HomeMy WebLinkAbout20201434 Ver 1_Meeting Request Review_20201008ID#* 20201434 Version* 1
Regional Office* Raleigh Regional Office - (919) 791-4200
Reviewer List* Stephanie Goss
Pre -Filing Meeting Request submitted 10/8/2020
Contact Name * Linda Diebolt
Contact Email Address* Idiebolt@hazenandsawyer.com
Project Name* 4 MGD WWTF Upgrade, Force Main, and Discharge Project
Project Owner* Johnston County
Project County* Johnston
Owner Address: Street Address
309 E. Market Street
Address Line 2
P.O. Box 2263
City
State / Province / Pegion
Smithfield
NC
Postal / Zip Code
Country
27577
USA
Is this a transportation project? * r Yes r No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F- 401 Water Quality Certification -
Regular Express
r- Individual Permit F- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below. *
The project consists of upgrades to the existing Johnston County
wastewater treatment facility (WWTF), installation of a force main from the
WWTF to a cascade aerator near the Neuse River, and installation of
discharge pipe from the cascade aerator to the Neuse River. Several
streams and wetlands will be traversed by the force main, a wetland will be
traversed by the discharge pipe, and a new outlet will be installed on the
bank of the Neuse River.
Please give a couple of dates you are available for a meeting.
10/15/2020
10/16/2020
10/26/2020
Please attach the documentation you would like to have the meeting about.
Delineation Index Map.pdf 500.26KB
pdr only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 10/8/2020
Reviewer Meeting Request Decision
Has a meeting been scheduled?* C Yes r No
Meuse Rivera
EFFLUENT /_�
DISCHARGE
0 SITE
I P T
E O ��
_ r IM
DISCHARGE AR IN �<
ll L
PIPE CASCADE AR M
AERATOR
1/ tr-1IMPACT ° :I REA l ACC
ift Cree`- AREA K
IMPACT IMPA
�i
AREA H „AREA
IMPACT
AREA G JACCESS
ROAD -
10y� FLUENT
�� FORCE
��\��o�- J//� MAIN F� --
��i
� I
I
IMPA T \ ��
ARE F�r� /---��
Creek , IMPACT
AREA E
I �
PACT- o
REA D o
IMPACT�-aM CT
eT r--
4 MGD / AREA B EA CI
� WSITE WTF IMPACT
t� .AREA A i
a �o i
I
� I
�l courvC1raE— -���° j
0 0.2 0.4 Hazen FIGURE 1: OVERALL IMPACT AREA MAP
Mile — WETLAND, STREAM, AND BUFFER IMPACT MAPS
1 inch = 0.4 mile _^�OHN_ ONCQUNI Johnston County 4 MGD WWTF, Force Main, and Discharge
NORPH•CAROL1NA Johnston County, North Carolina