permanently seeded with 10-20 pounds per acre of centipede during the period from March through September. Seeding performed during the period from April to August shall be temporarily seeded with 40 pounds per acre of German Millet. The permanent vegetative cover will be over seeded at the earliest possible time as specified above. 3. Mulch all areas immediately after seeding. Mulch shall be applied and anchored as specified hereinbefore. Page 3 5.3 MAINTENANCE A. The Contractor shall be responsible for maintaining all temporary and permanent erosion control measures in functioning order. Temporary structures shall be maintained until such time as vegetation is firmly established and grassed areas shall be maintained until completion of the project. Areas which fail to show a suitable stand of grass or which are damaged by erosion shall be immediately repaired. 5.4 REMOVAL OF SEDIMENT CONTROL DEVICES A. Near completion of the project, when directed by the Owner's agent, the Contractor shall dismantle and remove the temporary devices used for sediment control during construction. All erosion control devices in seeded areas shall be left in place until the grass is established. Seed areas around devices and mulch after removing or filling temporary control devices. END OF SECTION 02410 Page 4 NEW HANOVER COUNTY SOILS MAP .LV 4G .LL .A4 .SS .LL .91?BLS .LL O vm 0w 06 a d Z Soil Ma"ew Hanover County, North Carolina Map Unit Legend New Hanover County, Worth Carolina (NC129) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI JO Johnston soils 2.3 2.4% Le Leon sand 20.0 21.4% LY Lynn Haven fine sand 19.5 20.8% Nh Newhan fine sand 1.1 1.1% Rm Rimini sand, 1 to 6 percent slopes 0.3 0.4% Se Seagate fine sand 5.7 6.1 % TM Tidal marsh 7.9 8.4% To Torhunta loamy fine sand 20.6 21.9% W Water 1.0 1.0% we Wakulla sand, 1 to 8 percent slopes 15.5 16.5% Totals for Area of Interest 93.8 100.0% Natural Resources Web Soil Survey 4/23/2013 — Conservation Service National Cooperative Soil Surrey Page 3 of 3 USGS MAP 10, 3785 "83 r a 1 MasoyBpRo 0 v j - So(/ND q0 t `5 A � � , � pRCyA w` "/ot�ry 2r i ' �4iyy�y 'Pd rp�f Mawnboro CT C 44yc ! TfR CT m ,, MillbrOOli dU FINIAN OR O � I D/S,yFr c I v SHo?, �FRF�A'/%gy O H41*16 dh/!� -25 ' 25•. {�14 � U N - FNNF TR[ Rq/lS A Rp Tanglewood Ho/jdAry'cis D Masonboro uCA^'jDo/ R Boar Yard SO&V'D �Rd and Marina �c pyAk'/f TR( �'H/P,00 pR�/` DRAj SF M/yp�TRc - NC �Sye"ya, �9 FR/FND�rZN' ?�Oeg SHOEM4I( t4tL S(N FRS4y 3782 ,. CAPTAINS[,, MpfSlN I '�LgJOygl'/f2Wd appo O, 3781 A 01* 4CIUe -ref dta� p'yT 140 000 FEET RFNNFp . 3780 �Ro : Peden Point Z� Masonboro Sound Musowtboro Channel Masonboro Island Z17 1 2 350 000 FEET ZIA SECRETARY OF STATE North Carolina Secretary of State https://www. secretary. state.nc.us/corporations/C,orp.4spk?PitemId=10266114 Account North Carolina Elaine F elar', h It � =, : `i�i�i� t �I ! 01 I- t 1, PO Rox 2%22 Rah.-. 1, NC 271626.0622 19*1<i)Ril7.2'�?i1 Date: 12/11 /2013 here to: Document Filings I File an Annual Report Print a Pre -populated Annual Report Fillable PDF Form I Amend A Previous Annual Report Corporation Names Name Name Type NIC SEL PROPERTY INVESTORS, LLC LEGAL Limited Liability Company Information SOSID: 1320996 Status: Current -Active Effective Date: 6/3/2013 Citizenship: DOMESTIC Duration: PERPETUAL Annual Report Status: CURRENT Registered Agent Agent Name: KEETER, JEFFREY P. Office Address: 310 NORTH FRONT STREET SUITE 200 WILMINGTON NC 28401 Mailing Address: PO BOX 4 WILMINGTON NC 28402 ncipal Office Office Address: 310 NORTH FRONT STREET SUITE 200 WILMINGTON NC 28401 Mailing Address: PO BOX 4 WILMINGTON NC 28402 Officers i nis werisne is proviaea io the puouc as a pan of the Secretary of State Knowledge Base (SOSKB) system. Version: 2068 1 of 1 . . 12/11/2013 2:53 PM DEED NORTH Excise Tax: , 00e j , /9 e) A 1191033179�M�IIIE9 FOR REGISTRATION REGISTER OF DEEDS TAMMY THEUSCH BEASLEY NEW HANOVER COUNTY, NC 2013 SEP 12 12:27:36 PM BK:5768 PG:2974-2978 FEE:$26.06 NC REV STAFF: $20, 000.00 INRIF # MU79 OLINA GENERAL WARRANTY DEED Parcel Identifier No. R07600-003-014-00i@rified by County on the day of , 20_ By: Mail/Box to: This instrument was prepared by: Saffo Law Firm, PC 5900-B Oleander Dr., Wilmington, NC 28403 Brief description for the Index: 75.17 acres on Masonboro Loop Road THIS DEED made this 30 GRANTOR M13M CAPITAL, LLC, a North Carolina limited liability company day of August , 2013 , by and between Enter in appropriate block for each party: name, address, and, if a. GRANTEE SEL PROPERTY INVESTORS, LLC, a North Carolina limited liability cckm�d P6�7/6 01y Aa! Salle &/Uil /ve .:) N51 apropriate, character 6f entity, e.g. corporation or partnership. The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSE M, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in the City of Township, New Hanover County, North Carolina and more particularly described as follows: ALL OF THAT CERTAIN tract or parcel of land which is shown and described in Exhibit A attached hereto and incorporated herein by reference. The property hereinabove described was acquired by Grantor by instrument recorded in Book page A map showing the above described property is recorded in Plat Book page NC Bar Association Form No. 3 ® 1976, Revised ® 1977, 2002 Returned TO dVilliams & Co., Inc. Printed by Agreement with the NC Bar Association - 1981 flloc�k;CrOu ,h,Keeter,Behm M lamesWilliams.com TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever, other than the following exceptions: 1. 2013 ad valorem taxes, and applicable land use ordinances. 2. Easement for ingress and egress described in Book 1090, page 273: of the New Hanover County Registry, and other rights of way of record. 3. Road Maintenance Agreement -recorded in Book 4783, Page 432, New Hanover Registry. IN WITNESS WHEREOF, the Grantor has duly executed the foregoing as of the day and year first above written. MR CAPITAL, LLC (SEAL) (Entity Name)) By: y !.3 Z (SEAL) Title: Manager 0 By: (SEAL) Title: pa By: (SEAL) Title: -- " "A iNl '' >_-i State of North Carolina - County of 0 I, the undersigned Notary Public of the County and State aforesaid, certify that personally appeared before me this day and acknowledged the due execution of the foregoing instrument for the purposes tlimin expressed. Witness my hand and Notarial stamp or seal this day of , 20 . My CommissionExpires: � Notary Public ` "• �.• -'`'' Atxz i s State of North Carolina -County of �� I, the -undersigned Notary Public ofthe County and State aforesaid, certify that personally came before me this day and Q� fin^ O acknowledged that he is the of LL G a North Carolina or corporntion/limited liability con y/ TAW partnership (strike through the inapplicable), and that by authority duly given and as the act of each entity, he signed the forgoing instrument in its name on its behalf as its and eed. Witness my hand an .4 Notarial stamp or seal this day of P. A20 My ConmmissionExpires: rp ""• I '� Noi4Pfiblic 1 S A L1 TAM ;0_4 State of North Carolina - County of � I, the undersigned NotaryPublic of the County and State aforesaid, certify that Witness my hand and Notarial stamp or seal this day of , 20 . wMy Commission Expires: p Notary Public The foregoing Certificate(s) of is/are certified to be correct. This instrument and this certificate are duly registered at the date and time and in the Book and Page shown on the first page hereof. Register of Deeds for County By: Deputy/Assistant - Register of Deeds NC Bar Association Form No. 3 Q 1976, Revised ® 1977, 2002 James Williams & Co., Inc. Printed by Agreement with the NC Bar Association - 1981 www.lamesVtilliams.com EXHIBIT A Being part of that parcel or tract of land conveyed to Aqua Vista Farms, LLC in Deed Book 5746 at Pkee 2812 and located at 100 Aqua Vista Drive, City of Wilmington, New Hanover County, North Carolina; said parcel being more particularly described as follows: Beginning at an iron pipe in the northwestern comer of the property, said pipe having a northing and easting of 144557.99 and 2340505.79 (Point of Beginning); Thence along the southeastern right of way of Masonboro Loop Road, a 60' public right of way, South 22027'23" West for a distance of 1058.51 feet to an iron rod located at the northeastern corner of the intersection of Masonboro Loop Road and Masonboro Harbour Drive, a 60' private right of way, Thence along the northern right of way of Masonboro Harbour Drive, South 65031'41" East for a distance of 1728.44 feet to an iron pipe located between Lots 35 and 36 of the Masonboro Harbour Subdivision; Thence along a line North 24028' 19" East for a distance of 353.26 feet to an iron pipe; Thence along the following seven (7), courses and distances m a generally southeaster ly direction: (1) South 65°38'09" East for a distance of 640.91 feet; (2) South 41°50'14" East for a distance of 76.04 feet; (3) South 78156'22" East for a distance of 350.69 feet; (4) North 62°57'24" East for a distance of 158.14 feet; (5) South 68-50.09" East for a distance of 210.46 feet; (6) North 79°05'39" East for a distance of 75.49 feet; (7) South 71°08'28" East for a distance of 100.91 feet; Thence following the wetland line for the following sixteen (16) courses and distances: (1) North 18°06'08" East a distance of 291.31 feet; (2) North 22°46'25" East a distance of 59.07 feet; (3) North 03°00'39" West a distance of 52.34 feet; (4) South 75°48'58" West a distance of 18.17 feet; (5) South 16*51'06" West a distance of 44.75 feet, (6) South 02°42'55" West a distance of 57.27 feet; (7) South 31°47'27" West a distance of 57.89 feet; (8) South.69°24'06" West a distance of 123.32 feet; (9) North 14°34'07" East a distance of 302.75 feet; (10) North 72°36'36" West a distance of 20.20 feet; (11) South16016'14" West a distance of 183.52 feet; (12) South 24°57'54" West a distance of 150.65 feet; (13) North 11004'101' West a distance of 162.28 feet; (14) North 16°38'46" East a distance of 172.52 feet; (15) North 35001'30" West a distance of 170.08 feet; (16) North 34°46'58" East a distance of 213.70 feet to an iron rod; inemce along a line between the subject proper and *.he property conveyed to the State of North Carolina, North 691117'15" West a distance of 355.07 feet to an iron pipe; Thence along a line between the subject property and the property conveyed to the Endowment of UNCW, North 70°27'43" West a distance of 702.62 feet to an iron pipe; Thence North 20033'40" East a distance of 239.22 feet to an iron pipe, Thence North 69°57' 15" West a distance of 733.39 feet; Thence along a line between the subject property and the property conveyed to Joseph C. Gainey for the following three (3) courses and distances: (1) South 03°45'01" East a distance of 123.38 feet; (2) South 07°43'59" West a distance of 121.45 feet; (3) South 26°01'59" West a distance of 12.42 feet to an iron rod.; Thence North 70'32'11" West a distance of 1170.27 feet to the Point of Beginning, said parcel containing 3,274,450 square feet or 75.17 acres, more or less. The parties agree that the Grantee hereof, and its successors and assigns, shall have the right to relocate the easement described in Deed Book 1090, Page 213, of the New Hanover County Registry, in connection with the development of the above described tract;_provided, however, that in no event shall the Grantor, its successors and assigns, or Maurice S. Emmart,' Jr. and wife, Patricia G. Emmart, or their heirs, successors and assigns, be denied access to any property retained by -them. STORMWATER CALCULATIONS-I-YR 24-HR PRE POST RESULTS Project Name: Emmarts Landing Client: D. Logan Project Number: 13146.PE Prepared By: CWM Date: 2/14/14 Basin: DA #1 [PRE] pARA MOUNT'E E " O 1 N e E R 1 NC.. 1 W C Drainage area= 52.20 acres = 0.082 mil Curve Number HSG: A B C D Sum of Basin 50.0 8.0 0.0 42.0 100.0 Land Use % of Basin CN A CN B CN C CN D Weighted CN Woods - Fair 78 36 60 73 79 4 3.6 Pasture - Fair 22 49 69 79 84 14.37 Sum: 100.0 Sum: 58.03 Curve numbers taken from: TR-55 Use: = values input by user = values calculated by spreadsheet Basin: DA #2 [PRE] Drainage area= 21.90 acres = 0.034 mil Curve Number HSG: A B C D Sum % of Basin 50.0 0.0 0.0 5010 106.0 Land Use % of Basin CN A CN B CN C CN D Weighted CN Woods - Fair 65 36 60 73 79 37.38 Pasture - Fair 35 49 69 79 84 23.28 Sum: 100.0 Sum: 60.65 Curve numbers taken from: TR-55 Use: Gi Project Name: Emmarts Landing Client: D. Logan Project Number: 13146.PE Prepared By: CWM Date: 2/14/14 Basin: DA #1 [PRE] on D A RAMOUNTE Drainage area= 52.20 acres = 0.082 mil Hydraulic Lengtn = 155 tt. Slope = 1.3 % Ground Cover = Woodland n-value = 0.4 T (TR-55 Calc.) = 30.6 min. nyarauiic Lengtn = 1,9bu rt. Slope = 0.5 % Channel C.S. Area = 22 sf Channel Wetted Perm. = 16 ft n-value = 0.025 T (TR-55 Calc.) = 6.3 min. T = 36.8 min Basin: DA #2 [PRE] Drainage area= 21.90 acres = 0.034 mil Time of Concentration Shallow Concentrated Flow Hydraulic Length = 1,200 ft. Slope = 2 % Ground Cover = Unpaved T (TR-55 Calc.) = 8.8 min. ITC = 8.8 min. Basin: SIM DA #2 [PRE] Drainage area= 22.00 acres 0.034 mil Time of Concentration Shallow Concentrated Flow Hydraulic Length = 675 ft. Slope = 0.5 Ground Cover = Unpaved T (TR-55 Calc.) = 9.9 min. Channel Flow Hydraulic Length = 1,250 ft. Slope = 0.5 % Channel C.S. Area = 22 sf Channel Wetted Perm. = 16 ft n-value = 0.025 T (TR-55 Calc.) = 4.0 min. T, _ __ 13.9 min. Project Name: Emmarts Landing Client: D. Logan Project Number: 13146.PE Prepared By: CWM Date: 2/14/14 Basin: DA #1 [POST] PARAMOUNTE E N E3 1 N Drainage area= 32.20 acres = 0.050 mil Land Use Area (Ac.) % of Basin Patio Lots [53] (4,500 sf/lot) 5.48 Estate Lots [30] (6,500 sf/lot) 4.48 Roadway/Sidewalks 3.69 Future Misc. 0.39 Impervious (Total) = 14.03 43.6% Pond Area = 2.24 7.0% Open Space - Good 15.93 49.5% Sum: 32.20 100.0% Basin: DA #2 [POST] Drainage area= 22.00 acres = 0.034 mil Land Use Area (Ac.) % of Basin Estate Lots [44] (6,500 sf/lot) 6.57 Marina View Lots [6] (6,500 sf/lot) 0.90 Marina Lots [2] (4,000 sf/lot) 0.18 Roadway/Sidewalks 2.70 Future Misc. 0.15 Impervious (Total) = 10.50 47.7% Pond Area = 0.99 4.5% Open Space - Good 10.51 47.8% Sum: 22.00 100.0% Basin: DA-A [POST] Drainage area= 0.64 acres = 0.001 mil Area Calculations Land Use Area (Ac.) % of Basin Lots [1.5] (4,000 sf/lot) 0.14 Roadway 0.11 Pump Station 0.06 Impervious (Total) = 0.31 47.9% Open Space - Good 0.33 52.1% Sum: 0.64 100.0% Basin: DA-B [POST] Area Calcul; Land Use Lots [1.5] (4,000 s plot) Roadway Impervious (Total) _ Open Space - Good Drainage area= 0.38 acres = 0.001 mil Area (Ac.) % of Basin 0.14 0.07 0.21 55.0% 0.17 45.0% Sum: 0.38 100.0% Basin: DA-C [POST] Drainage area= 0.65 acres = 0.001 miz Area Calcul Land Use Lots [1.5] (4,000 sf/lot) Roadway Impervious (Total) _ Open Space - Good Basin: DA-D [POST] Area Calcul; Land Use Lots [3.5] (4,000 sf/lot) Roadway Impervious (Total) _ Open Space - Good Area (Ac.) % of Basin 0.14 0.17 0.30 46.7% 0.35 53.3% Sum: 0.65 100.0% Drainage area= 0.65 acres = 0.001 mil Area (Ac.) % of Basin 0.32 0.08 0.41 62.3% 0.24 37.7% Sum: 0.65 100.0% Basin: DA-E [POST] Drainage area= 0.45 acres = 0.001 mil Area Calcul; Land Use Lots [2.5] (4,000 sf/lot) Roadway Impervious (Total) _ Open Space - Good Area (Ac.) "/o of Basin 0.23 0.06 0.28 63.3% 0.17 36.7% Sum: 0.45 100.0% Basin: DA-F [POST] Area Calcul; Land Use Lots [2.5] (Y,000 sf/lot) Roadway & Misc. Impervious (Total) _ Open Space - Good Drainage area= 0.58 acres = 0.001 mi` Area (Ac.) % of Basin 0.23 0.15 0.38 65.3% 0.20 34.7% Sum: 0.58 100.0% Basin: DA-G [POST] Drainage area= 1.79 acres = 0.003 mil Area Calci Land Use Lots [8] (4,000 sf/lot) Roadway Impervious (Total) _ Open Space - Good Basin: DA-H [POST] Area Calo Land Use Lots [3] (4,000 sf/lot) Roadway & Misc. Impervious (Total) _ Open Space - Good ns Area (Ac.) % of Basin 0.73 0.25 0.99 55.1% 0.80 44.9% Sum: 1.79 100.0% Drainage area= 1.95 acres = 0.003 mil Area (Ac.) % of Basin 0.28 0.96 1.23 63.3% 0.72 36.7% Sum: 1.95 100.0% Project Name: Emmarts Landing Client: D. Logan Project Number: 13146.PE Prepared By: CWM Date: 2114114 Basin: DA #1 [POST] DARAMOUNTE E N G 1 N E e Drainage area= 32.20 acres = 0.050 mil Land Use % of Basin CN A CN B CN C CN D Impervious 50.5 98 98 98 98 Open Space - Good 49.5 39 61 74 80 Sum: 100.0 Curve numbers taken from: TR-55 Weighted CN 49.49 29.47 Sum: 78.96 Use: Basin: DA #2 [POST] Drainage area= 22.00 acres = 0.034 mil Land Use % of Basin CN A CN B CN C CN D Impervious 52.2 98 98 98 98 Open Space - Good 47.8 39 61 74 80 Sum: 100.0 Curve numbers taken from: TR-55 Sum Weighted CN 51,.16 24.85 Sum: 76-00 Use: Basin: DA-A [POST] Drainage area= 0.64 acres = 0.001 miz Curve Number HSG: A B C D % of Basin 5010 0.0 0. 50. Land Use % of Basin CN A CN B CN C CN D Impervious 47.9 98 98 98 98 Open Space - Good 5Z 1 39 61 74 80 Sum: 100.0 Curve numbers taken from: TR-55 Sum 100.0 Weighted CN 46.93 31.01 Sum: 77.94 Use: 7$ Basin: DA-B [POST] Drainage area= 0.38 acres = 0.001 miZ Curve Number HSG• A B C D °h of Bass^ 50.0 00 0.0 50.0 Land Use % of Basin CN A CN B CN C CN D Impervious 55.0 98 98 98 98 Open Space - Good 45.0 39 61 74 80 Sum: 100.0 Curve numbers taken from: TR-55 Sum 100.0 Weighted CN 53.88 26.79 Sum: 80.67 Use• 81 Basin: DA-C [POST] Drainage area= 0.65 acres = 0.001 miZ Land Use % of Basin CN A CN B CN C Impervious 46,7 98 98 98 Open Space - Good 53.3 39 61 74 Sum: 100.0 Curve numbers taken from: TR-55 D Sum N D Weighted CN 98 45.74 80 31.73 Sum: 77.47 Use: Basin: DA-D [POST] Drainage area= 0.65 acres = 0.001 miZ Curve Number HSG: A B C D % of Basin 50.0 0.0 0.0 5 .0 Land Use % of Basin CN A CN B CN C CN D Impervious 62.3 98 98 98 98 Open Space - Good 37.7 39 61 74 80 Sum: 100.0 Curve numbers taken from: TR-55 Weighted CN 61.09 22.41 Sum: 83.50 Use• �4 Basin: DA-E [POST] Drainage area= 0.45 acres = 0.001 miz Curve Number HSG: A B C D Sum % of Basin 50, 0.0 0.0 50.0 160.0 Land Use % of Basin CN A CN B CN C CN D Weighted CN Impervious 63.3 98 98 98 98 61.99 Open Space - Good 36.7 39 61 74 80 21.86 Sum: 100.0 Sum: 83.85 Curve numbers taken from: TR-55 Use: Basin: DA-F [POST] Drainage area= 0.58 acres = 0.001 miz Curve Number HSG: A B C D Sum % of Basin 50. 0.0 0.0 50.0 100.0 Land Use % of Basin CN A CN B CN C CN D Impervious 65.3 98 98 98 98 Open Space - Good 34.71 39 61 74 80 Sum: 100.0 Curve numbers taken from: TR-55 CN 20.64 Sum: 84.64 Use: Basin: DA-G [POST] Drainage area= 1.79 acres = 0.003 miz Curve Number HSG: A B C D % of Basin 50.0 0.0 0.6 50.0 Land Use % of Basin CN A CN B CN C CN D Impervious 55.1 98 98 98 98 Open Space - Good 44.9 39 61 74 80 Sum: 100.0 Curve numbers taken from: TR-55 Weighted CN 54.04 26.69 Sum: 80.73 Use: Basin: DA-H [POST] Drainage area= 1.95 acres 0.003 miz Curve Number HSG: A B C D of Basin 50.0 0.0 0.0 50: Land Use % of Basin CN A CN B CN C CN D Impervious 63.3 98 98 98 98 Open Space - Good 36.7 39 61 74 80 Sum: 100.0 Curve numbers taken from: TR-55 Weighted CN 62.00 21.85 Sum: 83.86 Use: Basin: RA-1 [POST] Drainage area= 1.60 acres = 0.003 miz Curve Number HSG: A B C D of Basin 0.0 100.0 0.0 0.0 Use % of Basin CN A CN B CN C CN D -Fair 100,0 36 60 73 79 Sum: 100.0 Curve numbers taken from: TR-55 Weighted CN 6000 Sum: 60.00 Use: 66... _ Basin: RA-2 [POST] Drainage area= 2.17 acres = 0.003 miz Curve Number HSG: A B C D % of Basin 50.0 0.0 0. 0 5 .0 Land Use % of Basin CN A CN B CN C CN D Woods -Fair 1 0 36 60 73 79 Sum: 100.0 Curve numbers taken from: TR-55 Sum i VV.V Weighted CN 5750 Sum: 57.50 Use: Basin: RA-3 [POST] Drainage area= 9.04 acres = 0.014 miz Curve Number HSG: A B C D % of Basin 45.0 10.0 0.0 45. Land Use % of Basin CN A CN B CN C CN D Woods -Fair 100. U 36 60 73 79 Sum: 100.fl Curve numbers taken from: TR-55 Sum 100.0 Weighted CN 57.75 Sum: 57.75 Use: 5S Project Name: Emmarts Landing Client: D. Logan Project Number. 13146.PE Prepared By: CWM Date: 2/14/14 Basin: DA #1 [POST] PARA MO TE E N O 1 N I—E E R i N c3, I N C Drainage area= 32.20 acres = 0.050 mil Time of Concentration Sheet Flow Hydraulic Length = 150 ft. Slope = 2 % Ground Cover = Grass n-value = 0.24 T (TR-55 Calc.) = 16.7 min. Pipe Flow Hydraulic Length = 1,500 ft. Slope = 0.5 % Pipe C.S. Area = 3 sf Pipe Wetted Perm. = 6.28 ft n-value = 0.013 T (TR-55 Calc.) 5.1 min. ITC _ 21.7 min. Basin: DA #2 [POST] Drainage area= 22.00 acres = 0.034 mil Time of Concentration Sheet Flow Hydraulic Length = 150 ft. Slope = 2 % Ground Cover = Grass n-value = 0.24 T (TR-55 Calc.)= 16.6 min. Pipe Flow Hydraulic Length = 1,600 ft. Slope = 0.5 % Pipe C.S. Area = 3 sf Pipe Wetted Perm. = 6.28 ft n-value = 0.013 IT (TR-55 Calc.) = 5.4 min. T, = 22.0 mtn. MASONBORO-PRE-SIM Type/1/ 24-hr NHC-1 YR Rainfall=3.85" Prepared by Paramounte Engineering, Inc. Printed 2/14/2014 HydroCAD®10.00 s/n M18437 © 2013 HydroCAD Software Solutions LLC Page 1 Summary for Subcatchment 21S: (SIM) DA#1 Runoff = 9.45 cfs @ 12.63 hrs, Volume= 75,186 cf, Depth= 0.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 4.00-28.00 hrs, dt= 0.0005 hrs Type III 24-hr NHC-1 YR Rainfall=3.85" Area (ac) CN Description 32.200 59 32.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 36.8 Direct Entry, 10 Subcatchment 21S: (SIM) DA#1 Hydrographi 9.45 cfs 1411 Type III 24-hr NHC-1 YR Rainfall=3.85" 8 Runoff Area=32.200 ac 7"- Runoff Volume=75,186 cf t' 6-" ,; Runoff Depth=0.64" 3 5 Tc=36.8 min M A] CN=59 3= 8 10 12 14 16 .18 20 22 24 26 28 Time (hours) Runoff MASONBORO-PRE-SIM Type 11124-hr NHC-9 YR Rainfall=3.85" Prepared by Paramounte Engineering, Inc. Printed 2/14/2014 HydroCADO 10.00 s/n M18437 © 2013 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 24S: (SIM) DA#2 Runoff = 9.28 cfs @ 12.25 hrs, Volume= 51,369 cf, Depth= 0.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 4.00-28.00 hrs, dt= 0.0005 hrs Type III 24-hr NHC-1 YR Rainfall=3.85" Area (ac) CN Description 22.000 59 22.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.9 675 0.0050 1.14 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 4.0 1,250 0.0050 5.20 114.34 Channel Flow, Area= 22.0 sf Perim= 16.0' r= 1.38' n= 0.025 13.9 1,925 Total RG Subcatchment 24S: (SIM) DA#2 Hydrograph 1 9.28 cfs I •Type III - . Runoff •• cf • , . . .• i 00 3-1 Tc=13.9 min 10 12 14 16 18 20 10 Runoff MASONBORO-PRE-SIM Type /// 24-hr NHC-1 YR Rainfall=3.85" Prepared by Paramounte Engineering, Inc. Printed 2/14/2014 HydroCAD®10.00 s/n M18437 © 2013 HydroCAD Software Solutions LLC Paae 3 Summary for Subcatchment 31S: (SIM) DA-A Runoff = 0.37 cfs @ 12.09 hrs, Volume= 1,494 cf, Depth= 0.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 4.00-28.00 hrs, dt= 0.0005 hrs Type III 24-hr NHC-1 YR Rainfall=3.85" Area (ac) CN Description 0.640 59 0.640 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 0.4- 0.35-; 0.3 ,0.25- 4 v 3 0.2= _o " 0.15' 0.1-. 0.05'. Subcatchment 31S: (SIM) DA-A Hyd-cgraph 0.37 cfs Type III 24-hr NHC-1 YR Rainfall=3.85" Runoff Area=0.640 ac Runoff Volume=1,494 cf Runoff Depth=0.64" Tc=5.0 min CN=59 • 1 i 2 0 22 2 4 2 • 2 i 0 Runoff MASONBORO-PRE-SIM Type Ill 24-hr NHC-1 YR Rainfall=3.85" Prepared by Paramounte Engineering, Inc. Printed 2/14/2014 HydroCAD®10.00 s/n M18437 © 2013 HydroCAD Software Solutions LLC Paae 4 Summary for Subcatchment 32S: (SIM) DA-B Runoff = 0.22 cfs @ 12.09 hrs, Volume= 887 cf, Depth= 0.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 4.00-28.00 hrs, dt= 0.0005 hrs Type III 24-hr NHC-1 YR Rainfall=3.85" Area (ac) CN Description 0.380 59 0.380 100.00% Pervious Area Tc Length Slo min) (feet) (ft 5.0 0.24- 0.22- 0.2 0.18= 0.16- 0.14= 3 0.12- u. 0.08' 0.06- 0.04� 0.02 : Velocity Capacity Description Direct Entry, Subcatchment 32S: (SIM) DA-B HVd..roc rapdh 1 0.22 cfs I Type III 24-h r NHC-1 YR Rainfall=3.85" Runoff Area=0.380 ac Runoff Volume=887 cf Runoff Depth=0.64" Tc=5.0 min CN=59 4 6 8 10 12 14 16 18 20 22 24 26 28 Time (hours) Runoff MASONBORO-PRE-SIM Type /// 24-hr NHC-1 YR Rainfall=3.85" Prepared by Paramounte Engineering, Inc. Printed 2/14/2014 HydroCAD®10.00 s/n M18437 02013 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 33S: (SIM) DA-C Runoff = 0.37 cfs @ 12.09 hrs, Volume= 1,518 cf, Depth= 0.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 4.00-28.00 hrs, dt= 0.0005 hrs Type III 24-hr NHC-1 YR Rainfall=3.85" Area (ac) CN Description " 0.650 59 0.650 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) UUM (ft/sec) (cfs) 5.0 Direct Entry, 0.4-- 0.35- 0.3 - 0.25- v 3 0.2 0 `L 0.15. 0.1 0.05 0, 4 Subcatchment 33S: (SIM) DA-C Hydrograph 0.37 cfs Type III 24-hr NHC-1 YR Rainfall=3.85" Runoff Area=0.650 ac Runoff Volume=1,518 cf Runoff Depth=0.64" Tc=5.0 min CN=59 6 8 10 12 14 16 18 20 22 24 26 28 Time (hours) � Runoff MASONBORO-PRE-SIM Type 111 24-hr NHC-1 YR Rainfall=3.85" Prepared by Paramounte Engineering, Inc. Printed 2/14/2014 HydroCAD®10.00 s/n M18437 ©2013 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 34S: (SIMI DA-D Runoff = 0.37 cfs @ 12.09 hrs, Volume= 1,518 cf, Depth= 0.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 4.00-28.00 hrs, dt= 0.0005 hrs Type III 24-hr NHC-1 YR Rainfall=3.85" Area (ac) CN Description 0.650 59 0.650 100.00% Pervious Area Tc Length Slope Velocity Capacity Description 5.0 Direct Entry, Subcatchment 34S: (SIM) DA-D Hydregraph 0.4= O.37 cfs ® 35 Type III 24-hr NHC-1 YR Rainfall=3.85" 0.3 Runoff Area=0.650 ac Runoff Volume=1,518 cf 0.25- Runoff Depth=0.64" 3 0.2 Tc=5.0 m i n " 0.15 CN=59 0.1- Q 4 6 8 10 12 14 16 18 20 22 24 26 28 Time (hours) RunofF MASONBORO-PRE-SIM Type /// 24-hr NHC-9 YR Rainfall=3.85" Prepared by Paramounte Engineering, Inc. Printed 2/14/2014 HydroCAD®10.00 s/n M18437 © 2013 HvdroCAD Software Solutions LLC Page 7 Summary for Subcatchment 35S: (SIM) DA-E Runoff = 0.26 cfs @ 12.09 hrs, Volume= 1,051 cf, Depth= 0.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 4.00-28.00 hrs, dt= 0.0005 hrs Type III 24-hr NHC-1 YR Rainfall=3.85" Area (ac) CN Description 0.450 59 0.450 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 35S: (SIM) DA-E Hydrograph 0.26 cfs 0.25- Type III 24-hr NHC-1 YR Rainfall=3.85" 0 2 Runoff Area=0.450 ac Runoff Volume=1,051 cf " 0.15� Runoff Depth=0.64" 3 Tc=5.0 min M 0.1- CN=59 A 1 12 14 16 18 20 Runoff MASONBORO-PRE-SIM Type 111 24-hr NHC-9 YR Rainfall=3.85" Prepared by Paramounte Engineering, Inc. Printed 2/14/2014 HydroCAD®10.00 s/n M18437 © 2013 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 36S: (SIM) DA-F Runoff = 0.33 cfs @ 12.09 hrs, Volume= 1,354 cf, Depth= 0.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 4.00-28.00 hrs, dt= 0.0005 hrs Type III 24-hr NHC-1 YR Rainfall=3.85" Area (ac) CN Description 0.580 59 0.580 100.00% Pervious Area Tc Length Slope Velocity Capacity Description in) (feet) (ft/ft) (ft/sec) (cfs) 5.0 0.35 0.3. 0.25 0.2if � 3 0.15 0.1. 0.05 0= 4 Direct Entry, Subcatchment 36S: (SIM) DA-F Hydrograpn 0.33 cfs Type III 24-hr NHC-1 YR Rainfall=3.85" Runoff Area=0.580 ac Runoff Volume=1,354 cf Runoff Depth=0.64" Tc=5.0 min CN=59 6 8 10 12 14 16 18 20 22 24 26 28 Time (hours) ❑ Runoff MASONBORO-PRE-SIM Type /// 24-hr NHC-1 YR Rainfall=3.85" Prepared by Paramounte Engineering, Inc. Printed 2/14/2014 HydroCAD®10.00 s/n M18437 © 2013 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 37S: (SIM) DA-G Runoff = 1.02 cfs @ 12.09 hrs, Volume= 4,180 cf, Depth= 0.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 4.00-28.00 hrs, dt= 0.0005 hrs Type III 24-hr NHC-1 YR Rainfall=3.85" Area (ac) CN Description 1.790 59 1.790 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 37S: (SIM) DA-G F±ydrograph 1.02 cfs Runoff 1 Type III 24-hr NHC-1 YR Rainfall=3.85" k Runoff Area=1.790 ac Runoff Volume=4,180 cf Runoff Depth=0.64" 3 Tc=5.0 min CN=59 1 12 14 16 18 20 MASONBORO-PRE-SIM Type l// 24-hr NHC-9 YR Rainfall=3.85" Prepared by Paramounte Engineering, Inc. Printed 2/14/2014 HydroCAD010.00 s/n M18437 ©2013 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 38S: (SIM) DA-H Runoff = 1.11 cfs @ 12.09 hrs, Volume= 4,553 cf, Depth= 0.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 4.00-28.00 hrs, dt= 0.0005 hrs Type III 24-hr NHC-1 YR Rainfall=3.85" Area (ac) CN Description 1.950 59 1.950 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 38S: (SIM) DA-H Hydrorgraph 1.11 cfs 0 Runoff Type III 24-hr 1-f NHC-1 YR Rainfall=3.85" I I 11 Runoff Area=1.950 ac I Runoff Volume=4,553 cf Jw- Runoff Depth=0.64" 3 Tc=5.0 min CN=59 Time (hours) MASONBORO-PRE-POST-OUT A Type 111 24-hr NHC-1 YR Rainfall=3.85" Prepared by Paramounte Engineering, Inc. Printed 2/14/2014 HydroCAD®10.00 s/n M18437 © 2013 HydroCAD Software Solutions LLC Page 1 Summary for Subcatchment 17S: PRE-DA#1 (OUTFALL A) Runoff = 15.32 cfs @ 12.63 hrs, Volume= 121,885 cf, Depth= 0.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 4.00-28.00 hrs, dt= 0.0005 hrs Type Ili 24-hr NHC-1 YR Rainfall=3.85" Area (ac) CN Description 52.200 59 52.200 100.00% Pervious Area Tc Length Slope min) (feet) (ft/ft) 36.8 1 14.. iV 10- v 0 8- H Capacity Description (cfs) Direct Entry, Subcatchment 17S: PRE-DA#1 (OUTFALL A) Hydrorraph 1 15.32 cfs I Type III 24-hr NHC-1 YR Rainfall=3.85" Runoff Area=52.200 ac Runoff Volume=121,885 cf Runoff Depth=0.64" Tc=36.8 min CN=59 Time (hours) p Runoff MASONBORO-PRE-POST-OUT A Type/1/ 24-hr NHC-1 YR Rainfall=3.85" Prepared by Paramounte Engineering, Inc. Printed 2/14/2014 HydroCAD®10.00 sh M18437 © 2013 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 18S: PRE-DA#2 (OUTFALL B) Runoff = 13.46 cfs @ 12.15 hrs, Volume= 58,630 cf, Depth= 0.74" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 4.00-28.00 hrs, dt= 0.0005 hrs Type III 24-hr NHC-1 YR Rainfall=3.85" Area (ac) CN Description 21.900 61 21.900 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.8 Direct Entry, Subcatchment 18S: PRE-DA#2 (OUTFALL B) Fludrogr aph 14- 13.46 cfs - Type III 24-hr 12 - NHC-1 YR Rainfall=3.85" Runoff Area=21.900 ac 10 _ Runoff Volume=58,630 cf 8 ' Runoff Depth=0.74" 3 Tc=8.8 min 1z 61 CN=61 2 2-: 4 6 8 10 12 14 16 18 20 22 24 26 28 Time (hours) 0 Runoff MASONBORO-PRE-POST-OUT A Type 111 24-hr NHC-1 YR Rainfall=3.85" Prepared by Paramounte Engineering, Inc. Printed 2/14/2014 HydroCAD®10.00 s/n M18437 © 2013 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 19S: POST-DA#1 Runoff = 45.01 cfs @ 12.32 hrs, Volume= 215,355 cf, Depth= 1.84" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 4.00-28.00 hrs, dt= 0.0005 hrs Type III 24-hr NHC-1 YR Rainfall=3.85" Area (ac) CN Description " 32.200 79 32.200 100.00% Pervious Area Tc min 21.7 Length Slope Velocity Capacity Description —(feet) (ft/ft) (ft/sec) (cfs) 50-: 45-: 35' 30 3 25:. ai 20- 15- 10. Direct Entry, Subcatchment 19S: POST-DA#1 Hydrocgrapt 1 45.01 cfs I Type III 24-hr NHC-1 YR Rainfall=3.85" Runoff Area=32.200 ac Runoff Volume=215,355 cf Runoff Depth=1.84" Tc=21.7 m i n CN=79 4 6 8 10 12 14 16 18 20 22 24 26 28 Time (hours) Runoff MASONBORO-PRE-POST-OUT A Type 11124-hr NHC-1 YR Rainfall=3.85" Prepared by Paramounte Engineering, Inc. Printed 2/14/2014 HydroCAD®10.00 s/n M18437 © 2013 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 20S: POST-DA#2 Runoff = 26.64 cfs @ 12.32 hrs, Volume= 129,731 cf, Depth= 1.62" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 4.00-28.00 hrs, dt= 0.0005 hrs Type III 24-hr NHC-1 YR Rainfall=3.85" Area (ac) CN Description 22.000 76 22.000 100.00% Pervious Area Tc Length Slope min) (feet) (ft/ft) 22.0 25- 3 15- 0 10 Capacity Description (cfs) Direct Entry, Subcatchment 20S: POST-DA#2 Hydrog, aph 26.64 cfs Type III 24-hr NHC-1 YR Rainfall=3.85" Runoff Area=22.000 ac Runoff Volume=129,731 cf Runoff Depth=1.62" Tc=22.0 m i n CN=76 • 8 1 1 12 14 16 18 20 22 24 26 28 0 Runoff MASONBORO-PRE-POST-OUT A Type Ill 24-hr NHC-1 YR Rainfall=3.85" Prepared by Paramounte Engineering, Inc. Printed 2/14/2014 HydroCAD®10.00 s/n M18437 © 2013 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 26S: RA-1 Runoff = 0.82 cfs @ 12.19 hrs, Volume= 4,006 cf, Depth= 0.69" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 4.00-28.00 hrs, dt= 0.0005 hrs Type III 24-hr NHC-1 YR Rainfall=3.85" Area (ac) CN Description 1.600 60 1.600 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.0 950 0.0080 1.44 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps Subcatchment 26S: RA-1 Hvdrocraph 0.9 0.82 CfS 0.8- Type ill 24-hr JLN YR Rainfall=3.85" 0.7 � noff Area=1.600 ac 0.6- ff Volume=4,006 cf 0.5 unoff Depth=0.69" c 0 4= Flow Length=950' LL Slope=0.0080 '/' 0.3- Tc=11.0 min 0 2- CN=60 0=1 .. 4 6 8 10 12 14 16 18 20 22 24 26 28 Time (hours) 0 runoff MASONBORO-PRE-POST-OUT A Type 11124-hr NHC-1 YR Rainfall=3.85" Prepared by Paramounte Engineering, Inc. Printed 2/14/2014 HydroCAD®10.00 s/n M18437 © 2013 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 29S: RA-2 Runoff = 0.87 cfs @ 12.21 hrs, Volume= 4,712 cf, Depth= 0.60" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 4.00-28.00 hrs, dt= 0.0005 hrs Type III 24-hr NHC-1 YR Rainfall=3.85" Area (ac) CN Description 2.170 58 2.170 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.1 550 0.0050 1.14 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.1 950 0.0050 5.09 16.00 Pipe Channel, RCP Round 24" 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 11.2 1,500 Total 0.9' 0.8-. 0.7-: 0.6-: 3 0.5-. 0 0.47 0.3f 0.2- 0.1. 4 6 Subcatchment 29S: RA-2 Hyclrocgralsh 0.87 cfs Type III 24-hr NHC-1 YR Rainfall=3.85" Runoff Area=2.170 ac Runoff Volume=4,712 cf Runoff Depth=0.60" Flow Length=1,500' Slope=0.0050 'J' T c=1 1.2 min CN=58 ..- .. .. .. , --� 8 10 12 14 16 18 20 22 24 26 28 Time (hours) ❑ Runoff MASONBORO-PRE-POST-OUT A Type Ill 24-hr NHC-1 YR Rainfall=3.85" Prepared by Paramounte Engineering, Inc. Printed 2/14/2014 HydroCADO 10.00 s/n M18437 © 2013 HydroCAD Software Solutions LLC Page 7 Summary for Pond 22P: P0ND#1 Inflow Area = 32.200 ac, 0.00% impervious, Inflow Depth = 1.84" for NHC-1 YR event Inflow = 45.01 cfs @ 12.32 hrs, Volume= 215,355 cf Outflow = 1.85 cfs @ 17.74 hrs, Volume= 54,182 cf, Atten= 96%, Lag= 325.3 min Primary = 1.85 cfs @ 17.74 hrs, Volume= 54,182 cf Routing by Stor-Ind method, Time Span= 4.00-28.00 hrs, dt= 0.0005 hrs Peak Elev= 21.64' @ 17.74 hrs Surf.Area= 111,018 sf Storage= 173,148 cf Plug -Flow detention time= 511.8 min calculated for 54.180 cf (25% of inflow) Center -of -Mass det. time= 373.5 min ( 1,224.6 - 851.1 ) Volume Invert Avail.Storage Storage Description #1 20.00' 448,430 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 20.00 97,422 0 0 21.00 107,857 102,640 102,640 22.00 112.763 110,310 212.950 23.00 117,726 115,245 328,194 24.00 122,745 120,236 448,430 Device Routing Invert Outlet Devices #1 Primary 16.00' 48.0" Round RCP -Round 48" L= 355.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet / Outlet Invert= 16.00' / 15.00' S= 0.0028/' Cc= 0.900 n= 0.013, Flow Area= 12.57 sf #2 Device 1 21.50' 12.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Device 1 22.80' 24.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #4 Device 1 23.00' 24.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 rimary OutFiow Max=1.84 cfs @ 17.74 hrs HW=21.64' (Free Discharge) E2=13-road-Crested CPRound 48" (Passes 1.84 cfs of 90.88 cfs potential flow) Rectangular Weir(Weir Controls 1.84 cfs @ 1.06 fps) =Broad -Crested Rectangular Weir( Controls 0.00 cfs) =Broad -Crested Rectangular Weir( Controls 0.00 cfs) MASONBORO-PRE-POST-OUT A Type 11124-hr NHC-1 YR Rainfall=3.85" Prepared by Paramounte Engineering, Inc. Printed 2/14/2014 HydroCADO 10.00 s/n M18437 © 2013 HydroCAD Software Solutions LLC Page 8 50- 45- 40-; 35-: 30-: 3 25-. rL 20-- 15- 10-- 5 .:. '. Pond 22P: POND#1 Hydrograph 45.01 cfs 1<; err Inflow Area=32.200 ac Peak Elev=21.64' Storage=173,148 cf 1.85 cfs - - - - ' - - - - . - - . 1 - - . . 10 12 14 16 18 20 22 24 26 28 Time (hours) ❑ Inflow ❑ Primary MASONBORO-PRE-POST-OUT A Type /// 24-hr NHC-1 YR Rainfall=3.85" Prepared by Paramounte Engineering, Inc. Printed 2/14/2014 HydroCADO 10.00 s/n M18437 © 2013 HydroCAD Software Solutions LLC Paoe 9 Summary for Pond 23P: POND#2 Inflow Area = 22.000 ac, 0.00% Impervious, Inflow Depth = 1.62" for NHC-1 YR event Inflow = 26.64 cfs @ 12.32 hrs, Volume= 129,731 cf Outflow = 1.82 cfs @ 16.00 hrs, Volume= 47,566 cf, Atten= 93%, Lag= 221.0 min Primary = 1.82 cfs @ 16.00 hrs, Volume= 47,566 cf Secondary = 0.00 cfs @ 4.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 4.00-28.00 hrs, dt= 0.0005 hrs Peak Elev= 20.88' @ 16.00 hrs Surf.Area= 53,202 sf Storage= 92,106 cf Plug -Flow detention time= 418.0 min calculated for 47,566 cf (37% of inflow) Center -of -Mass det. time= 286.1 min ( 1,146.3 - 860.1 ) Volume Invert Avail.Storage Storage Description #1 19.00, 212,748 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 19.00 43,252 0 0 20.00 50,280 46,766 46,766 21.00 53,614 51,947 98,713 22.00 57,003 55,309 154,022 23.00 60,450 58,727 212,748 Device Routing Invert Outlet Devices #1 Primary 17.50' 36.0" Round RCP -Round 36" L= 60.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet / Outlet Invert= 17.50' / 17.00' S= 0.0083 7' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf #2 Device 1 20.65' 6.0' long x 0.5' breadth Broad -Crested Rectanaular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #3 Device 1 22.30' 16.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #4 Secondary 22.50' 15.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 rimary OutFlow Max=1.82 cfs @ 16.00 hrs HW=20.88' (Free Discharge) =RCP_Round 36" (Passes 1.82 cfs of 43.70 cfs potential flow) 2=Broad-Crested Rectangular Weir (Weir Controls 1.82 cfs @ 1.34 fps) 3=Broad-Crested Rectangular Weir( Controls 0.00 cfs) econdary OutFlow Max=0.00 cfs @ 4.00 hrs HW=19.00' (Free Discharge) =Broad -Crested Rectangular Weir( Controls 0.00 cfs) MASONBORO-PRE-POST-OUT A Type 111 24-hr NHC-9 YR Rainfall=3.85" Prepared by Paramounte Engineering, Inc. Printed 2/14/2014 HydroCAD®10.00 s/n M18437 © 2013 HydroCAD Software Solutions LLC Pace 10 Pond 23P: POND#2 Hydrograph 26.64 cfs Inflow Area=22.000 ac Peak Elev=20.88' 25- Storage=92,106 cf 20 3 15 0 LL 10:, t . �I_82 cfs 0.00 cfs ,,.0 r- 4 6 8 10 12 14 16 18 20 22 24 26 28 Time (hours) Inflow Outflow ❑ Primary Secondary MASONBORO-PRE-POST-OUT A Type /I/ 24-hr NHC-1 YR Rainfall=3.85" Prepared by Paramounte Engineering, Inc. Printed 2/14/2014 HydroCAD®10.00 s/n M18437 © 2013 HydroCAD Software Solutions LLC Page 11 Summary for Link 25L: OUTFALL A Inflow Area = 57.970 ac, 0.00% Impervious, Inflow Depth > 0.52" for NHC-1 YR event Inflow = 3.55 cfs @ 17.10 hrs, Volume= 110,465 cf Primary = 3.55 cfs @ 17.10 hrs, Volume= 110,465 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 4.00-28.00 hrs, dt= 0.0005 hrs 3 0 E Link 25L: OUTFALL A Hydrograph 4 6 8 10 12 14 16 18 20 22 24 26 28 Time (hours) ❑ Inflow ❑ Primary STORMWATER CALCULATIONS-BMP RESULTS Pond #1 - Helms Port NC DENR Retention Requirements Post -Development Conditions Total Drainage Area 32.20 ACRE Value from CAD Impervious Drainage Area 14.03 ACRE Value from CAD Impervious Cover 43.6% Impervious Cover -(Impervious Drainage Area)/(Total Drainage Area)*100% Elevation of Permanent Pool Surface 20.0 FT Value selected by designer Depth of Permanent Pool 8.0 FT Value selected by designer Avg. Depth of Permanent Pool 5.5 FT See attached calculation Elevation of Wet Detention Pond Bottom 12.0 FT (Bottom Elevation)=(Permanent Pool Surface Elevation) -(Depth of Permanent Pool) Approximate Pond Length 570 FT Value from CAD Approximate Pond Width 125 FT Value from CAD Len th:Width Ratio 5:1 Ratio= Len th / MMdth :1 Required SAIDA Ratio for 90% TSS Removal 2.72 Value from chart. Reference: 90% TSS Removal Required Permanent Pool Surface Area 38,095 SF Required Surface Area=(Required SAIDA Ratio) *(Total Drainage Area) Provided Permanent Pool Surface Area 97,422 SF Interpolated value from stage -storage calculations Runoff Coefficient, Rv Required 1.5" Runoff Volume (Volume of Temporary Pool) Required 1 yr. 24 Hour Pre/Post Vol. Difference 0.442 IN/IN Rv=0.05+0.009*(% Impervious) 77,520 CIF 1.5" Runoff Volume=1.5 inch*Rv*1 fooY12 inch*(Total Drainage Area) 140,169 CIF See attached-NRCS (SCS) Method Calculations Volume Below Permanent Pool 499,701 CF Value from stage -storage calculations (cumulative pond volume at permanent pool elevation) Total Volume to be Controlled 639,870 CIF Total Volume to be Controlled=(Volume Below Permanent Pool)+(Re . Storage Volume) Storage Elevation at Required Volume 21.37 FT Value is interpolation based upon stage -storage values. See stage-storaqe calculations Total Pond Volume 499,701 CIF Value from stage -storage calculations Required Total Forebay Volume 99,940 CIF Forebay Volume= otal Pond Volume *20% Provided Total Forebay Volume 97,554 CIF Value from stage -storage calculations Provided Forebay Volume:Total Pond Volume 20% (Provided Forebay Volume)I(Total Pond Volume) *100% Diameter of Proposed Low -flow Orifice 3.50 IN Value chosen by designer Elevation of Outlet Structure 21.50 FT Value chosen by designer Total Elevation Head Above Orifice 1.50 FT (Total Elevation Head Above Orifice)=(Weir Elevation) -(Elevation of Permanent Pool Surface) (Average Elevation Head Above Orfice)=((Storage Average Elevation Head Above Orifice 0.50 FT Elevation at Required Volume)+(Elevation of Permanent Pool Surface)" -(Storage Elevation at Required Volume) Cd, Coefficient of Discharge 0.60 Value chosen by designer Q, Flowrate Through Low -flow Orifice 0.23 CFS Q=Cd ;(Pi){((Diameter of Orifice)*(1 ft/12 Drawdown Time for 1.5-inch Runoff 3.94 DAYS (Drawdown Time)=(1.5" Runoff Volume)/Q*(1 day/86400 seconds) Secondary Treatment Calculations: Infiltration Basin Rate of Infiltration 5.1 IN/HR Treatment Basin Bottom Area 2,238 SF Basin Depth 3 FT Unit Flow Rate 0.26 CFS Flow Rate through Low -flow Orifice less than flow rate into soil of infiltration basin (no stage -storage analysis req.) Pond #1 - Helms Port Stage -Storage Calculations for Proposed Wet Detention Pond Stage/Storage Above Permanent Pool (Including Forebay) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 20.0 97,422 0 0 Permanent Pool 21.0 107,857 102,640 102,640 22.0 112,763 110,310 212,950 23.0 117,726 115,245 328,194 24.0 122,745 120,236 448,430 Stage/Storage Total Pond (Including Forebay) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 12.0 48,669 - --Sediment Storage 13.0 53,335 0 0 +-Bottom Elev. 14.0 58,113 55,724 55,724 15.0 63,006 60,560 116,284 16.0 68,011 65,509 181,792 17.0 73,128 70,570 252,362 18.0 78,360 75,744 328,106 19.0 83,704 81,032 409,138 20.0 97,422 90,563 499,701 Permanent Pool 21.0 107,857 102,640 602,340 22.0 112,763 110,310 712,650 23.0 117,726 115,245 827,895 24.0 122,745 120,236 948,130 Forebay Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 12.0 7,693 - - -Sediment Storage 13.0 8,933 0 0 +Bottom Elev. 14.0 10,230 9,582 9,582 15.0 11,584 10,907 20,489 16.0 12,994 12,289 32,778 17.0 14,460 13,727 46,505 18.0 15,984 15,222 61,727 19.0 17,563 16,774 78,500 20.0 20,545 19,054 97,554 Forebay Volume Pond #2 - Helms Port NC DENR Retention Requirements Post -Development Conditions Total Drainage Area 22.00 ACRE Impervious Drainage Area 10.50 ACRE Impervious Cover 47.7% Elevation of Permanent Pool Surface 19.0 FT Depth of Permanent Pool 7.0 FT Avg. Depth of Permanent Pool 5.0 FT Value from CAD Value from CAD Impervious Cover --(Impervious Drainage Area)/(Total Drainage Area)*100% Value selected by designer Value selected by designer See attached calculation Elevation of Wet Detention Pond Bottom 12.0 FT (Bottom Elevation)=(Permanent Pool Surface Elevation) -(Depth of Permanent Pool) Approximate Pond Length 500 FT Value from CAD Approximate Pond Width 85 FT Value from CAD Len th:Width Ratio 6:1 Ratio= Len th / 1dth :1 Required SAIDA Ratio for 90% TSS Removal 3.34 Value from chart. Reference: "90% TSS Removal Required Permanent Pool Surface Area 32,008 SF Required Surface Area=(Required SAIDA Ratio)*(Total Drainage Area) Provided Permanent Pool Surface Area 43,252 SF Interpolated value from stage -storage calculations Runoff Coefficient, Rv 0.480 IN/IN Rv=0.05+0.009*(% Impervious) Required 1.5" Runoff Volume (Volume of 57,445 CF 1.5" Runoff Vo1ume=1.5 inch*Rv*1 fooY12 Temporary Pool) inch*(Total Drainage Area) Required 1 yr. 24 Hour Pre/Post Vol. Difference 78,362 CF See attached-NRCS (SCS) Method Calculations Volume Below Permanent Pool 171,814 CF Value from stage -storage calculations (cumulative pond volume at permanent pool elevation) Total Volume to be Controlled 250,176 CF Total Volume to be Controlled=(Volume Below Permanent Pool +(1.5" Runoff Volume) Storage Elevation at Required Volume 20.63 FT Value is interpolation based upon stage -storage values. See stage-storacie calculations Total Pond Volume 171,814 CF Value from stage -storage calculations Required Total Forebay Volume 34,363 CF Forebay Volume= otal Pond Volume *20% Provided Total Forebay Volume 36,949 CF Value from stage -storage calculations (Provided Forebay Volume)/(Total Pond Provided Forebay Volume:Total Pond Volume 22% Volume)*100% Diameter of Proposed Low -flow Orifice 3.00 IN Value chosen by designer Elevation of Outlet Structure 20.65 FT Value chosen by designer Total Elevation Head Above Orifice 1.65 FT (Total Elevation Head Above Orifice)=(Weir Elevation) -(Elevation of Permanent Pool Surface) (Average Elevation Head Above Oriffra)=f(Storage Average Elevation Head Above Orifice 0.55 FT Elevation at Required Volume)+(Elevation of Permanent Pool Surface)]/3-(Storage Elevation at Required Volume) Cd, Coefficient of Discharge 0.60 Value chosen by designer Q, Flowrate Through Low -flow Orifice 0.18 CFS Q=Cd*(Pi)*((Diameter of Orifice) *(I W12 in)]12/4*j2*32 2*(Average Head)]M/2 Drawdown Time 3.79 DAYS Drawdown Time " = 1.5Runoff Volume Q* 1 ) ( � Infiltration Basin Sizing to Handle 1.5-inch runoff volume Rate of Infiltration 5.1 IN/HR Treatment Basin Bottom Area 1,790 SF Basin Depth 2 FT Unit Flow Rate 0.21 CFS Flow Rate through Low -flow Orifice less than flow rate into soil of infiltration basin (no stage -storage analysis req.) Pond #2 - Helms Port Stage -Storage Calculations for Proposed Wet Detention Pond Stage/Storage Above Permanent Pool (Including Forebay) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 19.0 43,252 0 0 +•Permanent Pool 20.0 50,280 46,766 46,766 21.0 53,614 51,947 98,713 22.0 57,003 55,309 154,022 23.0 60,450 58,727 212,748 Stage/Storage Total Pond (Including Forebay) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 12.0 16,250 - - -Sediment Storage 13.0 19,024 0 0 •Bottom Elev. 14.0 21,910 20,467 20,467 15.0 24,909 23,410 43,877 16.0 28,023 26,466 70,343 17.0 31,248 29,636 99,978 18.0 34,586 32,917 132,895 19.0 43,252 38,919 171,814 Permanent Pool 20.0 50,280 46,766 218,580 21.0 53,614 51,947 270,527 22.0 bt,003 55,309 325,836 23.0 60,450 58,727 384,562 Forebay Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 12.0 2,894 - - --sediment Storage 13.0 3,582 0 0 ••Bottom Elev. 14.0 4,325 3,954 3,954 15.0 5,125 4,725 8,679 16.0 5,983 5,554 14,233 17.0 6,896 6,440 20,672 18.0 7,866 7,381 28,053 19.0 9,926 8,896 36,949 Forebay Volume Project Name: Helms Port Client: D. Logan Project Number: 13146.13E Prepared By: CWM Date: 2/17/14 Average Depth Calculation: (Option 2 per Errata) Pond #1 Asottom shelf = 90,563 Sf Asottom Pond = 44,402 Sf APerm Pool = 97,422 Sf Depth = 6.5 ft davg = 5.3 ft Pond #2 ABottom Shelf = 38,919 Sf Asottorn Pond = 15,442 Sf APerm Pool = 43,252 Sf Depth = 6.5 ft davg = 5.0 ft PARAMOUNT E E N G 1 N E E R 1 N G, 1 N fC Project Name: Emmarts Landing Client: D. Logan Project Number: 13146.PE Prepared By: CWM Date: 2/14/14 Infiltration System Design A Soils Information: Soil Type = Clean Sand Fill (< 5% Fines) SHWL = 1.4 EL. Infiltration Rate = 10 in/hr Stormwater Quality Requirement: Drainage Area to System = 0.64 Ac. Impervious Area = 0.31 Ac. % Impervious 48.44 % Runoff Coefficent (Rv) = 0.486 in/in Req. 1.5" Runoff Volume = 1,693 cf SCS Method 1 yr-24 Hr. Pre = 1,494 cf SCS Method 1 yr-24 Hr. Post = 4,108 cf 1 yr-24 Hr. Pre -Post Storage = 2,614 cf Weir Elevation = 8.50 EL. Storage Volume Provided = 2,930 cf Draw Down Analysis: Bottom Area of Trench 1,222 sf Bottom Elevation of Trench 3.5 ft Soil Column Depth 2.1 ft Draw Down Time = 0.11 days Infiltration System Design B Soils Information: Soil Type = Clean Sand Fill (< 5% Fines SHWL = 1.4 EL. Infiltration Rate = 10 in/hr Stormwater Quality Requirement: Drainage Area to System = 0.38 Ac. Impervious Area = 0.21 Ac. % Impervious 55.26 % Runoff Coefficent (Rv) = 0.547 in/in Req. 1.5" Runoff Volume = 1,133 cf SCS Method 1. yr-24 Hr. Pre = 887 cf SCS Method 1 yr-24 Hr. Post = 2,753 cf 1 yr-24 Hr. Pre -Post Storage = 1,866 cf Weir Elevation = 8.50 EL. Storage Volume Provided = 2,534 cf Draw Down Analysis: p.:�RAMOU1` TE a. N C3 I N E E R 1 N Q, 1 N C (from Darcy's Equation) Bottom Area of Trench 1,057 sf Bottom Elevation of Trench 3.5 ft Soil Column Depth 2.1 ft Draw Down Time = 0.12 days (from Darcy's Equation) Infiltration System Design C Soils Information: Soil Type = Clean Sand Fill (< 5% Fines) SHWL = 1.4 EL. Infiltration Rate = 10 in/hr Stormwater Quality Requirement: Drainage Area to System = 0.65 Ac. Impervious Area = 0.30 Ac. % Impervious 46.15 % Runoff Coefficent (Rv) = 0.465 in/in Req. 1.5" Runoff Volume = 1,518 cf SCS Method 1 yr-24 Hr. Pre = 1,324 cf SCS Method 1 yr-24 Hr. Post = 4,172 cf 1 yr-24 Hr. Pre -Post Storage = 2,848 cf Weir Elevation = 8.50 EL. Storage Volume Provided = 3,495 cf Draw Down Analysis: Bottom Area of Trench 1,457 sf Bottom Elevation of Trench 3.5 ft Soil Column Depth 2.1 ft Draw Down Time = 0.10 days Infiltration System Design D Soils Information: Soil Type = Clean Sand Fill (< 5% Fines SFIWL = 1.4 EL. Infiltration Rate = 10 in/hr Stormwater Quality Requirement: Drainage Area to System = 0.65 Ac. Impervious Area = 0.41 Ac. % Impervious 63.08 % Runoff Coefficent (Rv) = 0.618 in/in Req. 1.5" Runoff Volume = 2,186 cf SCS Method 1 yr-24 Hr. Pre = 1,518 cf SCS Method 1 yr-24 Hr. Post = 5,284 cf 1 yr-24 Hr. Pre -Post Storage = 3,766 cf Weir Elevation = 8.50 EL. Storage Volume Provided = 3,778 cf Draw Down Analysis: (from Darcy's Equation) Bottom Area of Trench 1,574 sf Bottom Elevation of Trench 3.5 ft Soil Column Depth 2.1 ft Draw Down Time = 0.12 days (from Darcy's Equation) Infiltration System Design E Soils Information: Soil Type = Clean Sand Fill (< 5% Fines SHWL = 1.4 EL. Infiltration Rate = 10 in/hr Stormwater Quality Requirement: Drainage Area to System = 0.45 Ac. Impervious Area =. 0.28 Ac. % Impervious 62.22 % Runoff Coefficent (Rv) = 0.610 in/in Req. 1.5" Runoff Volume = 1,495 cf SCS Method 1 yr-24 Hr. Pre = 1.051 cf SCS Method 1 yr-24 Hr. Post = 3,658 cf 1 yr-24 Hr. Pre -Post Storage = 2,607 cf Weir Elevation = 8.50 EL. Storage Volume Provided = 2,659 cf Draw Down Analysis: Bottom Area of Trench 1,137 sf Bottom Elevation of Trench 3.5 ft Soil Column Depth 2.1 ft Draw Down Time = 0.11 days Infiltration System Design F Soils Information: Soil Type = Clean Sand Fill (< 5% Fines SHWL = 1.4 EL. Infiltration Rate = 10 in/hr Stormwater Quality Requirement: Drainage Area to System = 0.58 Ac. Impervious Area = 0.38 Ac. % Impervious 65.52 % Runoff Coefficent (Rv) = 0.640 in/in Req. 1.5" Runoff Volume = 2,020 cf SCS Method 1 yr-24 Hr. Pre = 1,354 cf SCS Method 1 yr-24 Hr. Post = 4.893 cf 1 yr-24 Hr. Pre -Post Storage = 3,539 cf Weir Elevation = 8.50 EL. Storage Volume Provided = 3,608 cf Draw Down Analysis: (from Darcy's Equation) Bottom Area of Trench 1,504 sf Bottom Elevation of Trench 3.5 ft Soil Column Depth 2.1 ft Draw Down Time = 0.12 days (from Darcy's Equation) Infiltration System Design G Impervious Area: Soils Information: Soil Type = Clean Sand Fill (< 5% Fines) SHWL = 1.4 EL. Infiltration Rate = 10 in/hr Stormwater Quality Requirement: Drainage Area to System = Impervious Area = % Impervious Runoff Coefficent (Rv) _ Req. 1.5" Runoff Volume = SCS Method 1 yr-24 Hr. Pre = SCS Method 1 yr-24 Hr. Post = 1 yr-24 Hr. Pre -Post Storage = Weir Elevation = Storage Volume Provided = Draw Down Analysis: Bottom Area of Trench Bottom Elevation of Trench Soil Column Depth Draw Down Time = 1.79 Ac. 0.99 Ac. 55.31 % 0.548 in/in 5,339 cf 4,180 cf 12,969 cf 8,789 cf 8.50 EL. 8,877 cf 3,630 sf 3.5 ft 2.1 ft 0.12 days (from Darcy's Equation) Project Name: Emmarts Landing Client: D. Logan Project Number: 13146.PE Prepared By: CWM Date: 2/14/14 Infiltration System Design H Soils Information: Soil Type = Clean Sand Fill (< 5% Fines) SHWL = 1.4 EL. Infiltration Rate = 10 in/hr Stormwater Quality Requirement: Drainage Area to System = 1.95 Ac. Impervious Area = 1.23 Ac. % Impervious 63.08 % Runoff Coefficent (Rv) = 0.618 in/in Req. 1.5" Runoff Volume = 6,559 cf SCS Method 1 yr-24 Hr. Pre = 4,553 cf SCS Method 1 yr-24 Hr. Post = 15,852 cf 1 yr-24 Hr. Pre -Post Storage Req. = 11,299 cf Volume Provided = 12,312 cf Elevation @ Volume Provided = 7.50 EL. Surface Area @ Volume Provided= 6,077 sf Draw Down Analysis: L j--x 'ICIt.JNTE 'E N' G 1 N E E R 1 N G. i N C Bottom Area of Basin 3,723 sf Bottom Elevation of Basin 5.0 ft Soil Column Depth 3.6 ft Draw Down Time = 0.15 days (from Darcy's Equation) CONTOUR CONTOUR AREA INCR. ACCUM VOLUME [sq ft] [cu ft] [cu ft] 5.0 3,723 0 0 6.0 4,622 4,173 4,173 7.0 5,576 5,099 9,272 8.0 6,587 6,082 15,353 9.0 7,655 7,121 22,474 WETLAND APPROVAL LETTER U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2013-01819 County: New Hanover U.S.G.S. Quad: Wilmington NOTIFICATION OF JURISDICTIONAL DETERMINATION Property Owner: Aaua Vista Farms, LLC. Agent: Land Management Group, Inc. Attn: Corey Novak Address: 100 Aaua Vista Drive 3805 Wriehtsyille Ave. Suite 15 Wilmington, NC 28409 Wilmington, NC 28403 Phone No. (9101452-0001 Property description: Size (acres) 95 Nearest Town Wilmington Nearest Waterway AIW W River Basin Cage Fear River Basin USGS HUC 03030001 Coordinates N 34,1387 W -77.8661 Location description: The Property is located at 100 Aqua Vista Drive In Wilmington, New Hanover County. North Carolina. Parcel ID It is R07600-003-014-000 and R07700-001-017-000, Indicate Which of the Following Apply: A. Preliminary (Determination Based on preliminary information, there may be wetlands on the above described property. We strongly suggest you have this property inspected to determine the extent of Department of the Army (DA) jurisdiction. To be considered final, a jurisdictional determination must be verified by the Corps. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331). if you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also, you may provide new information for further consideration by the Corps to reevaluate the JD. B. Approved Determination X There are Navigable Waters of the United States within the above described property subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. X There are waters of the U.S. including wetlands on the above described property subject to the permit requirements of Section 404 of the Clean Water Act (CWAX33 USC g 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a Period not to exceed rive years from the date of this notification. We strongly suggest you have the wetlands on your property delineated. Due to the size of your property and/or our present workload, the Corps may not be able to accomplish this wetland delineation in a timely manner. For a more timely delineation, you may wish to obtain a consultant. To be considered final, any delineation must be verified by the Corps. X The waters of the U.S including wetlands on Your property have been delineated and the delineation has been verified by the Corns We strongly sgg est you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, Provided there is no change in the law or our published re ulations, may be relied upon for a period not to exceed five years. The waters of the U.S. including wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. There are no waters of the U.S., to include wetlands, present on the above described property which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. Page 1 of 2 X The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal. Area Management Act(CAMA). You should contact the Division of Coastal Management in Morehead City. NC, at (252) 808-2908 to determine their requirements. Placement of dredged or fill material within waters of the US and/or wetlands without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Christy Wicker at_(910) 251-4637. C. Basis For Determination The site exhibits mean high water and wetland criteria as defined in the 1987 Wetland Delineation Manual and it's a appropriate supplement, and is adjacent to the Atlantic Intracoastal Waterway. This determination is based on information provided by Land Management Group, Inc. and a site visit conducted by Christy Wicker on 10=013. D. Remarks E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 1OM15 Atlanta, Georgia 30303-8801 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by January 30, 2013. "It is not necessary to submit an RFA form to the Division Office if you do not obiect to the determination in this correspondence." Corps Regulatory Official: Date: 12/2/2013 Expiration Date: 12/2/2018 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the attached customer Satisfaction Survey or visit http://per2.nwp.usace.army.mil/survey.html to complete the survey online. U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2013-01819 County: New Hanover U.S.G.S. Quad: Wilmington NOTIFICATION OF JURISDICTIONAL DETERMINATION Property Owner: Aaua Vista Farms, LLC. Agent: land Management Group, Inc. Attn: Corey Novak Address: 100 Auua Vista Drive 3805 Wrightsville Ave. Suite 15 Wilmington, NC 28409 Wilmington. NC 28403 Phone No. (910) 452-0001 Property description: Size (acres) 95 Nearest Town Wilmington Nearest Waterway AIWW River Basin Cape Fear River Basin USGS HUC 300 30001 Coordinates N 34.1 W-77.8661 Location description: The property is located at 100 Aaua Vista Drive in Wilmington, New Hanover County, North Carolina. Parcel ID # is R07600-003-014-000 and R07700-001-017-000. Indicate Which of the Followins Apply: A. Preliminary Determination Based on preliminary information, there may be wetlands on the above described property. We strongly suggest you have this property inspected to determine the extent of Department of the Army (DA) jurisdiction. To be considered final, a jurisdictional determination must be verified by the Corps. This preliminary determination is not an appealable action under the regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331). If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also, you may provide new information for further consideration by the Corps to reevaluate the JD. H. Approved Determination X There are Navigable Waters of the United States within the above described property subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is g change in the law or our published regulations, this determination may be relied upon for a Oeriod not to exceed rive years from the date of this notification. X There are waters of the U.S. including wetlands on the above described property subfect to the permit requirements of Section 404 of the Clean Water Act MWAX33 USC 8 1344). Unless there is a change In the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. We strongly suggest you have the wetlands on your property delineated. Due to the size of your property and/or our present workload, the Corps may not be able to accomplish this wetland delineation in a timely manner. For a more timely delineation, you may wish to obtain a consultant. To be considered final, any delineation must be verified by the Corps. X The waters of the U.S. including wetlands on your Property have been delineated and the delineation has been verified by the Corns. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate .depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations. may be relied upon for a period not to exceed five years. The waters of the U.S. including wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. There are no waters of the U.S., to include wetlands, present on the above described property which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. Page 1 of 2 X The Property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal. Management in Morehead City. NC, at (252) 808-2808 to determine their requirements. Placement of dredged or fill material within waters of the US and/or wetlands without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Christy Wicker at (910) 251-4637. C. Basis For Determination The site exhibits mean high water and wetland criteria as defined in the 1987 Wetland Delineation Manual and it's a appropriate supplement, and is adiacent to the Atlantic Intracoastal Waterway. This determination is based on Information provided by Land Management Group. Inc. and a site visit conducted by Christy Wicker on 10/2/2013. D. Remarks E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved ,jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 1OM15 Atlanta, Georgia 30303-8801 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by January 30, 2013. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination"in this correspondence.** / Corps Regulatory Official: ( >/Z Date: 12/2/2013 Expiration Date: 12/2/2018 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the attached customer Satisfaction Survey or visit htip://pert.nwp.usace.army.mil/surySy.html to complete the survey online. 0 q g (T y O R I l N � ; Dr a g m °f `� g aVOM d LOI 02PWAVW i m ; 52227 23 W 1058.51 • -_ _—'•, E c r t l EA o i`1 Ri S g�mm�c ! g o9 I� �ttO `$ II s�8�o �•�� fil ill TTaa y�y � Y z -� W p-gg lj Asa w 2 a R8� Lo A i 7 to _m=ao��4aN M O I ; � • 76iiW iN I .� 1 • 1'O I I � � t I i 'ill I r y I 1 4-• z i i • � � �i 11 1 � 4 �f 33 9 : U1 i 6 I� Ln V �I STAL WATERWAY! N $ Z � Em--'Z WETLANDS SURVEY`eYESELPROPERTYINVESTORS. G G G G G G G G G G G G C OJIU� W N� OiD to V iANm ?Z (rIN�Z i/r1N I p Olt pp V prJ o •A O'p A OOf Z O C7 I i rir•irnni� mmfAiE V V W N mm W'iV NCp •yyyyyy'1 i NOONODO m 0 W r G m r i''• r_ v V Z a'ia•PD �wN�omaJm N� J r�r r y D N N N N N N Z � �> 2 OCw wrnJwmtni6'�"� vi Nb .Om Z f/f d(�iim O�IV � J� fnN o N � m ON1m •rD OI -'ONN`�J V O J W �[7� rn �AQUAVISTAFARMSLLC.�591f 04alder Dove, gui¢7DlMASONBOROTOWNSI-llPCaroWa1b903310NORTHFRONTSTREET,. WILMINGTON, NC 28401 y NEW HANOVERCOUNTYNC CLue,�ise#� 281GTN0 4444J111 N+ I W Srii W O N G t0 W N V W IV N W A N IV W N ,1 N O ID W V W W A (A N j + O m m N W�V m NWO f V 'V Z-' EWn ZW Z N W AV�W10.!N Z IW O co4. VZV W V W V ZVN IIVWtpI OAW W IVWI A4W VVOfI m2r^-C WZW41 O �o Nf 10 A $Zm NON V N�pm 1 V W _tG 10 _V N V aVSW W m FiA*:e U(T.A�� V 'mWf�gninir.iri W W tq NOIWO WIN '�' IW7 OWIA yy W W W W O 10O(� V AO (a W Z> fp 'c�Fn mrn Ag4 p mJ,ON+�SWii I ,.NIA y A 071 �N! �m O W W JA (J 'V W W W NfA v N W m W(� Q W W O N O W Q O ? N W V N W fl EnmN N CO V O V.o W t0 W N N? U W W W a+W 00 W mIGOONO O O IG W N N Z C7 m 22 ZmZ 14 Wy V V7 AN mfi W C my 0 W0 W V -?— W N v y NQAA ON Z mr ' :: � * `e * PT :e 1*1 QWo O ppoo O I,Ao A m W P V O W 4' O 1 W 0 W W 0 A N W f 0 V W W 10 W W ? `� W W A O 9 n m ma �z I I �pp � Ki G I C D I I 1 III} I 1 I iI �I I 1 I I 1I I I 1 I I � 0 W • 11{ I m$ro I V I � I 1 m f 1 I I W I 1 I D I 1 I T D Z I� D 1 I� d 'II 1� I 1 II I� ` mmm N+Omm V JJv V V m mA V v W V V N+Omm v W W rm V Orl Or, OINA W Or,rm W Eg NOtOm NN{T V �j, lr 011a Ulr 4- W lrN AA ArAZ m V W m ZZZ m m m+ �ZZ� V m V m ZZ N N+ yZ O J Z(/t m V1N �1l p + O C A N W++ O m A A tT NUIN A A A A w A In w N+ y� V1 N O r p Z m tli IS �W A UI I(J'I 3 (f ,A 1 UI 4l IS N W Li 1.11(R N O 1A I� N IW OI W N (� vi hi W f�i m W m O W d OI m m m f�j mm m} m m # N' O 1 10 V N hS 4S Q �mm1 + D -1 A D O N P GI WIC W'W p 'a. 0+ 0O d (A ZV O rr! m Im Rl m m m RllI RR I,j Ri R Im m i m E m` 3E lW m IUrl W HIV Nmf##J A �N W V OD W W m AO�I'm NONIN A I1�, N IW m NNOAm ��m In V O�%Qkm N N Nm W (A V 41+J •_I�+ m m jmQf�N+W A mm m P. A mA W N W V W yy IW QI A A O W _��O NN+N�� W N-N+OIDm pp+pfO W N�O mlD mm fO V mNA fO fO ,rD tO W N+OeD IrD G0�mrm OD OC m V m�A�m � z ZZZ 0) Z t'AS 1m0 W Ln IWp fT (,Im 142 V ZZZ W W Z�1 �Ntrm 1/! Amm 1�1 1nZ W g+m ZCZ mm Cm ONE m 0 p0 �p Oi NNpA NjIS O m IS m CSIA�N IN 'j�fS ,i z D fNil� W+A`f(n _�`r .V +m+ A `Rliini O N O No, 'Rir+i 1WOm 'ff� O oC W yy OAA `tiro r ,Am ifF :`Rlm W OA W EAjpmN rn,.Aim$ O :Imop,�ilpWl,'Oo�ii,Wi+o�i1 to V m0 W O�OINNN D .m p mm N �m fAmm _m m w W N m INTRACOASTAL WATERWAY J a N O M_ A F W '�' m"'" WETLANDS SURVEY AQUA VISTA FARMS MASONBOROTOWNSHIP NEW HANOVER COUNTY NC OL7NT� 5g1101andaIki�e, 5uirc 201 WgmingonNmhGmlin]ea05 (1111) �o5.(0� slu�v9tblblr� TIC Lian,e =2816 SEL PROPERTY INVESTORS, LLC 310 NORTH FRONT STREET, WILMINGTON, NC 28401 o,m '� m y J W Ir N U+W GNN N�Ommv� N N GN N G N G N Ny AW Gy G N�Ot�NNb N Ny N W G 00v N N CWOUA G G G N W N+IO G G N G AAAAAAOffffff �NNV N N W C m !_ la z mm D1 �����✓y.�y NNOb OC-4 y �y NIA � W Nt a O F, Z to cc Z.r.. V m a 01'. � c W N-W. rf_" 1Z*1 r y Z �m1m D ". ' y y W W iW C111S� O!pApppN y yy W fr 0oQ tr Z Z W W AOpp Z Z W (� f/ W Z Z W N �: Z Z N O No0 IS�dhi Z 2 HfJi I Z Z A A CO [.i 4i9 Z Z A A :D Oeo to Z Z A A V �� Z Z W W AO W 2 A��i� A y1� + W -hit. W y1/1 A A A A? 10 ep w� 'R W lfi y O W y _ �m"NJ 1 Y���i y y N? W 4± I W OI-�Oi 4i l y CA �1ICA� V yy OO�O�� -� Z p � Z mid Z Z V 1iV Z Z -A'W Ad V O�yj, I� A fJ� IA b rim _ADO N ' N N rui N n; C1m m A :E U:OAN A A 29 N N V O V � 4+ V if � � �f0 ' m ID rim V N I� rq V [LJ,�.Np W ' (11 l Ayym z m A NI�?��vO tD R E N OOi F � W W f F J f ;< Imo: v mONI � If fO I� N:NN W N N 4: rn A + r ri i ri ri rim ri rim ri � O y bp D NtOi:O mJ 1,No� J+�NOjm IO VIV A A W N? L �` #'v Nt,J>t pppp .I V p' N'+� W 0�+,ON1? �O N Oa vU �t"ii A p m Ifp N IV A O:O :O Lo Cl Of OOo+OJ -IN O U: pDN O N:D N N G7: O O A Z c7 V D A _O W m _ W V W O1 IQ T N ,O� W IV V fD W W W 07A o1 W 10 Z N t7 m IIQ m � � I I � v y I I mIJ v �IW r ; s I A � It "I C v m I I I S2428'19'W 353.26' 1 I 1 ; § w WETLANDS SURVEY p ORA T$ Mtn—__SEL PROPERTY INVESTORS, u,wn AQUAVLSTAFARMS 19110knndeeDrive, Snipe 201 LLC' y .r, melol�raml w" 310 NORTH FRONT STREET, y A MASONHOROTOWNSFUP 191ga9 Rfr(.)plo a�ao(F) WILMINGTON, NC 28401 u NEW HANOVER COUNTY NC - NCli�eme q: FoK;5-ir.5Gpo r00 coQIW U# W N sIS ����r.�r;c m mm Omi D A W N -r- �+ O E:Cr-N����� rmG S a W f11 AjW N O rV0 m V OV1 N+ W N O ro Omo V 0 emir A W N +� O mIQ V T N? W m A+V N N N L4A•pN•'ONpprmO N N ( N� W N Z N T W N Z Omf4mO�VDjO Z Z Z N N N NOO� (/I N y w V �Af07,mSNOVi UI N �cs j N N N N N W Z Z W W N N N 2 2 Z Z mOAOVo N N Z Z Z Z Z 10 N C m rW0 m A V m O `W O m rn m J dp f.11 f.G Li A A 1 1 V! d 'i ci1 yN, A W N Am cAir OV10 A CS d A V N rn{+71w,D rn W D —i O m O _ _ A AO O((�� O+ �(��rO O + WW V A V N O AA A_WNm O AN NA k A p�NO N �N M m -+ mN � m Ol 0� mwWmm V A_ W UI ,m f/� A� 'bi V N �m j m '(.j mNNrGmm A7 ANNN K; W m Zm f � ni ri r•i lSc` � ` f ` � f m Ye f r*i r*i rri m rn F ` f Ri ni F � f � � F f -. ' ri l� r+i W ' rn VAmrnA m r4 rn r'? r, VijjlIm. I o :�WrpN A -4'po V Nubr�, ANNNm W W N m 1yy0 Sj,m AN f0 Wf.r m V NN 100r W rG+ m �y_r InNO�'vN �10 fn WIN (TO Vm pNw 1 _N Ay V ONrNO.Nm��.� O pNOT Q rW0 Uf.IN OIO N+N V b. W V . ONm M. 4N�ZNS mOlm ,{ACm wm Omu NOOm W AA O�,I� I.1 GFgGGI.gK;gI. A. N N O m m V m E E GGG� i tNL O N ONOZ A S pZpppZ m+ r2r�� V O i A4. W W Z m m W m fit r341 N V .i mm� Ui� OWp AuSN �fAOm ul�yytJ 00m,-oy D� + N v A% m T N •N• ` N g S A m I :E !om [7im OomO Nmr.� O� � tnm OS SODA NN-�Wmoi m m� C uri'ww C C C C :omm.rmrnAm C C 0oo0ooZ C C C C C Zoe �Z 14 W N Z and m ''A tz tj m m a9 N ym 10 .W m 41 UI m m ;NSA W m m W N AIWo O Z�,j mmN mmNoW,"'NA O H mrVnJ0r+�0 W W NmA Z A m A WETLANDS SURVEY LJ ppRAM NT$ SEL PROPERTY INVESTORS, O M AQUA VISTA FARMS 591101andu Drivq Seim 401 wm i gen Nad c. n5 ,a8403 LLC 310 NORTH FRONT STREET, m r>eexet♦nitf>�enau �0O"�+t` TOWNSHIP MASONBORO TOWNSHIP plq Tlt-6N�7� (9tq 791-6760 (tt -NCTidiu� L•7.616 WILMINGTON, NC 28401 �* v NEW HANOVSR NC q: SOILS REPORT SOILS ASSESSMENT REPORT of the EI1 MARTS LANDING Masonboro Loop Road, Wilmington, NC Prepared for Paramounte Engineering January 27, 2014 Number 57 G. Craig Turner Land Management Group, Inc. 3805 Wrightsville Ave., Suite 15 Wilmington, NC 28403 910-452-0001 r-urrereci ftgroua.net Objective: Land Management Group, Inc. contracted with Paramounte Engineering to provide environmental services for the development of the proposed Emmart's Landing S/D, 'located near Myrtle Grove, North Carolina. One primary objective was to assess the site for possible use for allowable stormwater plans. Project Background: The site consists of approximately 75 acres of abandoned farmland that is proposed for a residential/marina project situated between Masonboro Loop Road and the Atlantic Intracoastal Waterway (AIWW). Approximately 60% of the site is in woodlands, 25 % in fields or orchards and the balance in shrub/scrub woodlands next to the marsh and a dredge spoil disposal area. Site Drainage Conditions: The site ranges from sea level on the eastern end to approximately 26 feet above mean sea level on the western end of the tract. One major drainage ditch runs north -to -south across the tract about 1200 feet from the AIWW. One, last ridge is located eastward of this ditch and then the land slopes gradually to the sound. The tract profile is shown in Figure One. Previous Work: Initially, the soils work on this site evaluated the existing soils on the site to determine what areas met the minimum requirement for infiltration stormwater systems. The initial soil boring report for the stormwater infiltration BMP was completed June, 2013 with additional areas evaluated in July, 2013. Subsequent evaluations occurred November, 2013. PJ Proposed Site Development Plans: The development plans call for the excavation and construction of a 75-slip marina for the residents of the project. The proposed layout is shown in Figure 2. FIGURE TWO: The plan calls for the construction of an inland basin containing a 75-slip marina facility. Dredge -spoil taken from the facility will be used to build-up existing grades for residential construction. The stormwater plans for this site require that infiltration systems be utilized within the 575-foot setback from the ORW located on this site. The plans for this are shown in Figure Two and the cross-section for this systems are shown in Figure Three. FIGURE THREE: 3 Based upon evaluation of original soils, Appendix A, additional modifications to the site are proposed. The plan shown includes the placement of dredge spoil over the existing soils, generally from eight to ten feet of fill. Clean, medium, sand fill (< 5 % fines),will be placed in trenches along lot lines to a depth equivalent to mean high water, 1.4 feet msl, for the length of the systems, to a depth adequate to six inches above the plastic pipe, see detailed plan prepared by Paramounte Engineering. This material will have a permeability of 10 inches per hour. Site Drainage: This drainage analysis of this site uses the Dupuit equation. This equation allows you to determine what drain spacings are necessary in order to achieve a desired water table drawdown with varying amounts of hydrologic inputs. For this site I have applied the equation in a manner that allows me to determine the effective drawdown of the proposed infiltration systems with outfall drainage occurring through lateral flow out of the ends of each system to prevent the rise of any potential water table mound below the existing infiltration trenches. Excavation of the marina will bring the tidal margin approximately eight hundred feet in the site. This will result in a considerable drainage effect for the area as the marina itself will maintain an effective drainage outlet with a maximum elevation of 1.4 feet, msl. 4 Transmissivity data for the project conducted across the site resulted in transmissivity values of 8.4 feet per day as shown in Table Four: FIGURE FOUR Site Testing for Emmerts Landing Piezometer Number Run Water Column Depth (inches) Infiltration Rate Ksat ([nihr) Infiltration Rate Ksat ((ft/day) 1 1 37.10 - 70.80 4.81 9.63 1 2 37.10 - 70.80 5.08 10.16 3 3 37.10 - 70.80 4.99 9.98 3 1 39.96 - 65.04 4.57 9.15 6 2 39.96 - 65.04 9.09 18.18 6 3 39.96 - 65.04 8.44 16.88 7 3 39.96 - 65.05 1.79 3.58 7 3 39.96 - 65.06 1.46 2.92 - .45 10 3 39.96 - 65.08 6.22 12.44 12 3 39.96 - 65.09 2.09 4.18 12 3 39.96 - 65.10 1.96 3.92 16 3 39.96 - 65.11 7.70 15.39 Geometric Mean: 4.20 8.40 This will result in extensive de -watering the soils around the marina for a distance of approximately 128 feet, see Table Five. This is based on in -situ soil permeability data taken on -site for the sides and upper slope areas of the marina basin. TABLE FIVE DUPUIT - FORCHHEIMER DRAINAGE EQUATION [lateral distance to zero drainage drawdown] d= [square root ((4xK)/r)]xh.]/2 d = lateral distance to zero drainage drawdown (ft) K = conductivity (ft/day) x/y direction, no z direction 8.40 r = daily effective rainfall (ft/day) [rainfall (input) - ET (loss) / 12] / time (days) 0.03600 hm = total drainage depth R -.zero drawdown depth A; or dewatered aquifer thickness (ft) 8.40 d = 128.3 ft lateral distance to zero drainage drawdown 933.33333 30.55050 256.62424 128.31212 Avg NC annual r = 0.0050 May (58 "lyr - 36" ET = 22"/yr / 365 = .0603 "May / 12 = .00502 ft/day) Avg NC coast annual r = 0.0032 ft/day (58 "/yr - 44" ET = 1411/yr 1365 = 0.0384 "May / 12 = .0032 May) 404 wet month r = 0.0161 ft/day (7' - 1" ET = 6" / 31 days = 0.197day / 12 = .0161 ft/day) Table six shows the drainage response for the fill areas around the lower sides of the marina basin and the resulting draw -down distance of 151 feet. The ex ep cted infiltration rate of a clean, medium, sand can easily exceed ten inches per hour (loin/ ham. 5 ABLE SIX: IUPUIT - FORCHHEIMER DRAINAGE EQUATION [lateral distance to zero drainage drawdown] [square root ((4 x K) / r}] x hm ] 12 = lateral distance to zero drainage drawdown (ft) = conductivity (ftdday) x/y direction, no z direction 10.00 = daily effective rainfall (ft/day) [rainfall (input) - ET (loss)112] / time (days) 0.03600 = total drainage depth B - zero drawdown depth A; or dewatered aquifer thickness (ft) 9.10 d = 161.7 ft lateral distance to zero drainage drawdown 1111.11111 33.33333 303.33333 151.66667 NC annual r = 0.0050 May (58 "/yr - 36" ET = 22"/yr / 365 = .0603 "May / 12 = .00502 ft/day) NC coast annual r = 0.0032 ft/day (58 "/yr - 44" ET = 147yr 1365 = 0.0384 "May / 12 = .0032 ft/day) wet month r = 0.0161 May (7" - 1" ET = 6" / 31 days = 0.19"/day / 12 = .0161 May) All of the infiltration systems proposed within as effective drawdown radius. Based u on this drainage effect the mean high water elevation is used as the SHWT. All systems must maintain a minimum two foot separation between the bottom of the system and this 1.4 feet, msl. Based upon this drainage scenario discussed above, using a rough design length of 250 linear feet of infiltration line on a given lot line, the discharge volume TABLE SEVEN: DUPUIT EQUATION [original equation solving for q' between any 2 water table points] _ -K x [(h,2 - h22) / 2L] ' = fe / day discharge per 1 unit width (1 foot) plume = q' x L = conductivity (ft/day) xty direction, no z direction 10.00000 = linear length between hi and h2 (ft) 150.00 = unconfined aquifer total thickness at higher drain (ft) 8.40 = unconfined aquifer total thickness at lower drain (ft) 1.40 q' = 2.29 ft31 dRy discharge per 1 unit width 'ol = 571.67 ft31 day Using the total length of the infiltration system times the discharge equals a potential discharge of : Eq. (1) 250 ft X 2.29 ft3/day X 7.48 gal/ft3 = 4,282.3 gal/day per system. Accordingly, the sand filled trenches will be constructed with clean sand placed in six- inch lifts, for a total depth of thirty-six inches with the storage pipe in the center. The sand -filled trenches will provide ample lateral discharge to either the down -slope areas or 0 the sand -filled areas behind the marina headwalls. The result is highly permeable soils receiving stormwater that is dispersed out the later ends of the trenches. Conclusions: The construction of the marina will de -water approximately 151 feet out from the marina headwall. Infiltration systems within that distance will dissipate collected stormwater within 2-5 days of the storm event. Trenches placed within dredge -spoil will discharge in the drawdown radius or laterally to the opposite end onto down -slope areas. 7 For DENR Use ONLY Reviewer. A& North Carolina Department of Environment and Submit + / Natural Resources % NCDENR Request for Express Permit Review Tirhe:NF� ` Confirm: FILL-IN all the information below and CHECK the Permits) you are requesting for express review. Call and Email the completed form to the Permit Coordinator along with a completed DETAILED narrative site plan (PDF file) and vicinity map (same items expected in the application acka a of the project location. Please include this form in the application package. • Asheville Region Alison Davidson 828-2964698;4 , (� • Fayetteville or Raleigh Region -David Lee 919-7914203, david leeclncdenr.aov Mooresville & Winston Salem Region - Patrick Grogan 704-235 2107 or patrick.groganc?ncdenrgov Washington Region -Lyn Hardison 252-948-3842 or 1yn.hardison(ancdenr.00v • Wilmington Region Janet Russell910-796-7302 orianet russe11@Dncdenr.gov • Wilmington Region -Cameron Weaver 910-796-7303 or cameron. weaverOwncdenr uov NOTE. Project application received after 12 noon will be stamped in the following work day. Project Name: EMMARTS LANDING County: NEW HANOV Applicant: D LOGAN Company: SEL PROPERTY INVESTORS, LLC Address: 60 GREGORY ROAD, SUITE 1 City: BELVILLE , State: NC Zip: 28451-_ Phone• 910-367-1348 Fax: 910-791-6760 Email: dlopan@loaanhomes.com Provided Existing Permits related to this Proiect SW SW _ sv! _ NPDES NPDES WQ _ WQ E&S_ _ E&S _ Other Physical Location: 100 AQUA VISTA ROAD WILMINGTON NC, OFF OF MASONBORO HARBOR ROAD Project Drains into WATERWAY waters - Water classification SA, HQW. ORW (for classification see- hftp:/lPortal.ncdenr.org/weblwq/ps/csu/classifications) Project Located in CAPE FEAR River Basin. Is project draining to class ORW waters? Y, within ''Y2 mile and draining to class SA waters Y or within 1 mile and draining to class HQW waters? Y Engineer/Consultant: TIM CLINKSCALES, PE, PLS Company: PARAMOUNTE ENGINEERING, INC Address: 5911 OLEANDER DRIVE, STE 201 City: WILMINGTON, State: NC Zip: 28403-_ Phone: 910-791-6707, Fax: 910-791-6760, Email: TCLINKSCALES@PARAMOUNTE-ENG.COM PLEASE PROVIDE ESTIMATED INVESTMENT AND EXPECTED EMPLOYMENT, IF AVAILABLE $ # JOBS SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑ Scoping Meeting ONLY ❑ DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: SECTION TWO: CHECK ONLY THE PROGRAM (S) YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑ 401 Unit ❑ Stream Origin Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Certification ❑ Isolated Wetland (_linear ft or _acres) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance ® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑ Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other ❑ Low Density ❑ Low Density -Curb & Gutter 12 # Curb Outlet Swales ❑ Off -site [SW (Provide permit #)] ❑ High Density -Detention Pond _ # Treatment Systems ® High Density -Infiltration 8#TreatmentSystems ElHigh Density -Bio-Retention _ # Treatment Systems El High Density -SW Wetlands It Treatment Systems El High Density -Other _ 0 Treatment Systems /❑ MOD:❑ `.VJ3r ❑ Pl-n Revision [I Redev. Exdlisic-1 `V: (, icr: • F.:;r #) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ Land Quality ❑ Erosion and Sedimentation Control Plan with 25 acres to be disturbed.(CK # (for DENR use)) SECTION THREE -.PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both Scoping and express meeting request) Wetlands on Site ® Yes ❑ No Wetlands Delineation has been completed: ® Yes ❑ No US ACOE Approval of Delineation completed: ® Yes ❑ No Received from US ACOE ® Yes ❑ No Buffer Impacts: ❑ No ® YES: _acre(s) Isolated wetland on Property ❑ Yes ® No 404 Application in Process w/ US ACOE: ❑ Yes ® No Permit Di�l' R we oniti Fee Split for multi le ermits: (Check if Total Fee SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance (❑ Maj; ❑ Min) $ SW ( HD, LD, ❑ Gen) $ 401: $ LQS $ Stream Deter— $ NCDENR EXPRESS October 2013 Emmarts Landing Express Storwiwater- Narrative January 2014 Project Narrative: Sel Property Investors, LLC is proposing the construction of a 159 lot neighborhood on a 75 acre piece of property at 100 Aqua Vista Road off of Masonboro Loop Road in New Hanover Counyt. In addition to stormwater management. The project is within a drainage basin that drains to Waterway (SA, ORW). The stormwater will be conveyed via curb and gutter and stormwater collection system to infiltration devices in various locations. In conjunction with this, they will be designed to meet the New Hanover County Storm Water Ordinance. Sel Property Investors and Paramounte Engineering have met with Chris Baker with DENR on 2 occasions to expedite the review of the project upon submittal. This project has an approved wetland permit and all permit applications including CAMA for the whole development have been submitted to the necessary agency for review and approval. vI�sl oil,, e DESIGN - lad 9ai Hill i _ 1 n _ D>MnRRT'S L&ND vc ON THE SOUbM PAR OC1N I E N PERFORMANCE RESIDENTIAL. SUBDIVMON 5911 OImdcDrngsmrc 261 SEL PROPERTY R4VESMP—%INC. S MASONBORO TOWNSHIP W NmtL Cmoaoa R/03 60 GREGORY ROAD, SUM NEW HANOVER COUNTY, NC (➢1� 191-6107 (� ry1y 791-6766 (l� SELMLE NC 2&451 Book 5926 Page 1122 Book 5908, Page 671 in the office of the Register of Deeds for New Hanover County; and, WHEREAS, under Article 15, Section 15.2 of the Declaration. the Declarant may, in its discretion, amend the Declaration at any time prior to January 1, 2046 or until all Lots (as that term is defined in the Declaration) are sold, without the consent or approval of any Class A memberships; and, WHEREAS, the Declarant now desires to further amend the Declaration for the purpose set forth below; NOW, THEREFORE, the Declarant pursuant to the authority and powers granted under Article 15 of the Declaration does hereby further amend the Master Declaration of Protective Covenants For Helms Port, as previously amended, by deleting Paragraph 4. 10 in its entirety and replacing it with the following: 4.10 Assignment to Association, Declarant has obtained certain permits and installed various permitted systems within the Residential Community during the course of developing the Property including. but not limited to (i) Permit No. - WQ0037170 issued by NCDENR to the Association for construction, maintenance and operation of a Private Pump Station and Sewer Wastewater Collection System System, (ii) Stormwater Management Permit Number SW8 140211 issued by the North Carolina Division of Water Quality (' NCDWQ") under NCAC2H.1000, (iii) NCDOT Permit D-065-14-010, (iv) CAMA Minor Development Permit No. 14-15, and modifications or amendments thereto. Declarant shall assign, and the Association shall assume all of such permits and systems including but not limited to water, sewer (including private lift station), land use, stormwater permits and systems and utility permits, agreements and easements between Declarant and any governmental agency or department or public or private utility company, whether or not specifically listed hereinabove. The Association shall, within ten days of a request by Declarant, accept the assignment and assume such permits and systems. Such obligation to accept assignment of such Permits and systems shall not be subject to the results of any inspections, analyses or reports. After such an assignment, the Association shall be responsible for and assume all duties, obligations, and rights and privileges of the Declarant under such permits, agreements and easements, including all maintenance responsibility, even if part of the water, sewer, land use, stormwater system or utility areas covered by the permits, agreements and easements are not located within the Properties. Further, the Association, and all Members, shall at all times perform under, comply with, observe all of the terms, covenants, obligations, responsibilities and provisions of that certain Operational Agreement between the Association and the North Carolina Environmental Management Commission dated July 2, 2014, and the Private Pump Station & Sewer permit #WQ0037170. A copy of the Operational Agreement and Approval Letter with System Description from the North Carolina Department of Environment and Natural Resources are attached hereto as "Schedule 4.10" and incorporated herein by reference. Each Lot Owner, by his, her or its acceptance of his, her or its Deed to a Lot acknowledges this disclosures and agrees to accept his, her or its Lot subject thereto, and further to fully comply with each of the terms of all applicable Permits. The Permits shall be available 2 FEBRUARY 2014 PREPARED FOR: SEL PROPERTY INVESTORS 310 NORTH FRONT STREET ALL EXISTING UNDERGROUND UTIU11ES SHALL BE PHYSICALLY LOCATED PRIOR TO THE BEGINNING OF ANY ~ CONSTRUCTION IN THE VICINITY OF SAID UTILITIES,_. o, ~ CONTRACTORS SHALL NOTIFY OPERATORS WHO MAINTAIN UNDERGROUND UTILITY LINES IN THE AREA OF m ; PROPOSED EXCAVATION AT LEAST TWO WORKING DAYS, BUT NOT > MORE THAN TEN WORKING DAYS PRIOR TO COMMENCEMENT OF EXCAVATION OR DEMOLITION. - CONTACT "CAROLINA ONE CALL" AT VICINITY MAP 1-800-6324949 (NOT TO SCALE) CONTACT THESE UTILITIES _- SHEET INDEX SHEET NUMBER SHEET TITLE C-0.0 COVER SHEET C-1.0 NOTES C-2.0-2.1. SITE PLAN C-3.0-3.4 GRADING AND DRAINAGE PLAN C-3.5-3.7 DRAINAGE AREA MAPS C-4.1-4.3 DETAILS NEW HANOVER COUNTY PLANNING DEPARTMENT CAPE FEAR PUBLIC UTILITY AUTHORITY (WATER & SEWER) ATTN: LINDA PAINTER ATTN: FRANK STYERS PH:910-798-7068 PH:910432-WO .Y PROGRESS ENERGY E, 1 r '1)I PIEDMONT NATURAL GAS PREP D B g . ATTN: CARL PAQUET ATTN: KEVIN LEATHERWOaD pH:910-350-2242PA 'Cl O ; PH:9i0-602.4304 �� C.A �� i ............ A 0 BELL SOUTH �- _ EMERGENCY DIAL 911 r':7 POLICE - FIRE - RESCUE ATTN: STEVE DAYVAULT r= r.r r N E a R r r.r , ry c. PH: 910-392-8712 WILD NGTON, NC FAYETTEVILLE, NC .. - 5911' Oleander Drive Suite 201 TIME WARNER CABLE �^�c� PH: 9iQ-763-46385 Wilmington, North Carolina 28403 (910) 791-6707 (0) (910) 791-6760 (F) NC License #: C-2846 PROJECT # 13146.PE 1� COORDINATION NOTES EROSION CONTROL AND SEQUENCE OF CONSTRUCTIONNOTES: PERMANENT SEEDING SCHEDULE - MIXTURE 5CP 1. THE CONTRACTOR IS REQUIRED TO OBTAIN ANY/ALL PERMITS REQUIRED FOR NOTE: THESE EROSION CONTROL AND SEQUENCE OF CONSTRUCTION NOTES ARE INTENDED FOR CONSTRUCTION OF THESE PLANS. EACH "PHASE" OF CONSTRUCTION. THE ORDER AND STEPS TAKEN MUST BE IMPLEMENTED AS EACH Seeding Mixture LEGEND PART OF THE PROJECT IS DEVELOPED; WHETHER AS A WHOLE OR IN PHASES. ANY EROSION SPECIES RATE (LB/ACRE) 2. ALL WORK IS TO BE IN ACCORDANCE WITH NEW HANOVER COUNTY, AND THE STATE CONTROL DEVICES/MEASURES MUST REMAIN IN PLACE UNTIL THE ENTIRE BASIN DESIGNED TO CENTIPEDE GRASS 10-20 OF NORTH CAROLINA. HANDLE SEDIMENTATION AND EROSION IS STABILIZED AND ALL IMPROVEMENTS WITHIN THE BASIN ARE COMPLETE. 3. THE CONTRACTOR IS TO ESTABLISH AND CHECK ALL HORIZONTAL AND VERTICAL Seeding Dates = EXISTING PROPERTY LINE -- 29 EXISTING CONTOUR CONTROLS TO BE USED WITH THE PROJECT. iN ADDITION, THE CONTRACTOR 1S TO 1. CONSTRUCT TEMPORARY GRAVEL CONSTRUCTION ENTRANCE($). ESTABLISH THE LIMITS OF MARCH- JUNE = EXISTING EASEMENT COMPUTE THE LAYOUT OF THE ENTIRE SITE PLAN IN ADVANCE OF BEGINNING ANY DISTURBANCE, AND TEMPORARY SILT FENCE. ----- 29 PROPOSED CONTOUR WORK ASSOCIATED WITH THE SUBJECT PLANS. CONTRACTOR SHALL EMPLOY A PROFESSIONAL SURVEYOR TO PERFORM SITE IMPROVEMENT STAKEOUT(S). 2, CLEAR AND REMOVE FROM SITE ALL TREES (ONLY ONES TO BE REMOVED), ROOTS, ROOT MAT, Soil Amendments ••.-•... ' ..�, ��..;.. '. '" " : ,:.. ;.•.; . ,,, ; = PROPOSED CONCRETE SIDEWALK ETC. FROM THE AREA WITHIN THE DESIGNATED CLEARING LIMITS. APPLY LIME AND FERTILIZER ACCORDING TO SOiL TESTS, OR APPLY EG=25.05 - EXISTING SPOT ELEVATION 4. ANYTIME WORK IS PERFORMED OFF -SITE OR WITHIN AN EXISTING EASEMENT, THE CONTRACTOR 1S TO NOTIFY THE HOLDER OF SAID EASEMENT A5 TO THE NATURE 3. INSTAL. REMAINING EROSION CONTROL MEASURES AS SHOWN ON THE PLANS WITHIN THE 300 LB/ACRE 10-10-10 FERTILIZER. = PROPOSED BUILDING FOOTPRINT OF PROPOSED WORK, AND TO FOLLOW ANY GUIDELINES OR STANDARDS WHICH AREA DISTURBED. ALL EROSION CONTROL MEASURES MUST BE INSTALLED BEFORE' Mulch -- -- - -- --- - -- ----� - - - PG=25.05- ^� PROPOSED EDGE OF PAVEMENT REASSOCIATED WITH OR REFERENCED iN THE RECORDED EASEMENT. COMMENCING CONSTRUCTION. DO NOT MULCH. _ - - = PROPOSED BUFFER AREAS 4. IMMEDIATELY UPON THE INSTALLATION OF ANY STORM DRAINAGE CATCH DROP TW=25.05-� PROPOSED SIDEWALK ELEVATION BASIN, INLET, GENERAL NOTES ETC., THE CONTRACTOR SHALL INSTALL INLET PROTECTION TO STOP ANY SEDIMENT FROM Maintenance FERTILIZE VERY SPARINGLY--20 WITH =.PROPOSED. LANDSCAPE ISLANDS TC=25.05 �"`� PROPOSED TOP OF CURB ELEVATION ENTERING THE DRAINAGE SYSTEM. LB/ACRE NITROGEN IN SPRING NO PHOSPHORUS. CENTIPEDE GRASS CANNOT TOLERATE HIGH PH OR EXCESS FERTILIZER.=EXISTING 1. EXISTING CONDITIONS WERE TAKEN FROM A SURVEY COMPLETED BY PARAMOUNTE 5, IMMEDIATELY UPON THE INSTALLATION OF ANY STORM DRAINAGE SYSTEM, THE CONTRACTOR TREE TO BE REMOVED INLET PROTECTION ENGINEERING, INC. THE SURVEY SHALL BE FIELD VERIFIED BY CONTRACTOR AND ANY DISCREPANCIES REPORTED TOTHE OWNER, OWNERS REPRESENTATIVE, AND/OR ENGINEER SHALL INSTALL OUTLET PROTECTION AS SHOWN ON THE PLANS AND DETAILS. +� _� _ WET-- -- - =WETLAND LINE IMMEDIATELY. 6. THE CONTRACTOR SHALL CONVERT THE SEDIMENT BASIN TO THE WET DETENTION POND ONCEMOVE TEMPORARY SEEDING -LATE WINTER/EARLY SPRING 1PF O -.IRON PIPE FOUND -- LOD LIMITS OF DISTURBANCE 2. REASONABLE CARE HAS BEEN EXERCISED IN SHOWING THE LOCATION OF EXISTING UTILITIES ON THE ENTIRE DRAINAGE BASIN IS FULLY STABILIZED. THE CONTRACTOR SE ANY E R HALL SEDIMENT FROM THE POND AND ESTABLISH THE FINAL POND BOTTOM SHALL RONCE ALL OiRF = IRON ROD FOUND ---- SF SILT FENCE THE PLANS. THE EXACT LOCATION OF ALL EXISTING UTILITIES IS NOT KNOWN IN ALL CASES. THE CONTRACTOR SHALL EXPLORE THE AREA AHEAD OF DITCHING OPERATIONS BY OBSERVATION, CONSTRUCTION IS FINISHED WITHIN THE POND DRAINAGE AREA THE CONTRACTOR SHALL REMOVE THE SKIMMER TO COMPLETE THE WET POND CONSTRUCTION. Seeding Mixture UMF = CONCRETE MONUMENT ELECTRONIC DEVICES, HAND DIGGING, AND BY PERSONAL CONTACT WITH THE UTILITY 0 -J`-�-- DRAINAGE FLOW PATH COMPANIES. IN ORDER TO LOCATE EXISTING UTILITIES IN ADVANCE OF TRENCHING OPERATIONS SO AS TO ELIMINATE OR MINIMIZE DAMAGE TO EXISTING UTILITIES. THE CONTRACTOR SHALL BE 7, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING AND RESTORING TO WINTER AND EARLY SPRING = TELEPHONE PEDESTAL RESPONSIBLE FOR ALL COSTS RESULTING FROM ANY DAMAGE TO THE EXISTING UTILITY LINES PRE-CONSTRUTION CONDITIONS ANY AREAS OUTSIDE THE PROJECT LIMITS THAT MAY INADVERTENTLY BE DAMAGED DUE TO THE FAILURE OF THE EROSION CONTROL MEASURES nTR C1-1 � DRAINAGE INLET LAB EL INCLUDING Loss OF UTILITY REVENUES. CONTRACTOR SHALLARRANGE FOR TEMPORARY . =TRANSFORMER PEDESTAL (PAD) SUPPORT OF EXISTING UTILITIES, SUCH AS POLES, CONDUITS, FIBER OPTIC CABLES, TELEPHONE CABLES, WATER LINES, ETC... 8. DURING GRADING AND AFTER GRADING HAS BEEN COMPLETED, THE SPECIES RATE (LB/ACRE) RYE (GRAIN) 12a -w---•+v-w-w-rr-- = EXISTING WATER MAIN DROP INLET CONTINUE TO MAINTAIN PERMANENT AND TEMPORARY EROSION CONTROL MEASURES UNTIL ANNUAL LESPEDE:ZA (KOBEIN PIEDMONT AND 3. CONTRACTOR SHALL COMPLY WITH THE LATEST REVISIONS AND INTERPRETATIONS OF THE FINAL INSPECTION AND APPROVAL BY NEW HANOVER COUNTY. COASTAL PLAIN, KOREAN IN MOUNTAINS) `� =EXISTING SANITARY SEWER MAIN DEPARTMENT OF LABOR SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION PROMULGATED UNDER THE OCCUPATIONAL SAFETY AND HEALTH ACT. 9. UPON. RECEIVING. FINAL INSPECTION AND NEW HANOVER COUNTY, THE OMIT ANNUAL LESPED FJA WHEN DURATION OF TEMPORARY COVER IS NOT °"E °'� � =EXISTING OVERHEAD ELECTRIC CONTRACTOR CAN REMOVE TEMPORARY EROSION CONTROL MEASURES.' TO EXTEND BEYOND JUNE. J 4. CONTRACTOR SHALL PLAN AND CONSTRUCT WORK SO AS TO CAUSE MINIMUM INCONVENIENCE 10. THE CONTRACTOR SHALL CONTINUE TO WATER, FERTILIZE, MOW AND MAINTAIN SUMMER TO THE OWNER AND THE PUBLIC. THE CONTRACTOR SHALL PROVIDE, ERECT, AND MAINTAIN AT SPRIGGED, SODDED, AND PLANTED AREAS UNTIL ALL CONSTRUCTION IS COMPLETE. ALL TIMES DURING THE PROGRESS OR TEMPORARY SUSPENSION OF WORK, SUITABLE BARRIERS, FENCES, SIGNS OR OTHER ADEQUATE PROTECTION, INCLUDING FLAGMEN AND WATCHMEN AS SPECIES RATE (LB/ACRE) NECESSARY TO INSURE THE SAFETY OF THE PUBLIC AS WELL AS THOSE ENGAGED IN THE GERMAN MILLET 40 CONSTRUCTION WORK. CONSTRUCTION SIGNING SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF "CONSTRUCTION AND MAINTENANCE OPERATIONS SUPPLEMENT TO THE MANUAL ON FALL " BY M NPDES WATER QUALITY STABILIZA 1: ION TIME FRAMES SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES AND SLOPES 7 DAYS NONE HIGH QUALITY WATER (HOW) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS 1F SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1,14 DAYS ARE ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN ST IN LENGTH ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE, EXCEPT FOR PERIMETERS AND HQW ZONES WETLAND NOTE DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO FINAL INSPECTION. AGRICULTURAL LIMESTONE AND 750 LS/ACRE 10-10-10 FERTILIZER. 1. WETLANDS EXIST AS SHOWN ON THE SITE PLAN. WETLANDS WERE DELINEATED BY LAND 4. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO CLEARING Mulch MANAGEMENT GROUP AND APPROVED ON DECEMBER 2, 2013. ANDIOR LAND DISTURBANCE. THE TEMPORARY CONSTRUCTION ENTRANCE SHOULD BE THE FIRST MEASURE INSTALLED. APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING OR A NC ACCESSIBILITY NOTES (CONT. } NC ACCESSIBILITY NOTES (CONT.): MULCH ANCHORING TOOL. A DISK WITH3l.ADES SET NEARLY STRAIGHT CAN BE USED AS A RAMP NOTES: EXISTING UTILITY NOTES 5. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN AND PERMIT SHALL BE MULCH ANCHORING TOOL. PARKING SPACE NOTES: MAINTAINED ON THE SITE AT ALL TIMES. 1. ANY PART OF AN ACCESSIBLE ROUTE WITH A RUNNING SLOPE GREATER THAN 5% - 1. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO VERIFY THE ACTUAL LOCATION AND AVAILABILITY Maintenance SHALL BE CONSIDERED A RAMP. 1. ACCESSIBLE PARKING t iPACES SHALL BE LOCATED ON THE SHORTEST ACCESSIBLE OF ALL EXISTING AND PROPOSED UTILITIES iN THE FIELD PRIOR TO GROUND BREAKING. 6. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE ROUTES OF TRAVEL FROI4 ADJACENT PARKING TO AN ACCESSIBLE BUILDING THESE PLANS (INCLUDING, BUT NOT LIMITED TO OFF -SITE BORROW OR WASTE AREAS, STAGING OR STORAGE AREAS), THE CONTRACTOR SHALL PREPARE AND SUBMIT A AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. 2, THE MAXIMUM RUNNING SLOPE FOR A RAMP SHALL BE 8.33%'AND THE MAXIMUM CROSS SLOPE SHALL BE 2.0%. ENTRANCE. SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND TO 2. ACCESSIBLE PARKING :SPACES SHALL BE AT LEAST NINETY -Six 96 INCHES WiDE. SITE NOTES: NEW HANOVER COUNTY FOR APPROVAL. CONTRACTOR SHALL PAY ALL FEES REQUIRED AND 3. THE CLEAR WIDTH OF AN EXTERIOR RAMP RUN SHALL BE FORTY EIGHT INCHES (NC _ ACCESS AISLES SHALL BE 60 INCHES WIDE. ONE OF SIX ACCESSIBLE SPACES SHOULD SHALL INSTALL NECESSARY MEASURES AT NO SEPARATE PAYMENT. THE CONTRACTOR SHALL BUILDING CODE 1104.1). WHERE HANDRAILS ARE PROVIDED ON THE RAMP RUN, THE PROVIDE A VAN ACCESSIBLE AISLE. THE AISLE SHOULD BE 96 INCHES WIDE OR PROVIDE THE OWNER AND THE ENGINEER A COPY OF THE AMENDED PERMIT. CLEAR WIDTH SHALL BE MEASURED BETWEEN THE HANDRAILS. ACCESSIBLE SPACE IS 11 FEET AND ACCESS AISLE IS FIVE FEET). WHERE PARKING 1. ANY DISCREPANCY IN THIS PLAN AND ACTUAL FIELD CONDITIONS SHALL BE REPORTED TO THE SPACES AND ACCESS A!S LES ARE. MARKED WITH LINES, THE WIDTH MEASUREMENTS OWNER PRIOR TO START OF CONSTRUCTION. GENERAL CONTRACTOR SHALL BE RESPONSIBLE 7. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION NC ACCESSIBILITY NOTES. 4. THE RISE FOR ANY RAMP RUN SHALL BE THIRTY (30) INCHES MAXIMUM. SHALL BE MADE FROM CENTERLINE OF THE MARKINGS. WHERE PARKING SPACES OR FOR VERIFICATION OF ALL SETBACKS, EASEMENTS AND DIMENSIONS SHOWN HEREON BEFORE CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS ACCESS AISLES ARE NOT ADJACENT TO ANOTHER PARKING SPACE OR ACCESS AISLES BEGINNING CONSTRUCTION. DETERMINED BY EITHER THE REVIEWING AGENCY OR THE ENGINEER. (NO SEPARATE GENERAL NOTES: 5. LANDINGS SHALL BE PROVIDED AT THE TOP AND BOTTOM OF RAMPS, LANDINGS MEASUREMENTS SHALL BE PERMITTED TO INCLUDE THE FULL WIDTH OF THE LINE PAYMENT). 1. SPECIAL ATTENTION SHALL BE GIVEN TO COMPLIANCE WITH AMERICANS WITH SHALL HAVE A SLOPE NOT STEEPER THAN 2.0% IN ANY DIRECTION. THE LANDING DEFINING THE PARKING SPACE OR ACCESS AISLE. 2. THE GENERAL CONTRACTOR SHALL CONTACT ALL OWNERS OF EASEMENTS, UTILITIES AND DISABILITIES ACT ADO STANDARDS), THE NORTH CAROLINA BUILDING CODFJANSI CLEAR WIDTH SHALL BE AT LEAST AS WIDE AS THE WIDEST RAMP RUN LEADING TO THE R.O.W.'S PUBLIC OR PRIVATE, PRIOR TO WORKING IN THESE AREAS. 8. ALL DISTURBED AREAS ARE 7'O DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL Al17.1. CA L A117.1, AND APPLICABLE LOCAL LAWS & REGULATIONS. LANDING. THE LANDING CLEAR LENGTH SHALL BE SIXTY (60) INCHES LONG MINIMUM. 3. PARKING ACCESS AISLES SHALL BE PART OF AN ACCESSIBLE ROUTE TO'T� THE TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL EE RAMPS THAT CHANGE DIRECTION BETWEEN RUNS AT LANDINGS SHALL HAVE A CLEAR BUILDING OR FAGiIt '' FACILITY ENTRANCE SHALL COMPLY WITH PROVISIONS 3. CONTRACTOR SHALL MAINTAIN THE SITE IN A MANNER SO THAT WORKMEN AND PUBLIC SHALL BE STABILIZATION IS ACHIEVED. 2. IT IS ESSENTIAL THAT CONTRACTORS ARE AWARE OF THE SITE ACCESSIBILITY LANDING OF SIXTY (60) INCHES BY SIXTY (60) INCHES MINIMUM. FORACCESSiBLE ROUTES. MARKED CROSSINGS SHALL BE PROVIDED WHERE THE PROTECTED FROM INJURY, AND ADJOINING PROPERTY PROTECTED FROM DAMAGE. REQUIREMENTS. ACCESSIBLE ROUTE MUS r CROSS VEHICULAR TRAFFIC LANES. WHERE POSSIBLE, IT IS 9. ALL AREAS DISTURBED UNLESS CONSTRUCTION Y CO OTHERWISE IMPROVED SHALL BE B NBOTH PARAMOUNTE ENGINEERING, INC. (PEI) H S DEVELOPED THESE NOTES AND DETAILS 6. RAMP RUNS WITH A RISE GREATER THAN SIX (6) INCHES SHALL HAVE HANDRAILS ON PREFERABLE THAT THE Af CESS;IBLE ROUTE NOT PASS BEHIND PARKED VEHICLES. 4. ACCESS TO UTILITIES, FIRE HYDRANTS, STREET LIGHTING, ETC., SHALL REMAIN UNDISTURBED, UNLESS COORDINATED WITH THE RESPECTIVE UTILITY. SODDED OR SEEDED AS INDICATED AND STABILIZED. TO ASSURE THAT CONTRACTORS ARE AE OF THE REQUIREMENTS AT THE POINT IN SIDES COMPLYING WITH THE AMERICANS WITH DISABILITIES ACT (2010 ADA STANDARDS), THE NC BUILDING CODEJANSI Al17.1, AND APPLICABLE LOCAL LAWS & 4. TWO (2) ACCESSIBLE P/ vRK1NG SPACES MAY SHARE A COMMON ACCESS AISLE. DURING TIME WHEN THEYARE BIDDING THE PROJECT. IN ADDITION, PEI HAS MADE A POINT IN REGULATIONS. 5. DO NOT SCALE THIS DRAWING AS IT IS A REPRODUCTION AND SUBJECT TO DISTORTION. 10. DEWATERING OPERATIONS, WATER SHALL BE PUMPED INTO AN APPROVED FILTERING DEVICE PRIOR TO DISCHARGE TO RECEIVING OUTLET THESE NOTES AND DETAILS, AS WELL ASIN OUR DRAWINGS TO PROVIDE SLOPES / GRADES AND DIMENSIONS THAT COMPLY WITH THE AMERICANS WITH DISABILITIES ACT - S. ACCESS AISLES SHALL IEXTEND THE FULL LENGTH OF THE PARKING SPACETHEY (2010 RDA STANDARDS), THE NORTH CAROLINA BUILDING CODEJANStA117.1 AND 7 .FLOOR SURFACES OF RAMPS AND LANDINGS SHALL BE STABLE, FIRM AND SLIP SERVE. PO COMPLETION OF 6. THE GENERAL CONTRACTOR SHALL REMOVE ALL DEBRIS FROM THE SITE UPON COM 11. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND APPLICABLE LOCAL LAWS & REGULATIONS. IF THESE SLOPES / GRADES AND RESISTANT. 6. ACCESS AISLES SHALL'ISE MARKED SO AS TO DISCOURAGE PARKING IN THEM. THE PROJECT AND AT LEAST ONCE A WEEK DURING CONSTRUCTION. AFTER EACH RUNOFF -PRODUCING. EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO THE DIMENSIONS ARE NOT ACHIEVABLE,. THE CONTRACTOR IS REQUIRED TO CONTACT THE 8. EDGE PROTECTION COMPLYING WITH AMERICANS WITH DISABILITIES ACT (2010 ADA 7. THE GENERAL CONTRACTOR SHALL KEEP THE AREA OUTSIDETHE "CONSTRUCTION LIMITS" MAINTAIN EFFECTIVENESS OF THE EROSION CONTROL O DEVICES SHALL BE MADE IMMEDIATELY. OWNER IMMEDIATELY AND BEFORE MOVING FORWARD WITH THE WORK O STANDARDS), THE NC BUILDING CODEIANSi Al17.1. AND APPLICABLE LOCAL LAWS & 7. ACCESS AISLES SHALL I40T OVERLAP THE VEHICULAR WAY. ACCESS AISLES S S SHALL � BROOM CLEAN AT ALL TIMES. 3. THE CONTRACTOR SHALL NOTIFY PEI IMMEDIATELY OF ANY CONFLICT BETWEEN REGULATIONS SHALL BE PROVIDED ON EACH SIDE OF RAMP RUNS AND ON EACH SiDE OF RAMP LANDINGS. B E PERMITTED TO BE PLA .ED ON EITHER SIDE OF THE PARKING SPACE EXCEPTFOR ANGLED VAN PARKING SPACES WHICH SHALL HAVE ACCESS AISLES LOCATED ON THE 12. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED BY CONTRACTOR ONCE THESE NOTES AND DETAILS AND OTHER PROJECT DRAWINGS, WHETHER BY PEI OR PASSENGER SIDE OF THE PARKING SPACES. ALL STREET SURFACES DRIVEWAYS CULVERTS, CURB AND GUTTERS, ROADSIDE DRAINAGE 8. , STABILIZATION OR A SUFFICIENT FFiGIENT GROUND COVER HAS BEEN ESTABLISHED OR AS DIRECTED BY OTHERS. THE CONTRACTOR SHALL NOT PROCEED WITH THE WORK FOR WHICH THE 9. WHERE DOORWAYS ARE LOCATED ADJACENT TO A RAMP LANDING, MANEUVERING DITCHES AND OTHER STRUCTURES THAT ARE DISTURBED OR DAMAGED IN ANY MANNER AS A THE ENGINEER. (NO SEPARATE PAYMENT). NEW HANOVER COUNTY'S FINAL APPROVAL IS ALLEGED CONFLICT HAS BEEN DISCOVERED UNTIL SUCH ALLEGED CONFLICT HAS BEEN CLEARANCES REQUIRED BY THE AMERICANS WITH D18ABILiTtES ACT (2010 ADA 8. FLOOR SURFACES OF P aRKING SPACES AND ACCESS AISLES SERVING THEM. SHALL RESULT OF CONSTRUCTION SHALL BE REPLACED OR REPAIRED IN ACCORDANCE WITH THE REQUIRED. RESOLVED. NO CLAIM SHALL BE MADE BY THE CONTRACTOR FOR DELAY OR DAMAGES AS ARESULT OF RESOLUTION OF ANY SUCH CONFLICT(S). STANDARDS), THE NC BUILDING CODEIANSI A117.1 SHALL BE PERMITTED TO OVERLAP , BE STABLE, FIRM AND SLIF RESISTANT. ACCESS AISLES SHALL BE AT THE SAME LEVEL SPECIFICATIONS. 13. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SHALL BE REQUIRED AT ALL CONSTRUCTION THE REQUIRED LANDING AREA. WHERE DOORS THAT ARE SUBJECT TO LOCKING ARE ADJACENT TO A RAMP LANDING LANDINGS SHALL BE SIZED TO PROVIDE A COMPLIANT AS THE PARKING SPACES THEY SERVE, CHANGES IN LEVEL ARE NOT PERMITTED. VERIFY LOCATION AND ELEVATION OF ALL UNDERGROUND UTILITIES. THE 9. CONTRACTOR SHALL VE STAGING AREA ENTRANCES AND ALL CONSTRUCTION ACCESS LOCATIONS INTO NON -PAVED 4. THESE ACCESSIBILITY NOTES AND DETAILS ARE INTENDED TO DEPICT SLOPE AND TURNING SPACE. ' 9. PARKING SPACES AND ,c.CCESS AISLE SHALL S,BE LEVEL WITH SURFACE SLOPES NOT LOCATION OF ALL EXISTING UTILITIES ARE NOT NECESSARILY SHOWN ON PLANS AND WHERE LOC N E AREA (O SEPARATE PAYMENT). DIMENSIONAL REQUIREMENTS ONLY. REFER TO SIDEWALK, CURBING, AND PAVEMENT c EXCEEDING 2.0% IN ALL Dl12ECTIONS. SHOWN ARE ONLY APPROXIMATE. THE CONTRACTOR SHALL ON HIS INiTIATIVEAND AT NO EXTRA DETAILS FOR ADDITIONAL INFORMATION. CURB RAMP NOTES: COST HAVE LOCATED ALL UNDERGROUND LINES AND STRUCTURES AS NECESSARY. NO CLAIMS 14. WHEN CROSSING CREEK OR DRAINAGE -WAY, THE DIVISION OF WATER QUALITY SHALL BE 10. PARKED VEHICLE OVERHANGSHALL NOT REDUCE THE REQUIRED CLEAR WIDTH FOR DAMAGES OR EXTRA COMPENSATION SHALL ACCRUE TO THE CONTRACTOR FROM THE CONTACTED PRIOR TO DISTURBING A CREEK. THE CONTRACTOR SHALL INSTAL. RIP -RAP WITH ACCESSIBLE ROUTE NOTES. 1. THE MAXIMUM RUNNING SLOPE OF A CURB RAMP SHALL BE 8.33% AND THE MAXIMUM OF AN ACCESSIBLE ROUTE. PRESENCE OF SUCH PIPE OTHER OBSTRUCTIONS OR FROM DELAY DUE TO REMOVAL OR FABRIC ALONG DfSTUF2BED BANKS AND GHANNELAND RESTORE SLOPESTO ORIGINAL CROSS SLOPE SHALL $E2.0%. REARRANGEMENT OF THE SAME. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE CONTOURS, BUT NOT STEEPER THAN 2:1 MAXIMUM. DISTURBED CREEK AREA SHALL BE I I - PARKING SPACES FOR VANS AND ACCESS AISLES AND VEHICULAR ROUTES TO UNDERGROUND STRUCTURES. CONTACT NORTH CAROLINA ONE CALL" TOLL FREE CONTRACTOR IS STABILIZED IMMEDIATELY. ACCESSIBLE PARKING SPACES AND PASSENGER LOADING ZONES, PUBLIC 2. COUNTER SLOPES OF ADJOINING GUTTERS AND ROAD SURFACES IMMEDIATELY ° SERVING THEM SHALL PROVIDE A VERTICAL CLEARANCE OF NINETY-EIGHT E GHT INCHES 1-800-632-4949 AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. THE STREETS OR SIDEWALKS, AND PUBLIC TRANSPORTATION STOPS TO THE ACCESSIBLE ADJACENT TO THE CURB RAMP SHALL NOT BE STEEPER THAN 5 /o. THE ADJACENT... MINIMUM. SIGNS SHALL BE: PROVIDED AT ENTRANCES TO PARKING FACILITIES ES RESPONSIBLE FOR CONTACTING ALL NONSUBSCRI$tNG UTILITIES. BUILDING OR FACILITY ENTRANCE THEY SERVE. SURFACES AT TRANSITIONS AT CURB RAMPS WALKS, GUTTERS AND STREETS INFORMING DRIVERS OF G-EARANCES AND THE LOCATION OF VAN ACCESSIBLE MAINTENANCE PLAN SHALL BE AT THE SAME LEVEL. PARKING SPACES. 10. ALL PERMITS RELATIVE TO PROJECT MUST BE OBTAINED, PRIOR TO CONSTRUCTION. 2. AT LEAST ONE ACCESSIBLE ROUTE SHALL CONNECTACCESSIBLE BUILDINGS, 3. THE CLEAR WIDTH OF A CURB RAMP SHALL BE 36 INCHES 3 M (6) MINIMUM, EXCLUSIVE 12. EACH ACCESSIBLE PARKING SPACE S HALL BE PROVIDED WITH SiGNAGE DISPLAYING 11. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH PERMITS ISSUED AND APPLICABLE FEDERAL, 1. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE ACCESSIBLE FACILITIES, ACCESSIBLE ELEMENTS AND ACCESSIBLE SPACES THAT ARE ON THE SAME SITE. OF FLARED SIDES, IF PROVIDED. *NOTE NC BUILDING CODE REQUIRES EXTERIOR THE INTERNATIONAL SYME OL OF ACCESSIBILITY. SIGNS SHALL BE INSTALLED ATA STATE, COUNTY, AND LOCAL CODES EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS ACCESSIBLE ROUTES TO BE 48 INCHES MINIMUM WIDE (1104.1 & 1104.2).* MINIMUM CLEAR HEIGHT 0 = SIXTY (60) INCHES ABOVE GRADE AND SHALL NOT INTERFERE WITH AN ACCESSIBLE ROUTE FROM AN ACCESSAISLE. 12. THE CONTRACTOR SMALL OBTAIN AND PAY FOR ALL INSPECTIONS, CERTIFICATIONS, EQUIPMENT, DESIGNED. WALKING SURFACES THAT ARE PART OF AN ACCESSIBLE ROUTE SHALL HAVE A 3. MAXIMUM RUNNING' SLOPE OF 5.0% AND A MAXIMUM CROSS SLOPE OF 2.0%. 4. LANDINGS SHALL BE PROVIDED AT THE TOP OF CURB RAMPS. THE CLEAR LENGTH SIGNS LOCATED WHERE THEY MAYBE HIT BY VEHICLES BEING PARKED SHALL BE INSTALLED WITH ETC., THAT MAY BE REQUIRED. 2. ALL CONSTRUCTION ENTRANCES WILL BE PERIODICALLY TOP DRESSED WITH AN ADDITIONAL 2 OF SHALL BE THIRTY-SIX INCHES MINIMUM. THE CLEAR WIDTH OF BOLLARD PROTECTION. 13, THE ENGINEER ANDIOR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND INCHES OF #4 STONE TO MAINTAIN PROPER DEPTH. ANY SE T SEDIMENT THAT IS TRACKED INTO THE STREET WILL BE IMMEDIATELY REMOVED. 4. ANY WALKING SURFACE THAT IS PARTOF AN ACCESSIBLE ROUTE WITH A RUNNING o SLOPE GREATER THAN 5.0 /o IS A RAMP AND SHALL COMPLY WITH THE GUIDELINES FOR LANDING SHALL WIDE THE LANDING SHALL BE AT LEAST AS WIDE AS THE CURB RAMP, EXCLUDING FLARED SIDES, LEADING TO THE LANDING. LANDINGS SHALL HAVE A SLOPE NOT STEEPER THAN 13. SIGNAGE AT ACCESSIBLE PARKING SPACES REQUIRED BY THE NC BUILDING CODE T METHODS ASSOCIATED THE. PROJECT AS SET FORTH IN THESE PLANS, RAMPS OR CURB: RAMPS. 2% IN ANY DIRECTION. SECTION 1106ASHALL CON IPLY WITH THE REQUIREMENTS OF NORTH CAROLINA 3. SEDIMENT FENCE - SEDIMENT WILL BE REMOVED BEHIND THE SEDIMENT FENCE WHEN IT 5. IF A CURB RAMP IS LOCATED WHERE PEDESTRIANS MUST WALK ACROSS THE RAMP, GENERAL STATUTE 20-37.6 AND 136-30 AND THE. NCDOT UNIFORM MANUAL ON TRAFFIC, CONTROL DEVICES. A SEP) �RATE!SIGN IS REQUIRED FOR EACH SPACE. SIGNS TO I BECOMES 0.5 FEET DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE BE REPAIRED AS 5. TRANSITIONS BETWEEN RAMPS, WALKS, LANDINGS, GUTTERS OR STREETS SHALL BE OR WHERE IT IS NOT PROTECTED BY HANDRAILS OR GUARDRAILS, IT SHALL HAVE INDICATE THE MAXIMUM PENALTY MUST BE PROVIDED AT EACH ACCESSIBLE SPACE. NECESSARY TO'MA NTAIN A BARRIER. SILT FENCE STAKES WILL BE SPACED 6 FEET APART UNLESS FLUSHAND FREE OF ABRUPT VERTICAL CHANGES (1/4 INCH MAXIMUM VERTICAL FLARED SIDES. A WIRE BACKING IS USED WITH 8 FOOT STAKE SPACING. CHANGE IN LEVEL PERMITTED). 14. ACCESSIBLE PARKING ;;PACE,` ACCESS AISLE STRIPING, AND INTERNATIONAL 4. ALL SEEDED AREAS WELL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING 6. FLOOR SURFACES SHALL BE STABLE, FIRM AND SLIP RESISTANT. 6. CURB RAMP FLARES SHALL NOT EXCEED 10% WHERE PROVIDED, . SYMBOL OF ACCESSIBILITN' SHALL BE PAINTED BLUE (OR ANOTHER COLOR THAT CAN BE DISTINGUISHED FROM F AVEMEN TO SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE 7. CUR FLARED ES F S SHALL BE LOCATED B RAMPS AND THE tAR SIDES O CURB RAMP 7ED SO THAT COVER 7. THE MINIMUM CLEAR WIDTH OF EXTERIOR ACCESSIBLE ROUTES SHALL BE FOURTY-EIGHT (48) INCHES MINIMUM MEASURED BETWEEN HANDRAILS WHERE THEY DO NOT PROJECT INTO VEHICULAR TRAFFIC LANES, PARKING SPACES OR PASSENGER LOADING ZONE NOTES: 0 5. INLET PROTECTION -INSPECT ROCK PIPE INLET PROTECTION AT LEAST ONCE A WEEK AND AFTER HANDRAILS ARE PROVIDED (NC BUILDING CODE 1104.1 & 1104.2). PARKING ACCESS AISLES. CURBS AT MARKED CROSSINGS SHALL BE WHOLLYCONTAINED WITHIN THE MARKINGS, EXCLUDING ANY FLARED SIDES. 1. PASSENGER LOADING ZONES SHALL PROVIDE VEHICULAR PULL-UP S PACE - - F EACH SIGNIFICANT 4 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE NINETY-SiX (96) INCHES WIDE MINIMUM AND TWENTY (20) FEET LONG MINIMUM. 1 � SEDIMENT AND RESTORE THE SEDIMENT STORAGE AREA TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN THE THE DEPTH OF TRAP PLACE E 8. WHERE AN ACCESSIBLE ROUTE MAKES A 180 DEGREE TURN AROUND AN OBJECT THAT IS LESS THAN FORTY-EIGHT (48) INCHES IN WIDTH, CLEAR WIDTH SHALL BE 8. CURB E LOCATED PREVENT THEIR RAMPS SHALL B TED OR PROTECTED TO N OBSTRUCTION BY PARKED VEHICLES. 2. PASSENGER LOADING ZONES SHALL PROVIDE A CLEARLY MARKED ACCESS AISLE F U SEDIMENT THAT REMOVED {N THE DESIGNATED DISPOSAL AREA AND REPLACE THETHAT FORTY TWO (42) INCHES MINIMUM APPROACHING THE TURN, FORTY-EIGHT (48) INCHES IS SIXTY (60) INCHES WIDE MINIMUM AND EXTENDS THE FULL LENGTH OF THE F { CONTAMINATED PART OF THE GRAVEL FACING. MINIMUM DURING THE TURN, AND FORTY-TWO (42) INCHES MINIMUM LEAVING THE TURN. THE CLEAR WIDTH APPROACHING AND LEAVING THE TURN MAY BE THIRTY -SEX 9. IT IS RECOMMENDED TO PROVIDE CURB RAMPS WITH A TWENTY-FOUR (24) INCH VEHICLE PULL-UP SPACE T-IEY SERVE. 6. L 6. SEDIMENT BASIN/SEDIMENT TRAPS - REMOVE SEDIMENT AND RESTORE THE BASIN TO ITS (36) INCHES MINIMUM WHEN THE CLEARWIDTH AT THE TURN IS SIXTY (60) INCHES DEEP DETECTABLE WARNING COMPLYING WITH 406.12 Al17.1, EXTENDING THE FULL WIDTH OF THE RAMP. REFERTO DETECTABLE WARNING DETAILS AND NOTES FOR 3. ACCESS AISLE SHALL AD JOIN AN ACCESSIBLE ROUTE AND NOT OVERLAPC THE ORIGINAL DIMENSIONS WHEN IT ACCUMULATES TO WITHIN ONE HALF OF THE DESIGN DEPTH. MINIMUM. * SEE NOTE 7 ABOVE FOR NC CLEAR WIDTH OF EXTERIOR ACCESSIBLE ROUTES" PLACEMENT, ORIENTATION AND NOTES. THE NC BUILDING CODE DOES NOT VEHICULAR WAY. � 13 PLACE SEDIMENT IN AN AREA WITH SEDIMENT CONTROLS. CHECK THE EMBANKMENT, SPILLWAYS, CURRENTLY REQUIRE DETECTABLE WARNINGS AT CURB RAMPS, NOR DO THE 2010 ADA AND OUTLET FOR EROSION DAMAGE, PIPING, AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS 9. AN ACCESSIBLE ROUTE WITH A CLEAR WIDTH LESS THAN SIXTY (60) INCHES STANDARDS -HOWEVER US DOT ADA REGULATIONS DO REQUIRE THESE. 4, VEHICLE PULL-UP SPACES AND; ACCESS AISLES SERVING THEM SHALL BE LEVEL IMMEDIATELY. - REMOVE ALL TRASH AND OTHER DEBRIS FROM THE RISER AND POOL AREA. SHALLPROVIDE PASSING SPACES AT INTERVALS OF TWO HUNDRED (200) FEET 10. FLOOR SURFACES OF CURB RAMPS SHALL BE DEEP GROOVED, % INCH WIDE BY % WITH SURFACE SLOPES NC EXCEEDING 2.0% IN ALL DIRECTIONS. ACCESS AISLES SHALL BE AT THE SAME LEA tEL AS THE VEHICLE PULL-UP SPACE THEY SERVE, 7. SKIMMER - INSPECT SKIMMER AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL TO MAKE SURE MAXIMUM, PASSING SPACES SHALL BE EITHER A SIXTY (60) INCH MINIMUM BY SIXTY (60) INCH MINIMUM SPACE, OR AN INTERSECTION OF TWO (2) WALKING SURFACES THAT INCH DEEP, ONE (1)INCH CENTERS TRANSVERSE TO THE RAMP. CHANGES IN LEVEL ARE NC PERMITTED. �-{ THAT THE INTAKE MECHANISM, ORIFICE, OR DISCHARGE PIPE IS NOT CLOGGED WITH TRASH OR SEDIMENT. iF THE BASIN IS DRY, MAKE SURE THAT ANY VEGETATION GROWING ON THE BOTTOM PROVIDE A COMPLIANT TSHAPED TURNING SPACE, PROVIDED THE BASE AND ARMS OF 11. WHERE PROVIDED, STOP LINES SHALL BE LOCATED IN ADVANCE OF CURB RAMP. 5. FLOOR SURFACES OF VE HICLE ;PULL-UP SPACES AND ACCESS AISLES SERVING THEM IS NOT HOLDING THE SKIMMER GOWN. TAKE SPECIAL PRECAUTION IN WINTER TO PREVENT THE SKIMMER FROM PLUGGING WITH ICE. THE T SHAPED SPACE EXTEND FORTY F.1GHT (48) INCHES MINIMUM BEYOND THE INTERSECTION. 12. WHERE PROVIDED, PEDESTRIAN ACTIVATED SIGNALS SHALL BE LOCATED SHALL BE STABLE, FIRM AND SLIPRESiSTANT. �y 8. OUTLET PROTECTION - INSPECT RIP RAP OUTLET STRUCTURES WEEKLY AND AFTER SIGNIFICANT 10. DOORS, DOORWAYS AND GATES THAT ARE PART OF AN ACCESSIBLE ROUTE SHALL ' ADJACENT TO THE SIDEWALK AND NOT ON THE SIDEWALK 6.VEHiCLE PULL-UP SPACE), ACCESS AISLES SERVING THEM AND A VEHICULAR ROUTE FROM AN ENTRANCE TO TF E PASSENGER LOADING ZONE, AND FROM THE PASSENGER a INCH OR GREATER) RAINFALL EVENTS TO SEE IF ANY EROSION AROUND OR BELOW THE RIP RAP TAKEN COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (2010 ADA STANDARDS) THE NORTH CAROLINA BUILDING CODE/ ANSI A117.1, AND APPLICABLE LOCAL LAWS & 13. WHERE PROVIDED, DRAINAGE INLETS SHALL BE LOCATED UPSTREAM OF CURB RAMPS AND NOT IN THE RAMP AREA LOADING ZONE TO A VEHICULAR EXIT SERVING THEM, SHALL PROVIDE A VERTICAL CLEARANCE OF ONE HUNDRED FOURTEEN INCHES MINIMUM. � HAS PLACE, OR IF STONES HAVE BEEN DISLODGED. IMMEDIATELY MAKE ALL NEEDED REGULATIONS. (114) REPAIRS TO PREVENT FURTHER DAMAGE. 11. DIRECTIONAL SIGNAGE INDICATING THE ROUTE TO THE NEAREST ACCESSIBLE 14. CURB RAMP TYPE AND LOCATION ARE PER PLAN. ACCESSIBLE ENTRANCE NOTES: d ~- 9. EMERGENCY SPILLWAY / FORESAY PROTECTION - AFTER EVERY HIGH-WATER EVENT INSPECT THE lNTEGRLTY OF THE LINED SPILLWAY AND THE ADJACENT EARTHEN BANKS. IMMEDIATELY BUILDING ENTRANCE SHALL BE PROVIDED AT INACCESSIBLE BUILDING ENTRANCES. I, r� 1. ACCESSIBLE ENTRANCE.> SHALL BE PROVIDED AS REQUIRED BY THE AM IC MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE, REPAIR ANY VOIDS IN THE RIP RAP 12. WHERE POSSIBLE, DRAINAGE INLETS SMALL NOT BE LOCATED ON AN ACCESSIBLE WITH DISABILITIES ACT (2010 ADA STANDARDS) AND THE NORTH CAROLtNA iL}D�6 ` CODE, AND APPLICABLE. LC CAL LAWS & REGULATIONS. LINED APRONS, RE-ESTABLISH ANY LOOSE STONES, AND FIX GAPS IN THE ADJACENT VEGETATIVE ROUTE. IN THE EVENT THAT A DRAINAGE INLET MUST BE LOCATED ON AN ACCESSIBLE COVER ROUTE, THE GRATE SHALL COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (2010 2. ENTRANCE DOORS, DOO RWAYS AND GATES SHALL COMPLY WITH THEAMRI CMS ADA STANDARDS), Al17.1, THE NC BUILDING CODE, AND APPLICABLE LOCAL LAWS & WITH DISABILITIES ACT (20.10 ADA STANDARDS) THE NC BUILDING CODEIANSI Al17.1 REGULATIONS AND SHALL BE ON AN ACCESSiBLf ROUTE. UNMPROPEM VICINITYMAP SCALE. 1"=10W PARCEL DATA SITE NAME* SITE ADDRESS: CURRENTZONIN8 NEW HANOVER COUNTY TAX PARCEL ID#. DENSITY CALCULATIONS STORMWATER BOUNDARY IMPERVIOUS AREA BOUNDARY FOR PERMIT TOTAL NUMBER PROPOSED: PATIO HOMES (PH): ESTATE LOTS (ES): WATERWAY LOTS (WW): MARINA VIEW LOTS (MV): ' ` . ' . . ` � / / i } | ' --------------------____ ` �na | ---- ,NC State of De 3688 PG 0555 � -_--- ---l���-----LE----- --------- ,-----_-- / | | -------------'-----------___������ - ----- - - ------ ' - ----'---------- ---'-- -- ------ - ` | --------- --- } --'--------_-------- | ^`` ' ---� -------`- -� ' / om�� ! | -~ ' - / ' ��o �^ o / ` �mn� / ummmmi�- ' 089903'G ' mo*o»n'.� / i | ' r- | Va »woncxnseu^ / m�� / 1�o '- ,eo / ~~����'° / ' � ` / / | uomposm � ` \ -- / / | � � ' ~^~ � [-'----'--------1 ` B°vmu^R, BOUNDARY/' ^ - / U�� ^| wmm / ' \ -~ ~^ '~-~ i [ Ep'Ep mm�somo��7��� ` »a w | ~~~°�`^ _|� | �`.^ ' ` -- ^'` ,°'*w / | ` 4-7-1 ---�' ~]� '`���-~�� � � _~�~ � ~ ._~�. � ~ ---�--`�� �' �� �r0�7�3�� | � | , | \ U ' ' ' | \ Ea` c�w c�� ' um�/r-m PUMP HELMS PORT 100 AQUA VISTA DRIVE EY U", =,." RESIDENTIAL DISTRICT v ` R' °""-°^~"4-""" � ' / l ' r VEHICULAR Fil PARKING 7�17&CREG ' --- ^ ` 61'3ACRES (IFRI , Ni —COASTAL CAMA 53 UNITS -45008F8IT VWETLANDS VROW WN[��'G��V8F8I� �F � 8UN[��'4VVu8F8LOT ' 1UNn��'���Q���� SF/LOT / � O 59°~.,~ ' mdASIDEWAL -71 / . ga _ ERI Li - - ` --^ 04xs - r.' FANKING STORM BOUN ARY640.91, / //` �� _-� �m SEE SHEET . _' '--AMENITY ' -' ' � '- ` E�] ' \-\ ' / DmQ / [ml / @�� \ rm} p���#� ' ' ' �`\ _ ' [------------- ~L / ' ' ' ' � / f�(� ��\ / � ` �' ' / ` ~~~--__� '~�' �� � . UBASIN ----___ ' . ' . _ 20036 .32 .31 Soo BASIN _^ - ' � |--60 FT RIW SURVEY NOTE: TOPOGRAPHIC AND BOUNDARY SURVEY COMPLETED BY PARAMOUNTE ENGINEERING, INC. AND SEALED BY DAVID M. EDWARDS, PLS. ` ` ' ` ' LAND DISTURBANC NOTE: SITE EXCEEDS ONE ACRE IN DISTURBANCE, ALL STATE PERMITS WILL HAVE TO BE SECURED PRIOR TO ISSUANCE OF A BUILDING PERMIT. EEMA NOTE: PORTIONS OF THE PROPERTY ARE WITHIN A FEMA FLOOD AREA AS SHOWN ON FEMA FIRM PANEL 37203144OW WITH AN EFFECTIVE DATE OF APRIL 3,2006. LINE BEARING DISTANCE L18 N29*29'53wW 26.W _+ E ' .' ' ' � ' -^- _-~. ` ` ~~_ � _ =EXaTING ,4o4WETLANDS ' ' ' ` ' D ZONE MODIFIED VALLEY - ' �' ' ' _~_~~~~~~~�� .-- .__-'`__O ' UNDER CURSING ` TMAL COLLECTOR ROAD CROSS SEC11ON� �/���VE . = ACTIVE OPEN SPACE� N�TTQ�{�l� . _, '= ' -.'-_---' ' |' ' .', . . _ SS_---' ` = SA4[7ARY � . =�0k� F-P,\]AAlE ' | . ' � ` . - �� =FIRE ^ ' ou�ya� '-�---'' - `SIGHT SIGHT ^/ UNMPROPERTY ;ac5a �w >~. -.harms -•—._. •.. . �Q'r O`O „� g cv,..f 3��`:,c t r ��/K{t��� a '� 4 � V ~--`., •--_.,,,..____..� �� r -., ref � •• .., 0�� yz S�'tt�•'Yt`.4�'' Y"'C�S'E'�.t "`,-4YnT.:-'3y,i,. ",�^w � �tr' ...... x ES 59too '�'O -' `.,..;.ts",'�`ue,'ter'4.:.;.:'.;�•.wr:`.,s5f"x'co°..`y„t �fv...,� ,':',r,:• Fn- .:'>'Y' ,r.'.a t43 .ire c . }bM'. ;'b f';`».. ,. .... ^,-;:`h'^±.• . M — 1 ' V .a-,. ' ,cw t- t . n t'.�. : t .y:..r� �, , 3..t.., -. .'..y . E�t,x r..,- `-.. � .•-: ! 'a` 7 '�- 4r �� �� s.fa} ,'' .{��:-."", Yes. �''� � s f a�y1�•£ ,.. ! ':;' 1 •' ' Zi-Sx3�' "hav � rx � �'�Y 'ry't£u`r� �.;�-. ' • •at.,. y�,5':- ., Q 3� d- r s 3g J/ I � r F V/ N WITH LAW LANDSCAPE 2� a TWALL } -...._fie, •:.. ...:• .. S AREA 8, C519} > 42 VICINITY MAP _`--------- 26 ., rc� SCALE:1"=1004' , • ..>....:... yam.- Q e �� -- (D62 ENTER t_.. t "~--- O POOL � l�6 063 p� PLANT `L9 E BED j' Lfi z Q 30 q? r0 N u (� Q 3� 48 W 6 ( ;.. 0 A9 ENiE2y - o ,� 1 �? ,��.� C, C� r W S"�0 �.. POOL.': wunrn rrl Q .. , DECK Ci-{ t ^ /• . r. ifi``f.SS LANDSCAPE LANDSCAPE Fey AREA AREA 'R r cw� ! 1? 4 .�54 �--- --- ' --- __ n BATH HOUSE C z r r OUTOpq;KIMNEN � J 57` 0 (� ` 75 *-� Z PARKING � ,� ..,,73 '�A• W-72 G7 V i\ 1 ... > .. •PIT: .:. ES-69 LANDSCAPE •: ; ?:. , ! BO T AREA Is Y MV-10 5 Ile 'LANDSCAPE t / AREA r ( ) . t 11 '�t>� . ,.,,; •..>v; .CANOE! i 1i n KAYAK ."•'. ••. •.n .; : STORAGE H. • G LF C - , .:: • v .J 12 PARKING >x ,..:•.: -13 PARKING PARKING a 1 , Q -- I oms� 50 FT RNV z a � a o y 4' 4' 2' 241 2' 11, LEGEND a d ' = PRCPERY LINE K2 114 PER FT 114 PER FT 112" PER FT _ O SLOPES- 3.1 SLOPES- 3.1 / _ Q o o z U. ' f = EXICOTINC 404 WETLANDS �- r Z SIDEWALK F }.. _, } z O (' < U sC�oit 2-SF9.5A SURFACE " _ M. E� a Z 0 MODIFIED VALLEY CURBZ 6 STONE 100 f EAR; FLOOD ZONE W a z w w w, A 8 825.OB BASE UNDER CURBING w a w ..+ , .. w z'z \i zw_,�in w PAS•�IVE :OPEN SPACE p m z u� TYPICAL COLLECTOR ROAD CROSS SECTION �� _ r°� a_ u � �. � ROAD A SURVEY NOTE. �_..) �• '' •' •� = ACTIVE OPEN SPACE SEAL TOPOGRAPHIC AND. BOUNDARY SURVEY COMPLETED BY NOT TO SCALE - `t,.yttyuttrr'r't 'rrpr.,r PARAMOUNTE ENGINEERING, INC. AND SEALED BY DAVID M. t CA,� FM =FOR ;E MPIN EDWARDS, PLS. 45 FT RAN' c _ ti Ss - LAND DISTURBANCE NOTE. s.5 SITE EXCEEDS ONE ACRE IN DISTURBANCE, ALL STATE W - WA'T ER l.�NE -y ^ �• '• �: �',' PERMITS WILL HAVE TO BE SECURED PRIOR TO ISSUANCE OF A BUILDING PERMIT. 1/4" PER FT 1f4" PER FT 10 PER FT _ = FIRE, HYDRANT SLOPES- 3:1 SLOPES= 3:1 30'R SIGHT 30 R SIGHT SIDEALK FEMA NOTE: TRIANGLE TRIANGLE 1.5-SF9.5A SURFACE MODIFIED VALLEY CURB PORTIONS OF THE PROPERTY ARE WITHIN A FEMA FLOOD AREA AS W-825.0B BASE 4 STONE UNDER CURBING I ;< A � � •Ar SHOWN ON FEMA FIRM PANEL 3720314400J WITH AN EFFECTIVE GRAPHIC SCALE E U 0 �C�CAi.. R®/ CR ���N 0 15 30 60 120 -DATE OF APRIL 3, 2006. AL STREET INTE �'T�O%I � NOT TO SCALE NOT TO SCALE P f SCALE: 1 "=30' PEI JOB#: 13148.PE t t r � I I I t t + + i HEET _7______T -7- -. i , t F J t � \\ / \ --� ....�f '�� I � f •f?/fr f` %"j 'Ifl•rl I l � i / w_ �\ � �if 11 r f%f J%j•; j �- fj�. 1 � / s \ t -- � 1 t r� l�f•Ifi rj Il f% ' / ��/r� 1 t 1....: \ , T .1 - _ _---- .� �1 _,..,........' ,» -ter ;�,1 � •• •' `' f� >/:." .�� ,- t-- -25 r / ,,�,.(� \ r tJ t `r _ j __ _ r < r r • t L \ ...�� \ ..� ��....... f e r _ ; j('' /�, , f '- � ,. t j IDda � r /_� + � l+ t , / �1 l �}r ..-,� f ' T . \ \ � ` / � � / �•-''�t`� t �r� , / � \ \ 1 1 f! .; , • d 1 � ') { t 1 t j t \ \ i 7Wv f � �J PRIVATE 45' R/W,\ w f / 1 I ! f ! ' ft ► ! ft {'�,--..---1` ..•L1G..�._.a„�.. yq Ir / / J� i �/ / Y/. \ `� t 1 4 1 t Jf t j I ! 1 t U e s ;! e j , � { � { { t \ � �, / "". ., = rt {t/(/�/ � • %�--� 1 , \ t I / i �� ' / I 1 1 I ! �-t---�--- t t f t ,�- , __ , � � 1 � ( ! \ \ t ♦ .. � ......�.� ..,.t,,.... i` .a ` � t i t � I ! { t / j/ / / _� I / / /,'L"{:` l �•���J, R�.,' r'� �i " �L_ o bl<.--i t A a-'.`_" _ _ ♦ \ \ \ \ „ 1 \ �t / \ _ 2J w j N t c��r t ! I t __ � t � ,,�',� ♦ \ \ \\\�� \ t r t - j / Jt / r +� 'l E ( tr I { { t t t 1 ; { t j �� `lt t / / -,t NIX\\ ILI, F >`�/ j jJ t ► � ! � ,` RO�""`� f �-�+�......�,� -� � : �. \ `) i C l / r ► L 1 � 1 ! 1 x \ � �I � �\y—� +)a. �.^. \� ` Lam,,, .'�''•,•��/ � i S { !. 1 J. fJ � / lf. , —�..r^ �; } \ Sl, r \ % � ®ew/ \/ �f //I i' ,.•\ ....,,,.L ?4,,, •�. -� \ �\ _` \ ` \_..__. ......��,,�\\� t 1 tl,/ ..-./ { �i �) ,,,��/'�4. �-+ �1l -'..���F± ! .\� us 1 j r' I t /� ^ JH�os ova" a ore \ / f ' 1 .r � � Z I+t SHEET C-3.z 1 r ! + \\\ ' , + � , f , r..r�n�+�:.�.�.�► ""` ' �:.�...-��Y b`. � ram(` _ _ : t w� : EV FEB I a 2314 wet t-vv -36 �1 BP =25,7 Of i Jill, II w� BP�=25.7 = '77 BPE-25.5 BPE=25.2 PH-19 PH-20 Ct _ �_ I p I PH-94 hI i BPE-25:1 BPE=25.3 BPE=25.6 � -APE--25.3 BPE=25.3 BPE=25.7 1 _ / . , -- - - BPE-'26.0 �` Ij Jljll { BPE=25.7 { BPE=25.6 f E=2 �� --- t-�c1 '� j� { ( BPE-25.2 t \ r v" i r} (,, t B-33 ..r� IJ t 2�(J r \ {\ J 4 MH-87 (CE \ LP.CL.=2428 " ""_ \� 4 �flo>'o _______ o tiF.cl =24.87 ---, � CB-8 .7�o - - I i ( t-v lii�4 �� 1 ✓-^ LP.CL.=2 7aoro_.,_ ROAD "B" / Es-27 ,1 �/ � 1 J BPE=25.3 I II J- I I fj / Ali I �'� `- PRIVATE 45' R - o I �,,.r ® 2 „e .,,• ... , . fW � HP.CL.=25.02 'zQ/o 1 \ 1 /--,-• 1/ L�CL = .29 [p\.4 BPE=26.2 1� J� 1 ;f ;' II =PH-45-az BPE=25.2 c6-`5a� BPE=25.4 , LP.CL.= 3. ( BPE=25.4 I I _ PH-22 � ! BPE=25. . \ - Lp. P. . 2a.a7 f J II - BPE=25.6 ` I ES-28 \ ES-33 0 C \BPE=25.5 \� BPE=25.2 C C 29 I I \ B-42 S PH-B ICJ IIII o H-49 I r - b II� { M\ � \ BPE=26.5 1 / � o ----i � � a I � II I l I BPE=25.3 PH-34 1 � BPE=25.3 ` I \\ '� i BPE=25.4 1 { \ \ PH-23 H CL.-24.78 \ \ '\\� \ i HP. L.= 11 ' I BPE-26.g ` 1 - -- _ - I I BPE=25.6 { ♦/ 1 \ '''\ I �j HP.CL.=za. 2 ' J�Ji( -- -- ® o BP=25.3� BPE"=26,1 I PH-30 �I�I \<`\\\\\ \ BPE-25.0 BPE26.7 H CL.=25.95 IIII BPE=25.3 HP. CL.= . 1 BPE=25.5' r0 � ♦ � , � � � � I I BPE=26.7 J - - r I BPE=25.6 { ♦ �j ♦� \ '�` t ; o CS } .�Z � i II� , PH-42 1 • � III I � -- -- ,� PH-6 t s o r BPE= I ES-31 _ ` 26.1 I 1 a \ �� BPE=26.7 qI ! ( PH-36 L = 4.23 ES-30 BPE• 25.7 -- -- III : _ � � { PH,29 . o / CB-4 \ � I FpH-49 {� BPE=25.0 I / { \ BPE=25.3 -- -- ----�� ': A _ II BPE--25,3 2 -- BPE 26. _ `� �, \ I I II ! i BPE=25.6 ( ♦ / \ `�� `` \�HP.CL.-24.70 r"�-- [� BPE=261 C $ II J { ��PH-50 . I i IIIIII Jill BPE-26.4 1 Ico s-27 BPE=25.0� 1 Lp.cL.=2 BPE=26 C23 BPE=25.2 - ITJ "\\ _ i PH 26 { r, -- �• I I -- - I BPE=25.3 _ _- L E3-40 ! , ;; • ' HP 4.91 "`': CB-52\''- BPE=26.1 tI -. - - I Ico LP .2 c BPE=26.0 ! PH-51 I ( - -- II ( 3 r- Jam''- �ao�,,. r M� \ ` ; �, I I BPE=25. C I � PH 38 PH-2 ® p. = 4.06 / /� w t ff 2 co BPE=25.3 BPE=�5.5 I ,�,,,,e %" t� I I II � f I II - - - ES-�B . I I t J Y o �'" I _. `' • �• BPS- 5,3 1 • , c�, t ,J l I f PH-52 I I ( BPE=26.1 LP.CL: 23.85 0 _ BPE=26.0 f ( � _ III+ �� 0% �. - 0,70,� 4.61 ''' BPE-25. , 0 7_ ----"_"` I --� - _ _ BPE=25.6 C 55 'f i i "22 I I ' F MH-39 -- - Z CL= 2.4.66 MH-36 J I r 1BPE=26 LP. 2 14 � 2 { ! f e-20 PH- i �J / BPE=25.2 '""` /BPE=25.3 �'` .; ....,...�---- • ; f � 001* BPE=25.4 1 5s- MHj i I f :e •• / / BPE-25.1 f -•�. �, VEGETATIVE SHELF ` 1J /;-. / BPE=25.0 ! BPE=25,4 t ) / { I I % BPE=26.1 `(�� \ l f/ ( P. .=24.74 �`.�•-.``` ----' -_ � `-1a _.._ -- " ;•�`^== ;`, BPE=25 ! � t .6 l i � BPE-25,5 r � •� � � /' � � E�25.5 HP L.= a.$2 i r 1 ca- o ••dC"- 1 1 f f ROAR PRIVATE R;''. �! f (WIDTH VARIES) Iill Ell - j{ ��\ t;: •: .--�- BPE= 25 l i f -� -':;:i -5 / _- - -� _\ _ _ . _ ; 41 ` r ( 1 STORMWATER \� POND #1 ' : / 1f � ) \ ES-71 J L \ J ___ _� / f \\ I , // MANAGEMENT POND #1 \ OUTLET STRUCTURE. .E�'_'�� LP .= 3.93 --`- ---- - rl / / BPE=2 ---_ __ --_ �\ (SEE DETAIL) C&2 BPE =25.0 7kg I / jj U _ ADC , ( � ( � -- ...� P�VATE P 25.0 .- �'j � iS Jj .... LP.CL.-2 .92 \_ "*�.,,"`, \ •--._.. � � ,/ c,-� ��•"y � (j f� 'OR FICE T N A� - � �,� � ,_ AS SHOWN __-- __--- FEB I BPE 25.3 /BPE=26.0� I I ES-3 II II( { a2 SEC P 'of ..BPE=26 0 � Jj lJ ( � �� \ ` \ - �. i �/ Y. , BPE=25.2 0 ES-1 '� ( I i BP =-.5 BPE=25.1 ES \ �I � ES-6 ES-7 -8 ( ( � ES-9 ES-10 ES-11 BPE=25.5 BPE=25.5 PE=25.1 BPE=25.1 BPE=25.5 )i \ BPE=25.6 : t SEE SHEET C-3.2 GRAPHIC SCALE 0 25 50 100 150 I SCALE: 1"-50' 6 Z W ct °a _ w Q U CJ5 110 U Z 0 .tl o Z C�7N� 0 v oO v w xOp��� ON z w W 0� u W u W W® z Z �UU O ' O iQ- a o El- �.. Z U a Z W (L ww w..Q Zzw A is w c0CLU_a 0 �0)a00 SEAL cn N. LPEI JOS#: 13146•PE 02.. SEE SHEET C-3.1 L�P.CL =23.92--1. C Jt CL.= 4.29 \ \ i :j ffP.CL.-24. ROAD ltG" `` / 1 , 1 - ` i LP.CL =-23. ., - •-- 7 PRIVATE 45' R/W C u �LP.CL.:iV. 1 ---- ,.. <- KIES-28 1 j 11 l\ \ LP:eL = 4.0 - ®,\BPE=25.5 iE \ t - c li S '� o`'` •.. r - � � � � � \ \ \ \ \ �° _ f °' \ 54 BPE=25.2 `�•` ``"� `��` MH-49 \� \ o CB 7 r� ! ES- '-/ HP.CL:=24.49 &1 $ /� ten;' ! I, `� 10 .....� BPE=25.0 1 1 1 •\ \ ` \ i r 1 H cL.,24.7a � 1 \ \�\ ES-29 � � \ ES-32 ^1' � -- BPE=25.21 � � ES-50 �' SP =25.3\ -77 tBPE=25.8\ E -49 1 \ c 107 1 BPE=25.0 0 \ (t ff {S �� o ; t Q •� \ \ �, ' t i1`� ��{{ BP.E=26.3 � \ 4 1, tl� \ i i BPE;-27.1 _5 BPS=25.2 LP.CL.=23.(6 ` Y BPE=24.8 \ \ N BI ca (CB-7)fl -- -- - t .III � / --..-� � �. � � •, 1 I � A. f A/ { f f 13� r � 1 f jf j t \ I t t PPE=1�.1 ( t • � M�-� � i i J PPE = 1.5 I 70' WO ---- o � !y_,_....-- Ate, 45' R•1�.:.-----•-•_.-..._-•-----~- , ._.. M$ 15t t , C -BPE=1.2 1 i i t �PE=42FU2�4.5 %� � � I -I- + kvo � vv, r � � ri / 1 1 _,_, t � Vr MV-6 9PE=26 2 ---\ �\� ` o CB \ \ \�HP.CL.=24.70 / ..�--•� ES-54 � BPE=25.0 �� � � ES 7 \ �� BPE=25 0 ,..-.-.,-- ,�.., •. n.. ...-::., o BPE 5.0 1 + E \ -•..._.. 8VBPE- - F _��BP= 6.8 _- -o % M- 3 2 v a 1 1 z 4a f LP.CL� z_ 4.1 o 7©/ \ t J 73 / -- Q� j I BPE=2 :'l \ j ,� O : _\�c-\�- " _"'_-- �.7Q% % s HP.CL.=24.29 \ 1 j BPE=2 .E? t --- _ \ __-- o I a c \ R -..... ca-1 \4-j 1 iIf HP - 4.91 _ , CB-52 � LP.CL. 23.91 MV 7 za ® �% ,,� o ' CB-4 MI ` �t MH-74 -"„--►--"`------•_ '.'`, v.. ".h• ` wA_.,•i' \ C :...,, j 0.70 co P. - 4.06 i' t ! r / o r �,. �o r v . CB-102 t HP.CL.-24.80 �%f� B- � t� R/W -.�. LP._ I c, COMMUNITY ru C BPE=25.3 j ��� -.. _ ES 74 � s BOATING F�CIL(TY � ,tU- a i - E 1- I / 1 � g t / 1 '� BPE-25.3 LP.cL.-23. % Q < . � L .CL.=24.15 � _ 1 A W F y I BPE=25.6 5 - .._. � � � \ ,�-� 1 / .••1 \,r _' . , , a 30 4 C r 1 / 'd M -1 J c°n M t01 BPE=25.3 / '' - ---- = --- -_= B 3 --- J8-63 ( 0 V-- :.., , . r. }} I 32 _--- BPE=25. } C 99 / - a ,4 ES-22 •, �1 " zo ES-17 7 -'� I t / lr ,�I r / x f N BPE=26.6 ES-60 1 BPE=25.9 ,. ; :, 1 f n ? BPE=25.2 ��7 f - ) /BPE=25.3 +, --�" ter _ --' E 26.6 Ey BP =25.7 ! �_�-- ._ _ 1 / --- \ \ i rCwuD 1 ( 1 HP.CL.=24. MH-56 ' !� r /\ p, /� j _-••4-_�___� I �---- % / ! / "" CB-6 5 t 1 - CB-97 QB- 6 C : 24.74 1 s f } 4 , f � � f ` 1 � � � 1 ` �v 9 � LP.C- W t t( 1 1 BPE=26.3 ES-19 1 J/ rt 1 \ LP.CL.=24.7 1 ES^65 1 ( t BPE=25 6 l-56 a / �� 72 -� .•.,•... -- BPE=25.6 1 + 4 / 1 (r ! % zo -- BPE=25.5 J t ... -.. ..... • •� \ / HP.c -2a.as BPE-26.8 7 H-64 1 r( t • ,: �' ,� �C/ 1 / ! I APE=25.5 \ � PE-. 5.8 ES-68 i •\ �, , , BPE=26,4 ,.�-'� `V \. � r' V ( it � '{•r \ �o I BPE-26.6 • r I J ( V 1 fl APPROX. \ 33 :1 t ; LP CL:2 9--1 rOAD �31 - 1 BPE=25.1 .....,........,Wig; RE oTV M H8 o►Q�-_ LP.CL5� : 1 I \ C = 3.93 ____ ,, / t ES-71 / _ .!' � l - / E=25.3 i --CB-91 E-SOX BORE #3 -� -= f / c BP25.0 �� , ,. -.. � J � � � L .. ELEVATION 21.86 HWT DEPTH 45" • .: \ ® � `� _...�• INFiI=T. BASIN j � tt 1. /j .� \ 1 F�S-6 �, / I / -- \ "# . .. SHWT ELEVA N 18.11 ES-70 �/ ! ( --•-' /�""""�• � CB-H5 8%0ATMENT f, �, ; ; ` BOTTOM OF BASIN 2Q.0 \ BPE=25.3_ J f /' , J CONTRA6TOR SHALL CMH-H4W-D WN Lu DRA � \ z l BP =25.0\ / _' ' ' '�-� ' PLU W- WN., r ; , ,� FICE T? INFILT\BASIN 10' VEGETATIVE SHELF�\ \� 1 f ' \ i „ A HOW! \ ( 1 0 ICE Si(�. � � 't' °, }�f l `� (SEE DETAIL) A N ��\ FILT. BASIN l �r f / `�"----- - \ 1 l 1 - , -' -_--- -' l--t Ell ES-1 2 •.. ` / 1. �`, (jj,. 1 •, _ ,_ ,..• ({/^, - . . ....... . BPE- 5.5t .rf. ES-11 r` `, [h j,jrfj PON #2` ` 1 $PE=25.6 t { }: OUTLET STRUCTURE PROPOSED '� \ l f t ,(61EE DETAIL} \ ••-� ! �.. t t�.• STORMWATER ••' :\ MANAGEMENT POND #2 \ p �RON'b,* EMERGENCY SPILLWAY (SEE DETAIL) '\ SOIL BORES ELEVATION 20.25 FES S WY ®.,,mow t } 0I � t f SHWT DEPTH 35" RIP RAP APRON #1 " ---- - __- HWT ATION 17.33 {SEE DETAIL} RIP RAP APRON #2` � .... BOTTOM OF BAS -- (SEE DETAIL) ------.... GRAPHIC SCALE � 1 .... � .... ..r � 0 25 50 100 150 IN, 1 1 SCALE: V--50' f _,7- 77-- ;' r 77711 j ''l--f= r s-�.-F I' rr j r' j" ;*'f"j f l ""-� ri �t ,`it'` � / � \` ._---- .- /`>{ >/' I !> l f I !• !F � � 1 j rr 1 / 1!' %! / f �lf71,7 � '`\ \ `"'`-. --'' �.! r"�.`j , � , `• j !', l' ` I l� !• f j ',may''" �-� f j I s ! � j j, I i r i 1s- F BPE-25.4 > / J r > -1'� � �(((}}} F r jt � !f ,! j� r r j f r j l �j ! j� t l s•-� f!� j all 11 F .•+' f .� � �i � � � r ® � ! r' ,' j r' > ,,> > > rI ; j j ! � ,r''r ,1''f' j � f , r •� ! j H-89 CB-90 Etat,} , t 'ti; T t�� >j' s , !- i f ! j � I' j �� , j r �..•�'-t J .` ( C ttti� MH-8$ .� t O �' ' j, !• rj i` j ! ! r j ! f` j L- > I / > j J f r�' ES 6 BP-25.7 lj ! r"•'E(• /`_ "'_ .� 1 � t �J, � "`+!r i' 1'j j � i! f j J j l! / i• f I j i j r ... ..,., �' � � ES-38 �/ '"`••'' , 1 j ! , r ` !' jl J I f • i' s j r r / BPE=25.7 ! i>, ! ---'- - '� _-__-_1►'=`-- j lam► � �i► t+► -4, u, (f BPE 25.7 P SIP BPE=25.6 �' r f' C a ( C� `� / I ST 'TiOfVI - ES-41 1 tl� N MF{-sr BPE=25,3 i ES 2 g t[ % 1 1 BP -25.3 i ES-43 ES-44 { l cri�n / BPE-- 5.9 BPE=26.9 ` t i�' ES-34 CB-s4 �_ t BPE=27.3� W f f� BPE=25.3 1 = I ESA6 J. 1 BPE 26.6 r r HP.Ci..-24. o •.«'.. - +. '' / 1 / t+V-3 ,f ROAD G o f `-- -- '�-•� ! / J BPE= 2.5 r '--- -_ f } % > /EP=9.88 {HP) ��P.C� =23:� -- f PRIVATE 45- R/W '. / J I --� ` , f �, -- > ----___ ,_� j �J t � HP.CL.=25. o �P.CL.= 3. / '�-"�� � t � \ \ � My � � � � C 5 ('� t ` J Cggg ® -.. _.._,.....� ."� J M _�* ` 1 rPE=?1.5 M G5 MHrG4 j ! BPE=25. \BPE 25.2 c&? . O �; ® , l MH- 7 1 � t HP.CL.'524.49 ... ._..- _:_.----•-•B- 2 \ � BPE=25.0 I �/ \' �- W ui \ \ ! \ ES-51 % J ! �.-24.30 ES-29 �� ES-32 ."- `R BPE=25.2 _ - ; �-. \ -� E 49 ( y e 107 _r.. 1-5 l 1 T \ _� + BPE=25.8� o / _ -- - BP�=25.3 ' t BPE=25.0 \ : a ` t 3 Gs t 11 kE=26 1 +_ BPE 27.9 5tB4/t 1 0 I0 i ` Ei E=15.5! } 'BPE='13.8 } BP =25.2 c �-� i N E } M-4( f { 0) E.P. BPE=24.8 7` ! t ►-► t , t M- -SPE=1 .2 • � N 1 ES-31 t3-75 j �..- BPE=25.3\ �. BPE=26.7 pill c ! . \' My-s fl BPE=26 2 LP.CL.= 3.3 BPE=25.0 _ > 2 i 3ti 0 BPE=25 4 ES-57 � BPE=25.0 I BPE=25.7 r. _ s �s -' BP 6.8 ° M-1 / +00.CL: 24.17 ,\ 2 M -,. \ ! BPE=2 .7 r �� ° (----•--"_____- �-. .:.:- 73 HP.CL. 24.2 ao � � �.;_ � � � � ` i � .3q+o© - -->^-�; 3 ____ -.---, l I 1tH-10 JBPE=2 COMMUNBOATt .._ - • ... , ..:,..t t 'T FACo iTY 31 i Ct3-52 I�Y LP.CL.=23.91 L .� ��• ` :; i � ..moo ...�:.:..,.,. ( �s . ! Y { •. i CB-102 1 �I�� � l 't HP.CL.=24.80.� ..,,_,,; ... .... ., t � i; ,�.,•_. SEE SHEET C-4.1 t E E s t E c � d rT� W f 2014 17' H GRAPHIC SCALE 0 25 50 100 150 SCALE:1"=50' Js` J f!� '• \ / •-----....— `"--'---^—•-- —. J ! 1 INFILT. TRENCH "A"JI'lf'''II{f----- r (2) 94 LF [188 LF TOTAL] �J frf�ilzf�I% ->jJ /f:,'r, / Y (SEE TYP. DETAIL J%J'ff f 'fs" !'''!'rJ!` ST TION !" I" cs- BPE=11.5f'J%f: / ` 1 fJlj � H-Al f C I;'i.I/jlJJ I f I H-A2 I ! INFILT. TRENCH "B'� MV-3* ► MV o 1L.=9/999 WW 2 {2} 80 LF j160 TOTAL] t f 1 BPE 2.5 MH P cL s7 BPE=11 5 (SEE TYP, DETAIL) MV 2* BPE=1 .1 / / • o !fEii/J,r' ` fI;P=9.88 (HP) f tj BPE 21.5 ---- STORM DRAIN MANHOLES loe M G5 (SEE DETAIL) MHjGa o CB- �----- - — PROVIDED FOR ROOF t ---f - co INFILT. TRENC "G" f �.r � H-S3 BYPASS STRUCTURE DRAINAGE TIE-INS s --'" af " J a CL.-laza 1 igvx - .•. TRENCH "G" oF7 m a r-- (5)122 LF. [610 TOTAL] {SEE TYP. DETAIL) INFILT.1 RENCH "C" W W-4 i (2)114 LF [228 TOTAL] 4 M-5 M_g 1 G ` '��.I �t SEE TYP. DETAIL --- 4t` f� BPE 1. 1_( ) ff M-4 B E=15.5/ 1 BPE=13.6) — PE=1 Q.2 1 — — RIP -RAP LINED \ �� � { \ ;�j WW-5 SWALE (TYP.) V"BASE WIDTH=T1 C \\ -• � H-a o SIDE SLOPE-3:1� } M . ) j MIN. D PT� 1 } P.CL.=10._ \f / /%r'' i • I jam` MH-D9 INFILT. TRENCH "D" W (2)124 LF [248 TOTAL] i ! LP.CL=9. (SEE TYP. DETAIL �-�`1' ii Lu .5 MH-air BPE r- CID BPE=11-5 t ` 10 DRAINAGE H-luj — , J EASEMENT (TYP.} 1 m 7 M t � i { INFILT. TRENCif H E t `s / % WW 7 4 ram' A `"' / 122 LF {TOTAL} )I \ I 3 , M 1 P- a l {SEE T`P. DETAIL} f I COM TY ` �--\ �f I ff - _ BOATING FACILITYLP r'1• {r1(, 1 � �� ' �`• ,f/i/IfJ/Jfll '.;II! / � -•1.. I 1 �. INFIL .TRENCH 1 [o J ` �`~` � � I VERFLOW BYPASS` I \ ♦ M {TYP.-SEE DETAIL} B E_ HP.CL.=10. o CB-F / t ` � /�, •,...�., / 1 � r l � " Ifflf 1,<( t ® � L--•/ _... MH-F3 r I FIL . TRENCH OBS RVA rION WELL / tt {2} 118 LF [236 TOTAL] 1� - / BPE=1�1.5 ` �� INSPECTION PORT TYP. / J J .� ��SEE TYP. DETAIL} WW-9 �\ � t (% . j 4-1 • j INFILT. BASIN"H°\ J 43 M-11 ff f lr UTLET STRUCTURES / y ( t � f M-12 1 t BPE=11.5 1 J ri. M-1 BPE= 2.5 114FILT. BASIN "Hu BPE714.0 , FEs-1y4 ` ! CB-H6 t J/ C2 ILI 11 l -- CB -Hs .,� pgYVA'i`� 45-__g�� ......• " � ,. � j ��, --y.— —,.;` ' ..,.� ��` f - 1 �, , / ��• v, I� f� GRAPHIC SCALE 0 25 50 100 150 SCALE: 1"=50' ! 1 i t ! 1 l i i i --.�--- _ _ _ ' _ i _ _f _ Ho_L-r ROAD ' _ PRIVATE 15' ACCESS EASEMENT ' - x0.9 mvere - _ �_ _ _ 1 \ 'TREE R - - - - ---- Z/Z— _ ! - f y + � + ! \ �,/ •� � j � f f>/',,f fj I r%! �f frf; f !�" /� � ''-1 ff-,r�I f flff%jf/f t ! ! . .__ ...o.�.,.,r, ..w.re .■,..® �3 'Wf � I f.! ,' f ` j 'f i/ �f i, I , , , • t r' / /", r l• f i k \ \ \ I ffyi,' -- f J r i 1 `t ♦ S ' \ \ \ { J \ • "" ; f l <f> k 1 1 I { 1 ) \ \ \ \ �j \ �� T: { �I t N N , t— ! \ { t -- \ � < � �' � r ! �j ► t t t { / f { } I' , r x � � -- -- --- s —1 _ 1 { { `i. / y 1 1 ♦ \ __ I / 1 # j r r���r . � / l 1 l i ! { ! , / I •%f i/ f�'� \ \ t \ .i it fit ) / f {llr I •f, • /I'i! / { r l / Ir. ,t . it / �it \ 1 1 I j C / aili ! 1/ \ \ ♦ / 1 /✓ !f;/off/f ' y \ \ " `�-`?' t I i { { f t / f ! U It }. t { I ' t ,• , _...: / /' ' I , f* 1 \ \ 1. ! { ! I ! 1•'l,/, ,r 1 t It Alt IN. \ c �i \� ,\ � . .... -•, -- -' J11--, `' -� l ® `Q I 1 \ \ \ � , J j / / l l t r / '',—..=,.—=- z rl h _ 1 If fit ti � �� I \ \ \r� \ � ,� .--' ,t J 1 ♦ `�, / � ._ \ \ ! t � � / 1 1 l t l//� . V � � �� �. 1 it i t r- � �' i ! ► / J J, jf! ` j/ `" ,, �s\`�� t \ \ 1\ . \ \ \ 1 , i 7 { ,.� / ! { / 5�/ \ �, \ N\Q t 1 / / 1 1 1 11 f li \ 1— j �� / t \ N { { 0) \ ,j tl L \ t l t ~\ \ 1. Jj f--r 1 / N i / � . -.� " 1 ! I)t �; 4 t It PRE DA#9 I 1 \ \ 2 �\ \ r , / , ' \ \ , / .— t t s t � \ \�� \ \ \ .- ! \ { j \ \ / �; � % I � cam! rn �t j t / I \\ \ \ { /! ! ` I / t 1 t t t t 1 t t 1 i { l 1 \\\mo t 1 \ i1(11�.011yt, 1 t tli (QUTFALL A) i , \ \ \ \ �. t / { c / ! J / 1 t ! t t \ �— _� t / �{ \ c l a ; \ \\ \ P 1 l t \ lI11 C it �• t• �! 52.2OAC. t t ! t t tf{! it t t t i t PRE DA#2 ii. 1 ✓,"....- 'r Ir%i. t i t t �It.,`�'\. ha •I ".� t, {{{I t. _ _ _ / \ (QUTFALL), It o � I �-• = j / \ y t t ! 1. O AC.: I / t 2 t <\ \\t _ 1 r _ t it •-""� ) \ � •� ' , k {{ { t { t / ( / � r ..-' \ ` � t t t , \ t i t t t t \\ �..:-..:'^�t � _." ik i// It t / { \ \ 1 ( { / I -� \ t I u C \ ( 1 i {{ t 1 1 t I I P i t \ i ` ! , ���-�� / 1 { -11kt t /rli (d i li ✓ r \ /p !)� I i t 1 1 } t 1 \ \ \ t - t t ff rlr. \\ / 1 t r-',1 \<,� J ►t,}t1 t '�; f ca t /jLt t \{I r \ 1, 11\\\� { V i(I ;, + r �� j.,. .• t1 ,1 _ r I i\\ iJt cc ,fir ,fi... . t \ _ f l /l 1t,t / 1 I \\ \ tt tt i' tf { � 1 i �, t ,�... � -- 1 /, t u 1! t f `, T �- -- "" ..._. w.'.-. / � ) .- t 1 i i E j \ ` t ,...-... \ / / / .' / lt\ tt l C •. �' 11 f ;t � ,_...- � � E /l I J J 1 — ---� 1 [ �q, 7/ �\\\ i jli c - • 1, i/ / 1�k ti i It J t ! j, ,{ J{ { i t 2 I _ _, f ; II # t t S,` t t j 1 l ! — r ^ ' ' { I / 1 I / / ! / j t { t t / /// }\ << . \ Ct 1 Ifyr t I , I [ I 1► t J / / r_- l / . / \ \ \ \ ! / / ( { I f j f J { i %-� \ \ .- t�\ /� ttti f f i j l \ `) / 3 f. r' ! 1) l ' -.___ .{ � \ t 1 _... / 1 / // / 1 \ 1 \ I t � d 1...-• / 1 l k l ! f ,. 1 l / Ij / I � ! 4 1� ^ �\� �..,•..... � \ r" 111t\\ k t\ 1'� ,f• � { '� �� 1 i _ 1 �� � � _ t � l tl I / / 1--27 1 / 11 _ t!t'�l I- ! / / ! l t \-. \•_-\ ,- \ �� r, � r 1 i t r [ � J • �� <..... `_-x`-- ..._—...— jlt / i `.'� / ....-_...{ j {jt� lj \ � \ / yF.! /\ � � f 1) ! { � 1 _ / ; j 1 / / ! k \\\�\\\\\ \ 11 1� �3t'j , . 1 ,s �{ r ,3 I! -- i/ _ --- .0 J _ _ r �- \� I / t t \ \ / \ If Itf , , a 77 ! \\\\�\\raj\///� Jf / l\ `` ¢\ i� \J \ " t \� \\� t `\ - ♦ 1 /t r i/ rr ' . / i f {C(lr r-- -- ,,.. 'Z5 -. 7 it `^• -,` • \ � , ` � \ \ � @..,�, � ~-- --. li i > ,72 / ` \ \ `. � " � 7\ t \ � �_ \ � � ! { , ...- fix'•'—'"- � 'v �.•. — ..- .•a. -�� \ ��\ , �, d,,\' { P 1\ — PRO' Ir rh {t I, l \ � t 9.! I IT' t RSONSO MA RO S � R \ A Z ` ~ f 1 f ..._._,� _ _ � '/ �. ` ! ! + � ! ' • rat.....- •..: , ; � 11.4 lie Ila MASON' G o-HA -- _ ZZZ t Z rt F O X---__--. `_ co M _ ---- - O _ _"_- _ 0Q Z LL -- _ _ O ci uj (z 2 j t UR.LL0X ® dco) aaU SEAL 1:l Ir­- z, •+vx 1'n ar- ,i y'1}i ` E • — r - % _— r- o ' v m: {- /\r,` GRAPHIC SCALE ,395 0 60 120 240 360 1 r + 1 i 1 i f 1 f I J � ;all j �f /A�i _f / ► t � IJ rl% r r r �": rf l-rr 1 I rf Z r 1 Q 1 U1 ? F 77 IJ i- J!f dill � 1 ��-�'t '`�- � l - - _ ^..�, ' �► ;`=.' .:...-� � �. '� �,.. _ ._ _ _-. y L—TL d f \. ... ,,. RC?. B f I 1 }( Ir r / r \ cv i 1 J , t \ ; ..... ! f _(f fI if `-•`,� / ! i1 ( t t -., _ \ \ ' ; \ �, /4-1 ._ ✓ ® - _ .f' �`.,- _ ',, /, i 4 I ffii __� s _fit.-- -- _- IIf ' ' ` \ \ \ 4� r / I C_ �„\� z fill I if I e _ _ • \ - r:. 1 1 \ -''� '�i o s r , ill \ - ;�' a a� t— = f :f fl fit• j � � idl ' !i �j � \ i � \ \\\,l,\ \ Y'.,..• -' �'" `'i� � ru f f I f!t� c 1 III 1\ N l\ \\ I` r i t ti'� / I °/ r S 2 5 -, /\ w c:a - ——.-...... _ L t �f — —----•—� 1 � II �W � � �-�',� - i Y + 90 1 f f is C}A# r i t f 0 1 tf lidf ( fii l r df\ 22 , C■ r``� -- ^ ` _ ° cn fill ' J,1 t f t - - l j i--- _ d ,,.I 1 j + / 1 ' r "t \ z +moo { !Ll � N \�i A#1 j I y.. ( r + I \\ 1 1 t I00 N V � o c- � 1 d. o W� . v V i toy^o + f it i / t d ` 1 _ .--a I �I .! �'' z"" t /• r. T �,Q? o c I 1 t \ 2: (. ) op � � Q �c' � — `' — _... i � � / �/'�d � — --�-�_ _ \ f 1 f J � l \� p 7 —`"�— — �"" — i � `- _. � \\ � SIN . + !►i ' ..-•-.L\- - I I /I � ; \ ----� � 26 �� S >< i � z 27 l/ r ! 1 a w H._._._.:..Y ".-.•L�1VVA %t(',. j 1 i i f -i 1...,,. \\�� /r r \ \ `} ...• — w °'°i°, jy J _ ."-. ''"'° "'..--.x.`_.`�..- „_ � r / }L,,. fjillf qdl ..... _....1_.:.' , ;ems '~ ,• ''� �.. . O / > \ ✓ / ! / � i � ~ ` ' `• ® � ®w ®♦ OADz ROAD A t _ � j R{7 ...•• ._•-• - / i t if f t ,,,,1 " — .+ r \ \ \A \ \�•=�•Ztt*c. i / - �` 1 \ \ \ k. L r t / �! ( � fop ' � � r ' ` ` - — \ \ � \\ \ `� .�� -�,' \ f� � ' / f /.� i \ r'�, j � � r 1 — _ -- j 1 - \ \> 411 v000rp CC M O --- rr _ O LL U �y�0 }- 65d -' Q Lu ��Q z �} U to ti!uj alzzU om � J S1�!'1L"•,�,litillft!ltitell///!/sr/ N Cq ° ; AL ty. Z :Td FED i ,y 'Ilan �2 GRAPHIC SCALE :506 0 50 100 200 300 SCALE:1"=100' PE! JOB#: 13146.PE 00 J MLzf I�tUm ` t ®� Yr•' I/��IIjjII�f°r I% r tj"f' ST TIONI DA A 1 r I rfllf• f, I 0.64 Ac. rl IMPV.=0.31 Ac. ff1 /;I Ij;lll 1 ; 1.79 Ac. 0,38 Ac. f ( IiMPV.=O. 9 Ac. 1MPV.=O 21 c.----�- --- -- �' vf, IN \` / I --- \� S ''� ..» ,� t / 0.65 Ac. P .=0.30 AcON l j l 53 � 6?4 6 25 A2Ro Arm JL __``__ � , \ � � m ` � 2a � as � N 62 � � � � � ` I � / / � � , � ` `, f�� � J r ; `� � � l }�•.. �_/ t. 1 4) i r A-� "-- f � Z r r j�ilj sr 1 o , OA5 Ac. `-7 t `\ I �; r I f PVC .28 Ac. .� / i 1 ��%If.f CI ! � [� � j ( � ) ,bseaa 1 r 1 33 l _ o Q , l� 1 ESA- i------_ 0.68 Ac zk 71 72------ o r,4.,..... 70 i -- Q/ � � `, _ _ r c ' , � � \ \\ � �•.. ,,,,,,... , �_ jam` - �,'� s- . (fjj ` " volm� MONO "... 1 OUTLET STRUCTU� E ROAD TXV OPENING @ El . 7.5 ,-- —� / \ i :,.: 1 { / EMER. WEIR@ EL. 8.25, DA-H I 1 1 "CULVERT L=138 L i ! 1.95 Ac. ! % IN�UP=1.4o J / INV. WN=1.00 ---- ---- f t / ROAD L &F (FILL T 4) r omega N-- i t GRAPHIC SCALE 0 25 50 100 150 SCALE: 1"=50' in Q O 1/S" VARIES 112^ R " 12" 1/2" R 12» RAD. V-0" " 6 6„ d FLUSH W/ 6 0 50 FT Rl4V 3" R 118" R 1/8" R n a ° 4° 1„ a s ASPHALT C 3" R 3 'v 4' 2' 24' . 4n � Q • d N d o "04 , 9 a zz 114" PER FT 114" PER FT 1i2^ PER FT - `- r 'o d . o n 6 r * •i, SLOPE $La d 1/2" JO 1/8" RA PE ° SLOPES= 3:1 SLOPES- 3:1 LEVEL o - c o �» US, TY 0 0 IN Dt P tt/...�°° 0 o n a d SIDEWALK � � .� .' � : '°. ' . � '. •. ' o ' . SEALER DUMMY GROOVE °' � . Q T... 18" 1CONTRACTION a d d MODIFIED VALLEY CURB 1.5" SFs.SA SURFACE 74' STONE „ CONTR EXPANSION JOINT ACTION JOINT - 8"25.OB BASE UNDER CURBING ® 18 ROADCROSS SECTION (TO BE USED WHEN PAVEMENT IS SLOPED AWAY FROM ISLAND 4' 300O PSI OR AS SPECIFIED BY THE APPROPRIATE CITYICOUNTY ENGINEERING ROAD -A CONCRETE DEPARTMENT OR THE DESIGN ENGINEER.} HANDICAP RAMP NOT TO SCALE -- 1/4" PER FT. - 18" CURB AND GUTTER 18 CURB AND GUTTER a NOT ToSCALE a REVERSE SLOPE) NOT TO SCALE 5,-----•-� 45 FT RMt NOT TO SCALE 1 SECTION VIEW SIDEWALK z ,. 0 22' 2' ss' GENERAL NOTES: Sn ASPHALT � :. • - . • � ,�\\\ Y � d PAVEMENT ���\ ' t - '-\��W CONTRACTION JOINTS SHALL BE SPACED AT MAX. IV INTERVALS, EXCEPT THAT A 15 FOOT " ° 4 0 ' ° . f/ CURB 12:1 MAX. tY SPACING MAY BE USED WHEN A MACHINE IS USED OR WHEN SATISFACTORY SUPPORT 1/4" PER FT 1/4" PER FT 1)'1 /2" PER SLOPES= 3:1 SLOPES= 3:1 FOR THE FACE FORM CAN BE OBTAINED WITHOUT THE USE OF TEMPLATESPAVEMENT AT 10 FOOT d a' INTERVALS. JOINT SPACING MAY BE ALTERED BY THE ENGINEER TO PREVENT a SECTION A -A UNCONTROLLED CRACKING. CONTRACTION JOINTS MAY BE INSTALLED BY THE USE OF 9n MODIFIED VALLEY CURB 1.5"-SF9.5A SURFACE "ONE TEMPLATES OR FORMED BY OTHER APPROVED METHODS. WHERE SUCH JOINTS ARE NOT 45° ° A 81-825.01]1 BASE UNDER CURBING FORMED BY TEMPLATES, A MINIMUM DEPTH OF 1-1/2" SHALL BE OBTAINED. ALL 10.1 CONTRACTION JOINTS EXCEPT IN 8" X 6" MEDIAN CURB SHALL BE FILLED WITH JOINT 3" ROAD CROSS SECTION SEALER. EXPANSION JOINTS SHALL BE SPACED AT 9V INTERVALS AND ADJACENT TO ALL TYPICAL ROAD RIGID OBJECTS. 6 5, NOT TO SCALE ' 112° EXPANSION JOINT- MAX. 54' O.C, � & BETWEEN STRUCTURES i T 2 -0 1-O 1-O 0 - - a WHEELCHAIR RAMP -(DROP CU 6„RSE GROOVED CONTRACTION NOT TO SCALE 0 • cg JOINT _ 5r`arr u_ .,•„ . ;2: 4.:.•..,•' �`�, { }r C �• .; . %tom ; : 6" AGGREGATE BASE PLAN LU zY 3:$;:�� > �L s. Y , ✓ � :,: .z:r:•s. STAKEOUT COURSE UNDER CURB. _j ,�. ' t ;�:.-., . �" •. ; • T P t; �nr jl�!^`p'e..,�� �'•,,.„` , �. � �Nv�ti:f'?s''�-C•.•�s pn?r,�{• aNT � J CURBINLET 3a'R WR ON -SITE SIDEWALK DETAIL VALLEY CURB (STD. 840.03) FORM GUTTER TO SIGHT SIGHT MODIFIED MATCH HOOD TRIANGLE TRIANGLE NOT TO SCALE MOD. VALLEY �, 5, NOT TO SCALE CURB & GUTTER X. �e �p �C Typ 1 i IVAI_ S 1 E IEET �pitl i GRSECTION _ U c 2-6 0 NOT TO SCALE Z r., c TRANSITION FROM MOD. CONTRACTOR SHALL VALLEY CURB & GUTTER TO ti MAINTAIN EOP & TRANSITION MATCH CURB INLET THE GUTTER LINE FOR CURB INSTALLATION Z v INLET INSTALLATION t CURB TRANSITION DETAIL NOT TO SCALE Wzcu I Z © (� ALL ELECTRICAL EQUIPMENT AND ASSEMBLIES SHALL CONFORM TO THE LATEST CODES. Ln MAIN DISCONNECT 2'x6" TREATED BOARDS (tYP) W DUPLEX CONTROL PANEL NOTE: PANEL SHALL INCLUDE MANUALTRANSFER NOTES AND SPECI FICATIONS SWITCH AND GENERATOR RECEPTACLE. 1. FENCING SPECIFICATIONS FOR WOOD FENCES THE FOLLOWING SPECIFICATIONS, DERIVED FROM ASTM F 637 AND STANDARD PRACTICE IN THE FENCE INDUSTRY, SHALL APPLY TO THE MATERIALS AND CONSTRUCTION OF I WOOD FENCES: 48" X36" ALUMINU M (A) POSTS AND FRAMING - POST SPACING SHALL NOT EXCEED EIGHT FEET (8'} !ADDER BASIN ALL POST HOLES SHOULD BE A MINIMUM OF THIRTY INCHES (30") DEEP FOR FOUR FEET (4') HIGH ACCE SA DOOR w/HINGED FENCES AND THIRTY-SIX INCHES (36') DEEP FOR FENCES HIGHER THAN FOUR FEET (41 UP TO SIX ELECTRICAL" {NON. TRAFFIC RATED} FEET (6'). ALL TERMINAL, CORNER AND GATEPOSTS SHOULD BESET TO THIRTY-SIX INCHES (36') ._.{ DEEP. CONDUCT (MIN 3-2") 4"SCREENED +, B POST HOLES SHOULD BE AT LEAST FOUR INCHES (4") LARGER IN DIAMETER THAN THE LARGEST VENT PIPE RAiLMOUHA C PLACE BOLTS U () _� � TO HAfiCHFE lA(NE DIMENSION OF THE POST. ALL TERMINAL, CORNER AND GATE POSTS SHOULD BE SET IN TREATED 4"x4" POST (17YP) CONCRETE: (C) FENCES UP TO FIVE FEET (5) SHALL HAVE A MINIMUM OF TWO RAILS (STRINGERS) TOP AND BOTTOM. FENCES OVER FIVE FEET 5' SHALL HAVE A THIRD RAIL AT CENTER HEIGHT. STRINGERS TOP ELEV i4 00 O 6" IN. FIN. GRADE ELEV 13.50 } SHALL BE 2X6 MINIMUM (NOMINAL). D MATERIALS -ALL MATERIALS USED IN WOOD FENCING SHOULD BE EITHER (1) NATURALLY SLOPE TO DRAIN AWAY SS CABLE I ROT -RESISTANT WOOD (SUCH AS CEDAR), (2) A WOOD PRESSURE TREATED FOR ROT -RESISTANCE, FROM WETWELL HOLDER OR (3) BE COATED THOROUGHLY WITH A PAINT OR PROTECTIVE COATING IMMEDIATELY ON FLOAT AND ERECTION. AOWER CABLicS i (E) FASTENERS - FASTENERS SHALL BE MADE OF A NON -RUSTING, NON -CORROSIVE MATERIAL, HALLIDAY S1 R3648 - OR COATED TO RESIST RUSTING. NAILS SHALL BE LONG ENOUGH TO PENETRATE THE RECEIVING 48" X 36"ALUMINUM MEMBER TWICE THE THICKNESS OF OF THE THINNER MEMBER BUT NOT LESS THAN ONE AND BASIN HATCH w/ ONE-HALF INCHES (1 1W). HINGED ACCESS �r„j ► ( COVER BOARDS SHALL BE 1/2" MINIMUM THICKNESS. 6' D!A CONCRETE WETERI L LADDER t-1/2' CHECK VALVE(G) SOLID WOOD FENCES SHOULD ALLOW FOR EXPANSION TO AVOID BUCKLING AS FOLLOWS: FOR DOOR W/ EPDXY COATED INTERIOR 1-1/2" GATE VALVE 7 r ! WIDTHS 2 TO 4 INCHES, A ONE SIXTEENTH INCH (1/16") SPACE SHOULD BE PROVIDED: FOR WIDTHS 6 TO 8 INCHES, A MINIMUM SPACE OF ONE EIGHTH INCH (1/8")SHOULD BE PROVIDED. VALVE BOX REQUIRED (SEE DETAIL) �""'� H THE TOPS OF THE COVER BOARDS SHALL BE CUT AS DOG EAR (CORNERS CUT OFF AT 4$ +; `,�",f 1 112` X2"REDUCER UE?GREE ANGLES}: 3"SCH 40 PVC — 2" SCH 40 PVC SCREENED VENT PIPE ;".: &' DIA. .: --1-10 SCH. 40 PVC TEE un I� LIFT -OUT CHAIN, '' 7' YP. ,.1/4" S.S. W/ is 1 LIFTING BAIL TOP VIEW RAIL SUPPORT, STRUCT. PLASTIC :: ; ,,•, �^i >, PRE -CAST CONC. SECTIONS RAIL MOUNTING FLANGE, SEAL w/ RAM -NECK AND _ :. 2` GUIDE RAILS, : TAINLESS STEEL ..• HYDRAULIC GROUT :...... . " STEEL '• � .. 10' SKIP LINES :' -• .. •; NEOPRENE BOOT (TYP) • � �• c i- INTERMEDIATE R All. SUPPORT z o cv YELLOW OR WHITE a , 1 1/2^ CHECK VALVE ; (AS REO D.) �{ Q GORE LINE 10' < 0 1 1/2' GATE VALVE" :` 4 �+----) 1 1/2" 900 SCH 40 PVC BEND 8" DR 35 PVC GRAVITY SEWER t., 'O✓✓✓CD ® ® p LINE wl RUBBER BOOT • j , INV - 2.06 " ►� .: < .. .. 1 112 DISCHARGI i PIPE, SGH 80 PVC. F- � � cn Q WHITE 30 4 14— o 0 o Z DIAGONAL LINE aAv 1 1/2'X2" REDUCER HIGH WATER ALARM LEVEL=2A0 h DUPLEX V Q vs n z LAG PUMP ON LEVEL=1.50 MYERS U EX WGL20 GRINDER PUMPS W �- z W EDGE LINE w o rsntl aevc LEAD PUMP "ON" LEVEL=1.00 (2HP, 230V,1 F H), (2 REQUIRED} O u a a q[ 2 MINI -SKIP LINES o 1/2 SCH 40 PVC TEE PUMPS "OFF" LEVEL = 0.50 ^ a Q: O i z w Q: F THRUST BLOCK i 1/4 x i 1/2 ADAPTOR 0- U a w W' Gl o YELLOW OR WHITE YELLOW OR WHITE 1 10 GATE VALVE BASE A VD WALL SECTION TO BE r is GROUT RING YELLOW OR WHITE N 2' v ' :`'.. < : • `. 1 1/2" CHECK VALVE 12" :: MONOL ITHIC POUR. NO JOINTS WILL SEAL CROSSWALK LINE : • ' : _ BOTTOM ELEV=-0.50 ° :.: BE ACCEPTED AT BASE ;. �, 4< CONTROL MOUNTING ® ® Y BRACKET, SST. 11' 2 'fi' C,� ' �- '._._,�.�.—.._.' M1N.12"NC.aZSTONE ,_ '�_ 13'- 1 1/2" BALL VALVE, PVC - c�` Q . ` c TURN LANE LINE o Q QQ o (Q o0 {� o0 0 WHITE TRUE UNION, BLOCKED TYPE O` LJC1 00 �OC� V V S OU 15 GROUTED FILLET RING BY CONTRACTOR CONTRACTOR SHALL WELLPOINT SITE IF NECESSARY S WHITE STOP OR TRANSVERSE BAR TO INSURE PLACEMENT OF TANK AND STONE - •le PLAN VIEW • THE FlRST IN DRY EXCAVATION r �- t � � ,�. ,� •�{ O MOTE. WHERE TWO WIDTHS ARE INDICATED, W D11i APPLIES FOR A 'NORMAL' WDTH LINE THE SECOND NOTE: All bobs, washers, and miscellaneous hardware shall be �� �;. Ins g � `, °,, '%. • ... CENTER LINE W107H APPLIES FOR A 'WIDE:' UNE 'WIDE:' LINES ARE stainless steel. : �- :i REQUIRED WHEN DESIGNATED IN THE PLANS, OR WHEN I � I� � 1-"-i G � h DIRECTED BY THE ENGINEER. SECTION VIEW BY:: H WHITE YELLOW 1.4 PAVEMENT MARKINGS LINE TYPES 6' CONCRETE LIFT STATION DETAIL C-44 NOT TO SCALE NOT TO SCALE P� I EMERGENCY SPILLWAY TOP OF RISER = 23.00 (6'X6' GRATE OPENING) SECONDARYSPILLWAY TOP OF RISER = 22.80 SEED/ SOD ALL SLOPES ABOVE PERMANENT POOL EL. (6'X6` GRATE OPENING) GALVANIZED BAR GRATING 1" x 1/8" BEARING BARS. FASTEN WITH J-CLIPS, ATTACK TO A 1 1/4" x 1 1!4" x 1/4" 10:1 SHELF 6" ABOVE & 6" BELOW PERMANENT POOL PLANTED WITH SUITABLE WETLAND PRIMARY SPILLWAY [RECT. WEIR] GALVANIZED ANGLE FRAME. MORTOR FRAME TO TOP OF _ 3 SPECIES OR VEGETATION. (COVER WITH HARDWARE CLOTH) OUTLET STRUCTURE LENGTH = 4' X 3 SIDES (12' TOTAL) EL. 21.50 -- -V PERMANENT POOL EL 20.00 3-1/2" SCH. 40 PVC 6" DRAWDOWN ORIFICE ��� I j j-� 3,.� 1 (ROUTE TO INFILT. BASIN) NORMAL POOL EL. = 20.00 cc-TF POND #1 SECTION NOT TO SCALE I OUTLET PIPE SUITABLE PLANTS # (� (1) 48" CULVERT' 48" RCP (CL.III) PICKERELWEED (PONTEDERIA CORDATA) I INV. UP = 16.0 DUCK POTATO (SAGGITARIA LATIFOLIA AND SAGGITARIA CARDINAUS) SWAMP ROSE (HIBISCUS MOSHEUTOS) INV. DOWN =15.0 BLUE FLAG (IRIS VIRGINICA) / SLOPE = 0.3% CARDINAL FLOWER (LOBELIA CARDINALIS) REINFORCED CONCRETE BOX J (CONTRACTOR SHALL SIZE FOR WET DETENTION POND PLANTING t..R-6" 6 x6TOP GRATE OPENING) CONTRACTOR TO INSTALL ON THE 10:1 SLOPED SHELF, EQUAL NUMBERS OF EACH OF THE LISTED SUITABLE PLANTS. DURING � / 6" EXTENDED BASE INSTALLATION, GROUP SIMILAR SPECIES OF (AS READ.) PLANTS TOGETHER. INSTALL PLANTS 24" O.C.IN 3• ` A CHECKERBOARD PATTERN., 10' EL. 20.00 EL. 19.50 (TOP OF RIP -RAP) -mli6 FILTER FABRIC 6" THICK CLASS W RIP -RAP FOREBAY F1130TECTION DETAIL. POND #1 NOT TO SCALE OVERFLOWSTRUCTURE ;STRUCTURE (SEE DETAIL,) TOP OF DAM EL. = 24.00 TOP EL. FOREBAY 20.00 1 YR 24-HOUR RUNOFF STORAGE EL. = 21.37 PERMANENT POOL EL. (NORMAL WATER SURFACE) 20.00 ao CL w MAIN POND a. w 1 .o w FOREBAY Q a *0 10,_ BOTTOM EL. FOREBAY =12.00 POND BOTTOM EL. =12.00 VEG SHELF 10:1 SLOPE 1. • V OF POND DEPTH IS FOR FOREBAY IS DIVIDED FROM THE SEDIMENT STORAGE EL. =13.00 SEDIMENT ACCUMILATION AROUND POt�ICt PONE MAIN POND BY EARTHEN BERM PER DWQ POLICY POND #1 - FOREBAY AND STORAGE POND SECTION NOT TO SCALE SECONDARY SPILLWAY TOP OF RISER = 22.30 SEED/ SOD ALL SLOPES ABOVE PERMANENT POOL EL. 10' (4'X4' GRATE OPENING) GALVANIZED BAR GRATING 1" x 1 /8" BEARING BARS. 10:1 SHELF W ABOVE & 6" BELOW PERMANENT EL.19.00 PRIMARY SPILLWAY [RECT. WEIR] POOL PLANTED WITH SUITABLE WETLAND (COVER WITH HARDWARE CLOTH} FASTEN WITH J-CLIPS, ATTACH TO A 1 1/4" x 1 1/4" x 114" _ 3 SPECIES OR VEGETATION. LENGTH = X X 3 SIDES (V TOTAL) GALVANIZED ANGLE FRAME. MORTOR FRAME TO TOP OF 10, EL. 18.50 (TOP OF RIP -RAP) EL. 20.65 OUTLET STRUCTURE _ PERMANENT POOL EL 19.00 3" SCH. 40 PVC F�ti -_ _ _ 6,. }'. DRAWDOWN ORIFICE �� I I i-- 3 FILTER FABRIC -���= (ROUTE TO INFILT. BASIN) / I l� _, )1 6f,:TH€CK CLASS'B' OF NORMAL POOL EL. =19.00 OUTLET PIPE "-- _. = = .._ - - _ _ -- _ 36" RCP (CL.111) '� _-�rT FOREBAY PROTECTION DETAIL: POND #2 POND #2 SECTION is (1) 24" CULVERT INV. UP =17.50 I I i _ NOT To SCALE C INV. DOWN 17.00 NOT TO SCALE SLOPE = 0.83°l0 15� SUITABLE PLANTS PICKERELWEED (PONTEDERIA CORDATA) EL. 23.00 I DUCK POTATO (SAGGITARIA LATIFOLIA AND SAGGITARIA CARDINALIS) SWAMP ROSE (HIBISCUS MOSHEUTOS) REINFORCED CONCRETE BOX BLUE FLAG (IRIS VIRGINICA) I I CARDINAL FLOWER (LOBELIA CARDINALIS) x EL. 22.50 (TOP OF RIP -RAP) / (CONTRACTOR SHALL SIZE FOR 6" I 4'x4' TOP GRATE OPENING) WET DETENTION POND PLANTING - - - - -� CONTRACTOR TO INSTALL ON THE 10:1 SLOPED FILTER FABRIC 6",THICK CLASS'B` RIP -RAF .SHELF, EQUAL NUMBERS OF EACH 6" EXTENDED BASE OF THE LISTED SUITABLE PLANTS. DURING �5� (AS REQ'D.} INSTALLATION, GROUP SIMILAR SPECIES OF 5k0 PLANTS TOGETHER. INSTALL PLANTS 24" O.C. IN A CHECKERBOARD PATTERN. EMERGENCY SPILLWAY D ETA I L . POND '1 2 POND #2 OUTLET STRUCTURE SECTION NOT ToSCALE NOT TO SCALE OVERFLOW STRUCTURE (SEE DETA L) TOP OF DAM EL. = 23.00 TOP EL. FOREBAY 19.00 1 YR 24-HOUR RUNOFF STORAGE EL. = 20.63 PERMANENT POOL EL. (NORMAL WATER SURFACE)19.00 w FOREBAY MAIN POND o 1am 10� VEG SHELF BOTTOM EL. FORESAY =12.00 POND BOTTOM EL. =12.00 ` 1' OF POND DEPTH IS FOR 10:1 SLOPE -n P FOREBAY IS DIVIDED FROM THE SEDIMENT STORAGE EL. =13.00 SEDIMENT ACCUMILATION AROUND POMD MAIN POND BY EARTHEN BERM PER DWQ POLICY POND #2 - FOREBAY AND STORAGE POND SECTION NOT TO SCALE h 'd LE BY: µ.s O cn w rY Z O a= d O Z F- z W =.a U z U " cry 00 C/-) p t, cN z o r C v 0Q U oz �, V, p po z z c w u z �t H }F--t C� 0 u 0 0 H z z q Z D LL � () O� LQ„ o o 0 Z �Sozo U Dada Z a LL1 �Qw w w "g z z Ic S2 5 z aa,w ORQ.. 0au.� i3 awu.1aom SEAL CA 441 Ar PEI JOB* 13146.PE V < r,Y RIM EL. VARIES (SEE PLAN) + i ,+ :• i 3 WEIR i WEIR EL. 8.50 :: i " : • BOTTOM OF TRENCH EL. 3.50 a I :•: 1.7 CROSS SECTION B CONCRETE BOX: PROPOSED ACCESS MANHOLE SIZE FOR NEEDED FRAME AND LID. (SEE DETAIL) CLEAR SPACE TO CONTRACTOR SHALL USE BRICK ACCOMMODATE BLOCK TO RAISE FRAME AND INFILTRATION PIPE GRATE TO FINISHED GRADES CONNECTION & BYPASS WEIR 3 BYPASS WEIR EL. 8.60 (V LENG TRENCH TOP EL. 8.00 INFILTRATION TRENCH j36" ADS N-12 PERFORATED PIPE] I °' I I BYPASS TIE-IN SLOPE & i..,. RIP -RAP LENGTH VARIES PIPE INV. EL. 4.25 i f' (SEE PLANS) TRENCH BOTTOM EL. 3.50 12" SUMP j E CROSS SECTION A UNDERGROUND INFILTRATION BYPASS SYSTEM DETAIL NOT TO SCALE MIN. 18" OF COVER AT LOWEST POINT .// - TRENCH TOP EL.8.00 / / / MIRAFI 140N OR APPROVED EQUIVALENT, OVERLAP AT THE TOP 12" CLEAN WASHED No.57 STONE (G COMPACTED TO 90%AASHTO T99 TRENCH BOTTOM EL. 3.60 36" ADS N-12 PERFORATED PIPE z INSTALL WITH FILTER FABRIC SHWL (MEAN HIGH WATER) =1,40 C4� TRENCH BOTTOM SHALL BE 78" LINED WITH CLEAN FINE SAND TO SHWL AS SPECIFIED BY THE GEOTECH. ENGINEER NOTE: SEE PLAN FOR LOCATION ANDLENGTHS OF INFILTRATION PIPE. S YTE DETAIL U DE GROUND INFILTRATION (TY GRADUATED BENCHMARK POSi'- DRIVE POST 12" DEEP AND MARK IN TENTHS OF A FOOT STARTING WITH BASIN EL 9.00 DESIGN ELEVATION AT BOTTOM OF BASIN 3 - LINED WITH CLEAN FINE SAND NOT TO SCALE EL. .50 DE SIGN STORAGE 7 BYPASS STRUCTURE (SEE DETAIL) WETLAND NOTE 1. WETLANDS EXIST AS SHOWN ON THE SITE PLAN. WETLANDS WERE DELINEATED BY LAND ALL OUTLET LENGTH MANAGEMENT GROUP AND APPROVED BY THE CORPS OF ENGINEERS ON DECEMBER 2, 2013 PIPES SHALL HAVE FLARED END SECTIONS 2. ALL PROPOSED RESIDENCES SHALL DIVERT ROOF DRAINAGE TO STREET VIA GUTTERS, LEADERS AND UNDERGROUND SCHEDULE 40 PVC CONDUIT, IF NECESSARY. - RIP -RAP STORM DRAIN PIPE APRON PLAN SLOPE - 0°lo TAILWATER FLOW 66 STORM DRAIN PIPE ' - - - _ -_ - - 0_ i LNu FILTER FABRIC N.C.D.O.T. CLASS 8 SECTION RIPRAR MINIMUM 18» THICK, TYPICAL RIP -RAP SCHEDULE UPSTREAM DOWNSTREAM PIPE DIA. (IN.) LENGTH (FT.) WIDTH (FT.) WIDTH (FT.) 1- 48 16 12 15 2 24 26 13 18 RIP —RAP APRON TH) NOT TO SCALE O 0 LL _Z F- Z tJ.t ..3 U Z TY - C.;.It� Cd .� I cN 00 0 r- N -`vk O Q. U z W, Zg0's' '--+ Z� RANITE) P.) C GALVANIZED BAR GRATING 1" x 1/8" BEARING BARS. PRIMARY SPILLWAY FASTEN WITH J-CLIPS, ATTACH TO A 1 1/4"x 1 1/4" x 1/4" TOP OF RISER = 7.60 GALVANIZED ANGLE FRAME. MORTOR FRAME TO TOP OF (3'X3' GRATE OPENING) OUTLET STRUCTURE p DESIGN VOL. EL. = 7.54to �,. / 4 EMERGENCY I t,�c� 0 SPILLWAY �, 00 0 i- (SEE DETAIL) I I 10 - c g s � Z �- ...- I T` ` 3 I I s— i Ci` t `" . a z O Y M-- F- �- Ca d u �utill cl REINFORCED CONCRETE BOX u a N { : �--{ i {•__.j , .__{ i {---{ � {-.—{ CONTRACTOR SHALL SIZE FOR� z ; r ;—° ,- I I 3'x3' T �EL.8.25�(rOP�(OF ERIP-RAP) Lt 0 a. Z I s I { {' {�; � OP GRATE OPENING} C SEAL c TO SHWL AS SPECIFIED BY THE ENGINEER i {' - ._'* - _ FILTER THI S B 6", CK CLAS IF' -RAP Q GEOTECH. mo SHWT tuiFAN HIGH WATER} EL. i.40 _ .--.!,-— — — w — — — — — — — — — - — _ — — — i I (1)18"CULVERT OUTLET PIPE _—----- —_ —_ — _ _ -- DESIGN NOTE: MAINTENANCE NOTE: 6" I lV' RCP (CLJ11) INV. UP =1.40 EMERGENCY SPILLWAY' DETAIL: INFILT. BASIN "Hs, --� THIS DETAIL DEPICTS THE DESIGN TO BE IMPLEMENTED FOR THE BASIN. PLEASE REFER TO PLAN SHEETS C-3 SPECIFIC WHEN SEDIMENT ACCUMULATES TO A DEPTH (ASSHOWN BY THE BENCHMARK) THAT REDUCES BASIN VOLUME TO 75% OF ITS DESIGN VOLUME, THE SEDIMENT _ {- — — — -' J " INV. DOWN = 1.00 h"�-'6 NOT TO SCALE � � - O `• F/v i N. INFILTRATION .QFOR BASIN DEPTH, ELEVATIONS, AND OUTLET STRUCTURE SIZE/ LOCATION. MUST BE REMOVED TO RESTORE THE INFILTRATION BASIN TO ITS ORIGINAL 6" EXTENDED BASE SLOPE = 0.30% DESIGN STORAGE DEPTH. E III �a INFILT. BASIN " H" OUTLET STRUCTURE SECTION INFILTRATION BASIN H DETAIL NOT To SCALE BY: NOT TO SCALE PEI JOB#: 131,