Loading...
HomeMy WebLinkAboutSW6201001_Calcs (Ditch)_202010081689 — Evelyn Estates Subdivision Ditch Calculations Ditch #1 Road A right Tc = 26.2 min + 5.9 min = 32.1 min; use 30 min Kerby: L = 527 If, s = 0.017, n = 0.4 Kirpich: L = 391 If, s = 0.005 DA=9.04ac C=0.5 1 = 3.88 in/hr Q = 17.54 cfs Ditch #2 Road A left Tc = 17.2 min + 14.2 min = 31.4 min; use 30 min Kerby: L = 262 If, s = 0.025, n = 0.4 Kirpich: L = 1,207 If, s = 0.005 DA = 6.53 ac C=0.5 1 = 3.88 in/hr Q = 12.67 cfs Ditch #3 End of Road A Tc = 30 min DA = 16.51 ac C=0.5 1 = 3.88 in/hr Q = 32.03 cfs