September 30, 2020
LETTER OF APPROVAL WITH_NIODIFICATIONS
Lee Park Baptist Church
Attention: Christopher Latta, Executive Pastor
2505 Morgan Mill Road
Monroe, North Carolina 28110
RE: Project Name: Lee Park Baptist Church Soccer Field Renovation
Acres Approved: 2.69
Project 1D: UN10N-2021.-012
County: Union, City: Monroe
Address: Morgan Mill Rd.
River Basin: Yadkin-PeeDee
Stream Classification: Other
Submitted By: Clint Lawrence, PE, Lawrence Associates
Date Received by LQS: September 2, 2020
Plan Type: New
Dear Mr. Latta:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall expire
three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is
required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction Stormwater General Permit. This form MUST be submitted prior to the commencement
of any land disturbing activity on the above named project. The N01 form may be accessed at
deq.nc.gov/NCGO1. Please direct questions about the N01 form to Annette Lucas at
Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. ncdenr.gov. After you submit a complete and
correct N01 Form, a COC will be emailed to you within three business days. Initially, DEMLR will
not charge a fee for coverage under the NCGO1 permit. However, on or after May 1, 2019, a $100 fee
will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in
Raleigh.
Title 15A NCAC 4B .0118(a) and the NCGO i permit require that the following documentation be kept
on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
North farolinaDeparlmeiltOfEnvironrne:nta?Quality i Div isfcnofEnergy, lrlineralarulLRO41Resaurce5
Mooresville Regional Office 1 610 East Crnter Avenue, Suite 301 i Mooresville, North Cordina 2$115 .
r:enn.�rygli::IJ4 '�
uwnnmemaTum omoe�w Lwu v 704,563,1699
Letter of Approval with Modification
September 30, 2020
Page 2 of 3
2. The NCGD1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.I(a) of our right of periodic inspection to
insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection
of existing natural resources and adjoining properties. If, following the con m.encement of this project,
the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may
require revisions to the plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality Iaws, regulations, and rules. In addition, local city or county ordinances or rules may
also apply to this land -disturbing activity. This approval does not supersede any other permit or
approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form if
there is any change in the information included on the form. In addition, it would be helpful if you
notify this office of the proposed starting date for this project. Please notify us if you plan to have a
preconstruction conference.
Your cooperation is appreciated.
Sincerely,
-&4')-'J
Shannon Leonard
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCGOI Fact Sheet
c: inspection Department
ec: Clint Lawrence, PE
Letter of Approval with Modification
September 30, 2020
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Lee Park Baptist Church Soccer Field Renovation
Project ID: UNION-2021-012
County: Union
1. The diversion berms shall be extended to edge of Limits to direct all of the disturbed area
to the skirniner basin.
2. The location of the borrow material source shall be provided to this office prior to
transporting fill material on site.