Loading...
HomeMy WebLinkAbout20021410 Ver 3_More Info Received_20100225Estes i Inc, Environmental Design & Consulting PO Box 79133, Charlotte, NC 28271 Office 704.841.1779 - Fax 704.841.1842 To: Ms. Cyndi Karoly NC Division of Water Quality 2321 Crabtree Boulevard, Suite 250 Raleigh, NC 27604 Dear Ms. Karoly, Letter of Transmittal Date: February 23, 2010 Subject: F-x p r L ss DWQ #2002-14100 Dixie River Road Roadway Project Charlotte, Mecklenburg County, NC EDI #0530 Enclosed please find our response to your February 18, 2010, Request for Additional Information. Specifically, 1. Response Letter - 1 Copy 2. Updated PCN Application - 2 Copies (? V a. Updated 11x17 Culvert Impact Exhibit - 2 Copies FEB YiS 2010 3. Updated Storm Water Management Plan a. Updated Plan Sheets (10 sheets) 2 Copies %°?'W"MWA*R - iWiIDSMN> STORlIIWATERQRAHCM b. Updated Storm Water Calculations - 2 Copies c. CD with electronic files of plans - 1 copy Please let us know if you have any questions or comments, or if you need additional information. We will respond promptly. Sincerely, Frank E. Henry, PE • P.O. Box 79133 Charlotte, N.C. 28271-7050 • Phone (704) 841-1779 Fax (704) 841-1842 • Estes Deli Inc. nvironmeotal Qesign & Consulting February 23, 2010 Ms. Cyndi Karoly NC DWQ 401 Oversight/Express Review Program 2321 Crabtree Blvd Raleigh, NC 27604 RE: DWQ EXP #02-14100 Dixie River Road Roadway Project Additional Information Dear Ms. Karoly: In response to your letter of February 18, 2010, we are providing the additional information requested. Enclosed please find: • two copies of the revised Stormwater Management Plans • two copies of the revised calculations two copies of the revised PCN and affected exhibits A recap of the comments and our responses follows: 1. Stormwater Management Plan: a. Wet Ponds 1 &2: Please provide erosion control matting along the entire spillway i.e. beneath the riprap on top of the berm to the toe of the slope. Instead of adding erosion control matting below the rip rap, the rip rap has been extended to cover the entire slope beneath the spillway to provide erosion control armoring/matting. b. Wet Pond 2 Outlet: i. Since the area between the pond outlet and the culvert inlet is being graded, please provide a riprap lined channel from the pond outlet that ties into the culvert inlet. The grades in this area have been revised to provide a channel directly from the pond outlet into the culvert inlet. This trapezoidal channel has been lined with riprap to prevent erosion. • P.O. Box 79133 Charlotte, N.C. 28271-7050 • Phone (704) 841-1779 Fax (704) 841-1842 • ii. Please show where the proposed grade and the existing grade tie in on the Culvert 2 Profile Plan. The Culvert 2 profile plan has been revised to show the proposed and existing grade and where these two tie in. 2. Beaverdam Creek Culvert: This office believes that the culvert inlet can be realigned so that the center of the stream enters the center of the culvert. After looking further into this, the culvert has been realigned and the skew of the culvert is now 63 degrees vs. the original 60 degrees. The center of the channel enters in a more direct alignment. The plans have been revised to reflect this change. Impact maps: all stream and wetland impacts should be shown and enumerated on the plan sheets. Please not that construction of headwalls and dewatering operations generally require temporary impacts to the stream, which should be enumerated on the plans and the PCN form. The plan sheets that show Culvert 1 (Sheet 2 and CUL-1) have been updated to include both the permanent and temporary impacts. The PCN and culvert exhibit have been updated to also include the temporary impact. 4. Please provide a cumulative impacts narrative (PCN, Section F, 3b) that explains why this project will not result in additional impact. The PCN has been updated to include the Cumulative Impacts narrative. We trust this meets your needs for continued review of this project, but please feel free to contact us with any questions or concerns. Sincerely, Frank E. Henry, PE enclosures cc: Derrel Poole, City of Charlotte Benjamin Taylor, PE, Kimley-Horn and Associates, Inc. • P.O. Box 79133 Charlotte, N.C. 28271-7050 • Phone (704) 841-1779 Fax (704) 841-1842 • of wAL_40 } O -c REVISED PER COMMENTS 2.23.2010 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification PCN Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit ? Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ® Yes ? No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ® No For the record only for Corps Permit: ? Yes ® No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes ® No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Berewick / Dixie River Rd. Realignment 2b. County: Mecklenburg 2c. Nearest municipality / town: Charlotte 2d. Subdivision name: Berewick 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: City of Charlotte - (Derrel Poole) 3b. Deed Book and Page No. Pin 19924147 and 19924141 3c. Responsible Party (for LLC if applicable): City of Charlotte, Engineering & Property Management 3d. Street address: 600 E. 4th St. 3e. City, state, zip: Charlotte NC 28202 3f. Telephone no.: 704.336.3598 3g. Fax no.: 704.336.6586 3h. Email address: dpoole@ci.charlotte.nc.us Page I of 10 PCN Form -Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ® Agent ? Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Chris Estes 5b. Business name (if applicable): Estes Design Inc. 5c. Street address: 515 Pembroke Dr. 5d. City, state, zip: Waxhaw NC 28173 5e. Telephone no.: 704.841.1779 5f. Fax no.: 704.841.1842 5g. Email address: Chris@EstesDesign.com Page 2 of 10 PCN Form -Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 19924147 and 19924141 Latitude: 35.165755 Longitude: - 1 b. Site coordinates (in decimal degrees): 80.971796 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 5.68 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Stowe Branch to Beaver Dam Creek proposed project: 2b. Water Quality Classification of nearest receiving water: WS 2c. River basin: Catawba 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Residential 3b. List the total estimated acreage of all existing wetlands on the property: 0 acres within road right of way 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: See attached exhibits 3d. Explain the purpose of the proposed project: A Road Crossing that was previously permitted as part of a large mixed use development under NWP39 since expired. 3e. Describe the overall project in detail, including the type of equipment to be used: The permit will replace an expired permit for a culvert road crossing. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ®Yes ? No ? Unknown project (including all prior phases) in the past? Comments: Previously permitted 4b. If the Corps made the jurisdictional determination, what type ? Preliminary ®Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Lend Rindner / Estes Name (if known): Len Rindner / Chris Estes Design Inc. Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. See attached 5. Project History 5a. Have permits or certifications been requested or obtained for ® Yes ? No ? Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. USCAE Action ID2007-548-360 DWQ# 2002-1410 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. Page 3 of 10 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ? Wetlands ® Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary W1 ? P ? T ? Yes ? Corps ? No ? DWQ W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ®P ? T culvert Stowe Branch ® PER ? INT ® Corps ® DWQ 8 236 S2 ? P ® T dewatering Stowe Branch ® PER ? INT ® Corps ® DWQ 8 20 S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 256 3i. Comments: Previously permitted and mitigated see exhibits for previous permits and WRP mitigation receipt Page 4 of 10 PCN Form -Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number - Permanent (P) or Temporary 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4L Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. Pond ID 5b. Proposed use or purpose 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ? Neuse ? Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary im act required? B1 ?P?T ?Yes ? No B2 ?P?T ?Yes ? No B3 ?P?T ?Yes ? No 6h. Total buffer impacts 6i. Comments: Page 5 of 10 PCN Form - Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Several designs were considered. The proposed design includes higher wing walls to reduce grading impacts. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Strict erosion control measures to be followed. Pump around to be used to alllow working in the dry. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ® No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? pro ? Mitigation bank ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: Payments to WRP/EEP already made in 2006 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: Payments aleady made - see Action ID 2007-548-360 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form -Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. Comments: ? Yes ? No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? na % 2b. Does this project require a Stormwater Management Plan? ® Yes ? No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: The overall development has an approved plan 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: Copies of the storm water management plan are included with this application. 2 Ponds are incorporated into the plan to treat storm water from the proposed road. ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ® DWQ Stormwater Program ® DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? City of Charlotte ® Phase II 3b. Which of the following locally-implemented stormwater management programs ? NSW ? USMP apply (check all that apply): ® Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ® No attached? 4. DWQ Stormwater Program Review ? Coastal counties 4a. Which of the following state-implemented stormwater management programs apply ? HQW ? ORW (check all that apply): ® Session Law 2006-246 ® Other: 401 WQC 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ® Yes ® No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ® Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ® Yes ? No Page 8 of 10 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ? Yes ? No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B.0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. This project is a linear transportation project that has incorporated water quality controls for proposed storm water runoff. The water quality controls have been designed to mitigate potential pollutant discharge in strict accordance with the current BMP requirements. Currently there are no additional direct impacts to the stream anticipated in the foreseeable future. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Municiple - Charlotte Mecklenburg Sewer district Page 9 of 10 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or El Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ® Yes ? No impacts? E] Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ® Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS, NC Natural Heritage Program 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? USFWS, NC Wildlife Resources Commission 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NC Department of Cultural Resources - SHPO 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determi iR7 Mecklenburg County Polaris, FEMA Christopher J. Estes 2.23.2010 Applicant/Agent's Printed Name Ap li nt/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 10 of 10 PCN Form - Version 1.3 December 10, 2008 Version 1S 2S (9s Pre-dev DA-1 Post-de DA-1 Post-De v A-1 (UND) 3P --? 8P Dixie Wet Pond 1 Outfall 1 SubCa Reach and Lin k Pond 1 Type 11 24-hr 1 year, 24 hour storm Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 2/22/2010 HydroCAD® 9.00 s/n 05123 © 2009 H droCAD Software Solutions LLC Page 2 Summary for Subcatchment 1S: Pre-dev DA-1 Runoff = 2.43 cfs @ 12.10 hrs, Volume= 0.188 af, Depth> 0.53" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1 year, 24 hour storm Rainfall=2.58" Area (ac) CN Description 4.260 71 4.260 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.5 Direct Entry, From spreadsheet Subcatchment 1S: Pre-dev DA-1 Hydrograph 2.43 cfs Type II 24-hr 1 year 24 hour storm 2 Rainfall=2.58" Runoff Area=4.260 ac Runoff Volume=0.188 of Runoff Depth>0.53" 1 Tc=15.5 min CN=71 ® Runoff 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Pond 1 Type 11 24-hr 1 year, 24 hour storm Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 2/22/2010 HydroCAD® 9.00 s/n 05123 @2009 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 2S: Post-dev DA-1 [49] Hint: Tc<2dt may require smaller dt Runoff = 13.36 cfs @ 11.96 hrs, Volume= 0.621 af, Depth> 1.38" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1 year, 24 hour storm Rainfall=2.58" Area (ac) CN Description 5.410 87 5.410 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, From spreadsheet Subcatchment 2S: Post-dev DA-1 Hydrograph 14- 13.36 cfs 13 Type II 24-hr 1 year 12 24 hour storm 11- Rainfall=2.58" 10- 9 Runoff Area=5.410 ac Runoff Volume=0.621 of LL ' Runoff Depth>1.38" 6 5 Tc=5.0 min a CN=87 3 "i 2 ®Runoff 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 ;1770 21 22 23 24 Time (hours) Pond 1 Type 11 24-hr 1 year, 24 hour storm Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 2/22/2010 HydroCAD® 9.00 s/n 05123 © 2009 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 9S: Post-Dev DA-1 (UND) [49] Hint: Tc<2dt may require smaller dt Runoff = 0.27 cfs @ 11.96 hrs, Volume= 0.013 af, Depth> 0.89" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1 year, 24 hour storm Rainfall=2.58" Area (ac) CN Description 0.170 79 0.170 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 9S: Post-Dev DA-1 (UND) Hydrograph 0.3 0.28 0.26 0.24 0.22 0.2 0.18 0.16 0 0.14 U. 0.12 0.1 0.27 cfs Type II 24-hr 1 year 24 hour storm Rainfall=2.58" Runoff Area=0.170 ac Runoff Volume=0.013 of Runoff Depth>0.89" Tc=5.0 min CN=79 ® Runoff 0.06 0.04 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Pond 1 Type 11 24-hr 1 year, 24 hour storm Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 2/22/2010 HydroCAD® 9.00 s/n 05123 @2009 HydroCAD Software Solutions LLC Page 5 Summary for Pond 3P: Dixie Wet Pond 1 This pond has been sized based on a future wall to be installed by others. Due to this, the custom stage data that appears in these calculations is smaller than the actual pond grading. When the wall is installed above temporary pool on the back side of the pond, the pond will be sufficient. Inflow Area = 5.410 ac, 0.00% Impervious, Inflow Depth > 1.38" for 1 year, 24 hour storm event Inflow = 13.36 cfs @ 11.96 hrs, Volume= 0.621 of Outflow = 1.09 cfs @ 12.52 hrs, Volume= 0.343 af, Atten= 92%, Lag= 33.6 min Primary = 1.09 cfs @ 12.52 hrs, Volume= 0.343 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 635.45'@ 12.52 hrs Surf.Area= 10,988 sf Storage= 14,372 cf Plug-Flow detention time= 242.4 min calculated for 0.343 of (55% of inflow) Center-of-Mass det. time= 126.2 min ( 949.8 - 823.7 ) Volume Invert Avail.Storage Storage Description #1 634.00' 45,482 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 634.00 7,800 0 0 634.50 9,888 4,422 4,422 635.00 10,486 5,094 9,516 636.00 11,596 11,041 20,557 637.00 12,457 12,027 32,583 638.00 13,340 12,899 45,482 Device Routing Invert Outlet Devices #1 Primary 633.30' 18.0" Round Culvert L= 38.0' RCP, square edge headwall, Ke= 0.500 Outlet Invert= 633.00' S=0.0079'/' Cc= 0.900 n=0.013 #2 Device 1 634.00' 1.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 635.20' 30.0" W x 10.0" H Vert. Orifice/Grate C=0.600 #4 Device 1 636.80' 14.0' long x 0.5' breadth Top of Grate Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #5 Secondary 636.80' 45.0' long x 22.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=1.09 cfs @ 12.52 hrs HW=635.45' (Free Discharge) L1=Culvert (Passes 1.09 cfs of 9.34 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.07 cfs @ 5.68 fps) 3=Orifice/Grate (Orifice Controls 1.02 cfs @ 1.61 fps) -Top of Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=634.00' (Free Discharge) LS=Emergency Spillway (Controls 0.00 cfs) Pond 1 Type 11 24-hr 1 year, 24 hour storm Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 2/22/2010 HrdroCAD® 9.00 s/n 05123 @2009 H droCAD Software Solutions LLC Page 6 Pond 3P: Dixie Wet Pond 1 Hydrograph 13.36 cfs Inflow 0 Outflow Inflow Area=5.410 ac ® Primary Secondary 14 Peak Elev=635.45' 13 12 Storage=14,372 cf 11 10 w v 3 0 U. 5 1.09 cfs 0.00 cfs 0 1 2 3 4 5 6 7 8 9 1011 12 1'3 14 15 1'6 1'7 18"'1'9 20 21 22 23 24 Time (hours) Pond 1 Type 11 24-hr 1 year, 24 hour storm Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 2/22/2010 HydroCAD® 9.00 s/n 05123 @2009 HydroCAD Software Solutions LLC Page 7 Stage-Discharge for Pond 3P: Dixie Wet Pond 1 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 634.00 0.00 0.00 0.00 634.05 0.00 0.00 0.00 634.10 0.01 0.01 0.00 634.15 0.02 0.02 0.00 634.20 0.02 0.02 0.00 634.25 0.03 0.03 0.00 634.30 0.03 0.03 0.00 634.35 0.03 0.03 0.00 634.40 0.03 0.03 0.00 634.45 0.04 0.04 0.00 634.50 0.04 0.04 0.00 634.55 0.04 0.04 0.00 634.60 0.04 0.04 0.00 634.65 0.05 0.05 0.00 634.70 0.05 0.05 0.00 634.75 0.05 0.05 0.00 634.80 0.05 0.05 0.00 634.85 0.05 0.05 0.00 634.90 0.05 0.05 0.00 634.95 0.06 0.06 0.00 635.00 0.06 0.06 0.00 635.05 0.06 0.06 0.00 635.10 0.06 0.06 0.00 635.15 0.06 0.06 0.00 635.20 0.06 0.06 0.00 635.25 0.15 0.15 0.00 635.30 0.32 0.32 0.00 635.35 0.53 0.53 0.00 635.40 0.79 0.79 0.00 635.45 1.07 1.07 0.00 635.50 1.39 1.39 0.00 635.55 1.73 1.73 0.00 635.60 2.10 2.10 0.00 635.65 2.50 2.50 0.00 635.70 2.91 2.91 0.00 635.75 3.35 3.35 0.00 635.80 3.81 3.81 0.00 635.85 4.28 4.28 0.00 635.90 4.78 4.78 0.00 635.95 5.29 5.29 0.00 636.00 5.82 5.82 0.00 636.05 6.35 6.35 0.00 636.10 6.80 6.80 0.00 636.15 7.20 7.20 0.00 636.20 7.57 7.57 0.00 636.25 7.91 7.91 0.00 636.30 8.24 8.24 0.00 636.35 8.56 8.56 0.00 636.40 8.86 8.86 0.00 636.45 9.15 9.15 0.00 636.50 9.43 9.43 0.00 636.55 9.70 9.70 0.00 636.60 9.96 9.96 0.00 636.65 10.22 10.22 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 636.70 10.47 10.47 0.00 636.75 10.71 10.71 0.00 636.80 10.95 10.95 0.00 636.85 12.97 11.62 1.35 636.90 16.47 12.65 3.81 636.95 20.92 13.91 7.01 637.00 25.40 14.61 10.79 637.05 29.84 14.74 15.10 637.10 34.75 14.86 19.89 637.15 40.09 14.98 25.11 637.20 45.84 15.10 30.74 637.25 51.90 15.22 36.68 637.30 58.30 15.34 42.96 637.35 65.02 15.46 49.56 637.40 72.04 15.57 56.47 637.45 79.01 15.69 63.32 637.50 86.17 15.80 70.37 637.55 93.52 15.92 77.60 637.60 101.04 16.03 85.01 637.65 109.16 16.14 93.01 637.70 117.50 16.26 101.24 637.75 126.06 16.37 109.69 637.80 134.83 16.48 118.35 637.85 144.04 16.59 127.46 637.90 153.49 16.70 136.80 637.95 163.17 16.80 146.37 638.00 173.08 16.91 156.17 Pond 1 Type // 24-hr 1 year, 24 hour storm Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 2/22/2010 HydroCAD® 9.00 s/n 05123 © 2009 HydroCAD Software Solutions LLC Page 8 Summary for Pond 8P: Outfall 1 [40] Hint: Not Described (Outflow= Inflow) Inflow Area = 5.580 ac, 0.00% Impervious, Inflow Depth > 0.77" for 1 year, 24 hour storm event Inflow = 1.11 cfs @ 12.51 hrs, Volume= 0.356 of Primary = 1.11 cfs @ 12.51 hrs, Volume= 0.356 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Pond 8P: Outfall 1 Hydrograph p Inflow ® Primary v 3 0 U. 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) (is) Pre-d ev DA-2 2S (9s) Post-de? '. Post Dev A-2 (UND) 3P --D 8P A Dixie Wet Pond 2 Outfall 2 SubCa Reach and Link Pond 2 Type 11 24-hr 1 year, 24 hour storm Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 2/22/2010 HydroCAD® 9.00 s/n 05123 @2009 H droCAD Software Solutions LLC Page 2 Summary for Subcatchment 1S: Pre-dev DA-2 Runoff = 0.83 cfs @ 12.31 hrs, Volume= 0.188 af, Depth> 0.19" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1 year, 24 hour storm Rainfall=2.58" Area (ac) CN Description ' 11.670 60 11.670 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 24.2 Direct Entry, From spreadsheet Subcatchment 1 S: Pre-dev DA-2 Hydrograph 0.9 0.85 0.8 0.83 cfs Type 1124-hr 1 year 0.75- - 24 hour storm 0.7 0. 6 5 Rainfall=2.58" 0'6 Runoff Area=11.670 ac .., 0.55 0.5 Runoff Volume=0.188 of c 0.45 LL 0.4 Runoff Depth>0.19" 0.35 Tc=24.2 min 0.3 0.25 CN=60 0.2 0.15 0.1 Runoff 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Pond 2 Type 11 24-hr 1 year, 24 hour storm Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 2/22/2010 HydroCAD® 9.00 s/n 05123 @2009 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 2S: Post-dev DA-2 [49] Hint: Tc<2dt may require smaller dt Runoff = 48.23 cfs @ 11.96 hrs, Volume= 2.249 af, Depth> 1.45" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1 year, 24 hour storm Rainfall=2.58" Area (ac) CN Description 18.630 88 18.630 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, From spreadsheet Subcatchment 2S: Post-dev DA-2 Hydrograph 50 48.23 cfs 45 Type Il 24-hr 1 year 4 24 hour storm Rainfall=2.58" 35 " Runoff Area=18.630 ac F 30 Runoff Volume=2.249 of U. 25 Runoff Depth>1.45" 20 Tc=5.0 min 15 CN=88 10_ ® Runoff 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Pond 2 Type 11 24-hr 1 year, 24 hour storm Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 2/22/2010 HydroCAD® 9.00 s/n 05123 © 2009 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 9S: Post Dev DA -2 (UND) [49] Hint: Tc<2dt may require smaller dt Runoff = 0.24 cfs @ 12.00 hrs, Volume= 0.020 af, Depth> 0.22" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1 year, 24 hour storm Rainfall=2.58" Area (ac) CN Description * 1.080 61 1.080 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 9S: Post Dev DA-2 (UND) Hydrograph 0.26 0.24 0.22 0.2 0.18 0.16 J2 0.14 0 0.12 0.1 0.08 0.06 0.04 Type II 24-hr 1 year 24 hour storm Rainfall=2.58" Runoff Area=1.080 ac Runoff Volume=0.020 Runoff Depth>0.22" Tc=5.0 min CN=61 0.24 cfs 111 Runoff 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Pond 2 Type 11 24-hr 1 year, 24 hour storm Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 2/22/2010 HydroCAD® 9.00 s/n 05123 @2009 H droCAD Software Solutions LLC Page 5 Summary for Pond 3P: Dixie Wet Pond 2 Inflow Area = 18.630 ac, 0.00% Impervious, Inflow Depth > 1.45" for 1 year, 24 hour storm event Inflow = 48.23 cfs @ 11.96 hrs, Volume= 2.249 of Outflow = 0.78 cfs @ 17.68 hrs, Volume= 0.624 af, Atten= 98%, Lag= 343.6 min Primary = 0.78 cfs @ 17.68 hrs, Volume= 0.624 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 653.97'@ 17.68 hrs Surf.Area= 40,914 sf Storage= 73,250 cf Plug-Flow detention time= 403.7 min calculated for 0.623 of (28% of inflow) Center-of-Mass det. time= 273.7 min ( 1,093.3 - 819.6 ) Volume Invert Avail.Storage Storage Description #1 652.00' 210,330 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 652.00 32,706 0 0 652.50 34,232 16,735 16,735 653.00 38,218 18,113 34,847 653.40 39,322 15,508 50,355 654.00 40,996 24,095 74,450 655.00 43,829 42,413 116,863 656.00 46,720 45,275 162,137 657.00 49,666 48,193 210,330 Device Routing Invert Outlet Devices #1 Primary 652.00' 18.0" Round Culvert L= 51.0' RCP, square edge headwall, Ke= 0.500 Outlet Invert= 651.00' S=0.0196'/' Cc= 0.900 n=0.013 #2 Device 1 652.00' 3.5" Vert. Orifice/Grate C= 0.600 #3 Device 1 653.85' 30.0" W x 8.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 655.50' 14.0' long x 0.5' breadth Grate at Top of Structure Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #5 Secondary 655.50' 20.0' long x 31.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=0.77 cfs @ 17.68 hrs HW=653.97' (Free Discharge) t1=Culvert (Passes 0.77 cfs of 9.40 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.43 cfs @ 6.50 fps) 3=Orifice/Grate (Orifice Controls 0.34 cfs @ 1.12 fps) -Grate at Top of Structure ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=652.00' (Free Discharge) t--5--Emergency Spillway (Controls 0.00 cfs) Pond 2 Type 11 24-hr 1 year, 24 hour storm Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 2/22/2010 HydroCAD® 9.00 s/n 05123 © 2009 HydroCAD Software Solutions LLC Page 6 Pond 3P: Dixie Wet Pond 2 Hydrograph 0 Inflow 48.23 cfs tEl Outflow Inflow Area=18.630 ac ® Primary p Secondary Peak Elev=653.97' Storage=73,250 cf U 30 0 25 U. 20- 15- 10- 0.00 cfs 5-4 0.78 cfs 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Pond 2 Type l/ 24-hr 1 year, 24 hour storm Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 2/22/2010 HydroCAD® 9.00 s/n 05123 @2009 HydroCAD Software Solutions LLC Page 7 Stage-Discharge for Pond 3P: Dixie Wet Pond 2 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 652.00 0.00 0.00 0.00 652.05 0.01 0.01 0.00 652.10 0.02 0.02 0.00 652.15 0.05 0.05 0.00 652.20 0.07 0.07 0.00 652.25 0.10 0.10 0.00 652.30 0.13 0.13 0.00 652.35 0.15 0.15 0.00 652.40 0.16 0.16 0.00 652.45 0.18 0.18 0.00 652.50 0.19 0.19 0.00 652.55 0.20 0.20 0.00 652.60 0.22 0.22 0.00 652.65 0.23 0.23 0.00 652.70 0.24 0.24 0.00 652.75 0.25 0.25 0.00 652.80 0.26 0.26 0.00 652.85 0.27 0.27 0.00 652.90 0.28 0.28 0.00 652.95 0.29 0.29 0.00 653.00 0.30 0.30 0.00 653.05 0.31 0.31 0.00 653.10 0.31 0.31 0.00 653.15 0.32 0.32 0.00 653.20 0.33 0.33 0.00 653.25 0.34 0.34 0.00 653.30 0.35 0.35 0.00 653.35 0.35 0.35 0.00 653.40 0.36 0.36 0.00 653.45 0.37 0.37 0.00 653.50 0.37 0.37 0.00 653.55 0.38 0.38 0.00 653.60 0.39 0.39 0.00 653.65 0.39 0.39 0.00 653.70 0.40 0.40 0.00 653.75 0.41 0.41 0.00 653.80 0.41 0.41 0.00 653.85 0.42 0.42 0.00 653.90 0.52 0.52 0.00 653.95 0.69 0.69 0.00 654.00 0.90 0.90 0.00 654.05 1.16 1.16 0.00 654.10 1.45 1.45 0.00 654.15 1.77 1.77 0.00 654.20 2.12 2.12 0.00 654.25 2.50 2.50 0.00 654.30 2.89 2.89 0.00 654.35 3.31 3.31 0.00 654.40 3.76 3.76 0.00 654.45 4.22 4.22 0.00 654.50 4.70 4.70 0.00 654.55 5.15 5.15 0.00 654.60 5.52 5.52 0.00 654.65 5.86 5.86 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 654.70 6.17 6.17 0.00 654.75 6.47 6.47 0.00 654.80 6.74 6.74 0.00 654.85 7.01 7.01 0.00 654.90 7.26 7.26 0.00 654.95 7.51 7.51 0.00 655.00 7.74 7.74 0.00 655.05 7.97 7.97 0.00 655.10 8.19 8.19 0.00 655.15 8.41 8.41 0.00 655.20 8.62 8.62 0.00 655.25 8.82 8.82 0.00 655.30 9.02 9.02 0.00 655.35 9.21 9.21 0.00 655.40 9.40 9.40 0.00 655.45 9.59 9.59 0.00 655.50 9.77 9.77 0.00 655.55 10.99 10.39 0.60 655.60 13.06 11.37 1.69 655.65 15.69 12.58 3.11 655.70 18.77 13.98 4.79 655.75 21.45 14.74 6.71 655.80 23.70 14.86 8.84 655.85 26.14 14.98 11.16 655.90 28.76 15.10 13.66 655.95 31.52 15.22 16.30 656.00 34.43 15.34 19.09 656.05 37.48 15.46 22.03 656.10 40.67 15.57 25.10 656.15 43.83 15.69 28.14 656.20 47.08 15.80 31.27 656.25 50.41 15.92 34.49 656.30 53.81 16.03 37.78 656.35 57.48 16.14 41.34 656.40 61.25 16.26 45.00 656.45 65.12 16.37 48.75 656.50 69.08 16.48 52.60 656.55 73.23 16.59 56.65 656.60 77.49 16.70 60.80 656.65 81.86 16.80 65.05 656.70 86.32 16.91 69.41 656.75 90.81 17.02 73.79 656.80 95.39 17.12 78.26 656.85 100.05 17.23 82.82 656.90 104.80 17.33 87.46 656.95 109.54 17.44 92.10 657.00 114.36 17.54 96.82 Pond 2 Type 11 24-hr 1 year, 24 hour storm Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 2/22/2010 HydroCADO 9.00 s/n 05123 © 2009 HydroCAD Software Solutions LLC Page 8 Summary for Pond 8P: Ouffall 2 [40] Hint: Not Described (Outflow= Inflow) Inflow Area = 19.710 ac, 0.00% Impervious, Inflow Depth > 0.39" for 1 year, 24 hour storm event Inflow = 0.79 cfs @ 17.65 hrs, Volume= 0.644 of Primary = 0.79 cfs @ 17.65 hrs, Volume= 0.644 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Pond 8P: Outfall 2 Hydrograph F Inflow Primary w w u 3 0 U. 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) a) .0 _m U l0 v a L N_ L C C 00 L N c m L d 3 0 x 0 a 'D U O 0. (0 7 U l0 3 `o U l0 C O U c m E 'v N N 0 L 3 c m o 0 C) o00 U N N N c Cl a N a m ?- N cs N N N C l0 m f0 m c o o m m E 08 n ? o NQ O 0 O ? m -Of Ea c - XLO ?mY co Y Oho .2 .2 O EZ,a i O ?vv d t' " eda C m? 0 > O Q a i N L a) J O a Y ? O u L) 9L x x co m? N x X co ao i0 u u x C C a C C N w n 0 0 m U U E 7 7 N f0 N U, -F. _ > 0 o s0 N N (p r ? N N ? a a m W > > H 7 7 > > O U U S? Z . Culvert Designer/Analyzer Report DRR CROSSING 1 Peak Discharge Method: User-Specified Design Discharge 572.82 cfs Check Discharge 654.06 cfs Grades Model: Inverts Invert Upstream 640.00 ft Invert Downstream 638.00 ft Length 191.00 ft Slope 0.010471 ft/ft Drop 2.00 ft Headwater Model: Allowable HW/Height Headwater Depth/Height 1.20 Tailwater Conditions: Constant Tailwater Tailwater Elevation N/A ft Name Description Discharge HW Elev. Velocity x Trial-1 1-10 x 7 ft Box 572.82 cfs 648.18 ft 16.64 ft/s Title: Dixie River Road Project Engineer: Matt Edwards k:\...\20100219drr culvert size.cvm CulvertMaster v3.1 [03.01.009.00] 02/22/10 04:13:45 PM © Bentley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 Culvert Designer/Analyzer Report DRR CROSSING 1 Design:Trial-1 Solve For: Headwater Elevation Culvert Summary Allowable HW Elevation 648.40 ft Storm Event Design Computed Headwater Eleva 648.18 ft Discharge 572.82 cfs Headwater Depth/Height 1.17 Tailwater Elevation N/A ft Inlet Control HW Elev. 647.39 ft Control Type Entrance Control Outlet Control HW Elev. 648.18 ft Grades Upstream Invert 640.00 ft Downstream Invert 638.00 ft Length 191.00 ft Constructed Slope 0.010471 ft/ft Hydraulic Profile Profile S2 Depth, Downstream 3.44 ft Slope Type Steep Normal Depth 3.15 ft Flow Regime Supercritical Critical Depth 4.67 ft Velocity Downstream 16.64 ft/s Critical Slope 0.003551 ft/ft Section Section Shape Box Mannings Coefficient 0.013 Section Material Concrete Span 10.00 ft Section Size 10 x 7 ft Rise 7.00 ft Number Sections 1 Outlet Control Properties Outlet Control HW Elev. 648.18 ft Upstream Velocity Head 2.34 ft Ke 0.50 Entrance Loss 1.17 ft Inlet Control Properties Inlet Control HW Elev. 647.39 ft Flow Control Unsubmerged Inlet Type 45° wingwall flares - offset Area Full 70.0 ft' K 0.49700 HDS 5 Chart 13 M 0.66700 HDS 5 Scale 1 C 0.03020 Equation Form 2 Y 0.83500 Title: Dixie River Road Project Engineer: Matt Edwards k:\...\20100219drr culvert size.cvm CulvertMaster v3.1 [03.01.009.00] 02/22/10 04:13:45 PM 0 Bentley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 Culvert Designer/Analyzer Report DRR CROSSING 2 Peak Discharge Method: User-Specified Design Discharge 128.70 cfs Check Discharge 147.61 cfs Grades Model: Inverts Invert Upstream 648.30 ft Length 200.00 ft Drop 0.39 ft Invert Downstream 647.91 ft Slope 0.001950 ft/ft Headwater Model: Allowable HW/Height Headwater Depth/Height 1.20 Tailwater Conditions: Constant Tailwater Tailwater Elevation N/A ft Name Description Discharge HW Elev. Velocity x Trial-1 1-6 x 4 ft Box 128.70 cfs 652.49 ft 8.84 ft/s Title: Dixie River Road Project Engineer: Matt Edwards k:\...\20100219drr culvert size.cvm CulvertMaster v3.1 [03.01.009.00] 02/22/10 04:15:02 PM 0 Bentley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 Culvert Designer/Analyzer Report DRR CROSSING 2 Design:Trial-1 Solve For: Headwater Elevation Culvert Summary Allowable HW Elevation 653.10 ft Storm Event Design Computed Headwater Eleva 652.49 ft Discharge 128.70 cfs Headwater Depth/Height 1.05 Tailwater Elevation N/A ft Inlet Control HW Elev. 652.14 ft Control Type Outlet Control Outlet Control HW Elev. 652.49 ft Grades Upstream Invert 648.30 ft Downstream Invert 647.91 ft Length 200.00 ft Constructed Slope 0.001950 ft/ft Hydraulic Profile Profile M2 Depth, Downstream 2.43 ft Slope Type Mild Normal Depth 3.18 ft Flow Regime Subcritical Critical Depth 2.43 ft Velocity Downstream 8.84 ft/s Critical Slope 0.004039 ft/ft Section Section Shape Box Mannings Coefficient 0.013 Section Material Concrete Span 6.00 ft Section Size 6 x 4 ft Rise 4.00 ft Number Sections 1 Outlet Control Properties Outlet Control HW Elev. 652.49 ft Upstream Velocity Head 0.80 ft Ke 0.50 Entrance Loss 0.40 ft Inlet Control Properties Inlet Control HW Elev. 652.14 ft Flow Control Unsubmerged Inlet Type 45° wingwall flares - offset Area Full 24.0 ft' K 0.49700 HDS 5 Chart 13 M 0.66700 HDS 5 Scale 1 C 0.03020 Equation Form 2 Y 0.83500 Title: Dixie River Road Project Engineer: Matt Edwards k:\...\20100219drr culvert size.cvm CulvertMaster v3.1 [03.01.009.00] 02/22/10 04:15:02 PM © Bentley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 Dixie River Road Erosion Control Kimle -Horn and Associates, Inc. Charlotte, North Carolina Date: 9/1/2009 KHA Project #: 015016055 Prepared by: KRT Checked by: RIP RAP APRON CALCULATIONS Per NCDENR Design Manual Structure: Apron 1 Pipe Diameter (in): 18 Slope (%): 0.79 0.0079 Manning (n): 0.013 Radius (in): 9 Pipe Area (sf): 1.77 Wetted Perimeter Flow Area Hydraulic Flow Velocity Depth Theta (ft) (sf) Radius Flow (GPD) (CFS) (fps) Flowing Full: 18.0 6.283 4.712 1.767 0375 6.050.397 9.36 5 30 10-year flow: 1413 4.355 3.266 1.488 0456 5,801,932 8.98 6.03 Discharge (Q10) = 8.98 Pipe Diameter (in) = 18 d50 = 0.9 Figure 8.06a Design Conditions = Assume Minim um Tailwater Width at Pipe Outlet 'Do' (ft) = 4.5 Length of Apron 'La' (ft) = 10 Figure 8.06a Width at End of Apron 'W' (ft) = 14.5 Min. Stone Depth (in) = 24.3 Stone Class = Class B RIP RAP APRON CALCULATIONS Per NCDENR Design Manual Structure: Apron 2 Pipe Diameter (in): 18 Slope (%): 1.96 0.0196 Manning (n): 0.013 Radius (in): 9 Pipe Area (sf): 1.77 Wetted Perimeter Flow Area Hydraulic Flow Velocity Flowing Full: Depth 18 0 Theta 6 283 (ft) (sf) Radius Flow (GPD) (CFS) (fps) 10-year flow from ICPR: . 9.25 . 3.197 4.712 1.767 2398 0 915 0.375 9,530,120 0 382 14.75 8.34 . . 4,990, 534 7.72 8.44 Discharge (Q10) = 7.72 Pipe Diameter (in) = 18 d50 = 0.9 Figure 8.06a Design Conditions = Assume Minimum Tailwater Width at Pipe Outlet'Do' (ft) = 4.5 Length of Apron 'La' (ft) = 10 Figure 8.06a Width at End of Apron 'W' (ft) = 14.5 Min. Stone Depth (in) = 24.3 Stone Class = Class B 0 N a?0 Y J O QH KUUI 0: VI p Z l SUE- ROW ?? tuaoN 'i 0 "i i W Ov R m o < a w U ? ? ? H rn w m a a ?o I o w ?r _ ? wo i L N co ROW- z o SUE i _ zJ Jo aJ <N?a o _ < o0 ozv / U w zz po U X Z w -, 1 w 1 ? 1 H 1 W 1 U 1 a 11 Za OM I a ?m O U 0 ?1 -.D,. n z 1 I 1 I I •_ ' X I N 1 U^J ¢ I c 11 m?x 3 I t ? ? ° w 1 \' a 1 2 0 o a O Q I w .R 0w f f i? / J m I O I m 0 / z I IL 10 w , ' ? ? c°a ? ?°n an on ? '? w (o ,n ,o (n m m \ I 1 ? mqm a , o e ?' + o° 8R'Z89 3/A3 F q `i ? I "6"£L+B1L 50A3 ? ? w " ` r r ? °. x SB'ZBB 30AB ^ ' gn a fiq 85 {9iRlZ ?4 5 - = k a m _ N?d 91 ZB9 '3Jn3 m " d w ? u ? x 9t Z 1 e ? ? n 89 n 3 8Z'Cf+81Z 50A8 ? 5 n you " R ?.8 Wy (?yy?.11,,y "m i 00 n _ 96'8C9 -3??8 Ot'1Z+01Z 'S3M8 SS'9% 3M3 S6 £/+9UL S:N3 O N ? m??g "oSYry c??5? 1xn od5u ya + nm + m mggm8 " u n " K ?=55< xr C 0 0 O -Ils d^ty q.Z sso\'+1owvJ to L,IJ 9los to\?o.v?a ?rn?:H / S 1 O a! a n Q., o u w m + a ao N / ° I / C4 0 NO N® 1 ?? Q ,` WJ ±N a U ±w ad Q J N2 NN 1 0 i 011,11 O M N N O W F- Q Z g ° N, V g rn ZL tf of 4 1M W 2 X W J LL 0 Z Q Z 4 J ?N W U a?¢ W- n v9 On q C OZG9 4 J w + W07 x? ozL9 - 0 U LL 0ZL9 sU0 9, 9 OG9 ° ° Y k o 81 0'999 10 W g £'L 99 m ZMO a 3 o c d o 5.999 R 5 O orc° 0999 W yw mamu A'997 0 ?..? 1.999 ? cn z'6S9 co J ? O