Loading...
HomeMy WebLinkAboutSW6200905_1669-PIPE CALCS_202010081669 — Currin Property Subdivision *Cross pipe calculations use 25-year storm intensity Tc = 17 min, use 15 min Kerby: L = 366 ft, s = -0.05, n = 0.4 DA=3.86ac C = 0.55 1 = 5.89 i n/h r Q = 12.50 cfs Pipe 2 Tc = 16 min, use 15 min Kerby: L = 315 ft, s = -0.05, n = 0.4 DA = 2.13 ac C = 0.55 1 = 5.89 in/hr Q = 8.57 cfs