Loading...
HomeMy WebLinkAboutNCG130071_Inspection_20200211 (2)ROY COOPER Governor MICHAEL S. REGAN Secretary WILLIAM E. (TOBY) VINSON, JR. interim Director Nelco Recycling & Aggregate Co Attention: Garen Nelson 165 McLeod Dr Mooresville NC 28115 NORTH CAROLINA Environmental Quality February 11, 2020 Subject: Compliance Evaluation Inspection Nelco Recycling & Aggregate Co NPDES Stormwater Certificate of Coverage- NCG130071 Iredell County, North Carolina Dear Mr. Nelson: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Nelco Recycling & Aggregate Co on February 6, 2020. Please note that in the stormwater inspection report summary we ask that you develop and implement a Stormwater Pollution Prevention Plan and conduct qualitative monitoring. The report should be self-explanatory, however, should you have any questions, please do not hesitate to contact me at (704) 663-1699 or by E-mail at james.moore@ncdenr.gov. Enclosure: NCG13 permit c: Stormwater Permitting Branch e Sincerely, aresMoore Assistant Regional Engineer North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources Mooresville Regional Office 1 610 East Center Avenue. Suite 301 1 Mooresville, North Carolina 28115 704.663.16n9 Permit: NCG130071 SOC: County: Iredell Region: Mooresville Contact Person: Don Mason Effective: 06/01/18 Expiration: 05/31/23 Owner: Nelco Recycling & Aggregate Co Effective: Expiration: Facility: Nelco Recycling & Aggregate Co. 165 McLeod Dr Title: Mooresville NC 28115 Phone: Directions to Facility: From the Intersection of NC 150 and Hwy 21 in Mooresville, travel approximately 500 feet to McLeod/Iredell County solid waste facility. The site is located at the end of the road. System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 02/06/2020 Entry Time: 03:OOPM Exit Time: 03:35PM Primary Inspector: Lily C Kay Phone: 704-663-1699 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Wholesale Trade of Non-metal Waste and Scrap Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: 11 Storm Water (See attachment summary) Page 1 of 3 Permit: NCG130071 Owner - Facility: Nelco Recycling & Aggregate Co Inspection Date: 02/06/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: A SWPPP has not been developed or implemetned and qualitative monitoring has not been conducted. A copy of the permit is included with this inspection with the details of the SWPPP. Qualitative monitoring guidance can be found at https://files.nc.gov/ncdeq/Water%20Quality/Surface%2OWater%2OProtection/SPU/SPU%20- %20NPDES%20Permit%20Monitoring%20Forms%20and%20Data/Qual-Monitoring-Guide-20080618-DWQ-SPU.pdf If you have any questions, please contact me at Lily.Kay@ncdenr.gov or by phone at (704) 235-2137. Page 2 of 3 Permit: NCG130071 Owner - Facility: Nelco Recycling & Aggregate Cc Inspection Date: 02/06/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? El N El D # Does the Plan include a General Location (USGS) map? El N D El # Does the Plan include a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? El 0 D El # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? El El # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? R 11 El El # Does the facility provide and document Employee Training? El 10 El D # Does the Plan include a list of Responsible Party(s)? n In El 0 # Is the Plan reviewed and updated annually? El 11 El 0 # Does the Plan include a Stormwater Facility Inspection Program? El 10 0 El Has the Stormwater Pollution Prevention Plan been implemented? Comment: A Stormwater Pollution Prevetion Plan was not available at the time of inspection. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? Comment: No qualitative monitoring reports were available at the time of inspection. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? # If the facility has representative outfall status, is it properly documented by the Division? EJ IN 0 El # Has the facility evaluated all illicit (non stormwater) discharges? Comment: All storm drains at the facility connect to a small pond or sump that collects sediemnt and is cleaned a few times a year. Page 3 of 3