Loading...
HomeMy WebLinkAbout20180180 Ver 2_As-Built Report-DWR comments_20201008From: Merritt, Katie To: Cara Conder Subject: Hollowell As -Built Report Date: Thursday, October 8, 2020 4:25:00 PM Hey Cara, I have finalized my review of the Hollowell AsBuilt Report for the Buffer & Nutrient Offset Bank. I have a few comments on the report: 1. DWR approves the usage of Bald Cypress towards performance standards as requested on page 5 of the report. 2. 10 vegetation plots are located within the riparian areas adjacent to Coastal HW stream restoration. It is noted in the BPDP, MBI & As -Built Report that all veg plots will be monitored for five years. Please note, that while this may be acceptable for most riparian areas within the project, the buffer mitigation credits located adjacent to the Coastal HW stream restoration areas are dependent on the performance of the stream restoration. Therefore, if the stream restoration isn't meeting performance standards, the 10 vegetation plots located within these riparian areas will require further monitoring beyond the 5 years. Those plots are 2,4,6,16,17,27,28,32,40,42 3. Shrubs were planted, however they were not shown on the planting list in the BPDP. The BPDP also does not include shrubs as the performance standard, only hardwood trees. Shrubs are included in the stem densities provided with the data in the As -Built report. DWR will have to hold WLS accountable to only using stem densities of hardwood trees (& bald cypress) towards the performance standard in the annual monitoring reports. However, DWR is okay with including the shrub data in with the annual monitoring reports. If you have any questions, let me know. I'll be preparing the credit release letter later today. Thanks, Katie