Loading...
HomeMy WebLinkAboutWQ0007569_More Information Received_20201012Initial Review Reviewer Thornburg, Nathaniel Is this submittal an application? (Excluding additional information.)* r Yes r No If not an application what is the submittal type?* Permit Number (IR)* Applicant/Permittee Email Notifications Does this need review by the hydrogeologist?* Hydrogeologist Email: Regional Office CO Reviewer Admin Reviewer • Annual Report r Residual Annual Report r Additional Information r Other WQ0007569 Carolina Water Service, Inc. of North Carolina r Yes r" No Submittal Form Project Contact Information Rease provide information on the person to be contacted by NM Staff Name * Linwood Stroud Email Address* Istroud@stroudengineer.com electronic subnittal, confirmation of receipt, and other correspondence. Project Information ........ ......... ................................................................................................................................. . Application/Document Type* r New (Fee Req ui red) r Modification - Major (Fee Required) r Renewal with Major Modification (Fee Required) r Annual Report c Additional Information r Other Phone Number* 252-756-9352 O Modification - Minor C Renewal C GW-59, NDMR, NDMLR, NDAR-1, NDAR-2 r Residual Annual Report r Change of Ownership We no longer accept these monitoring reports through this portal. Please click on the link below and it will take you to the correct form. https://edocs.deq.nc.gov/Forms/NonDischarge_Monitoring_Report Permit Type:* r Wastewater Irrigation r High -Rate Infiltration r Other Wastewater r Reclaimed Water r Closed -Loop Recycle r Residuals r Single -Family Residence Wastewater r Other Irrigation Permit Number:* W00007569 Fbs Current Existing permt number Applicant/Permittee Address* 4944 Parkway Plaza Blvd., Suite 325, Charlotte, NC 28217 Facility Name * Brandywine Bay WWTP Please provide comments/notes on your current submittal below. At this time, paper copies are no longer required. If you have any questions about what is required, please contact Nathaniel Thornburg at nathaniel.thornburg@ncdenr.gov. Please attach all information required or requested for this submittal to be reviewed here.* (Application Form} Engineering Rans, Specifications, Calculations, Bc.) pm 131-21-006.pdf 88.02MB upload only 1 R3Fdocurrent (less than 250IVB). Miltiple documents rust be contained into one RJFfile unless file is larger than upload limit. * V By checking this box, I acknowledge that I understand the application will not be accepted for pre -review until the fee (if required) has been received by the Non - Discharge Branch. Application fees must be submitted by check or money order and made payable to the North Carolina Department of Environmental Quality (NCDEQ). I also confirm that the uploaded document is a single PDF with all parts of the application in correct order (as specified by the application). Mail payment to: NCDEQ — Division of Water Resources Attn: Non -Discharge Branch 1617 Mail Service Center Raleigh, NC 27699-1617 Signature * Submission Date Is filled in autor atically once subrritted. —L% SW CORNER- 'O OF OARDOIA, W."m DO ` = R 4e2 PG 4T4 CURVE DATA d S T ,s '3s. 345. r6 �xm ma - i Owora cr, = e.,e ®warx e - e.,T , c "g- > r FOTC Lusm n.0 ,vs ,m.zo tm z, 36 ay R EIP MD DCIT TWP E O°, tt,-xsi•ss•aa •E °`"TM `r ,eT,a as ,.. '_ 37 DRIVING RANGE is i�a si , z°•=o� 1e tt N/F O �x NMI` ®M-TM D. w-p ss'sz BOGDE SOUND +Vxy't •J —�,� CARDL INA -'pm VICINITY MAP IN.T.S.1 �?♦ ago sj, /' f e z .�qs.� \ ♦♦ ,'i = N NATER amxA i - x s ` SERVICE fN°m xlREtrNx- s5x•w•zel / -^»a •\ ' 1 cxmn - ieo.aa ®lw'�Ro1.Ds �, ,t40 � � .: ♦.� \ ` x , a 31 d' efi 45 a -0Q ` ° LEGEND ,E r m ,4'4' _l - 5ET IRON ROD s4. s5a ss. ,/ 1 b .a sf tsaz.<ar �d '»'azl F ® °N Ixzttla-�e1a ®T 601 SIP SET IRON PIPE 'TtoARt_ �—.sLv d's0 a0 °$�.,'s.o, dd �'.+'E' ��s''`b,' 't S / e :1 ° 1 5 w ise x/ S— I , 6 ET,, EXISTING IRON IT Ir t,x5 xv °� Nnitw j s ,s•e me em xe EIP EXISTING IRON PIPE ss ufsun gems ma anmr u<m,xV. \V ��„ ss, PD j 'qa 39 x 3 F = SF SWARE FEET , , T%.e sr Y O ul metmm= zO°so','e •e ® o,n GE OVER EAU ELECTRIC �F m ' 1*°as Po LONTM •' L ,a.ee RlN RIGHT OF NAY ttsxTo[[.L!!-k•u_._ a9 'J� n '.��I",P� s P�fis.t zY- zss zRaaise EIP OR DEEDBOOKBOOK ��11••11 `•Tv .sl\r<zt*i CTO NCC CCNURETE NONUL'ENT L/�>s �ol�� .'2S` ze'Pd",/dit x �(! s.s, V ��_ df, (ztiae'aaaiirssaiii Ows',mx so =zi.se ~®ioum ,x =ss,m •„• CONTROL CORNER F' 1/ ' 'B" 9 `Xztx xztx xxxxxxzr N/F NON OF FORLERLY / f%yS-_I' A� _ sx xst s.xxexzxzr e�0 tt eeum Ln-ssx•za•as•z �+ 9 `�Cz a>zisvintnrt sal 19�y eTT. lS ✓ C pro µ9 ;$$ f %1 "�x= x,t xwx x" w m l >Q,eE.ao°.x ::. �0.64 t •' �<eew o� •39-14-E 36.43 Pr T Eo' 50,. °. $ �' .. Mu= ` 56 r .am.a :c rt; ®woIT, , . ex 5, T3.W:::�ryx;.:�:rv;;::.. R,mz.xIF . .: i ''�$�.'' x • c z _ _ _ ,Ua Lax' >��T(r •IPA I's 1 2-0 l�•�� - --,t.� �- ' �.f�sz .4tki4eiazlxettifaxxrex:ixx 52 :• %59 j4---- ::::::;: :::::x ,. v�N Sx`ti`: t eJ<lf ' 'EIP l az .fC r � ----- - � �-'A01a a.sa �'°.tx" ttz4ppesittttsxrtttrx \Sz Odm°otuzr x xx 5gx:zt tNB6.605L ®�oisztr - azl Lro� H� �r:;:9.♦`, 23 J ® e)„\ . Mpe 60T.35 1 0TA1) EIP -:r n.>3 , B` b9 / / •E � ♦ ,'' sr f J f I W Tet, o-,` nsr ,`� / • a%/ ° ° tt = l amm G m �01 Iv,: uxlua ..... arom x tr - 'cal - -mr'a Z's; a �; ?aA��.�"' ,pr 60 zi ,fi°� =so s =e:�a.t sF 'ro 'rc m t tt� m L»ae ° l ........ FUTURE /D'•� �a+P> sc, �;T Oauro',n -nr.sa ®wm"i -..M .ao.si � sa ''61 N3i 66'S9 rE •�O �� BT� EIP r�J C/P AROL INA NATER SERVICE ,rtxr ssz•m wneo er - a eeo•w •, r �u � ss' '+ x/f OFAnus - �xwm�o,xm 0= -CI -e.,r �' iv CAROLINA WATER SERVICE EIP S36.64'S4'V "''" Lw'•TM to cea�iY'Y1M M�Tma'x el�nsa�t�z�..cz4 rw°x ° �b° 6 aoxx er 'r ®t�w m a®cmx�xlR[Ci1tH=xn•<z'tsl Na Ll'L' uiss ul'm.LelxlXlt IiTM z r •t�zx d ,�\ ,P Tx . ea i9' L.F. - 91.H Ldosx = i F00o xor! ei♦'rr.�.'P' DEDICATION OF ROAD DESIGN AND CONSTRUCTION e.o uz zxaro SUBDIVIDER TO MAINTAIN ROADS: cnal_x,s'ul,l drzzxrzz cram xlPFttIM•xm•xe•xPE ,rc ca.L" TIE': :'st ar AEcsxeE ULxcrm wvFamwnaLxrLiva�cwimum OL Wxx -xL.Eo ®+`�°iroxszxm -<a.s x OLuwTM01 -xo.a ouwuNv v emmixo oe emPmm .. �+ s lvisisx xEaunars lm miw frs • elx, cf ms ssamvtrttx ._" uv n,x re wnT,o,ro a,Awams m sux �'xrn s}a, uts.5 IY uz exenxsraxstxE� SITE DATA! NW REV55Eo' 'F E. to ss REFERENCE NAPS ssttr.. FLSAv,xV eaalsOax °six TtFICATE OF APPROVAL , m we. BY PLANNING BOARD N.a nns5 xcm x¢ srlrx u xmsx tssa,p xv. N.L-u _ tN CN70(j,�''., Iuuosx aLw<E we, iO1nE wF«si xL`F s. D.TL 7xe-se z. •.,'� 0. IT4 P5 456 'xrmt"x`"�"ITTiVAT.1xx"`d;�,F�tot`�2�I'Is Fp`'E ,9= �XsJ3'L snx i •-�xxnlcensns. e.ss. FINAL PLATef"'xstsao`Lmr° 4° ,aax 4�g SEAL} _— WxT,1F, w:E i:;,9.55F �[��[�[OC1� lL�][a�l�C]E l4�f3'Ct0.i TMli d r y L-36B8 8 ee.s sF CERTIFICATE OF OWNERSHIP AND DEDICATION �srm��o F �'� � �. ' :� a ' � x LOTS 23 - 61 avy; m�'pa� 'mwmre .NE saa�Fina� aussxrrex�s�wssulm sle,s. um a m� MOREHEAD TWSP. CARTERET COUNTY NORTH CAROLINA l/s�l'w^ •,'6- /::::::::::::::::3➢ €.. SURVEYED: 'v„n so sml,: .,w..sv sosTn ��x?tom �/ 3�plinutA/ .................. GOLF & SHORE PROPERTIES INC. ---- xoAFnovuafaxmer lxL UAtzss, OWNER: eLmsr..r,a,e.rm .'lrFvmalwlr- ,• C.J. 3-8-95 mummvlAwm+G wfurxmr. `I'I MUq •., �;p��;A /y�p,LA.I•A.L.0 s. zn,nrEsr, sxu ADDRESS RT. 2 HRA CI YINE HAY DRAWN p ID ,ro,w eL,a x,. °.emev ww„ m'xmmvL'R°s txs Fxu,r v ,xs Lm MOREHEAD CITY N.C. Tq•"".O't rxE roue, trxnnr.,E ,s,a _---___ Nprsrrmmms�szxOrAr 28667 M.L.M. u M". '4J-'1' q7 FanU<"i,Laoi mxox` r.woinwmlg aFrici to axsuwss f°zvr r°Em's"a i°1 APPROVED: w$wt p n� oy 100' o' D ioD' zoo' mo a-""`u�i ;,"sr�°<..,x°�'�aro. 9TROUD ENGIN88RINfi.P.A. S.T.C. UOL�C /2�a s �av w H4NTAON PLAZA ONE SUITE 302 DATE: Sy, "(ass Nn xcaa..,rs vuarrs u Lams MOREHEAD CITY, N.C. 28667 A— °A .. oOu" s aLLG" eC M ` ws jEl u °mom rom x.r 0 Ielsl aaa-rare SCALE: 1" - 100' m �a9ss"ON mlg0D4tnnrzlwAEa•taAvms SCALE: JOSEkH T.CHANCH, HJ.B. 1" - 100' Brandywine Bay WWTP Groundwater Discharge Stormwater Impact Analysis The Brandywine Bay W WTP project is designed to dispose of effluent by high rate infiltration. To function properly in conformance with the 2T rules requires a groundwater lowering system with a discharge rate of 691,200 gpd. The design proposes to discharge the groundwater to a ditch along the eastern boundary of the golf course driving range. This ditch is part of the Brandywine Bay drainage system which flows northward and westward to a combination 60" CMP and 5'x7' box culvert crossing at Hwy. 70. From Hwy 70 the drainage follows natural channels to Hull Swamp. Hull Swamp is Classification C and is tributary to Newport River, also Classification C in the White Oak River Basin. From the groundwater discharge point the drainage follows a series of ditches to Hwy. 70. At several points along this route there are culverts which are the limiting factors controlling the surface water levels during storm events. The impact on the surface water levels is calculated for peak flow conditions for the 1 year, 5 year, 10 year and 25 Year storm events with results as follows: • Point A, 48" CMP —The surface water levels are contained within the drainage system during all storm events with no flooding. For the 25 year event, the water level increase due to pumping groundwater Is 0.06 feet. The freeboard to the adjacent ground surface is 0.7 feet. The conclusion is no significant impact. • Point B, 2-24" RCP -- Even without the groundwater discharge, the culverts at this location are undersized for the 5 year, 10 year and 25 Year storm events. The analysis indicates that overflow of the ditch banks will occur during these events. Even so the discharge of groundwater discharge has very minor impact. The overflow can be easily resolved by replacing the existing 24" pipes with a larger pipe. This should be done with or without the groundwater discharge. 0 Point C, 42" RCP, Brandywine Blvd. Crossing —The surface water levels are contained within the drainage system during the 1yr., 5yr., and 10 yr, storm events with or without the groundwater discharge with no flooding. For the 25 year event, the water level rises to slightly above the ditch bank the pavement surface on Brandywine Blvd. The discharge of groundwater has little effect on the peak water surface level; 0.1 ft. or less. 0 Point D, 42" RCP, Lord Granville Road Crossing —The surface water levels are contained within the drainage system during all storm events with no flooding. For the 25 year event, the water level Increase due to pumping groundwater is 0.09 feet. The freeboard to lord Granville Road pavement surface is 2.45 feet. The conclusion is no significant Impact. • Point E, 5'x7' box culvert in parallel with a 60"CMP, Hwy 70 crossing-- During the 25 year storm event these culverts less than 75% full with or without the groundwater discharge. The influence of the groundwater discharge is minute; less than 0.01 ft. \\\\1\11yi41liiri 11fp/�,/ .0� ;4�;. pF S�fi�0. lj. PE 5279 rhnnn�lyS� kx� 0716f2026, Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name; Morehead City, North Carolina, .F 9� USA* Latitude. 34,7333°, Longitude:-76.7333° Elevation: 8,57 ft** sour= PSRI MapsV'Gor source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. 4onnin, D. Marlin, B. Lin, T. Parzybok, M.Yekla, and D. Riley NOAA, Natlonal WealherService, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inchealhour)l Average recurrence interval (years) 1 2 5 10 25 50F 100 200 500 1000 5,75 1 6.78 7.92 8.84 10.00 10.9 11.8 12.7 13.8 14.7 5 min 5.32-6.22) 11 (6.25-7,32) 7.28-8.54 (8,14-9.54) 9.13-10.8) 9,92-11.7 (10.7-12.7) (11.443.6) 1 (12.3-14.9) 13.i-1fi.0) 10-min (4.254996 5,005�86) 5.836 84 6. 00.63 (7,27.8,56) 7, 0 93A (8. 9 i0.1) (9.76-1.8)10.3-12.6) 15-min 3,54 4214 4. 9 4 91) (4. 2.5.77) 1 (fiA8 6644) 61fi7324) (6.67 7.88) (7.15 8,50) (7. 0 9�10) (8, s 9690) (8. 240.5 30-min 2 43 (2,84 3 2,89- 9 3.49-4.10 3.974266 4.555836) 1 (5.02 5.94) 1 (5.486 51) 6.51 7.8$ 6.98.8753 1. 60-min 1 51- .77) 1.012?13 2. 4 2463 (2. 9 3.04) 3.03 3z7) 3: 0 4302) I (3.77-4 48) I (4. 5.4 97) 1 (4.67 5365 5.03 6 23 1.02 1 2.25 2.57 2.92 3,34 3.83 4,27 2-hr 0.937-1.11) (1.14-1.35) (1.454.71) (1.70-2.01) 2.05.2.42) (2,33.2.79) (2.64-3.16)1 (2.95-3.57)jL(3.39-4.15} 11 (3.754.64) 0.736 F-T-8-9-4--j 1.35 1.66 1.92 2,20 251 2.97 3,36 3-Ilr (0.672-0.807) 0.818-0.982) 1.44-1.25) 1.234.48) 1,50-1.81) 1 (1.72-2.10) (1.7-2.41 2,22-2.74J 1 (2,59.3,25) 2.91-3.69 6-hY (0.40 -0 500) (0.487 p 608) 0.620-0.777 (0.733.4.924)j(0.898--1,13) (1.04 1731) (1.19 i 51 } 1. 5--1.73 (1.57 2 05) 1,77 2933) 0.263 0.320 0.411 0.491 0,608 4.711 0,824 6.950 1.14 1.30 12•hr . (0.236.0.300) ( (0.287-0.3B4 0.366-0.468) (0.436.0.559) (0.535-0.6B9)(0.620.0.803) (0.711-0.928) (0.813-1.07) {0.957-1.28) 1.0-1.46) 24•hr 0,142.0166(0.173.4203) j(0.223-0 262 0.264.0311 0.324-0 384) (0.374.0.447) i(0.928-0517) (0.486-0 595 0.568-0,712 0.637-0815 2-day (0, 81--4.096 00MO. 17) 0.126-0 150 0.149.0178 0.184 0 221 0.2112-0 258} (0.243.0 300) 1(0.277-0 348) (0326.0 421 0.367.0A85 0.063 0.076 0.097 1 0.115 0,141 0.163 0.188 0.215 0.256 0,293 3-day (0.058.0,068) (0.070.0.082) (0,09.0.106) (0.106-0.125) ILO.129.0.163) (0.148-0,178) (0.168-0.205) (0.190-0.236) (0.222.0.282) 1(0.249.0.324) 0.050 0,061 0.077 F 0. 991 I F 0.110 0-. 1-2 -7-11 0.145 0,165 0.194 0.221 4-da y (0,046.0054) (0,056-0,065) (0.071-0.083) (0.084-0.098) (0.101-0120) (0.116-0138) (0131.01-98) (0.147-0.180) (0.170-0.2112) (0.190.0.244) 0.33 0,040 0.050 0.05E 0.074 0,080 0.091 0,103 0.119 0.133 7-day ( 00300036) (0.037-0.043 0.046-0.054) 0.054-0.063) 0.084-0.076 (0.073.0,087) (0.082.0.099) 0.092-0.112) 0.105.0,131J (0.115.0.147 4,026 0.031 0.039 0.045 0,45A 0.061 0.069 0.078 0,090 0.100 10•day (0.024-0.028) (0,029.0.034 0.036.0.042) 1(0.042-0.049J (0.050-0.058) (0.056.0.066) (0.063.0.075) 1(0.070.0.084) 0.080-0.098 (0.087.0.109) ( 0.018 1 0.021 1 0.026 r 0.029 0,035 0.039 1 •0.043 1 0.048 0.055 0.060 20-day j(0.0 17.0.019)(0.020-0.023) (0.024.0.027) {0.027-0.031} (0.032.0.037) (0.036-0.042) (0.040.0.047) (0.044 0.052) (0.049.0.060) 1 (0.053-0.066) 0.014 30-day a252036 3 4.045 A 0:15 006-0018 0.019.0022 0.02-0025) (0.2 0029 (0.08-0033 003-.030 0034-4040) 0.70045 0.00.0 049 45-day 0 013 00a3-4 0150.010--0 01800i8-0 021).02 01 0.0110 024 0023.0 027) 0.028.0 030 0028.0033 0. 3 -0 038) 0.034-4041 fi0-day (0000--0 012) (0.01 -0 014 0.014.0 016 0.016 D 0t8) (0.018-0 021) (0. 20.0 023) (0022.0 025) (0024-0 028) 0026.0 031 )002B 0 034) t Precipitation frequency (PF) estimates In this table are based on frequency analysis of partial duration series (PnS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 110% confidence Interval. The probability that precipitation frequency estimates (for a given duration and average recurrence Interval) will be greater than the upper bound (or toss than the lower bound) Is 5%. Estimates at upper bounds are not chacked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values, Please refer to NOAA Alias 14 document for more Information. Back to Top PF graphical Brandywine Bay Stormwater Runoff Calculations Composite Runoff Coefficient Roofs C= 1 Pavement & Gravel C= 0.95 Lawns (flat) C= 0.15 Wooded C= 0.15 Wetlands G 0.1 Design Point Acres Roofs Pavement & Gravel Lawns (flat) Wooded Wetlands Total Acres Composite C A 6.7 7.2 63.9 32 40 149.8 0.213 B 8 8.9 79.1 32 40 168 0.221 C 8 8.9 79.1 32 40 168 0.221 D 8 9.4 83.4 32 40 172.8 0.221 P 27.4 33.9 269.3 32 40 402.6 0.270 a N N V N 0000 CI u C4 CJ Ci r3 p C 40 � oa v a v "' V A n h n � lNs. V 0 ri C) 0 ri 0 0 ri 0 ri 0 ri u V'1 °1 0odo 0 } N N N N N ❑ UI m m m m p to l0 l0 to lO � Q Cf 00 M 01 V ro d trN d� 00 N U 3 ri m w co 0 0 00 1n L1 v ai 00 00 ri rS Q v r�i Lo Lo .n-I V N N DO C rri +m-i. i� C C vi O H d Ip D In 0H c O � rn m v- O O OO p OO a c° in LA > In INn n r 'cO0 0 u h in In If) w .Q w � a O CD 1Ci N N N U N N N N 0 0 0 0 0 0 Q m u o W a ❑ '-' u C rl A A ri p 40 oo M iii N ri O1 LO u U � n t ❑ ai 00 nrr� nn X u w U 0 rr 0 W 0 4 0 r! 0 14 N 0 0 0 0 _ N ci N H N ri N H N H A m m m m m CL 19 lO W lO lO G 7 v 4 g 1' lD In t{ n f 4 h OU to In m N 10 v H 3 Vl 00 O 00 00 w L1 C l 00 N C4 Q H -OU-. r�-i •N-I rri V O O m n 1Q c Y Vri C C t) nj h H [t 10 N G n m m o 0 O � w O }L O O O � O O 04 c 1n In N to i�o V r n n � J Y N m O • n N N N m as ri ri n x ¢ � O M H ri O Uli N N rV N N O O O 0 0 to + '� a Q ra U A W a ❑ 11, Co a o 0 0 U 1-i 1-1 r3 H O G a Lo ^ m rat m In 1n m A-- � m co 00 U r4 a h r n h n U CV7 0 ri 0 A 0 r4 0 ri 0 ri N 0 000 0 N N N N N 3 O H H H H 'p to 40 U1 l0 O7 lO m V1 lO 01 lO � O l7 ❑. cy N H M N N c}} 00 Iwo roll00 0 m CM1 Vf 00 OO lD M 00 ID co W N Q v r�i H H 1h-i h C = M N O C c w 49 h off N OH G O � m 111 O' t 0 0 0 0 0 }� O Lnr O N O O O CM > Lo lO [nQ n A -71 'Cpq Y n N In In 00 r- z Q O N N U 111 N N N N N � N (D 0 0 0 0 c a m U A Lu n. ❑ a) C a Cl! r. n N 4 MO MO O N n 'C m i-^ tUn ri ri rt N di i0 h n n n n PO L) 1.7 U O A O A O A O A O A H 0 0o a 0 0 w N N 0 N 0 N N 3 r-I r-1 H ri ri A o1 01 a1 m m ^p w LO to 1O IO V O O C7 Q 0 O 0 pNj N V H co co LO Q ro VH H H V rh-I N C w 0 O1 'G W N � C h 01 01 O O A � O O O O O C3�i O O O O O c° > n Ln m n in � a $ pp 00 Y n N In N 00 iQ rimer O N N U N CHV (1 N N r0+ N Q 00 00 c y 'Lap w •� Q rA U A to a A m a m m —i � Q m c6 p H H H �77 al 7 'ct O O a) O o 0 0 V � + C J O 0) 77 N >,m •--� Q —u Y � Co G O Co rn C) rn m J °} C31 r- LO It Q ca io rn n n m J u c+7 L'i m rn O N c-I O Q V) Ql 7' O O ci W t0 n H y C Q rn V N O O) O V) VI Q 00 't O 't U V Ln d(A al a N 00 (I O) V' vpi C O cn o a C u u u C a U 0 N u 00 V cr N N V N ct N V) O N O CL 0 0 Q co u o a r- m � r Ul c O v rn V) n tD n m c 0o -t4 � $ r ai � o0 > + -1 4 -q C O � to to 10 m rn O �m °° a r s r1 N J m rn n m a co Lo a) n a rn r. 00 LO J u 'HV 0 Ln Ln Lo m N + N -I Lfl N L .-I l0 N N Q � a7 � T tp N c I O1 C .--I N V lfl O fV O li i LO N N in c�7 0o m In H h u LOh tto a) b.0 m L 27 u C n N� H iD 4 N 00 V) LD n n tD +; Q a a ro u u u u a a a C V 00 It N N L) N v '-' CN n � y O � O z a 6 z Y Q m u Q �o a a 'n LO I- It c m Ln zs N m m a) ti m m m -' a--1 Ln N + > + -1 - O J Y > N n LQ m Q1 n N LLI O ,-i i1] ry 7 > � i Cl) J °} m a ova Lno Q Olf r; 00 to J u _ o o Lr) m m 00 o m L N 00 M m a a) m ro 00 Om 00 x C O O ri OOl N o0 m ni N N Q) m N m LO LL U + n co n OO Lfl 00 O 00 L h N c-I m M O CD 00 LD 00 V 00 O'i n Ln �o a Of CJ C o mp n a) s_- 'u u u 00 d N N N w _ � O c-I c-I z o- 0 Z Y Q in u in 0 a m 11 --, C) O L N N 00 cf n O + C � Y r6 L al It N n O r' 3 ro n ni N ai l0 cri O O >cv '-i ct J rn rn rn ct n oo to a) n Q ai r co J u rn oa m It +Ln N H V L Ln CL o a 3 c O V) N 0) n n HO U + O O aJ GA V) U N m tO to p C O N a N o O o rn +; Q- ro C) fe M: cc C O +, Q 03 00 It N N V _ It N It It al Q N V) G O (U O Q c-I N ri ri z a 0 Z Y a m u o o_ Brandywine Bay Hwy 70 Box Culvert and 60 " CMP Analysis Box Culvert Width 7 Ft. Box Culvert Invert 4.2 ft. 60 " CM P CL El. 6.29 ft, 60 " CMP Area 19.63 SF Flow Capacity (CFS) WL Elevation (ft.) 5'x7' Box Culvert 60" CMP Total Q Depth Q(CFS) CL Depth Q (CFS) (CFS) 6.3 2.1 63.9 0.01 9.5 73.4 6.4 2.2 68.5 0.11 31.3 99.9 6.5 2.3 73.3 0.21 43.3 116.6 6.57 2.37 76,6 0.28 50.0 126.6 6.58 2.38 77.1 0.29 50.9 128.0 6.59 2.39 77.6 0.3 51.8 129.4 6.6 2.4 78.1 0.31 52.6 130.7 6.7 2.5 83.0 0.41 60.5 143.5 6.8 2.6 88.0 0.51 67.5 155.5 6.9 2.7 0.61 73.8 167.0 7 2.8 j93.2 98.4 0.71 79.6 178.0 7.1 2.9 03.7 0.81 85.1 188.8 7.15 2.95 106.4 0.86 87.7 194.1 7.16 2.96 106.9 0.87 88.2 195.1 7.17 2.97 107.5 0.88 88.7 196.2 7.18 2.98 108.0 0.89 89.2 197.2 7.19 2.99 108.6 0.9 89.7 198.2 7.2 3 109.1 0.91 90.2 199.3 7.3 3.1 114.6 1.01 95.0 209.6 7.4 3.2 120.2 1.11 99.6 219.8 7.48 3.28 124.7 1.19 103.1 227.9 7.49 3.29 125.3 1.2 103.5 228.9 7.5 3.3 125.9 1.21 104.0 229.9 7.6 3.4 131.7 1.31 108.2 239.8 7.7 3.5 137.5 1.41 112.2 249.7 7.8 3.6 143.4 1,51 116.1 259.6 7.9 3.7 149.5 1,61 119.9 269.4 7.95 3.75 152.5 1.66 121.8 274.3 7.96 3.76 153.1 1.67 122.1 275.3 8 3.8 155.6 1.71 123.6 279.2 8.1 3.9 161.7 1.81 127.2 288.9 8.2 4 168.0 1.91 130.6 298.6 8.3 4.1 174.3 2.01 134.0 308.3 8.4 4.2 180.8 2.11 137.3 318.1 8.5 4.3 187.3 2.21 140.5 1 327.8 Comments 1 yr. storm 5 yr. storm 10 yr. storm ?5 yr. storm Brandywine Bay WWTP Groundwater Discharge Water Quality Impact Analysis The Brandywine Bay WWTP project is designed to dispose of effluent by high rate infiltration. To function properly in conformance with the 2T rules requires a groundwater lowering system with a discharge rate of 691,200 gpd. The design proposes to discharge the groundwater to a ditch along the eastern boundary of the golf course driving range. This ditch Is part of the Brandywine Bay drainage system which flows northward and westward to Hull swamp. Hull Swamp is Classification C and is tributary to Newport River, also Classification C in the White Oak {liver Basin. To determine the water quality impact of the groundwater discharge samples were taken form 3 existing groundwater monitoring wells at the WWTP site and in close proximity to the proposed ground water lowering system. These samples were tested for pH, BOD Ammonia Nitrogen, TKN, Nitrate -Nitrite Nitrogen, Nitrate Nitrogen, Nitrite Nitrogen, Total Phosphorus, iron and Turbidity. Samples were also taken from the surface water In the ditch In close proximity to the proposed groundwater discharge point. The surface water samples were tested for the same parameters. Results are tabulated below. Monitoring Wells Surface Parameter Unit MW-2 MW-3 MW-4 Average Water phi 6.7 6.6 7 6.8 7 BOD mg/L <2.0 <2.0 <2.0 <2.0 4.6 Ammonia as N mg/L 0.41 0.25 7.64 2.8 5.16 TKN mg/L 0.19 0.59 8.79 3.2 5.35 Nitrate -Nitrite as N mg/L <.04 <.04 <.04 <.04 0.11 Nitrate Nitrogen mg/L <.04 <.04 <.04 <.04 0.11 Nitrite as N mg/L <0.02 <0.02 <0.02 <0.02 <0.02 Total Phosphorus mg/L 0.13 0.13 0.12 0.1 0.24 Iron ug/L 742 585 65 464.0 719 Turbdity NTU 1.9 10 16 9.3 5.8 This sampling and testing Indicates that the discharge of groundwater will have no detrimental impact on the surface waters. �uutiYUYYnunrnu CAR 04 'Ni�,�% 0nt-. �SS10N - # PE 5279 FNGIVA "Q - ODE 5,�`,. 0 114 OAKMONT DRIVE GRUMVILLP, N.C. 27868 13RA11DYWINE BAY-WBT.,LS (Ct'iS) CFTS SYSTEMS, INC. 5058 HWY, 70 WEST WEST RIDGE CTR., APT. N2A MOREHEAD CITY ,NC 28557 nrinkJ:p4WA4or YD, ]771'6 �° s' 4laatnxasror IDi 10 F; PHONE (252) 766-6208 FAX (262) 756-0633 ID#1 206 S DATE COLLECTED: 08/18/20 DATE REPORTED : 08/28/20 REVIEWED BY: Mi V-2 N111-3 MW-4 Analysts Mothod I'AlkAMETERS Date Analyst Code PH (not to be used for rel:orling) 6.7 6.0 7.0 08/18/20 GNB 4500HB-11 BOD, mgll <2.0 <2.0 <2.0 08/19/20 NIAR 521OB-11 Ammonin Nitrogen as N, ing/1 0,41 0.25 7.64 08/20/20 TLH 350.1 R2-93 Toinl Igeldnid Nitrogen as N,nigh 0.91 0.59 8.79 00/26/20 ICES 351.2 R2-93 Nllrate-Nifille as N, mg/1 (talc) <0.04 <0,04 <0.04 353.2 R2-93 N11mic Nitrogen as N, nigh <0.04 <0.04 <0.04 09/19/20 DTL 353,2 R2-93 Nih-Ite Nitrogen as N, ulg11 <0.02 <0.02 <0.02 09/19/20 TLH 353.2 R2-93 Total Phosphorus as P, mg/1 0.13 0.13 0,12 08/26/20 TLH 365.4-74 Iron, l:gh 742 585 65 08/21/20 LFJ EPA200.7 Turbidity, NTU 1.9 10 16 08/18/20 TiVIR 213OB-11 114 OAKMONT MOVE GREENVILLE, N.C. 27858 BRANDYWINE BAY WSM (CV75) CWS OYSTEMS, INC. 5058 HW'Y, 70 WEST WEST RIDGE MR., APT, N2A MOREHHAD CITY ,NC 28557 PA1I,AMIUMRS Pl-I (1101 to be used For reportiug) 1101), mg/1 Ammonia Nitrogen as N, mg/l Total lgohlahl Nitrogen as N,mg/I Nitrate-Niti4te its N, mg/1 (enle) Nitrate Nitrogen as N, mg/1 N110te Nitrogen as N, mg/1 Total Phosphorus as P, mg/l Iron, ag/i 'nu-bidily, NTU Discharge Annlysis Molhod Stream Date Aunlyst Code 7.0 08/12/20 GN13 4500H13-1I 4,6 08/12/20 GN13 521OB-11 5.16 08/13/20 TCW 350.1 R2-93 5.35 08/19/20 KCS 351.2 112-93 0.11 353.2 R2-93 0.11 08/12/20 um 353.2 112-93 C0.02 08/12120 DTL 353.2 R2-93 0.24 08/I9/20 TLH 365.4-74 719 08/17/20 LVJ KPA200.7 5.8 08/12/20 KDS 213011-11 Drinking Bator XDl 37716, Heatnwatar ID1 10 PHONE (252) 766=6208 FAX (252) 756-0633 ID(i 1 333 Y DATE COLLECTED: 08/1.2/20 DATE REPORTED ; 00/26/20 REVIEWED M r J rr rr + 1 1 ! ! 1 / ! � r � /r r , L ! I U !}/`r—�sr��L� J ! J l J J I'+-1 J J r r ! f Response to Request for Additional Information No.2 A. Easement: 1. The proposal received May 15, 2020 to discharge the groundwater lowering water into the ditch on the north side of the site provides an easement dated December 2, 1976 to the utility company to install, alter, repair maintain and operate storm drains. However, the extent of this easement is unknown, as the referenced "Exhibit 1" was also not attached. Lot 57, the adjacent property from the discharge point, and other properties in the subdivision to the north are listed as part of the Hammock Place subdivision. Please provide verification that the easement covers the Hammock Place Subdivision. The plans have been changed to discharge the ground water at a point which bypasses the stormwater drainage system interior to Hammock Place Subdivision. The groundwater will be conveyed via a force main which will be located within the 20' sewer easement as shown Final Plat, Hammock Place which is recorded in Map Book 29, page 199, Carteret County registry. A copy of the Final Plat is attached and the proposed discharge point is marked on the copy. The discharge point is in a ditch located along the property line between Hammock Place Subdivision and the Driving Range. The ditch is within a 20' drainage easement as shown on the recorded plat. The alignment and discharge point are shown on the revised plans, Sheet C3. B. Water Quality: 1. The proposal does not discuss the chemistry of the water that will be discharged into the ditch, or the potential impacts of the water chemistry on receiving water bodies. This proposal shall include estimated effluent concentrations for parameters that describe the quality of the groundwater discharge water, and provide a discussion of the effects of these parameters on receiving water bodies. The discussed parameters shall include at a minimum: a. Nutrients, including a discussion or model on how nutrients will affect downstream surface water quality of Hull Swamp. b. Iron, which is common to shallow groundwater, which may cause an issue with iron bacteria blooms in receiving waters and impact the performance and aesthetic of receiving stormwater systems; c. pH; d. BOD; and e. Turbidity The water quality analysis is attached. C. Application: 1. The proposal provides calculations that the first 24" culvert and a point upstream of this culvert would not flood at the proposed flows during a 10-year storm event. Please provide an explanation as to why a 10-year storm event was chosen for the calculations. The attached drainage calculations have expanded to include the lyr., 5 yr., 10 yr., and 25yr. storm events. 2. The figure sent May 22, 2020 named "DITCH TO 70" contains a culvert labeled "`24" INV. 11.25", which then appears to daylight and flow northeast over Sleepy Court into a Swale that flows from the back of the cul-de-sac into the main drainage ditch leading out of the subdivision. However, from review of stormwater permits in the area, it is instead suspected that this culvert actually runs northwest underneath Sleepy Court and into the main drainage ditch via the culvert labeled as `24" RCP INV. 10.70". This flow path is shown as the yellow highlighted path in the attached map. Please verify the flow path of the groundwater lowering discharge and make any necessary changes to the application based on any changes in this flow path. The flow path has been changed to bypass Sleepy Court and the entire internal drainage system for Hammock Place Subdivision so that this is not an issue. 3. The proposal includes discharging water into an existing ditch which ties into existing stormwater swale for the Hammock Place subdivision. This stormwater system was not designed with the additional flow coming from this groundwater lowering system in mind, both in terms of quality and quantity of water. Please provide documentation from the North Carolina Division of Energy, Mineral and Land Resources (NCDEMLR) Stormwater Program that verifies that the proposed additional flow won't adversely impact the downstream stormwater systems serving the entire flow path between this ditch and Hull Swamp. I have provided my analysis of the proposed discharge to Dan Sams, Engineering Supervisor, NCDEMLR Wilmington Regional Office and requested his review. 4. The additional flow coming from this groundwater lowering system also crosses Highway 70. Please provide documentation from the North Carolina Department of Transportation (NCDOT) stating that the additional water is not a concern for the culvert or the road. I have provided the project information and hydraulic analysis at the Hwy 70 culvert crossing to NCDOT and requested their concurrence. Their response will be provided upon receipt. BRANDYWINE SAY WWTP UPGRADES ,ft.m �M CIj VICINITY MAP PROJECT NO.: PNt3t-21- 1 DRAWING NO.: oot MOREHEAD CITY, NORTH CAROLINA CAROLINA WATER SERVICE.INC. OF N.C. S STROUD ENGINEERING, P.A. FIOi-0 COERCE STREET GCOMMERCE REENVIL— NORTH RI_INn 22058 2521 -9352 AREA MAP 500 25o o SO. i000 GRHPRIC SCALE.:•=500' B INDEX OF DRAWINGS SHEET Cl COVERSHEET/INDEX OF DRAWINGS SHEET C2 EXISTING CONDITIONS & DEMOLITION SHEET C3 OVERALL PROPOSED SITE PLAN SHEET C4 PROPOSED GRADING PLAN SHEET C5 INFLUENT PUMP STATION SHEET C6 PROPOSED SITE PLANT PLAN SHEET C7 PROPOSED TANK PLAN SHEET C6 PROPOSED FILTER/UV DETAILS SHEET C9 PROPOSED EQUIPMENT & PIPING PLAN SHEET CIO RAPID RATE INFILTRATION DETAILS SHEET C I I SITE WORK DETAILS SHEET C12 HYDRAULIC PROFILE SHEET C 1 3 OFFICE BUILDING SITE PLAN SHEET C14 EFFLUENT PIPE PROFILES SHEET Bl OFFICE BUILDING PLANS SHEET B2 MECHANICAL/ELECTRICAL BUILDING PLANS SHEET B3 UV/FILTER BUILDING PLANS SHEET Sl TANK FOUNDATION PLAN SHEET S2 BRIDGE CRANE STRUCTURAL DETAILS SHEET El COMPOSITE ELECTRICAL SITE PLAN & ONE -LINE DIAGRAM SHEET E2 MECHANICAL/ELECTRICAL BUILDING ELECTRICAL PLAN SHEET E3 UV/FILTER BUILDING ELECTRICAL PLAN SHEET E4 SBR TANK & INFLUENT PS ELECTRICAL PLAN SHEET E5 OFFICE & GENERATOR AREA ELECTRICAL PLAN SHEET E6 ELECTRICAL SCHEDULES FOHA(L DCSOOGH - Hair INELLASED FOG� comalrRucTOOII, `? eH ry_. 1 ROPE 52T9 jlEEs�dj � z Za L INWOOD E. STROOD. P.E. S\/ / HAMMOCK PPACE ` 6. s1P� Elv Ex. 1. 1..1 Puw — — — — — — — — — — P. PROJECTPROJECT NI DRAWING NO.: BRENT C. WHEELWRIGHT & ROGERS.PETA L _- — -- 1 //- / BRENDAP DAIL \---------_ .;boa -------------- A- -- t..`::o.r 'a..... u I ' BRISTER BS9F )r:i'r , - -t\ / % ' ,r;i'; l' y'" �I I -� VENTURES` LLC iL_I :I oe ,nsz. P sz Ex. P,Pss � •;"�b. &o' \ y /;?„5„°; wy, I � I I ",�'" N„ +d'L' ��,'' o. IET is3o n _ i H&B VENTURES cat, OwF MH C, LLC , u„ i NINE LITTLE, LLC ,e ----------------- WC u WEApERgcJR _rvw PE52•/g 0�00�AL DESUGH — NOT �o zs d RCSLEQ3ED FOR GRAPHIC SCALE: ,'=su 6DG�1�4G'�NJ64OD� l?/jZlza IEGEM --------- 11:1ER IxG SUeCpHld xEaDER OExxHEe lxD DIGCxeRGE xE.NER G L �GERVATIp1 HELL PROJECT NO.: p DRAWING NO.: GRAPHIC SCALE: �D \� WHEERLWRIGHT n caxC—E° aAP P. 2 F a z CONSTRUCTION SEQUENCE xe b�pmal a ib ampserdanon woos me aew uavrp la mmw�ree. me yy an ueaneaaprextmar: oilrtlaezun uaa �aetrcat�me m MecDonstrnnionWMe ................ . �"aareaaRee ntt wDh��elx rc'�asiall naa� p'"ea�nea°vam�ehmR wm�lami`m'�nda �a, a meta xa 1,11 dmaoaiXiai a.ni5ea it m792,i'ud L%^oraGln non i la°.xiri to otncr enema aaarem .manna mawl meaearea as a wo oa maEroe oa as ale wire oa a m plaa. oniae}iyer a ee'h eor rapm as lean ion dpa amo�na eo sxME.F ."b. aware. an zt gSMmeina a e manner. mNllE'-I 'Zib"z rax'ry eMuent pkeewHA rwmillelmnveviiwuee eoHmux imeatwn ponetl� xeaarrept. p etxan amm ml .Da;41am emxm m.xle Z. H lewi enable Ne begcennihipm of zonnNnioneofathe new�wVprtmp tM]S xtG .x nn wells:u a.amm ."mane. hr op�ztanN't'nmau pumps ertl wnrenett �a iM1epez�utsetl v�akati z Me Nolh w tlot enzlwenng MytM1eaunLarem �Plt�tb ban�imm'pmYo''o1M Gme adbp.oaszme nan �txmaezaaumulatetl In Me bpemm o(Ne ].G ppndantl rwe man�,er elna/o toltxeera�irye �n�u nzl�M. Monitor NelleuW level Imgatb�reeE kdnllake zuretne r aaaw ena zgeNe plareiM1ls Gslnmsenireponmmpe nremthe inxltrauon zhem°: cw��.etiotn m:<na�alp"`ewaia wnxn were aotma,o-ae�en lEL ,Ep '. . El M---------- — fir, i E—:— SIAEACE —S —1— INFILTRATION ElAffl� EMBANKMENT SEC INFILTRATION BASIN2 IS 21- EMBANKMENT MBANKMLEN WS.C,..; T El S ENTRANCE ROAD SEC S—E: HIS C4 ri -77 - - - - - - - - - - -- 0 ol ----- -------- X" ---------- A IJ "DID, T 4, -------------- ------ 4, gi REV I S 1 0 N S — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — _4 -------- — — — — — BRANDYWINE BAY WWTP UPGRADES *'q 1111—P,cu PO OWNER: CAROLINA WATER DESIGNED: L11 ADDRESS: PS7BVDllC2E469l0N8C OF N.C. azza 121-4. APPROVED:— 10 21 FUMAL DE808M NOT RELEASED FOR 4STROUD ENGINEERING. P-A- 1111/2. PROJECT NO.: P GRAPHIC SCALE: N COSTRUCTOOM V, ICA-1-- DRAWING NO.: S— I SHEET CS OF 14 EXIIIINo 8 lVo I— WA5H '??I 111.10 A.D.L. REMAINRAIL is HEWV1 1,,15TING RSVVE V411"No CINC-1 C.N1 D vAL V,P, 11111ING o—o 1A.1 CoN M— lANI.; REPL401;S EXISTING CONDITIONS ooCT,,,A, PL,—,CUA"1RSTL,_ L. PLAN VIEWIM -o" \L5 C A Yo— ... Ni oil 0 DIP �111Tolll ,H N IIII PUMP C.ECK 1-1 1' PLUG I—E R KV E —,T,4G P-5, A, LVE, su" R 16L E E L IATI Is E p —E I A' WIE xi G PLUG PROPOSED CONDITIONS o-- E-1- ELo.. PLAN VIEW /-B 'N \L5,j PROPOSEDCONDITIONS I' SECTION 2 II II VALVE SYMBOL LEGEND o'- IEE I' 11UG VAL. A' U— VALVE H, E V I S 1 0 N S MANUAL PLUG VALVE AI—A-C PLUG VALVE n —L—T I-P ITAT— INI. 1.1. MANUAL BUTTERFLY VALVE D.1=11111 BRANDYWINE BAY WWTP UPGRADES CHECK VALVE VALVE VAULT SECTION r3 E.E.1 INI—P. CAlTILIT CAROLINA WATER OF MANUAL GATE VALVE (07 I 111CARICELO ADD—N.C. — plioll: E .1 reDx—TPAAK M-1IDI "AILI.TE,,N N.E. 1-1 EXISTING CONDITIONS SECTION EC —LE: (@ RELEASED F (0 IR COMM V ....... PROJECT NO.: — DRAWING NO.:DDs NORTH _Exeio �-cnx�nE.D .x 5R T� euroxer PC GP uc cve m l��� wuunx surt[xrcr HcxEcx vnxvE jhMAxunx -TE vnivc PROJECT NO.: P - - ORAwING N0.• LGR L YARD r r y rexG xroxenr� SBR•1 aRo x.Gxexr LE 11 ---�\ vecvE n eax FLOI x �DIS sXEE i ---- \ e MECHANICAL/ELECTRICAL BUILDING =_-_-___-_ FM I_ sxECr n PGR xEraus� DIGESTER UV/FILTER PaR GEreBUILDING : ___--- a==. �sEE sxEEr cx us1 EQUALIIZATION ----------------� /�G n Pwe ________�_______ ec vxov os[o 1-1 sire nu A Texx Gxelx ,—�" BRANDYWINE BAY WWTP UPGRADES Ixv"s� —E.— T-1111. —TIlIT eouxT.. xxxrx cePo��xe OWNER: CARD CE, WATER OF N.C. DESIGNEDt cEs ORnXrv: cxu ADDREBB:SEROIGEOINC. 901 �o� 1��.� /� 1� 2 (� (� 1�1� 0 2 H IT 0 MRELEASED I��i 5� OO II � �� � � PHONE: ezza SENGINEERING, PPROVED: xEs 9TROUD P.A. DATE G 0 o �AIF2IL 1�DD BLS ((S� II22� InM o c o RLS ISnnEQ5�SnLSnnD 5�FOnWn GRAPHIC SCALE: : l lhOuV u W V u OuV ^^^v'�✓ LEI HZU F i cu— SCALE:'=�o' GXEEi CB OF 1 SBR-1 YI0�-,T,l,W FD� D' I T - I I ID I - I� I 'I - - ---------- III O -------------- -V TID SBRll I T- IR- ............ II- - - - - - - - - - - - - SIR 'ET-L" IIII J1 1 IDR IET IIE OKI`% I II 112 II FT 'i�_ -MZAK - - - - - - - - - - - - - III8LDWtR I II II D, 'o I, ---------- -------- TF— ❑ III - - - - - - - - - - - - - - - - - - - -I - - - - - - - - I -- - - - - - - - - - -- H 41 IIII L=== - - - - - - - - - - - - - - - - - - - - - - - - - - - - ---------------------- = ------ --------------- SBR-2 PLAN LIE! 13��I TO. IlR- STER IET 1110 T.lE DE-IP710H fM'DO -ID II -TER MO ELEVATION PIPING I P I ��IE PROJECT NO pRpW�NG NO.' DIGESTER % FUMAL DE6112M - M07 RELEABIED FOR COMSIMC7110M �mil.k 14)1?-1- L1111ID E. -0- I.E. I POST EQUALIZATION J I °° °Ew °°wPwEe=°e �TawE eE ee,°�s ❑ ❑ w.wu.v ww° v.vve I sxEET szi ee I RE—GERA NE1 °e.ee °ew w„„. T.w ° 0 eEe°w .° we". ILI _",.."_„ eEv - •� SECTION g v 1 BITTIeE " wv :°— UV ev •xaz" Eve°w eurTEeav v.vvE <.°�.,TT ,e eeTTEaa1 1— eea* .gyve Ee °1 eSTOP Eve v°w weiTIC re °�' --- -- ,TE " wv° TEE ' -- — s".k• eve°w --- ------------------ ------ (� I I v,vvE jm ,o Eve°we ,> v;"yeu ERar a vY �i wr °w� w ,e °J ,°�x,vg- Eveww ww�T �TYe, ,e e�TTEwa. v,vvE ° e Tree. v.vve eE.e,°Ew.T a°w eEe°w°E c-011 TE r°*,� i zee o. e•xe" wE°.IEA sA_. �. ,, b" -V ree o m .vvEC.Ell° Eve°w oa:iw,e°Ye.v ow A wE °E ew,e's IKET PROJECT NO.: v - DRAWING NO.: °�sre FUNAL RELEASED FOR COOGJ87RUCTOO DECANTER SECTION �21 sine. w*s Cg PROJECT NO.: >w DRAWING NO.: SECT . .ION 1 sc.�E—o Cg DECANTER RESDETAIL I ;s sc ,,E Ss T C9 SECTION 4 w.s C9 ey Pt(g try FONLA L DD ESOSN — NOT RELEASED FOR CON87 RUCTOON xw000LE. siRouo. P.E. INFILTRATION BASIN w2 SECTION, .T ro scus Cl0 .;� WIN � d °Pae"E� III SNIP RAPS III °Q I Ls� Pvc EPP,oExr PIPE II II EFFLUENT DISTRIBUTION SPLASH PAD ttus. vz a -0 0 III _ II oEP,x vAR E I I _ - II cxt« Ei§o: EEso. DEWATERING PUMP SECTION 9H xor To I -I nr exx l0 vn�vi ec�wni caucE xIYI z OxzPx EAieawvacvE DEWATERING PUMP PLAN VIEW 9A '• xxr ,e scus CIO s000 Pzl coucxerE z vvc DEWATERING PUMP SECTION 9C No+ To SULI C10 PROJECT NO.: PM+3+z,- TYPICAL DEWATERING PUMP DETAIL xor TO scuE C10 °gzfsseE DRAWING NO, DEWATERING WELL SECTION - 10 1-1 CIO INFILTRATION BASIN ^1 SECTION / 2 T xo+ To scnE 210 4� ILL sac+o+ SECTION � EFFLUENT DISTRIBUTION SPLASH PAD / s1 sous. ve=+a C10 sTl w a G P+P xaeEE wcu cav I R III 1 ' Rl— wax - I I + E I . HIlL I I I II I II ' I I EAcx wA. ry x AERIAL PIPE CROSSING CONCRETE PIER DETAIL SEA4E. xrs c1D MONITORING WELL SECTION ' ' ` NOI TO z 1E C10 GROUNDWATER LEVEL OBSERVATION WELL / 6 1 PLAN aVIEW 11 N,T ro "AEE C10 cALI + C10 ocxaeEE wEu uv yna +s aQ Pwc WN4 `" I I ISEE xE _ I I f vAEVE v.wE I eo°o Ps+ mxcxErE "°ITII x "ErEx PIPE s°PPONT 12 —1 SECTION NCP+o RarE +xv+Er 12 vxE scn SEC e• °^ a+�... cEnExr oxouT BRAND BAY RELEASED FOR °w OOO NSTRMC 700H xzxrox I—RIIPI, ONxNN: CAROLINAxsWATER rERE uarexlu axx sxa`cnr+ox NITR,,+ve over .L` AOOR� 9E BVICE, Ill. OF N.0 + _ ppf32>9g = PHONE — ++ WELL CAP DETAIL 10 5 Icar+Ox uuueER tt rxE xaNE nis+cx�O€ 525-xsso H 51 e. 711 I INING THATxTHE WEicxisynOT IOR NarEI . ♦ waxx+x0 THAT 7" 4RWrvpw _ I.wr IRT' ry suPPcr AxoWTIFICAT +r nw scu+: xrs C10 xainNoocsTO ♦NE TOP III O.Trax Or THC SCNEPni Ax TxECP. E STRGGG 6NCIN y s. rx1 OEvix ERRING. P.A. Oxa R. rxE xxxEx 12 C10 vauucEi�aw eox FENCE DITA11.1 PROJECT NO, au DRAWING NO, ai FONAL DES90H - H07 'All RELEASED FOR 60MSTRUC700H 7-6 ao......_ _....... _............... 35........ __...... 30 _...... ................. __ ...... ......... ._.. -_..... ..._ ..........._ _........ _ ............. __... . ............ __. ... wL 3T.p .......... __. . LEL uv.oza ziluc OVERFLOW WEIR a........... ... ..TIOu cTERNDIGESTER RREO 25........ ...... SBR •1 _..... .............. ................ _.... 'ET 'DTIVE ..FIIMP.... ............. POST EQ _....... 2r.6s T 2r'6s wl 25.1r w.1R EL zz.s .................. I .......-. .. .. 25 FLUIDYNE CLOTH UV DISINFECTION R - z0.... _ ....... -... .............. ........... ..... ........... ......... .............. MEDIA, FILTER .........FLOW--6[5TRIBUTiON ................. _...:. - - -.... zp TOR 19.O REle.s STRUCTURE POST ED PUMP -INFILTRATION BED t0_..... s_..._ _-...... ............_. ....... ......... ............. _.- ...... - ............. _. ........... -.-. HIGH RATE INFILTRATION BASIN •2 ___.... __ ................. _. ......... __... ........ _......... .......... ........... ... ROT i 36 p INFLUENT .......... .. ... ............... .... -. ..............PUMP - STATION ....TOP 36.0 .. ...... ........... ............... IT 1.11 .. DIGESTER .0 LEVxEOzeRzii Nc LoERI— wEIR 61 L QC E LION pE LETID ........... ............ .............. ....... 25.......-....... SEE •2 -._.-.. _.... JET MOE VE ...PUMPS. ..... POST EQ 27.65 Zi.65CTIOx .. wL 25.1r WEIR EL 22.5 .. ......... .... FLUIDYNE CLOTH UV DISINFECTION suR zt.0 zp zo....... ......... ............. ......... .. .... ......... ..... .. ......... MEDIA..FILTER .... FLOW--DTSTRIBUTIOIC _...:. - TOP tR.O PEiR.s STRUCTURE POST EO PUMP -INFI HED TION- is.........ROT 19.5 -.. ........... _.-. �..I.g., y.. ......... ...... .................. ...... ... -.. 10 ....... 5 ......... ......... ............. ............... ... .......-.. .................. .......-........ .... .......... ................ ........ ...... ......... HIGH RATE INFILTRATION BASIN "1 -......... .................. -. ....... -.-................ ................ ............ ............. ..... ................_ 10 ...... s ROT 1.36 . .. INFLUENT ... ..........-...... PUMP -STATION ET IMSLI - ... .. -. ... ........... ............_ ................. ..... ................ -.. ... -... IT IMSLI W E I S ION S IT f ONAL DIEBRaaMn e M04 E"s Wiz` RELEASED n�n(�S�FT��TnI naa 5�F OO R PROJECT NO.: Puol zt-O6 OOMS II RUC ll DOIN DRAWING NO.: LINIODD E. STROIDt P.E. -- — --- — — — — — —o---------------x —:--------&------------------------------------- NP AxGE --------------- r - - --- -_ EEIIE l� DEr., = x1D . ,..P, x------------ -------- 0------- -----0--------------- ------ -- _ --- ------ GxGPETE DxNPE xG n o Lo __ __________ ____ ____ _a.s . ' - - - - - Ex a^ rDuceuA,x ___________________________ ,._.._.._.._.. ...._.._.._.._.-..-.._.._._.._. _FY............................................................................{Y_.._.._ ' Lc U PfA � P xG Sv - PROPOSED OFFICE SITE PLAN (A \ PROPOSED OFFICE GRADING PLAN C13 sGACE. , =,o C13 RESE V 41SDs �E:D's iILIN Eo PARKING �► sxcEr uETnE siox n REV IS I DNS W XIWY PENALTY E s zso e"s. D oc.cx. OF —Ell.G FICTION IF AFER G—TEPIxc D,scxA— xEADE PrF�..,..„, BRANDYWINE BAY WWTP UPGRADES HANDICAP SIGN DETAIL 0 poEssq y P r cDx s E. ITS C13 °F'Eu '= OWNER; CAROLINAWATERDESIGNED:.Es SERVICE, INC. OF N.C. `--'S. ADDRESS: siojxDx zaosoa I DEANN:: F]H A L DDE80(am - MO4 f .EETPAPxDP..nD,TE,D x PHONE: iioaiD5i-,990'2etza APPRDVED: I[s RELEASED FOR 0 6OQ H87RMC 700H $ 3TROUD S ENGINEERING. P.A. DATE: PROJECT NO.: P - " `/"--"'-" � -" /O/��Za � i cnnai SCALE:As sx DRAWING NO.: _ SHEET C13 DF 1 PROJECT NO.: au DRAWING NO.: "oFx�"'✓E's�i s' uoxExEno To.xsx�P. c.vTeweT co mxoux. EFFLUENT PIPE PROFILE BASIN 1"�_ a = OWNER: CAROLINA WATER SERVICE, INC. OF N.C. DESIGNED: �Es HIGH RATE INFILTRATION "PFsvD = ADDRESS: s;o a:i i> n2aTI oRAwx: c scn.E v_ _z 1. � PHONE: _ ezza iID APPROVED:"" 2I� nnnn /� In� 2 (� (l Ian I�� 5� Ir U11VQLS DLS C�JEI:-J IIV — IIV O� II NG � ^j STROUD ENGINEERING. P.A. DATE: ILI��n�E((���e5�SnEn ID/�a 5�FOR ^n CoII 8 11 RUC Il DDH �s �D L L(L/�'O �/.� si;oi _ �..ai St:AEE:�:;• 9. SHEET C14DF 14 HARDWARE DOOR AND HARDWARE SCHEDULE '" = p(� O _ ® '_s�,';,k nooxsRL.w000 sREATR,rv� saE woCO I.C. OFFICE cLosEr OFFICE ® _ COTTERS ROreR ICArvE T,E ARO © I i°rww�nl l vEFT DOW SCHEDULE COMMENTS © ® MATERIAL '�71' ILNGLE PANE VINYL PUSH OUT 3 4 f Bl FINISH SCHEDULE CONFERERCEIAR— RDOu FLOORS CE,C,rvcs OFFICE dEATR,HC TILI cats _ cv'RBZAaoF ECODE TIIE O ® ury..pc aosET 111111TI IYI IlAll- RUESEIGING a AaO PCIT ❑ a FLOORPLAN A SCALE. , _ -O B1 FRONT ELEVATION @ REAR ELEVATOION @ =� Hl PROJECT NO.: DRAWING NO.: LEFT ELEVATION �21 SCALE. . _, _ Bl RIGHT ELEVATION �41 SCALE. ,_ -O Bl TYPICAL WALL SECTION �31 SCALE. ,_, f UMAL DD ESDOa - NOT RELEABED FOR OOM87RUO700a FOUNDATION PLAN SCALE. PROJECT NO.:R -s* DRAWING NO.: xRaRW,R ECRW,LL,ANE SITE a rEo li—�— 11 ALLESIaIRFAE Df CONCRETE AIEI To 9- AND FRU vWA Ca R.vERncAL - _ I -CELLS . ER IE— .1 C.RCRETC — HE z -°' co _UIBu°sp r TYPICAL FOOTING DETAIL �1 ` FOOTING DETAIL i SCALE: ."-r-O• B2 SCALE: i,A=r-O• B2 TIFICAi TINT IRC.LT CCUDOWELS AN ❑ 01:11:10 ❑❑ TYPICAL FOOTING CORNER DETAIL (31 SCALE. ITS B2 TYPICAL REINFORCING DOWEL PLACEMENT DETAIL %4-- SCALE: RTs 132 10 E: SAW CUT SHIBULD BE 'OCR AS CONCRETE 5 To ALLOW TROCTION TRAFFIC SEE PLAN) ON sLAe. OR LO:.T FLEAR DEEP AT 1C.DL SAWED JOINT DETAIL r5, SCALE. Nrs 112 A F,sz�E ' RELEASED GOO G3 C OO M 37RUCT00M OFFICE BUILDING KITCHEN ELEVATION A ­­ m-, - '\L3� ® � Dix TOILET ELEVATIONS I . 111,11114 I'l_ _�Al A L .1 1 ll­­ �� PROJECT NO.: DRAWING NO.: FILTER BUILDING -KITCHEN ELEVATIONS 24' Vle'� lklll Z —T TJ SHOWER ELEVATION FILTER BUILDING BATHROOM ELEVATIONS IIAL13 V­­ LAVATORY ELEVATION FHHAL DIESHOH - HOlr RELEASED FOR COH87RUC700H FLOORPLAN A FRONT ELEVATION / 1 SCA-'W=,•-V B4 LEFT ELEVATION �31 SCALE: �B4 RIGHT ELEVATION SCALE: -C B4 PROJECT NO.: FWnI-zno DRAWING NO.: FOUNDATION PLAN SCALE. o B5 TYPICAL FOOTING ^ TYPICAL REINFORCING DOWEL CORNER DETAIL / 2 \ PLACEMENT DETAIL �31 B5 SCALE. rvTs B5 $AWED 0 IIL.L 11 TIE1111 ,SEE cLaNr r Sl r sRo D HE IT 1-1ILLD'CD TRUCTTON TRAFFIC SAWED JOINT DETAIL (2) SCALE. NTs B5 FOOTING DETAIL / 1 SCALE. .-, -a B5 ar PE szre . FOMAL DD CESOOM - M04 '.....C. RELEASED FOR p C OO HO TRUC TOOH I x'eiER xEeiER� ENERGEN[v GHODER® Lee eRE — 60 e° FLOORPLAN A GCALE. G B6 FRONT ELEVATION / s—E. -D B6 REAR ELEVATION / D� SCALE. ie = -0 B6 R E V LEFT/RIGHT ELEVATION BRANDYWINE BAY WWTP UPGRADES. SALE. �e= -G B6 ,�„p<H^zaR6. 3:apaE s,e. k 1AI-11 PE 52]9 = ..P. CAROLINAx WATER _ e SERVICE, INC. OF NC =vim a ADDD� P.O. Bou xaoxoe 1,� EEE?'� � 5io� xE5raA0x oR..sul rE �o� r�%L[EASED DCSO(a - a0O 4INOXB f�On� R.RDE�RINmsF...D.xxD. PROJECT NO. : HNn+-zi-oDD �OWSu Wv64�0003O FOUNDATION PLAN / H TYPICAL FOOTING CORNER DETAIL / J SCALE. ITS B7 TYPICAL REINFORCING DOWEL PLACEMENT DETAIL �61 SCALE. NTs 137 � sawcB �B PILL 'IT"OR .IBINT PI RR ISLE PLANT EAB BEEP AT JOINT NOTE: ASASOOUTASHOULD BE IASETo ALLOW pCONSTRUCT ION TRAFFIC SAWED JOINT DETAIL SCALE: ITS B7 PROJECT N0PN:3:-p*o URAWI NG N0.' FOOTING DETAIL / 1 ANO. B cPU-PEERC r EI.P-ET BsI OB RETE scacE�,, -0 B7 FOOTING DETAIL / SCALE: " BB.,EA.�ENE LNAT SITE F To sgxPk TEB� TO Rlw TNNciRNENT. EVE zNo"c°BNRSE BEI�IR IS 'TICAL . B BEAN tCD uREF I W- E�III� uousR FOOTING DETAIL / 2 SCALE: \B7 STEP FOOTING DETAIL / 4 1 SCALE: ITS B7 rFOHAL DES"3K - NOT L�ELLEASEO FOR 'OO NSYR JC6400M opt H.cgR�<",e 2Qo-p�Ees: r cB snB INrmo1. FOUNDATION SECTION 1 • • • • SI • • • • • SBR^1 • • • • • • PiW • • • • • • � max ::ice �. � I �� �e�• • • • • • DIGESTER • • • • ra J • • • • aePP,�E , POST • • • • •.�T,x• • • • • • • • • • • • • EQUALIIZATI.ON • N cJ • SBR^2 • • • • • • • • • • • • • • • MR Too of L. THS IIIT SECTION 3 Sl SH Ilk IS SECTION 4 �'�PoVia`'°°• s 4'- ` ap PE STS -: PLAN VIEW A1 RE LEAanEfI flD/�y�FOR C�OHISYRMC� II OOH PROJECT NO.: DRAWING NO.' RER€`s"c III • x ie� I..- ,. AIWI IA ESRL oxxcewTS ou ,xs,oE or ease P,uc ex.xx'I nxo xa w NTea ox°s9 n vox PEn45 �ry ry . L PROJECT NO.: vN DRAWINC NO, I PLAN VIEW %1 DETAIL �1 DETAIL rT1 SECTION SECTION sc.11. 3.,6 -o S2 FOHAL DES02M - MOO V RELEASED FOR OOMa4G3M0400M ,...,. ` 4' .w.,y 105-41-11 PE5M 4-w ip P !p/l, 'Zo Pwa PROJECT NO. DRAWING NO.: PLATFORM PLAN VIEW 1,53 PLATFORM FRAMING BEAM CONNECTION DETAIL FUNAL DE008H — HOT RELEASED FOR COO N87RUCTOON PANEL 7LP' \ OEWAIERING PUMP CONTROL PANB. 1 - DW ME, J/ UNOQiGRWND ELECTRICAL SERMCE GENERATOR AREA _ - - - - - - - - - - - - TD UTUTY TRANSFORMER BY UTILITY SEE SHEET E5 ' OW PMP 460/277 -C. 3-PHASE. 4-WRE GENSET MIS/Eenv 3P 4W 5. KW w 00, p3/0 GROUND IV OFFICE BUILDING 101 N01E 2 8DD r SEE SHEET E5 r GENSEf i AoI N INFLUENT MECHANICAL/ELECTRICAL BLDG. d PUMP ------------------------------------ INFUMEN µa ,o'$ STATION UV/FILTER BUILDING ENCLOSED EN.GSEo �' SEE SHEET E4 SEE SHEET E3 BREAKER ERE. R PANEL 7HP' 48DY/27]v 46GY/env 3P 4W ) SCR SP 4W INFLUENT SCREEN" 1000A BOOA / CONTROL PANEL ,� — — — — — — — PANEL '2XP' ' NFMRY P EL kIP' \ — — — — — — — — — — — — — 1 PANEL 'IlP' - POST EO PUMP \ 100D.A ENCLOSED BREAKER I. CONTROL PANEL \ ENCLOSED BREN(ER 'ECB2' DEWAIERING PUMP p3/0 GROUNDING A15 \ CONTROL PmF1 2= ELECTRODE CONDUCTOR PANEL 'I HP' — \ /'TPANSFORMER 'XFMR1' d _ 1000.A DW PMP \ pW MP ABO 4SP 1000 2 Y/2JN 4W \ I pW PM, — ` — — — I I SBR TANK ,DOO.A MECHANICAL/ELECTRICAL SEE SHEET E4 BUILDING aov%env `\ SEE SHEET E2 3P 4W \ 1000A BUS MLO ` L \ UVtFlLTER BLDG. 400.A —A , 60D PANEL 2HP PANEL 3HP MCC 175D L \ /,/ �VN PMP PANT/2]]v 480Y/2nV 600Ap\/', SP 4W SP 4W 480Y/2JJV %FMRl \ 400A BUS 200A BUS Sp 4W 112.5 KVA —� 400A MCB ) MLO MLO 4BOV 3P 3W PRIMARY 2o61/120V SP 4W SECGNDARr L � PMP \ DI-TERING PUMP CONTROL PAN3 EL #6 GROUNDING ELECTRODE . ♦ �'— — — — — — — — — — — — — — — — — — — — 70D L _ _ _ _ CONDUCTOR I PANEL p2/0 GROUND (NOTE 1) %FMR2 L 980VVUS }P 1W 400A 3W PRIMARY 208Y/120V 3P 4W SECONDARY I SOD A MCI ---- J 2 Y/12V — — — — J { � E1�Cl ftDODE 15a SHEET NOTESOFFICE E 15D CONDUCTOR PANEL 2P 1. DO NOT INSTALL MAIN BONDING JUMPER (REMOVE IF PRESENT). P3JLP BUS 150A MCB 2. GENERATOR IS NOT A SEPARATELY DERIVED SYSTEM. DO NOT BOND NEUTRAL & GROUND. BUS 150A MCB 208Y/120V SP 4W 203P 4W V L — — — — — — — — -- — — — — M6 GRWND — _ (NOTE i) 1 ELECTRICAL ONE -LINE DIAGRAM EI SCALE: NONE PROJECT NO.: PM131-21-006 DRAWING NO.: 019 FEEDER SCHEDULE ID £ddDdR ALPS CONWR AND PSdDSR 200 20 1/2'C.3 2./12G O 60 1-1/4'C,3B4,/4N,p1OG 600 60 1"C.3A4,pIOG J00 70 1"C,3#4,#BG cm w ISO 1-1/2"C.3g1/O,ql/ON,0G I.SOJ LED 1-1/2'C.3W/O,DI/ON,#5G 1]E0 175 1-1/2°C,3/2/0,NSG 200A 200 2'C.3{13/O,Y3/ON,ReG ® S. 3°G3135ok—,f350kcm11 N,y2G 400.A 400 3-1/2'C.3i600kcm6.y800kcmi N.@2G fi00 600 (2)3'C,3A350k<m11,1P350—I N.#lG ® 800 (3)3'C,3i300k—I.fl300k<mil N.rl/OG I0m0.A 1000 (3)SC,3/WOkcmil,p400k<mil N,p2/OG 1004J 1000 (3)3'C,3/400k<mil,i400k<mil N.NI/OG 51DNG METHOD: COPPER, 80'C #12 THROUGH pt, 7— 1/0 AND ABOVE rf1 COMPOSITE ELECTRICAL SITE PLAN E1 SCALE: 1" = 40' R E V I S 1 0 N S COMPOSITE ELECTRICAL SITE PLAN & ONE-UNE DAGRAM BRANDYWINE BAY W WTP UPGRADES MOREHEAD CITY CARTERET COUNTY NORTH CAROUNA F s�s, OwNaR: CAROLINA WATER SERNCE, INC. (IF N.C. DESIGNED: '^ ADDR1355: _ M DRAWN: WCB - PE021990 '. MOM: 701-525-7990 APPROVID: LMS DATE: 1/17/2020 MqE STROIID ENGINBHRWG, P.A. N5 AS SHOMN L. MICHAEL STROUD, P.E. 1�115B ° SHEET El OF 6 - ---- -BCt - 1HP-a,10,12 ------ 1 1-23 1-21 N 1 2 SEIR =I PANEL M V movM ov ---------- AT-- mcc NOTE mov --- IMP I t t A =k mov L --- 1. /MCC-4 C— NOTE1 MCC-7 1-17 ovMP II II HEM .0 2 8L., BLWR 5 I.P 3 .0 G I I ov OV ELy NOTE 1 El 1LP-15 HP11 /—I- MECHANICAL ELECTRICAL BUILDING ELECTRICAL PLAN Ez SCALE: 1/4"=1'-0" 1UP-13 HEM A lLP-. A A A 0 IF E10— mill M m A 0 O A A A MECHANICAL/ELECTRICAL BUILDING ELECTRICAL PLAN BRANDYWINE BAY WV-rP UPGRADES MCREHEA) CON —TERET C-1 NORTH CAR —A ov� CAROFNA WAIR SERACE, INC OF N.C.DESIGNED: ADDRESS: DRAWN: WGB PHONE: 704-52507990 APPR— V DATE, 1/17/202T MECHANICAL /ELECTRICAL BUILDING LIGHTING PLAN BCALE A5 —M PROJECT NO.:::: 131-21-ON DRAWING N020 ,L2SCALE: 1/4"=l'-O" — IV —NA L MICHAEL STROUD. P.E. O=-9352 —T. GE 6 SO PUMP — PANI PROJECT DRAVANG POST EO PUMP CONTROL 2HP-8,10,12 uv 1E 7- 2HP :%TIMP-111 P .'m u up =11 I P— axE Ron RonU-T Ron Ran RaMT o�eN�o„a, I'm ,Reno 1 WAcRxcr M"— 32 eon Pp .MOT.ml Pum I on lz eon IAI Ron21� on Ron on Ron 1A.1 on on eon 21/1A Ron2 on 1 on 1. 0 ... .. .. K. U.— 02eo —.0 211 2% Do r Do A Boa 21 .2 2LP w —2 P 2 aEum lu.P 2 —1 1- pn 2 1.75 eon von xP 1� 1/, 1. /, 1p" —. 1. . /2 P 2.. 11 eoneon �P— 1 eon a+npin ./I —c o oon 1 1/1 1 1.� eon on ,uan I.. I'll,Ron oon on 1p— 11AIE Z ./I on w on P.— �N KV� 1- (12M 0- 1 2.1 R7 (=O) —UNGe.aa con UV/FLTER BUILDING ELECTRICAL PLAN BRANDYWINE BAY WWTP UPGRADES MORSHEAD — CARTEPET COUNTY NORTH —OUNA 0w - CAROLINA WATER SERVICE, INC. Of N.C.DESIGNED: ADDRESS: a" WE 1. . A DRAWN: WGB PHONE: 704-525-7990 AFPm—: LMS A—GRMERING, PA. D—1/17/20M —.—S _—T ECAUE:AS SHONN -=l _. ..__ SHEET E3 OF 6 SBR TANK ELECTRICAL PLAN 5GA- 1/4-=l'-U" PROJECT NO, PM131-11- DRAWNG NO.; 022 „INFLUENT PANEL PUMP CONTROL PANEL ,?3. INFLUENT N, 3., SCREEN CONTROL PANEL INFLUENT PUMP STATION ELECTRICAL PLAN SCALE: 110111110 1 L. MICHAEL STROUD. P.E. X HP NP G 3LP-J 43_ 3 P-g 3 P-13 1P-20.22 3L 3LP __ ____-- / _ __• G 3lP-i 3LP-11 � 3LP-3 \ 31Y-16,18 \ � WHt GENERA BLOCK HEATER 48" C � NP GENERA R BATTERY CHARGER ' 3HP-7,9 NBET %1-'� OFFICE BUILDING ELECTRICAL PLAN 11P-31 E5 SCALE: 1/4"=1'-O" 3LP-15 C F c �3� GENERATOR AREA ELECTRICAL PLAN 3 c E5 SCALE: 1/4-=I'—O" c B C C c c c c21 a aIAI OFFICE BUILDING OFFICE PLAN R E v s 0 N s EFJ SCALE: 1/4"=1'-0" 0MCE BUILDING & GENERATOR AREA ELECTRICAL PLAN BRANDYWINE BAY W WTP UPGRADES MOREHEAD CITY CARTEREf COUNTY NORTH CAROLINA DwNER: CAROM WATER SERNCE, INC. OF N.C. DESIGNED: wcB P°sEAt IV ADDRESS: p DRAWN: WGB aPE021B90 7 PAONE: 704-525-799 APPROVED: DAS PROJECT NO.: PM131-21-006 DATE: 1/17/2020 q s/'MS'IROUD ENGINEERING, P.A DRA`MNG NO.: 023 / ✓✓-LV/ � 10J e nA L. MICHAEL S1R000, P.E. (�) T58-Y152 CIRW SHEET ES OF e 3LP mmnsow 1P .. ;T zon I zan von I von v vv pn =an I I m« snx1L , van pn nxc vaAv I r � � .«w :on zan zan I v T o< U� nnrzx .� van von zon pn van von von von von vvn pn von von von von pn wn vvn pn vvn (zx1 aUs (, p Ourci (,ao� ruvcs a.m a.ee (wa,o) a.r (ox) EQUIPMENT CONNECTION SCHEDULE °-© VAPOR TIGHT LED STANCHION MOUNTED UTILITY LIGHT 1-1le RIGID STEEL CONDUIT (TYPJ B' ABOVE WALKWAY DECK RNLING C J-BO% SIDE NEW (STAIR) PROJECT NO.: P-1-21-DOB DRAWING NO.: 024 GENERATOR SCHEDULE wonn� �v .w TRANSFER SWITCH SCHEDULE +amnnv av .w PANEL SCHEDULE ENCLOSED BREAKER SCHEDULE .eornm m .w .mrnm m TRANSFORMER SCHEDULE zreri�wxnuv wus zaw.nzo..w .w 25- ANGIE MOUNT STANCHION — 1-1/4- CONDUIT HUB T STYLE G-GUIT BODY AS NEEDED ]'G` ABOVE WALKWAY W STYLE BO% FOR DECK — RECEPTACLE (WHERE INDICATED) GALVANIZED U-BOLTS J-BOX K i) END NEW SIDE NEW (TYPICAL) (CATWALK OR PLATFIXtM) I SBR WALKWAY LIGHTING DETAIL E6 SCALE: NONE MOTOR CONTROL CENTER SCHEDULE mnm ,�"--po a SEAL �. a PEO219Bp ENCLOSED BREAKER SCHEDULE .eornm m .w .mrnm m TRANSFORMER SCHEDULE zreri�wxnuv wus zaw.nzo..w .w 25- ANGIE MOUNT STANCHION — 1-1/4- CONDUIT HUB T STYLE G-GUIT BODY AS NEEDED ]'G` ABOVE WALKWAY W STYLE BO% FOR DECK — RECEPTACLE (WHERE INDICATED) GALVANIZED U-BOLTS J-BOX K i) END NEW SIDE NEW (TYPICAL) (CATWALK OR PLATFIXtM) I SBR WALKWAY LIGHTING DETAIL E6 SCALE: NONE MOTOR CONTROL CENTER SCHEDULE mnm ,�"--po a SEAL �. a PEO219Bp