HomeMy WebLinkAboutNCC204365_ESC Approval Submitted_20201008I
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Acting Director
NORTH CAROLINA
Environmental Quality
June 16, 2020
LETTER OF APPROVAL WITH
PERFORMANCE RESERVATIONS
Cherokee County Board of Education
ATTN: Ms. Jeana Conley
911 Andrews Rd.
Murphy, NC 28906
RE: Project.Name: MARTINS CREEK ELEMENTARY - DRAINFIELD REPAIR
Acres Approved: 1.39
Project ID: CHERO-2020-003
County: Cherokee
City: Murphy
Address: Tobe Stalcup Rd.
River Basin: Hiwassee
Stream Classification: Little Brasstown Creek - C
Submitted By: Civil Design Concepts, P.A. - Mr. Benjamin Munn, P.E.
Date Received by LQS: April 20, 2020
Date Revision Received by LQS: June 3, 2020
Plan Type: Institutional
Dear Ms. Conley,
This office has reviewed the subject erosion and sedimentation control plan and hereby
issues this Letter of Approval with Performance Reservations. A list of the reservations is
attached. This plan approval shall expire three (3) years following the date of approval, if no
land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
Should the plan not perform adequately, a revised plan will be required (G.S. 113A-54. 1) (b).
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit fee.
After the fee is received, you will receive the COC via email. You MUST obtain the COC prior
to commencement of any land disturbing activity. The eNOI form may be accessed at
deq.nc.gov/NCG01. PIease direct questions about the eNOI form to Annette Lucas at
Annette.lucas ncdenr. ov or Paul Clark at.Paul.clark(@ncdenr.gov. If the owner/operator
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
D
Q;;�,
�
Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
N4a00
0eFIMM21OU011ty
825,296,4500
Fetter of Approval with Performance Reservations
Cherokee County Board of Education
Attn: Ms. Jean Conley
June 16, 2020
Page 2 of 4
of this project changes in the future, the new responsible party is required to apply for
his/her own COC.
Title 15A NCAC 4B .0118 (a) and the NCG01 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land -disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. This permit allows for a land -
disturbance, as called for on the application plan, not to exceed the approved
acres. Exceeding the acreage will be a violation of this permit and would require a revised
plan and additional application fee. You are requested to file an amended form if there is any
change in the information included on the form.
Your cooperation is appreciated.
Sincerely,
A
Fred Walker, P.E.
Express Engineer
Land Quality Section
Letter of Approval with Performance Reservations
Cherokee County Board of Education
Attn: Ms. Jean Conley
June 16, 2020
Page 3 of 4
Enclosures: Certificate of Approval
NPDES NCG01 Fact Sheet
Performance Reservations
ec: Mr. Benjamin Munn Cbmunn@cdcgo.com]
cc: Regional Office file
Letter of Approval with Performance Reservations
Cherokee County Board of Education
Attn: Ms. Jean Conley
June 16, 2020
Page 4 of 4
PERFORMANCE RESERVATIONS
Please note that the developer is responsible for the control of sediment on -site. if the
approved erosion and sediment control measures prove insufficient, the developer must
take those additional steps necessary to stop sediment from leaving this site. Each
sediment storage device must be inspected after each storm event. Maintenance and/or
clean out is necessary anytime the device is at 50% capacity. (G.S. 113A-57(3)).
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities
tD
M)
o
a�
�
b
o
C
�
�r
a
�-►
CD
o
°
CDPolo-
rZ
.
•
o
ve
CD
_
CD
R
j�ryAyy.d�
fDft
o
CD
.�
CD