Loading...
HomeMy WebLinkAbout20021410 Ver 3_Approval Letter_20100302MA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary March 2, 2010 City of Charlotte Attn: Mr. Derrel Poole 600 E. 4rn Street Charlotte, NC 28202 Subject Property: Berewick / Dixie River Rd. Realignment Stowe Branch [030834, 11-127, C] Beaverdam Creek [030834, 11-126, C] Approval of 401 Water Quality Certification with Additional Conditions Dear Mr. Poole, Mecklenburg County DWQ EXP#: 02-1410 v3 You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 256 linear feet of perennial stream (including 236 linear feet of permanent impact and 20 linear feet of temporary impact) for the purpose of constructing the proposed road realignment, as described within your Pre-construction Notification Application dated February 23, 2010 and received by DWQ on February 25, 2010. The impacts are covered by: General Water Quality Certification Number 3704 (GC3704) which allows you to use Nationwide Permit NW 14, when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, and Non-discharge regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 Permit. This approval is for the purpose and design that you described in your PCN application (dated February 23, 2010) with additional information received by DWQ on February 11, 2010, February 25, 2010, and March 1, 2010. If you change your project, you must notify us and you may be required to send us a new application. If the property (or a lot on the property) is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h). This approval requires you to follow the conditions listed in the attached Water Quality Certifications (GC3704) and any additional conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification are met. No other impacts are approved including incidental impacts: 401 Oversight/Express Review Permitting Unit One 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 NorthCarolina Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604 Natunally Phone: 919-733-17861 FAX: 919.733-6893 Internet: http://h2o.enr.state.nc.uslncwetlands/ An Equal Opportunity 1 Affirmative Action Employer City of Charlotte Page 2 of 5 March 2, 2010 Impact Type Amount Approved (Units) Plan Location or Reference Stream (perennial) 236 (linear feet - permanent February 23, 2010 Stream Impacts Table Stream (perennial) 20 linear feet) - temporary February 23, 2010 Stream Impacts Table No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification and authorized by this approval letter. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. No Sediment and Erosion Control Measures in Wetlands and Waters Sediment and erosion control measures shall not be placed in wetlands or waters without prior approval from the Division. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or stream beds or banks, adjacent to or upstream and down stream of the above structures. All sediment and erosion control devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Land Resources or locally delegated program has released the project. 4. Stream Mitigation The DWQ stream mitigation required for this project (236 linear feet at a 1:1 ratio) has already been paid to NCEEP (formerly NCWRP) on November 9, 2002. 5. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. Erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. Design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 6. Construction Stormwater Permit NCGO10000 Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an NPDES General stormwater permit (NCGO10000) administered by DWQ is automatically issued to the project. This General Permit allows stormwater to be discharged during land disturbing construction activities as stipulated by conditions in the permit. If your project is covered by this permit [applicable to construction projects that disturb one (1) or more acres], full compliance with permit conditions including the sedimentation control plan, self-monitoring, record keeping and reporting requirements are required. A copy of this permit and monitoring report forms may be found at http •//h2o enr state. nc. us/su/Forms Documents. htm. 7. If concrete is used during the construction, then a dry work area should be maintained to prevent direct contact prevent direct contact between curing concrete and stream water. Water that City of Charlotte Page 3 of 5 March 2, 2010 inadvertently contacts uncured concrete should not be discharged to surface waters due to the potential for elevated pH and possible aquatic life/fish kills. Stormwater Management Plan The final, written stormwater management plans submitted with your PCN form and received by the NC Division of Water Quality on February 17, 2010, with revisions received on February 25, 2010, and March 1, 2010, and supplemental information received earlier on February 11, 2010 must be implemented. The approved stormwater best management practice (BMP) devices consist of two wet ponds and associated appurtenances. The structural stormwater practices as approved by this Office as well as the drainage patterns must be maintained in perpetuity. No changes to the structural stormwater practices shall be made without written authorization from the Division of Water Quality. Stormwater easements shall be recorded for a distance of at least 10 feet on each side of all stormwater conveyances, and on all lots containing these structures including future access for maintenance. The stormwater easements shall allow for the ability to maintain the structures, perform corrective actions as described above and shall provide protection of the structures from potential alternations by future property owners. The Operation & Maintenance (O&M) agreements for the proposed wet ponds, signed by the Mr. Derrel L. Poole (City of Charlotte Engineering and Property Management Project Manager) on February 16, 2010, must transfer with the sale of the land or transfer of responsibility for the stormwater facilities. DWQ must be notified promptly of every transfer. 9. Culvert Installation All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual (http://www.ncdot.org/doh/operations/BMP manuaUdownloadBMP Manual.pdf) such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. Culverts required for this project shall be installed in such a manner that the original stream profiles are not altered. Existing stream dimensions (including the cross section dimensions, pattern, and longitudinal profile) must be maintained above and below locations of each culvert. Culverts shall be designed and installed to allow for aquatic life movement as well as to prevent head cutting of the streams. If any of the existing pipes are or become perched, the appropriate stream grade shall be re-established or, if the pipes installed in a perched manner, the pipes shall be removed and re-installed correctly. Culvert(s) shall not be installed in such a manner that will cause aggradation or erosion of the stream up or down stream of the culvert(s). Existing stream dimensions (including the cross section dimensions, pattern and longitudinal profile) shall be maintained above and below locations of each culvert. Placement of culverts and other structures in waters, streams, and wetlands must be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and downstream of the above structures. The applicant is required to provide evidence that the equilibrium shall be maintained if requested in writing by DWQ. City of Charlotte Page 4 of 5 March 2, 2010 The establishment of native, woody vegetation and other soft stream bank stabilization techniques must be used where practicable instead of rip rap or other bank hardening methods. If rip-rap is necessary, it shall not be placed in the stream bed, unless specifically approved by the Division of Water Quality. Installation of culverts in wetlands must ensure continuity of water movement and be designed to adequately accommodate high water or flood conditions. Widening the stream channel should be avoided. Stream channel widening at the inlet or outlet end of structures typically decreases water velocity causing sediment deposition that requires increased maintenance and disrupts aquatic life passage. 10. Protective Fencing The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities to ensure compliance with GC 3704. 11. Notification of Construction The applicant and/or authorized agent shall contact the DWQ Express Review Program in writing at the letterhead address within ten (10) days of the commencement of construction. 12. Certificate of Completion Within thirty (30) days of the completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Please send photographs upstream and downstream of each culvert site to document correct installation along with the Certificate of Completion form. The applicant/permittee and their authorized agents shall conduct all activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act), and any other appropriate requirements of State and Federal Law. If the Division determines that such standards or laws are not being met, including failure to sustain a designated or achieved use, or that State or Federal law is being violated, or that further conditions are necessary to assure compliance, then the Division may reevaluate and modify this General Water Quality Certification. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you wish to contest any statement in the attached 401 Water Quality Certification you must file a petition for an administrative hearing. You may obtain the petition form from the Office of Administrative Hearings (OAH). You must file the petition with the office of Administrative Hearings within thirty (30) days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours. The OAH accepts filings Monday through Friday between the hours of 8:00am and 5:00pm, except for official state holidays. The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings. The petition may be faxed-provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: City of Charlotte Page 5 of 5 March 2, 2010 Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Telephone: (919)-733-2698, Facsimile: (919)-733-3478 A copy of the petition must also be served on DENR as follows: Ms. Mary Penny Thompson, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Lia Myott Gilleski or Joseph Gyamfi at 919-733-1786. CHS/Um/lmg Enclosures: Certificate of Completion GC 3 704 cc: Steve Chapin, USACE Asheville Regulatory Field Office Alan Johnson, DWQ Mooresville Regional Office File Copy DLQ Mooresville Regional Office File: 021410v3BerewickDixieRiverRdRealignmentProject(Mecklenburg)401(NW ] 4).doc