Loading...
HomeMy WebLinkAboutSW6200905_1669-DITCH CALCS_202010081669 - Currin Hill Subdivision Ditch Calculations Q = 2.57 cfs Ditch #1 Ditch #5 Road A Sta. 0+00 to 2+75 left Road A Sta. 22+50 to 27+00 left Tc=15min Tc=30min DA=1.65ac DA=1.67ac C = 0.5 C = 0.5 1 = 5.26 in/hr I = 3.81 in/hr Q = 4.33 cfs Q = 3.18 cfs Ditch #2 Ditch #6 Road A Sta. 2+75 to 3+50 left Road A Sta. 7+50 to 11+00 right Tc= 15 min Tc=5 min DA = 2.62 ac DA = 0.30 ac C=0.5 C=0.95 1= 5.26 i n/h r 1= 7.80 i n/h r Q = 6.89 cfs Q = 2.22 cfs Road A Sta. 7+00 to 11+00 left Road A Sta. 11+00 to 15+50 right Tc= 10 min Tc=30 min DA=0.77ac DA=1.44ac C = 0.5 C = 0.5 1 = 6.24 in/hr I = 3.81 in/hr Q = 2.40 cfs Q = 2.74 cfs Ditch #4 Ditch #8 Road A Sta. 11+00 to 22+50 left Road A Sta. 15+50 to 21+00 right Tc = 19.9 min + 5.4 min = 25.4 min, use 30 min Tc=30min Kerby: 355 If, s = 0.025, n = 0.4 DA = 3.02 ac Kirpich: 683 If, s = 0.02 C = 0.5 DA = 1.35 ac I = 3.81 in/hr C = 0.5 1 = 3.81 in/hr Q = 5.75 cfs Ditch #9 Road A Sta. 21+00 to 27+00 right Tc=30 min DA = 4.87 ac C = 0.5 1 = 3.81 i n/h r Q = 9.28 cfs