HomeMy WebLinkAboutNCC204553_ESC Approval Submitted_20201013Engineering Services Department
Terry Kuneff, r E.
INTERIM DIRECTOR
September 14, 2020
Owner/Financially Responsible Pa
Maryfield, Incorporated
109 Penny Road
High Point, NC 27260
%I111111111111110�
Now
NCB RTH CARc� LINA'S INTERNATIONAL CITYT
RE: APPROVAL of EROSION and SEDIMENTATION CONTROL PLAN
Project: Pennybyrn at Maryfield
Location: at/near 109 Penny Road, High Point, NC 27260
Land -Disturbing Permit # EN 20 0133 2309
Dear Sir or Madame:
The Engineering Services Department has completed the review process for the Soil Erosion
Sedimentation Control Plan (GP 20 0002) submitted on 9/02/2020 for the broiect referenced
above. Based on our review, the plan is hereby approved.
This plan approval will specifically cover the Erosion and Sediment Control measures
required for both the Grading Phase and the Building Phase. If a different identity (from
the Grading Phase) executes the Building Phase, this approved Erosion and Sediment
Control Plan (E&SCP) may be transferred to the firm/person executing the Building Phase.
Prior to transferring the plan, written authorization and a Financial Responsibility Form must
be submitted to our office for review. The terms and conditions of the approved plan shall
remain in place unless otherwise noted.
The Erosion Control Measures shown on the plans) are a
may be required to make the measures work correctly.
approximate. Some field adjustment
An Erosion Control Financial Guarantee (Surety) will not be required.
This letter will serve notice that:
• As per NCGS 15A NCAC 04B .0120 (b) and (c), INSPECTIONS AND
INVESTIGATIONS, this letter shall serve as notice that inspection of sites shall be
carried out by the staff of Department of Environmental Quality or other qualified
persons authorized by the Commission or Department of Environmental as necessary
to carry out its duties under the Act and no person shall refuse entry or access to any
representative of the Commis
requests entry for purposes
• As per High Point Development Ordinance 2.5.10.G.1 and 2, the Land -Disturbing
Permit will
sion or any representative of a local government who
of inspection.
become null and void one (1) vear from the date of issuance. You may
request In writing, 180-day perm
good cause.
it extension 30 days prior to the expiration date, for
• The approval of the draft Erosion and Sediment Control Plan and the Land Distu
Permit issued by the City of High Point is conditional based on the applicant's
compliance with Federal and State water quality laws, regulations, and rules.
rbing
• The approval of the draft Erosion and Sediment Control Plan is based in part on the
accuracy of the information provided on the submitted Financial Responsibility Form.
If any changes to the submitted Financial Responsibility Form (e.g. ownership,
address, company name) occur, then you are required to submit an amended form
showing such changes.
The approval of the draft Erosion and Sediment Control Plan does not supersede any
other permit or approval.
• Approval of the draft Erosion and Sediment Control Plan authorizes the permittee to
discharge stormwater in accordance with the standard and regulations of current
General Permit NCGO10 and the National Pollutant Elimination System (NPDES).
• This Letter of Approval must be posted at the site of the land disturbing activity along
with the Land -Disturbing Permit, the approved Erosion and Sediment Control Plan, a
copy of the NPDES/NCGO 10 Permit, and a copy of the Certificate of Coverage
(COC)o
Records of the Erosion and Sediment Control's Inspections must be kept on site for
twelve (12) months.
All data used to complete the e-NOI and all Inspection Records must be maintained
for a period of three (3) years and available upon request (40 CFR 122.41).
Construction site pollutants must be maintained on -site and not allowed to reach the
state's waters. Any spent fluids from construction traffic must be cleaned up and
disposed of properly. Any herbicide, pesticide and fertilizer must be used in
accordance to the label restrictions. All wastes composed of building materials shall
be disposed of in accordance with North Carolina General Statues, Chapter 13 0A,
Article 9 — Solid Waste Management, and rules governing the disposal of solid waste
(NC. Administrative Code Section 15A NCAC 1313). No dumping of paint and other
liquid building material waste in storm drains. Concrete materials onsite, including
excess concrete, must be controlled and managed to avoid contact with surface
waters, wetlands or buffers. No concrete slurry shall be discharged from the site.
Only minor deviation from the approved plan can be approved by the Erosion Control
Inspector. Deviations are limited to the following deficiencies:
o Addition of E&SC measures (e.g., silt fence, inlet protection, check dam,
rolled erosion control practices, etc.).
o Relocation of E&SC Measures that improve the overall stormwater and
sediment control.
• Erosion Control Measures must be maintained until site is stabilized with sufficient
ground cover. The Sedimentation Pollution Control Act of 1973 (NCGS 113A-51
through 66) is performance -oriented, requiring protection of existing natural resources
and adjoining properties. If following the commencement of this project, the
approved E&SCP is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973, revisions to the plan may be required by the Erosion
Control Inspector.
• A condition of this approval is that the streets in this phase must be kept free of
sediment.
Erosion Control Measures to prevent construction traffic from tracking sediment onto
the streets must be maintained. Any debris or sediment shall be cleaned from the
street surface immediately.
• All applicable fees must be paid prior to the issuance of the Land -Disturbing Permit.
When you are ready for the Land -Disturbing Permit to be issued, please notify my office to
arrange for a pre- construction meeting.
Site Data:
Project Name: Pennybyrn at Maryfield
Land -Disturbing Permit (Ul P Project Tracking ID): # EN 20 0133 2309
Limits of Disturbance (in acres) approved: 5.64 acre per FR/OF
Address: at/near 109 Penny Road
City: High Point
State: NC
Zip Code: 27260
County: Guilford
Latitude (in decimal degrees): 35.992 degrees
Longitude (in decimal degrees):-79.961 degrees
River Basin: Cape Fear
Receiving Water -Body: West Fork Deep River
Stream Index: 17-3-(3)
Draft E&SCP submitted by: Green Mountain g, EngineerinPLLC
Dates) draft E&SCP Received: September 2, 2020
Plan Type: E&SCP
Is this site part of a project covered under a common plan of development: No (new plan)
Additional Information:
You will be required to complete and submit an electronic Notice of Intent (NOI) form
requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater
General Permit from the Department of Environmental Quality (DEQ).
If I can assist you in any way, please feel free to contact my office at 336-883-3353.
Sincerely,
Scott E. Ford
Engineering Servic
(336) 883-3194
cc: File
es
Department
Mr. Joseph O'Buch., c/o Green Mountain
Greensboro, NC 27409 (via email)
Engineering, PLLC, 7A Wendy Court,