Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20201403 Ver 1_Meeting Request Review_20201006
ID#* 20201403 Version* 1 Regional Office* Raleigh Regional Office - (919) 791-4200 Reviewer List* Stephanie Goss Pre -Filing Meeting Request submitted 10/6/2020 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Sara Kent sskent@burnsmcd.com Piedmont Natural Gas - Line 473 Piedmont Natural Gas Johnston Street Address 4720 Piedmont Row Drive Address Line 2 aty Charlotte Fbstal / Zip Code 28210 Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No State / Province / Region NC Country United States Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below. * The Project includes the construction and operation of an approximately 1.75-mile, 8-inch natural gas pipeline. The pipeline will tie into the existing Line 94 pipeline south of NC Business Route 70 and at the southern terminus of Wildwood Drive. The pipeline will then travel north along Wildwood Drive and cross NC Business Route 70 and the North Carolina Railroad via Horizontal Directional Drill (HDD). The route then continues northwest paralleling NC Business Route 70 and the railroad before turning northeast/east along Highway 42. The pipeline extends along Highway 42 for approximately 0.8-miles before crossing to the north side of the road via a conventional bore and terminating at the Flowers Plantation Regulator Station. The pipeline terminus points are at: south/west (35.626745, - 78.43911) and north/east (35.643098,-78.430338). An approximately 0.3- acre launcher and main line valve station is proposed at the southern terminus and the Flowers Plantation Regulator Station is approximately 0.5 acres. Please give a couple of dates you are available for a meeting. 10/14/2020 10/15/2020 10/20/2020 10/21 /2020 Please attach the documentation you would like to have the meeting about. Line 473 Figures.pdf 915.72KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature ��¢ C,` .ter Submittal Date 10/6/2020 Reviewer Meeting Request Decision Has a meeting been scheduled?* r Yes r No NORTH CAROLINA d2 E OLO siATt HIN = Limits of Disturbance u 0 N � BURNS 0 500 pflp `ME©ONNEL Feet Virginia SoTh cawim Topographical Map Line 473 Piedmont Natural Gas Johnston County, NC ;ounce: Esri; Burns & McDonnell Consultants, Inc. fir: 'r��:-.�• � r� '� ■. lad � ■iiiffll:�l'� �� Aril/+ �relriri�*� l r fR 25 2032 697 ' Source: Esri; USDA MRCS; Burns & McDonnell Consultants, Inc. Source: Burns & McDonnell Consultants, Inc.