HomeMy WebLinkAboutNCC204429_NOI Application_20201008Action History (UTC-05:00) Eastern Time (US & Canada)
Subrrit by Anonymous User 10/2/2020 12:13:03 PM (NCG01 NOI Submission)
Approve by Meloy, Michael 10/2/2020 12:46:38 PM (Review- Construction NOI 32475)
• Clark, Paul reassigned the task to Meloy, Michael 10/2/2020 12:28 PM
* thx
• The task was assigned to Clark, Paul by round robin distribution 10/2/2020 12:13 PM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: October 6, 2020 5:00
PM 10/2/2020 12:13 PM
Subnut by Selkane, Aziza 10/8/2020 2:25:18 PM (Payment Verification for NCC204429)
* Caviness and Cates Building and Development Co.
• Selkane, Aziza assigned the task to Selkane, Aziza 10/8/2020 2:24 PM
• The task was assigned to DEMLR NCG01 Payment Team. The due date is: November 13, 2020 5:00
PM 10/2/2020 12:46 PM
.• SThF� ';
1
NORTH CAROLINA
EnrlronmertW quallly
A. Project Information
Part A.
Project Location and Waterbody Information
Are you submitting r No
an NOI that was r Yes
rejected before?
Previous Rejected 32392
NOI No.
Prior Reviewer Michael Meloy
Name
1a. Project Name * Glenmere Subdivision, Phase 2 49, 50, 51, 77, 79, 81
1 b. Specific Lot This field any be used to list specifc lot numbers.
Numbers 49, 50, 51, 77, 79, 81
2. County* Wake
3. Highway or Street Near intersection of N. Smithfield Road and Broadway Street
Address * Street narre only is acceptable if no address number assigned yet
4. City or Township* Knightdale
5. State * NC
6. Zip Code * 27545
7. Latitude * Enter the latitude in decimal degrees
35.7771
8. Longitude* Enter the longitude in decimal degrees (M. ST be negative)
-78.4751
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin* 10/12/2020
Estimated Construction Project Start Date
10. Date to End* 10/01 /2021
Estimated Construction Project End Cute
11. SIC (Primary)* Residential, Single Family Houses (SFE) (1521)
Standard Industrial aassification for Developrrent
12. Acres to be 1.28
disturbed* (including off -site borrow and waste areas)
13. Total site area 1.28
(acres) *
14. Post- 0.65
construction (Estirrated)
impervious area
(acres) *
NCC Project NCC-WAKE-2020-Glenmere Subdivision, Phase 2 49, 50, 51, 77,
Tracking ID 79,81
Assigned autorratically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please
enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You
may enter up to 3 waterbodies if needed.
15a. Receiving Poplar Creek
Wate rbody* %rre of waterbody into which stornwater runoff will discharge
15b. Waterbody 27-35
Index No.* NCWaterbody Index Nurrber
Stormwater rJ No
discharges will flow r- Yes
to additional
wate rs *
16a. Is this project r Yes
subject to the NC r No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B. ^
Fternittee Inforrration - Legally Fbsponsible Entity and Individual
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization Legally Pesponsible Entity
Name * Caviness & Cates Building and Development Company
IF pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field.
Note: The organization name must match the business entity name registered with the NC Secretary of State. You can
verify the registration here.
2. First Name * Christopher E.
If Corporation, enter Faegistered Agent First Wre
3. Last Name* Cates
IF Corporation, enter F;bgistered Agent Last %rre
3b. Title Vice President
4. Permitee E-mail pam@cavinessandcates.com
Address*
5. Permittee 910-481-0585
Telephone No.*
6. Permittee Mailing Street Address
Address* 639 Executive Place
Address Line 2
City
Fayetteville
Fbstal / Zip Code
28305
Check box if the F Yes
street address the
same as mailing
address
7. Permittee Street Street Address
Address* 639 Executive Place
Address Line 2
State / Frovince / Region
NC
Country
us
City State / Ftovince / Region
Fayetteville NC
Postal / Zip Code Country
28305 us
8. Type of Non -Government
Ownership *
C. Site Contact Information
Part C.
Roject Site Contact Information
..............................................................................................................................................................................................................................................................................................................................................................................................
1. Primary Site Pamela
Contact - First
Name *
2. Primary Site Geddie
Contact - Last
Name *
3. Title
4. Site Contact E- pam@cavinessandcates.com
mail Address*
5. Site Contact 910-778-7902
Telephone No.*
6. Organization
Name
7. Site Contact Street Address
Mailing Address* 639 Executive Place
Address Line 2
city
Fayetteville
Postal / Zip Code
28305
8. Consultant Name (Optional)
First and Last nave
9. Consultant E-mail This person will be copied on all correspondence.
10. Consultant
Telephone No.
State / Frovince / Pegion
NC
Country
us
D. E&SC Plan
Part D. ^
Erosion & Sediment Control (E&SC) Ran Approval Information
......................................................................................................................................................................................................................................................................................................................................
1. Date E&SC Plan 09/25/2020
Approved *
2. E&SC Plan Project SEC-044851-2020
Number/ID * Assigned by agency or local program
3. E&SC Plan f State DEQ Office
Approved by* r Local Program
4. Local Program* Wake County
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application. For linear projects, please also upload a site map showing the overall extent of the project or
include the beginning point and end point coordinates in the "Notes" box below.
5. E&SC Plan
SEC-044851-2020_Approval-
Approval letter or
S&EConstructionPlan ReviewChecklist-V.2 WM 9- 297.75KB
Grading Permit
25-20.pdf
Mast be RFfornat
6. Site Location Map
Helpful for linear project review
(Optional)
Wst be FDFfornat. Rease do not upload entire set of E&SCplans.
7. Notes (Optional)
Ffovide any additional information that night help the reviewer better understand how uploaded documents support
the application. Include additional w aterbodies for linear projects if necessary.
8. NOI Certification
GL49,50,51,77,79,80 & 81 NOI.pdf 374.19KB
Form
Mast be R7Ffon-rat
This is an Express
F No
Review Project*
r Yes
E. Certification
North Carolina General Statute 143-215.66 (1) provides that:
Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other
document filed or required to be maintained under this Article or a rule implementing this Atide; or who knowingly makes a false statement
of a material fact in a rulemaking proceeding or contested case under this Atcle; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring device or method required to be operated or maintained under this Amide or rules of the
Commission implementing this Atcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
17 I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
rJ The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* 17 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* rJ If the Erosion and Sediment Control Plan approved by the delegated program is
not compliant with Part II (Stormwater Pollution Prevention Plan) of the
NCG010000 General Permit. I will nonetheless ensure that all conditions of Part
II of the permit are met on the project at all times.
* 17 I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Responsible Person named on this Notice of Intent
f Authorized Responsible Person*
Important: The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible
person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who
owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager
that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more
information on signatory requirements, see Part IV, Section B, Item (6) of that permit.
Signature
Cf - �lffrr-e'eafAI , � 6., C, rr� -r f
Type Name* Christopher E. Cates
Title Vice President
Organization Legally Ibsponsible Entity
Caviness and Cates Building and Development Company
Date * 10/02/2020
F. Tracking and COC Info
NOI Tracking No. 32475
NC Reference No.
NCG01-2020-4429
Uses 'count_nurrber' variable (increrrented by SP)
Certificate of
NCC204429
Coverage (COC)
Uses 'count number' variable (increrrented by SP)
No.*
Count Number 4429
Sequential nurrber for subrrittal that is incremented by Stored Frocedure
COC Year 2020
Year of date reviewed (used to assign YY digits after "NOC' in COCno.)
Initial Invoice No. NCC204429-2020
Invoice Due Date 11/1/2020
Initial Fee $ 100.00
Invoice Status OPEN