Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCC203636_MODIFICATION Supporting Documents_20201012
ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality September 18, 2020 LETTER OF APPROVAL WITH MODIFICATIONS Centene Management Company, LLC Attention: Tobias Rafael, Owners Representative 7700 Forsyth Boulevard St. Louis, Missouri 63105 RE: Project Name: Centene East Coast Headquarters (Express Review) Acres Approved: 28.68 Project ID: MECKL-2021-008 County: Mecklenburg, City: Charlotte Address: Governor Hunt Rd. River Basin: Yadkin -Pee Dee Stream Classification: Other Submitted By: Kevin Vogel, PE, LandDesign Date Received by LQS: September 8, 2020 Plan Type: Revised Dear Mr. Rafael: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.govfNCG01. Please direct questions about the NOI. form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO 1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1 m � (letlariment of En -am 0. ty North Carolina Department of' Environmental Quality ' Division cif Energy, Mineral and Land Resources Mooresville Regional Office 1 610 East Center Avenue. Suite 301 i Mooresville, North Carolina 28115 704.663.1699 Letter of Approval with Modification September 18, 2020 Page 2 of 3 1. The approved E&SC plan as well as any approved deviation. 2. The NCGOI permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-S 1 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Shannon Leonard Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGO1 Fact Sheet c: Inspection Department ec: Kevin Vogel, PE Letter of Approval with Modification September 18, 2020 Page 3 of 3 Project Name: Centene East Coast Headquarters (Express Review) Project ID: MECKL-2021-008 County: Mecklenburg Plan approval is for clearing & grubbing and initial grading as shown on the plans. Plan approval does not include site development. A separate site development plan shall be submitted and approved by this office prior to conducting -any site development on the property. 2. In Phase 1 A, on Sheet C4-03, a rock check dam with a minimum 3' height, 4' top crest width shall be installed in the existing channel (below MH-3) where the stone outlet in the silt fence is shown. This measure shall be installed upon start of land disturbance activities in this location. 3. On Sheet C4-06, diversion berms (along the top of fill slopes) and adequately sized slope drains shall be provided to convey run-off down proposed slopes. During fill placement operations, the diversion berms and slope drains shall be installed at the end of each work day. 4. On Sheet C4-07B, the silt fence shall be installed along the toe of the fill on the outlet side of the 72" RCP. mks \..� IL. n \ . / . k . p : ■ 6 � � C . � � . • ■ . ? � . K - . / ■ . �■ � � : y � . 2 • ~ 2 d ■ G � / - • � . ■ � E . � � . / • � � � / ■ • \ .. . p d � ■ � k K 6 � \ / ■ \ # . # 2 :. . \ . � - ■ » \ ■ � �� . .. . . . . . : ■ © . : � \ 2 - �