HomeMy WebLinkAboutNCC204567_ESC Approval Submitted_20201012Notice:0
It is a direct violation of your approved plan to initiate
any land disturbing activities PRIOR to holding a
scheduled Pre -Construction Conference (Pre -Con). To
prepare for this Pre -Con follow these steps:
1. Complete and submit an electronic Notice of Intent
(NOI) form requesting a Certificate of Coverage
(COC under the NCGO10000 Construction
Stormwater General Permit. See attached approval
letter for link to apply.
2. Receive your COC within 3 business days from
DEMLR. (Email a copy of the COC to Danielle
Rudisill: drudisillklincolncounty. org )
3. Contact our office at 704-736-8501 to schedule your
Pre -Construction Conference prior to any land
disturbance. (A pre -con cannot be scheduled
without first obtaining a COC from DEMLR) Your
copy of the approved plan and grading certificate
will be delivered to you and/or your grader onsite
at the meeting.
SOIL EROSION and SEDIMENTATION CONTROL
Lincoln County Natural Resources Department
RN Lrs 115 West Main Street, Lincolnton, NC 28092 704-736-8501 Fax: 704-736-8504
LETTER OF APPROVAL
Project Name: West Lake Preparatory Academy
Submitted By: Kimley-Horn and Associates, Inc.
Project ID 4: 20-COM-05
Date received by LCNRD: 7/29/20
Location: Forney Creek Parkway, Denver, NC
Plan Type: Institutional: School
Watershed: Catawba River Basin
Acres Approved: 5.10 acres
Contact Office to Schedule Pre -Construction Conference Prior to Any Land
Disturbance
Date: 1015120
Red Apple at Lincoln, LLC
c/o Scott Woodrey
800 Corporate Dr., Suite 124
Ft. Lauderdale, FL 33334
To Scott Wood rey,
This office has reviewed the subject Soil Erosion and Sedimentation Control Plan. We find the plan to be acceptable
and hereby issue this Letter of Plan Approval. If any modifications, performance reservations, or recommendations are
applicable, a list is enclosed and incorporated as a part of this letter of approval. If any modifications are not
incorporated into the plan and implemented in the field, the site will be in violation of the Soil Erosion and Sedimentation
Control Ordinance of Lincoln County. This plan approval shall expire two (2) years following the date of approval, if no
land -disturbing activity has been undertaken, as is required by Lincoln County Soil Erosion and Sedimentation Control
Ordinance Section 9(b).
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent
(NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General
Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named
project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette
Lucas at Annette. lucas(a)ncdenr.gov or Paul Clark at Paul. clark(o7ncdenr.gov. After you submit a complete and correct
NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for
coverage under the NCG01 permit. However, on or after August 1, 2019, a $100 fee will be charged annually. This fee
is to be sent to the DEMLR Stormwater Central Office staff in Raleigh.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the
job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) and Lincoln County Soil Erosion and Sedimentation
Control Ordinance Section 11(f) of our right of periodic inspection to insure compliance with the approved plan.
Lincoln County's Soil Erosion and Sedimentation Control Ordinance is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, the Soil Erosion and
Sedimentation Control Plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973
(North Carolina General Statute 113A-51 through 66) and Lincoln County Soil Erosion and Sedimentation Control
Ordinance Section 9(d), this office may require revisions to the plan and implementation of the revisions to insure
compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing
activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the
information included on the form.
Your cooperation is appreciated and we look forward to working with you on this project. If there are any questions,
please no hesitate to contact this office at the above number.
erely,
nie T. R si , ESC
Erosion and Sedimentation Control Administrator
Lincoln County Soil and Water Conservation District
Natural Resources: Soil Erosion and Sedimentation Control