HomeMy WebLinkAboutNCC204530_ESC Approval Submitted_20201008ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Director
Buckeye Elm Contracting, LLC
ATTN: Mr. Joel Miller
782 Hartford St.
Worthington, OH 43085
NORTH CAROLINA
Environmental Quality
October 5, 2020
LETTER OF APPROVAL
RE: Project Name: Bostic Landfill
Acres Approved: 1.95
Project ID: RUTHE-2020-011
County: Rutherford
City: Bostic
Address: 377 and 389 W. Church St.
River Basin: Broad
Stream Classification: Second Broad River - WS-V
Submitted By: Mr. David Weikle, P.E.
Date Originally Received by LQS: April 6, 2020
Date Current Revision by LQS: October 2, 2020
Plan Type: Remediation Project
Dear Mr. Miller,
This office has reviewed the revised subject erosion and sedimentation control plan and
hereby issues this Letter of Approval, This plan approval shall expire three (3) years
following the date of approval, if no land -disturbing activity has been undertaken, as is
required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised
plan will be required (G.S. 113A-54.1)(b).
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eN01) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit fee.
After the fee is received, you will receive the COC via email. You MUST obtain the COC prior
to commencement of any land disturbing activity. The eNOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the eNO1 form to Annette Lucas at
Annette.lucasOncdenngov or Paul Clark at Patil.clai7k@n-cdenr.gov. If the owner/operator
North Carolina Department of Environmental Quallty I Division of Energy, Mineral and Land Resources
D- Asheville Regional office 12090 U.S, Highway 70 I Swannanoa, North Carolina 28778
Letter of Approval
Buckeye Elm Contracting, LLC
AT" I'N: Mr. Joel Miller
October 5, 2020
Page 2 of 3
of this project changes in the future, the new responsible party is required to apply for
his/her own COG
Title 15A NCAC 4B .0118 (a) and the NCG01 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made (luring the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land -disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. This permit allows for a land -
disturbance, as called for on the application plan, not to exceed the approved
acres. Exceeding the acreage will be a violation of this permit and would require a revised
plan and additional application fee. You are requested to file an amended form if there is any
change in the information included on the form.
Your cooperation is appreciated.
4 ce ' ,
Mi hael Smith?�_
Assistant Regional Engineer
Division of Energy Mineral, and Land Resources
Letter of Approval
}buckeye Elm Contracting, LLC
ATTN: Mr. Joel Miller
October 5, 2020
Page 3 of 3
Enclosures: NPDES NCG01 Fact Sheet
ec: Mr. David Weikle, P.E. dweikle(o)shieldengitieering.com
cc: Regional Office file