HomeMy WebLinkAbout20021410 Ver 3_Approval Letter_20100302MA
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins Dee Freeman
Governor Director Secretary
March 2, 2010
City of Charlotte
Attn: Mr. Derrel Poole
600 E. 4rn Street
Charlotte, NC 28202
Subject Property: Berewick / Dixie River Rd. Realignment
Stowe Branch [030834, 11-127, C]
Beaverdam Creek [030834, 11-126, C]
Approval of 401 Water Quality Certification with Additional Conditions
Dear Mr. Poole,
Mecklenburg County
DWQ EXP#: 02-1410 v3
You have our approval, in accordance with the attached conditions and those listed below, to place fill
within or otherwise impact 256 linear feet of perennial stream (including 236 linear feet of permanent
impact and 20 linear feet of temporary impact) for the purpose of constructing the proposed road
realignment, as described within your Pre-construction Notification Application dated February 23, 2010
and received by DWQ on February 25, 2010. The impacts are covered by: General Water Quality
Certification Number 3704 (GC3704) which allows you to use Nationwide Permit NW 14, when issued by
the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any
other required federal, state or local permits before you go ahead with your project including (but not
limited to) Erosion and Sediment Control, and Non-discharge regulations. Also, this approval to
proceed with your proposed impacts or to conduct impacts to waters as depicted in your
application shall expire upon expiration of the 404 Permit.
This approval is for the purpose and design that you described in your PCN application (dated February
23, 2010) with additional information received by DWQ on February 11, 2010, February 25, 2010, and
March 1, 2010. If you change your project, you must notify us and you may be required to send us a new
application. If the property (or a lot on the property) is sold, the new owner must be given a copy of this
Certification and approval letter and is thereby responsible for complying with all conditions. If total fills
for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream,
compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h). This approval
requires you to follow the conditions listed in the attached Water Quality Certifications (GC3704)
and any additional conditions listed below.
The Additional Conditions of the Certification are:
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general
conditions of this Certification are met. No other impacts are approved including incidental
impacts:
401 Oversight/Express Review Permitting Unit One
1650 Mail Service Center, Raleigh, North Carolina 27699-1650 NorthCarolina
Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604 Natunally
Phone: 919-733-17861 FAX: 919.733-6893
Internet: http://h2o.enr.state.nc.uslncwetlands/
An Equal Opportunity 1 Affirmative Action Employer
City of Charlotte
Page 2 of 5
March 2, 2010
Impact Type Amount Approved (Units) Plan Location or Reference
Stream (perennial) 236 (linear feet - permanent February 23, 2010 Stream Impacts Table
Stream (perennial) 20 linear feet) - temporary February 23, 2010 Stream Impacts Table
No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond
the footprint of the impacts depicted in the Pre-Construction Notification and authorized by this
approval letter. All construction activities, including the design, installation, operation, and
maintenance of sediment and erosion control Best Management Practices, shall be performed so
that no violations of state water quality standards, statutes, or rules occur.
No Sediment and Erosion Control Measures in Wetlands and Waters
Sediment and erosion control measures shall not be placed in wetlands or waters without prior
approval from the Division. If placement of sediment and erosion control devices in wetlands
and waters is unavoidable, design and placement of temporary erosion control measures shall not
be conducted in a manner that may result in dis-equilibrium of wetlands or stream beds or banks,
adjacent to or upstream and down stream of the above structures. All sediment and erosion
control devices shall be removed and the natural grade restored within two (2) months of the date
that the Division of Land Resources or locally delegated program has released the project.
4. Stream Mitigation
The DWQ stream mitigation required for this project (236 linear feet at a 1:1 ratio) has already
been paid to NCEEP (formerly NCWRP) on November 9, 2002.
5. Erosion and sediment control practices must be in full compliance with all specifications governing
the proper design, installation and operation and maintenance of such Best Management Practices
in order to protect surface waters standards:
a. Erosion and sediment control measures for the project must be designed, installed, operated,
and maintained in accordance with the most recent version of the North Carolina Sediment
and Erosion Control Planning and Design Manual.
b. Design, installation, operation, and maintenance of the sediment and erosion control
measures must be such that they equal, or exceed, the requirements specified in the most
recent version of the North Carolina Sediment and Erosion Control Manual. The devices
shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects,
including contractor-owned or leased borrow pits associated with the project.
c. Sufficient materials required for stabilization and/or repair of erosion control measures and
stormwater routing and treatment shall be on site at all times.
6. Construction Stormwater Permit NCGO10000
Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land
Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an
NPDES General stormwater permit (NCGO10000) administered by DWQ is automatically issued
to the project. This General Permit allows stormwater to be discharged during land disturbing
construction activities as stipulated by conditions in the permit. If your project is covered by this
permit [applicable to construction projects that disturb one (1) or more acres], full compliance
with permit conditions including the sedimentation control plan, self-monitoring, record keeping
and reporting requirements are required. A copy of this permit and monitoring report forms may
be found at http •//h2o enr state. nc. us/su/Forms Documents. htm.
7. If concrete is used during the construction, then a dry work area should be maintained to prevent
direct contact prevent direct contact between curing concrete and stream water. Water that
City of Charlotte
Page 3 of 5
March 2, 2010
inadvertently contacts uncured concrete should not be discharged to surface waters due to the
potential for elevated pH and possible aquatic life/fish kills.
Stormwater Management Plan
The final, written stormwater management plans submitted with your PCN form and received by
the NC Division of Water Quality on February 17, 2010, with revisions received on February 25,
2010, and March 1, 2010, and supplemental information received earlier on February 11, 2010
must be implemented. The approved stormwater best management practice (BMP) devices
consist of two wet ponds and associated appurtenances. The structural stormwater practices as
approved by this Office as well as the drainage patterns must be maintained in perpetuity. No
changes to the structural stormwater practices shall be made without written authorization from
the Division of Water Quality.
Stormwater easements shall be recorded for a distance of at least 10 feet on each side of all
stormwater conveyances, and on all lots containing these structures including future access for
maintenance. The stormwater easements shall allow for the ability to maintain the structures,
perform corrective actions as described above and shall provide protection of the structures from
potential alternations by future property owners.
The Operation & Maintenance (O&M) agreements for the proposed wet ponds, signed by the Mr.
Derrel L. Poole (City of Charlotte Engineering and Property Management Project Manager) on
February 16, 2010, must transfer with the sale of the land or transfer of responsibility for the
stormwater facilities. DWQ must be notified promptly of every transfer.
9. Culvert Installation
All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP
measures from the most current version of NCDOT Construction and Maintenance Activities manual
(http://www.ncdot.org/doh/operations/BMP manuaUdownloadBMP Manual.pdf)
such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent
excavation in flowing water.
Culverts required for this project shall be installed in such a manner that the original stream
profiles are not altered. Existing stream dimensions (including the cross section dimensions,
pattern, and longitudinal profile) must be maintained above and below locations of each culvert.
Culverts shall be designed and installed to allow for aquatic life movement as well as to prevent
head cutting of the streams. If any of the existing pipes are or become perched, the appropriate
stream grade shall be re-established or, if the pipes installed in a perched manner, the pipes shall
be removed and re-installed correctly.
Culvert(s) shall not be installed in such a manner that will cause aggradation or erosion of the
stream up or down stream of the culvert(s). Existing stream dimensions (including the cross section
dimensions, pattern and longitudinal profile) shall be maintained above and below locations of each
culvert.
Placement of culverts and other structures in waters, streams, and wetlands must be placed below
the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches,
and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow
low flow passage of water and aquatic life. Design and placement of culverts and other structures
including temporary erosion control measures shall not be conducted in a manner that may result
in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and downstream
of the above structures. The applicant is required to provide evidence that the equilibrium shall be
maintained if requested in writing by DWQ.
City of Charlotte
Page 4 of 5
March 2, 2010
The establishment of native, woody vegetation and other soft stream bank stabilization techniques
must be used where practicable instead of rip rap or other bank hardening methods. If rip-rap is
necessary, it shall not be placed in the stream bed, unless specifically approved by the Division of
Water Quality.
Installation of culverts in wetlands must ensure continuity of water movement and be designed to
adequately accommodate high water or flood conditions. Widening the stream channel should be
avoided. Stream channel widening at the inlet or outlet end of structures typically decreases water
velocity causing sediment deposition that requires increased maintenance and disrupts aquatic life
passage.
10. Protective Fencing
The outside buffer, wetland or water boundary and along the construction corridor within these
boundaries approved under this authorization shall be clearly marked with orange warning fencing
(or similar high visibility material) for the areas that have been approved to infringe within the
buffer, wetland or water prior to any land disturbing activities to ensure compliance with GC 3704.
11. Notification of Construction
The applicant and/or authorized agent shall contact the DWQ Express Review Program in writing
at the letterhead address within ten (10) days of the commencement of construction.
12. Certificate of Completion
Within thirty (30) days of the completion of all work approved within the 401 Water Quality
Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is
required to return the attached certificate of completion to the 401 Oversight/Express Review
Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh,
NC, 27699-1650. Please send photographs upstream and downstream of each culvert site to
document correct installation along with the Certificate of Completion form.
The applicant/permittee and their authorized agents shall conduct all activities in a manner consistent with
State water quality standards (including any requirements resulting from compliance with §303(d) of the
Clean Water Act), and any other appropriate requirements of State and Federal Law. If the Division
determines that such standards or laws are not being met, including failure to sustain a designated or
achieved use, or that State or Federal law is being violated, or that further conditions are necessary to
assure compliance, then the Division may reevaluate and modify this General Water Quality Certification.
Violations of any condition herein set forth may result in revocation of this Certification and may result in
criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct
impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon
expiration of the 404 or CAMA Permit.
If you wish to contest any statement in the attached 401 Water Quality Certification you must file a
petition for an administrative hearing. You may obtain the petition form from the Office of
Administrative Hearings (OAH). You must file the petition with the office of Administrative Hearings
within thirty (30) days of receipt of this notice. A petition is considered filed when it is received in the
office of Administrative Hearings during normal office hours. The OAH accepts filings Monday through
Friday between the hours of 8:00am and 5:00pm, except for official state holidays. The original and one
(1) copy of the petition must be filed with the Office of Administrative Hearings.
The petition may be faxed-provided the original and one copy of the document is received by the Office
of Administrative Hearings within five (5) business days following the faxed transmission.
The mailing address for the Office of Administrative Hearings is:
City of Charlotte
Page 5 of 5
March 2, 2010
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699-6714
Telephone: (919)-733-2698, Facsimile: (919)-733-3478
A copy of the petition must also be served on DENR as follows:
Ms. Mary Penny Thompson, General Counsel
Department of Environment and Natural Resources
1601 Mail Service Center
Raleigh, NC 27699-1601
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water
Act. If you have any questions, please telephone Lia Myott Gilleski or Joseph Gyamfi at 919-733-1786.
CHS/Um/lmg
Enclosures: Certificate of Completion
GC 3 704
cc: Steve Chapin, USACE Asheville Regulatory Field Office
Alan Johnson, DWQ Mooresville Regional Office
File Copy
DLQ Mooresville Regional Office
File: 021410v3BerewickDixieRiverRdRealignmentProject(Mecklenburg)401(NW ] 4).doc