Loading...
HomeMy WebLinkAboutNCC204424_ESC Approval Submitted_20201008ROY COOPER Governor MIC14AEL S..REGAN .4ecr ctary MAN WRENN Director (NORTH CAROLINA Environmental Quality September 30, 2020 LETTER OF APPROVAL WITH_NIODIFICATIONS Lee Park Baptist Church Attention: Christopher Latta, Executive Pastor 2505 Morgan Mill Road Monroe, North Carolina 28110 RE: Project Name: Lee Park Baptist Church Soccer Field Renovation Acres Approved: 2.69 Project 1D: UN10N-2021.-012 County: Union, City: Monroe Address: Morgan Mill Rd. River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: Clint Lawrence, PE, Lawrence Associates Date Received by LQS: September 2, 2020 Plan Type: New Dear Mr. Latta: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The N01 form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the N01 form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. ncdenr.gov. After you submit a complete and correct N01 Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCGO i permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. North farolinaDeparlmeiltOfEnvironrne:nta?Quality i Div isfcnofEnergy, lrlineralarulLRO41Resaurce5 Mooresville Regional Office 1 610 East Crnter Avenue, Suite 301 i Mooresville, North Cordina 2$115 . r:enn.�rygli::IJ4 '� uwnnmemaTum omoe�w Lwu v 704,563,1699 Letter of Approval with Modification September 30, 2020 Page 2 of 3 2. The NCGD1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.I(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the con m.encement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality Iaws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, -&4')-'J Shannon Leonard Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGOI Fact Sheet c: inspection Department ec: Clint Lawrence, PE Letter of Approval with Modification September 30, 2020 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Lee Park Baptist Church Soccer Field Renovation Project ID: UNION-2021-012 County: Union 1. The diversion berms shall be extended to edge of Limits to direct all of the disturbed area to the skirniner basin. 2. The location of the borrow material source shall be provided to this office prior to transporting fill material on site.