Loading...
HomeMy WebLinkAbout820557_SSE Calculations_20201013Sludge Survey Evaluation Form Today's Date 10/13/2020 Facility # 820557 Owner: BDC Farmin Lagoon ID 1 Sludge Survey Received: 9/23/2020 Sludge Survey Performed: 11/14/2019 Sludge Depth (Row O): (ft) 2.4 Existing Treatment Depth (Row P): (ft) 5.90 Start Date: 01/01/81 Facility age at time of survey: (yr) 39 Average Sludge Accumulation (ft/yr): 0.06 Requested Extension: (yr) 5 Requested Due Date 12/31/2025 Sludge Accumulation during extension period: (ft) 0.31 Treatment Depth Available after Extension: (ft) 5.59 Sludge level OK? YES Ratio Estimates Based on Depth EXISTING EXEMPTION 0.29 0.33 Ratio of Sludge layer to total trmt depth Ratio of Sludge depth OK? YES EXISTING EXEMPTION Average Sludge layer thickness (T) 2.4 2.71 Depth of the lagoon from top of bank to bottom soil surface (D) 0 Slope=Horizontal/vertical side slope (S) 0 Length at the top of inside bank (L) 0 Width at the top inside slope (W) 0 Thickness of existing liquid treatment zone (Y) 5.90 5.59 Length at midpoint of sludge layer (Lm)=L-2S(D-(T/2)) 0.00 0.00 Width at midpoint of sludge layer (Wm)=W-2S(D-(T/2)) 0.00 0.00 Volume of sludge (Vs)=Lm*Wm*T 0.00 0.00 Volume in gallons (Vsg)=Vs*7.481 0.00 0.00 Thickness of total treatment zone (Z)=T+Y 8.30 8.30 Length at midpoint of total treatment zone (Lz)=L-2(S)(D-(Z/2)) 0.00 0.00 Width at midpoint of total treatment zone (Wz)=W-2(S)(D-(Z/2)) 0.00 0.00 Volume of total treatment zone (Vz)=Lz*Wz*Z 0.00 0.00 Ratio(R) of sludge layer volume to total trmt volume #DIV/0! #DIV/0! Sludge Volume Ratio OK? #DIV/0! Maximum extension until end of permit cycle Next survey to be done: (calendar yr) 2019 Notification letter mailed: 10/13/2020