November 9, 2004
Yancey County
DWQ Project No. 041051
NCSR 1387 (Bloody Fork Road)
APPROVAL of 401 Water Quality Certification with Additional Conditions p 0%@ L5 O vv L
Mr. J. J. Swain, Jr., P.E.
Division Engineer
N C Department of Transportation
Post Office Box 3279
Asheville, North Carolina 28802
Dear Mr. Swain:
N O V 1 2 2004
DENR - WATER QtIAM
_.WETLANDS AND STORMMTER BRMICH
You have our approval, in accordance with the attached conditions and those listed below, to impact 70 linear feet of
Bloody Fork (70 linear feet of new pipe) in order to make improvements to NCSR 1387 (Bloody Fork Road) in Yancey
County. The project must be constructed in accordance with the application dated June 23, 2004 (received June 28,
2004), including the environmental commitments made in the application letter. After reviewing your application and
further field review on October 26, 2004, it was determined that there would not be additional impacts to the streams at
Stations 24+38 and 25+50. We have decided that this fill is covered by General Water Quality Certification No. 3404,
corresponding to the U.S. Army Corps of Engineers Nationwide Permit Number 14. In addition, you must acquire any
other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and
Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the
accompanying 404 Permit unless otherwise specified in the Water Quality Certification.
This approval is valid solely for the purpose and design described in your application (unless modified below). Should
your project change, you must notify the DWQ in writing and submit a new application. If the property is sold, the new
owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the
conditions. If total wetland fills for this project (now or in the future) exceed one acre, or if total impacts to streams (now
or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506
(h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the attached certification and any
additional conditions listed below.
Erosion and sediment control practices must be in full compliance with all specifications governing the proper design,
installation and operation and maintenance of such Best Management Practices in order to protect surface waters
standards:
a. The erosion and sediment control measures for the project must be designed, installed, operated, and
maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control
Planning and Design Manual.
The design, installation, operation, and maintenance of the sediment and erosion control measures must be
such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina
Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow
sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the
project.
For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated,
and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual.
Nof Carolina
?turally
North Carolina Division of Water Quality 2090 U.S. Highway 70 Swannanoa, NC 28778 Phone (828) 2964500 Customer Service
Internet h2o.enr.state.nc.us FAX (828) 299-7043 1-877-623-6748
b.
C.
An Equal Opportunity/Affirmative Action Employer
Mr. J. J. Swain, Jr., P.E.
November 9, 2004
Page Two
d. The reclamation measures and implementation must comply with the reclamation in accordance with the
requirements of the Sedimentation Pollution Control Act.
2. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the
impacts depicted in the Preconstruction Notice Application. All construction activities, including the design,
installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be
performed so that no violations of state water quality standards, statutes, or rules occur.
3. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable.
If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed
and the natural grade restored within six months of the date that the Division of Land Quality has released the project.
4. The NCDOT shall use Best Management Practices for the Protection of Surface Waters (NCDOT August 2003) and
Sedimentation and Erosion Control Guidelines for Sensitive Watersheds [15A NCAC 413 .0124 (a)-(e)]. Measures
should be implemented prior to any ground disturbing activities to minimize impacts to downstream aquatic
resources. Temporary or permanent herbaceous vegetation should be planted on all bare soil within 5 days of ground
disturbing activities to provide long-term erosion control. Erosion control matting should be used in conjunction with
appropriate seeding on disturbed soils in steep slope and riparian areas. Matting should be secured in place with
staples, stakes or, wherever possible, live stakes and native trees. Riparian vegetation must be reestablished within
the construction limits of the project by the end of the growing season following completion of construction.
5. Stormwater shall be directed to vegetated buffer areas, grass lined ditches or other means appropriate to the site for
the purpose of pre-treating stormwater runoff, and must not be routed directly into streams. Mowing of existing
vegetated buffers is strongly discouraged, so that they may be utilized for stormwater diffuse flow.
6. Culverts that are less than 48-inch in diameter should be buried to a depth equal to or greater than 20% of their size to
allow for aquatic life passage. Culverts that are 48-inch diameter or larger should be buried at least 12 inches below
the stream bottom to allow natural stream bottom material to become established in the culvert following installation
and to provide aquatic life passage during periods of low flow. This may require increasing the size of the culvert to
meet flow conveyance requirements. If any of the existing pipes are perched, they shall be removed and replaced, and
re-installed correctly, unless demonstrated that this is topographically unfeasible.
7. Removal of vegetation at the stream crossing and adjacent to streams should be minimized. Native trees and shrubs
(e.g. Rhododendron, dog hobble, willows, alders, sycamores, dogwoods, black walnut and red maple) should be
planted along the streambank to reestablish the riparian zone and to provide long-term erosion control in the vicinity
of the road crossing and along the streams within dedicated rights of way.
8. Riprap placed for bank stabilization should be limited to the streambank below the high water mark, and
vegetation should be used for stabilization above the high water elevation.
9. The dimension, pattern and profile of the stream, above and below the culverts, should not be modified by widening
the stream channel or reducing the stream depth. Disturbed floodplains and streams should be restored to natural
geomorphic conditions.
10. Heavy equipment must be operated from the banks rather than in the stream channel in order to minimize
sedimentation and to reduce the likelihood of introducing other pollutants into the stream.
11. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent
contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials.
12. Excavation of the stream crossings and relocations should be conducted in the dry, if possible. Sandbags, cofferdams,
flexible pipe or other diversion structures should be used to minimize excavation in flowing water.
13. If concrete is used during culvert installation (e.g., headwalls), a dry work area should be maintained to prevent direct
contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete should not be
discharged to surface waters due to the potential for elevated pH.
14. Discharging hydroseed'mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is
strictly prohibited.
15. The presence of equipment in the channels must be minimized. Under no circumstances must rock, sand or other
materials be dredged from the wetted stream channel under authorization of this permit, except in the immediate
vicinity of the culverts. Instream dredging has catastrophic effects on aquatic life, and disturbance of the natural form
of the stream channel will likely cause downstream erosion problems, possibly affecting other landowners.
16. Rock check dams at culvert outlets should be removed at project completion to avoid blocking movement of aquatic
life.
17. This certification does not authorize the discharge of waste rock and dirt into the stream or riparian zone except for
permitted areas associated with culvert conditions.
R
r Mr. J. J. Swain, Jr., P.E.
November 9, 2004
Page Three
18. All work shall be performed during low flow conditions (below bankfull).
19. Upon completion of the project, the NCDOT shall complete and return the enclosed "Certificate of Completion" form
to notify the NCDWQ when all work included in the §401 Certification has been completed. The responsible party
shall complete the attached form and return it to the Transportation Permitting Unit of the NC Division of Water
Quality upon completion of the project. The NCDOT is strongly advised to send in photographs upstream and
downstream of each structure to document correct installation.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act
within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to
Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center,
Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have
any questions, please telephone or Mr. Mike Parker of the Asheville Regional Office at 828.296.4500.
Sincerely,
g, P-M-?
J---Alan W. Klimek, P.E.
Attachment
cc: Wilmington District, US Army Corps of Engineers
Roger Bryan, Division 13, DEO
Ed Ingle, Roadside Environmental
Angie Pennock, USACE Asheville Field Office
Transportation Permitting Unit
Mike Parker, Asheville Regional Office
MEMORANDUM
TO: John Dorney
Non-Discharge Branch
Regional Contact: _Michael R. Parker
WO Supervisor: Forrest Westall
Date:
SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS
Facility Name NCDOT - SR 1387
Project Number 04 1051
Recvd From DOT
Received Date 6/28/04 Recvd By Region
Project Type pave road
Region Asheville
Certificates Stream Stream Impacts (ft.)
Permit Wetland Wetland Wetland Stream Class Acres Feet am
Type Type Impact Score Index Prim. Supp. Basin Req. Req.
YO N F- 7-3-36 r _c TR 40,307. F- 70.00 70.00
F14 Stream 77-@-
Mitigation Wetland
MitigationType Type Acres Feet
Is Wetland Rating Sheet Attached? O Y ON Did you request more info? O Y ON
Have Project Changes/Conditions Been Discussed With Applicant? O Y O N
Is Mitigation required? O Y 0 N
Provided by Region: Latitude (ddmmss) 355929
County YANCEY
County2
Longitude (ddmmss) 822214
Comments:
DOT is imposing to grade, widen and nave NCSR 1387, Bloody Fork Road in Yancey Counly,
DOT proposes to extend one culvert and add a new culvert. During the site visit a couple of areas
were noted that may need to be included as impact.
Recommendation: O Issue OQ Issue/COnd p Deny
cc: Regional Office
Central Office Page Number 1
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
August 12, 2004
Mr. J. J. Swain, Jr., P.E.
Division Engineer
North Carolina Department of Transportation
Post Office Box 3279
Asheville, North Carolina, 28802
WETLANDS 1401 GROUP
AUG 1 9 2004
Re: Permit Application for Proposed Stream Impacts
DWQ No. 041051
SR 1387, Bloody Fork Road
Yancey County
Dear Mr. Swain:
WATER QUALITY SECTION
The Division of Water Quality has reviewed your submittal for a 401 Water Quality Certification for the aforementioned project.
Review of your application revealed it lacking necessary information required for making an informed permit decision. The permit
application was deficient in the following areas:
• Several streams, believed to be State surface waters, were noted during the site visit that were not listed on the 401 Certification
Application. Another site visit has been scheduled with Mr. Roger Bryan to review these possible impact areas. If these areas
are determined to be jurisdictional waters, a revised 401 Certification application will be necessary.
Therefore, pursuant to 15A NCAC 2H .0507(a)(5), we will have to place the permit application on hold until a determination of these
waters has been made. Furthermore, until the NC Division of Water Quality receives the information, we request (by copy of this
letter) that the US Army Corps of Engineers place the permit application on hold.
If you have any questions or require additional information, please contact Mike Parker at 828-296-4500.
Sincerely,
Alan W. Klimek, P.E.
Director
cc: US Army Corps of Engineers Asheville Field Office
Roger Bryan, Division 13 DEO
Asheville Regional Office
Transportation Permitting Unit
j? ata a;
North Carolina Division of Water Quality 2090 U.S. Highway 70 Swannanoa, NC 28778 Phone (828) 296-4500 Customer Service
Internet: h2o.enr.state.nc.us FAX (828) 299-7043 1-877-623-6748
An Equal Opportunity/Affirmative Action Employer
WETLANDS /401 GROUP
.? ?. JUN 2 8 2004
STATE of NORTH CAROLINA WATER QUALITY SECTION
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY LYNDO TIPPETT
GOVERNOR SECRETARY
PO BOX 3279, ASHEVILLE, NC 28802
June 23, 2004
Mrs. Angie Pennock 0,41051
US Army Corps of Engineers
151 Patton Avenue, Room 208
Asheville, NC 28801-5006
Subject: Nationwide Permit #14
SR 1387, Bloody Fork Road
State Project No. 13 C. 1000 1 9(DWQ Minor Permit Fee $200)
Yancey County, NC
Dear Mrs. Pennock:
I have enclosed a straight-line diagram with erosion control plan, a PCN application for
NWP #14, and a vicinity map relative to the proposed project on SR 1387, Bloody Fork
Road, Yancey County, NC.
Bloody Fork Road is currently a 12-14 feet wide gravel road. Division of Highways
plans to pave the road 18 feet wide and increase the typical section. Grading will be
moderate.
We propose to extend one existing culvert and add one new culvert on Bloody Fork.
Total culvert extensions will be 70 linear feet. No stream relocation will be performed
for the project. Existing channel morphology will be maintained upstream and
downstream of the culvert. The culverts will be placed below existing streambed
elevation. Riparian vegetation will be reestablished along disturbed areas associated with.
the culvert extension. Stormwater will be diverted through grass-lined ditches or
vegetated buffers prior to entering streams.
No effect on federally listed species (threatened or endangered) or their habitats is
anticipated. The culvert replacements are located approximately 0.25miles from the
Cane River, a known location for the Appalachian elktoe (Alasmidonta reveneliana).
The proposed project contains minimal instream work consisting of extending/adding two
culverts on Bloody Fork. High Quality Water erosion control measures will be
implemented to limit potential sedimentation from the project.
n
Mrs. Angie Pennock
Page -2 SR 1387, Yancey County
June 23, 2004
As a part of the 401 Certification process, a copy of the application will be forwarded to
the NC State Historic Preservation Office as required by Section 106 of the National
Historic Preservation Act of 1966 and GS 121-12(a).
By copy of this letter, we request David McHenry, North Carolina Wildlife Resources
Commission Coordinator, to comment directly to the Corps concerning the permit
request.
By copy of this letter, we are asking Ed Ingle, Area Roadside Environmental Engineer, to
comment on the above project. Temporary encroachment into the buffer zone of the
Bloody Fork will be required for the entire project. The streams are classified as trout. A
buffer variance will be required.
By copy of this letter, I am forwarding seven (7) copies of the application package to
Cynthia Van der Wiele, NC Division of Water Quality, 401/Wetland Unit and an
additional copy to Mike Parker, NC DWQ Asheville Regional Office for review and
comment. Please charge the application processing fee of $200.00 to WBS element #
13C.100019. Please forward comments directly to the Corps with copy to Division 13
Environmental Officer.
Your earliest consideration for this request would be greatly appreciated. If you have any
questions or information needs, please contact me at (828) 251-6171.
Sincerely,
P 0 A?
Roger D. Bryan
Division 13 Environmental Officer
Enclosures
cc: J.J. Swain, Jr., P.E.
H. M. Coates, P.E.
Ed Ingle
David McHenry
Cynthia Van der Wiele
Mike Parker
Marella Buncick
T
Office Use Only: Form Version April 2001
w 5
USACE Action ID No. DWQ No.
If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than
leaving the space blank.
1. Processing
Check all of the approval(s) requested for this project:
X Section 404 Permit
? Section 10 Permit
X 401 Water Quality Certification
? Riparian or Watershed Buffer Rules
2. Nationwide, Regional or General Permit Number(s) Requested: NWP 14
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (see section VIII - Mitigation), check here: ?
II. Applicant Information
1. Owner/Applicant Information
Name: NC Department of Transportation
Mailing Address: P.O. Box 3279
Asheville NC 28802
Telephone Number: 828-251-6171 Fax Number: 828-251-6394
E-mail Address: rdbryan@dot.state.nc.us
2. Agent Information (A signed and dated copy of the Agent Authorization letter must be
attached if the Agent has signatory authority for the owner/applicant.) N/A
Name:
Company Affiliation:
Mailing Address:
Telephone Number: Fax Number:
E-mail Address:
Page 1 of 8
. +6W
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: SR 1387 Bloody Fork Road
2. T.I.P. or State Project Number (NCDOT Only): 13C.10001 9
3. Property Identification Number (Tax PIN): N/A
4. Location
County: Yancey Nearest Town: Ramse, own
Subdivision name (include phase/lot number): N/A
Directions to site (include road numbers, landmarks, etc.): SR1387 is located off of US 19W
between Lewisburg and Ramseytown communities.
5. Site coordinates, if available (UTM or Lat/Long): 35° 59'29"N 82° 22'14"W
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Describe the existing land use or condition of the site at the time of this application:
Existing secondary road
7. Property size (acres): 2.6
8. Nearest body of water (stream/river/sound/ocean/lake): Bloody Fork (Class C-Tr)
9. River Basin: French Broad
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.ne.us/adniin/maps/.)
Page 2 of 8
10. Describe the purpose of the proposed work: We propose to grade, drain, base, pave and
install erosion control measures for SR 1387 (Bloody Fork Road). We propose to extend one
existing culvert and add one culvert on Bloody Fork. Total culvert extensions/additions will
be 70 linear feet. The culverts will be installed to insure aquatic life passage within the
streams.
11. List the type of equipment to be used to construct the project: Excavator, backhoe, and
trucks.
12. Describe the land use in the vicinity of this project: Rural, wooded, homes.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
N/A
V. Future Project Plans
Are any additional permit requests anticipated for this project in the future? If so, describe the
anticipated work, and provide justification for the exclusion of this work from the current
application: No, no future plans.
VI. Pr ed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Wetland Impacts
Wetland Impact Type of Impact* Area of Located within Distance to
Page 3 of 8
Site Number
indicate on ma Impact
acres 100-year Floodplain**
es/no Nearest Stream
linear feet Type of Wetland***
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at htW://www.fema.?,ov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.)
List the total acreage (estimated) of existing wetlands on the property: 0.0
Total area of wetland impact proposed: 0.0
2. Stream Impacts, including all intermittent and perennial streams
Stream Impact
Site Number
indicate on ma
Type of Impact* Length of
Impact
linear feet
Stream Name** Average Width
of Stream
Before Impact Perennial or
Intermittent?
leasespecify)
13+75 Culvert 20 Bloody Fork 4 ft P
28+50 Culvert 50 Bloody Fork 3 ft P
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.uses.uov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com,
www.mal2quest.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 70 feet.
Page 4 of 8
3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any
other Water of the U.S.
Open Water Impact
Site Number
indicate on ma
Type of Impact* Area of
Impact
acres Name of Waterbody
(if applicable) Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging,
flooding, drainage, bulkheads, etc.
4. Pond Creation - N/A
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
The existins secondarv road must be improved to meet current safety standards for paved
roads. The culvert extensions requested are the minimum necessary to establish an appropriate
typical section for the roadway. The new is culvert is necessary to avoid a residence on the road.
Riparian vegetation will be established on disturbed areas associated with the proiect
construction.
VIII. Mitigation - N/A
Page 5 of 8
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
ht!L)://h2o.c.nr.state.nc.us/ncwetlands/stn-np-ide.htm].
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
N/A
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that
you would like to pay into the NCWRP. Please note that payment into the NCWRP must be
reviewed and approved before it can be used to satisfy mitigation requirements. Applicants
will be notified early in the review process by the 401/Wetlands Unit if payment into the
NCWRP is available as an option. For additional information regarding the application
process for the NCWRP, check the NCWRP website at htty:Uh2o.enr.state.nc.us/=/index.htm. If
use of the NCWRP is proposed, please check the appropriate box on page three and provide
the following information:
Amount of stream mitigation requested (linear feet):
Amount of buffer mitigation requested (square feet):
Amount of Riparian wetland mitigation requested (acres):
Page 6 of 8
Amount of Non-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres):
IX. Environmental Documentation (DWQ Only)
Does the project involve an expenditure of public funds or the use of public (federal/state/local)
land?
Yes X No ?
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No X
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ?
X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) - N/A
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify. )?
Yes ? No X If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
(square feet Multiplier Required
Mitigation
1 3
2 1.5
Total
* Zone i extends out 30 teet perpendicular from near bank of channel; Gone L extends an
additional 20 feet from the edge of Zone 1.
Page 7 of 8
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or. 0260.
XI. Stormwater (DWQ Only)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
The existing compacted gravel roadway acts as an impervious surface. Paving of the roadway
should eliminate sedimentation from fines associated with gravel surface treatment. The
roadway surface will be 40% of right of way acreage. Stormwater will be diverted through
settling basins or grass lined buffers prior to entering the streams.
XII. Sewage Disposal (DWQ Only)- N/A
XIII. Violations (DWQ Only)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes ? No X
Is this an after-the-fact permit application?
Yes ? No X
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
With regard to hazardous spill basins the road is not classified as an arterial route, therefore
hazardous spill basins are not required.
KV Z3A
Apploant/Agent's Sijnature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.
Page 8 of 8
S
f.4 k
? <? ? _ ? ? t ?,.,?? r? .`. ??? -? ? •' ?O ? r? ?t'y?``-r \. ?? i xr t'ry' .,.+?''`???v
r 1 q ddd ?.??"ay"`"
• r?t ?? ? a!--'i' ?? { p ? ?"`?4?1 °x 1 ? :. i ; 9 ? ""'?-,.++" e ' 4?.-•'",af y,.r•?" .lam f??t.
f 'NO
40
_Lk
R^"*.•.'?-p?..,.?.fi'
?iAt?7ryfcJ 4
a I t? ?? f `? '?
?. ""_ ', 1 ` •' t? a ? ` f ° ? .? ". Y.'; s; ?" f'y, :..w•_ r•f ? ?x ?t •? , ? l,'•.- Sy;'', ?? tw 4''??,.,?"'°..,??.......,?,,.,,?
d
%
f 'k r w t ti ff + -, 4 t ?i s `"`s - E 5
r
r
?. ...? 4 1 1 > "Y., 1
'' X1`6 4 'l" rt
kl? ?j -Pb"'K f 3; •4 40 ?? 9`ki \? t ?`L.sy.^.." ' f 'y A
?/Z
6°W y
Name: BURNSVILLE Location: 035° 59'30.66" N 082° 22' 19.79" W
Date: 6/23/2004 Caption: SR 1387, Bloody Fork Road
Scale: 1 inch equals 1000 feet Yancey County, NC
Copyright (C) 1998, Maptech, Inc.
e \
A f
W w
u n•
- EP
1 1
r Cs.
/
'
co
FLAT I TOP MOUNTAIN
\
co
WILDUFF MANAGEMENT AREA
2
\ l \
\
b FLAT TOP
/ ' I
I
(?
- `3A3
?/
9 5 w \
1 / r
. ?.
I` 0 /
' falS Lost
Grove i 41
1
?
V
j ?. \ . +341 •,
I
J
/
I
510UJ( \ l
1411]
i
1360 ?
J ?. \ \ \ Iced I,
/ I V A A ?• Bl0 creea'R
' \ \ +A:2 1620 Ch, 1619
,?p• I 'r7 1413
:t- FOREST
1411
• p 1360 j
laaa
R
?
adl
/
LITTLE
7iLE BALD
'•? ' a 1An \
•
.2
$ 2. +3°41
6
MTN. I
1t.•py •
NATIONAL .
.
`. '333
+336 I
\??+tlc law Mmer
_
1410 ;•'
RsMRx
c + i I \
1365
a
m?
C?ODe1 Ra
Lewisburg 0
395
335
1
1605
2
I BIG BALD \ 1397 Byr05
a ChGDGI
J B~
?- 36]' 365 Y S
-?
-
+ye r Dend cn.
\?-
•^
MTh.
Log
\ 1x03. 1606 :l' 0 1411+
1
\
` ?'\ ,? '3 1335,2 l
35
.
1659
PISGAH J b ?
` •
\ - :m ' 33] 3341
41
P
' _AdP / ll' 1386
\
'
. •1 1602 ?.+415] 1385
•
/
q
laC9.
0
\?• '1m2 Day
Peter en
T
BOOk GCpe1 b
>
1395 .. _
+406 ,
1356 625 135, c f 416
1333
• "' BOIe lbl
/ .. - ., 1 1
'0
6
?
1.3 / i 1355 1 35
5 p
Hipping
` 1731'
a1q -
'
i: t 1383 .' 1356
1 -
Eu :
\• Y 13 135
-
\
?
` Sroo+
1'9 iACi I
1
1.6 0I
.
v /
,
/ \
9
C \ I
t
. 13-6
?' 1 \
382
359
1 y
\ ca5 Mlne Brar< '
l
N /. I 389. \ 1365
\ 1360?I
330
97
v \ \
l 9
J \ 1
1
l
a•Ar Z
\ - \ 1 I
1` 7 5
1f?f9
`J
Cane Rivs f I. /
I
1
a. 5
J
Bald Crook ..9 .
/ 1E /
- 9URNMLLE
••
\
,.. I
\ Z ? rOr?1.SJA . I lY
lj/ I Y
/ \ I I`
q l
I
1125 11231\ 1121
1126 J A?4 •J 1118 / > 1196
?? I ?)
` \ 1 1 - 'f \ \. I 9] 0 1'109
O CHESTNUT Poir1}Gap AUSTIN
MTN• I I
\ MTN 1113']' +110
.
9
1
1126.
G \ PISGAH \
p. •. 06
1,111 1183 .,\
\
li
2
t 'lu
\
HIGH PEAK `
1121
\ \
1,07
_ Ponsocola /
1E•7C '\ 1101 0
`
ROCKY
n J KNOB •- - 1102 /.
( 1
OGLE
. ? lit` .2 Murchison
1102
^ •
JC? MEADOR o e
•
COXCOMB
?
MTN. •? ,y c I a% 1103
u
CANE R._R I -
GAP 0p
`
Y FLAT -'
SPRING
Figure 1. SR 1387, Station 13+75 (top) and Station 28+50 (bottom), Bloody Fork, Yancey County,
NC.
N.C. DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
SECONDARY ROAD SURVEY
SUBJECT: SR 1387 Bloody Fork Rd.
LOCATION: From End Of Pavement To End Of Maint.
WORK TYPE: Grade, Drain, Base, and Pave
WORK ORDER: PRIORITY: 24
COUNTY: Yancey TOWNSHIP: Ramseytown
DATE: 5-26-04 SCALE: 1"=50'
NOTES: 45' R/W
0.47 mi.
PREPARED BY: TSW
I(L
PIPE DATA SR# 138-7 BLOODY FoRk R D
CO. MADl-, v. WORK ORDER
STATION PRESENT SIZE PROPOSED SIZE -NOTES
?3 +?5
!r1 25 - ?2" CMP 777777, mP
o - " C as I
P ? x7 20'
(k66506 1-16 '- 10"(07P
2?+ S
,qq+ 38
25+ 9
2(e TT
0''a14 "CMP
.0' - tT l /
-/5'-c,rnP OP. 40 - t 'r
EP. 4o'- 3011 (mo
E . 20'- l51f A GPO E
EPLA€E
R O/,0(
SS fiO%6 E 140'- le"
CRUs5P PE yo'- 'r
R) vgVhy,0i85 0 '- (
S,-u „ (M-4
MP
2(o+riq
974 9(0
f 12 qU'-)2''C A
U-y' ST E yu'-rs''CmP
EP. 30,-)e" mp
a OP. ({G'-10x <mP 7kCO CE
EPIqCe?
PROPOSED PrvEw9 A E t
K?ssNi?E ?'- I
CRO55 lP C to'- /' ' io,77,(-;T?
"CmP
Cn?o
-20+27 uO - 7 00 olp o' - rs'
(al
0
3
2+ y0
3Z4 86 u -/g)"
CMP
We 7Q ,_ 11 MlP 14eG
aPGSED kCPIf-? L167
R \ 1i
? 0 0 . !50'-
" mP
PR /??cD
GSSFj,CE o'- b rh%
f>r? -- So
:r If s'' c. ? ' c'
STATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS
EROSION SYMBOLS
STD # DESCRIPTION
245.03 TEMPORARY SILT DITCH ---------------------------------------------- TSD --
245.05 TEMPORARY DIVERSION -------------------------------------------
---
TEMPORARY SILT FENCE ---------------------------------------------
,,,
890.05 TEMPORARY SLOPE DRAIN WITH EARTH BERM ----------------- --1
245.01 SILT BASIN TYPE A -----------------------------------------------------------
245.02 SILT BASIN TYPE B ---------------------------------------------------------------
TEMPORARY ROCK SILT CHECK TYPE A ------------------------------
TEMPORARY ROCK SILT CHECK TYPE B ------------------------------ -- )?.
892.01 TEMPORARY ROCK SEDIMENT DAM TYPE A ---------------------- -
892.02 . TEMPORARY ROCK SEDIMENT DAM TYPE B -------------------- - -
897.01 ROCK PIPE INLET PROTECTION ----------------------------------
---------
ROCK SILT SCREEN --------------------------------------------------------------- -
-
245.04 STILLING BASIN --------------------------------------
868.01 RIP RAP ------------------------------------------------------------------- - }-J J T7? RR
DITCH LINER -----------------------------------------------------------
ENVIRONMENTALLY SENSITIVE AREA-----------------------------
PIPE OUTLET ENERGY DISSAPATOR ----------------------------------------- 0.
EROSION CONTROL MATTING ----------------------------------- ECM
FIBER GLASS ROVING ----------------------------------- -- z ------------ FGR
SILT CHECK DAM TYPE-A -----------------------------------------------------0
SILT CHECK DAM TY-PE--B-------------------------------------------------------
' \ R
WOODS
WOODS
-51fe /3 t*?s
ROGER eYRC
29C)/-730
?-- 551- 72'' CMP
rx?. APe 20'onl owes E"d
I' .I I j ••I 3
t{ ` ROCK I 5 : i I ez
W? L io u'
0),j to lE (3YRD
422. 33Z
i
3 Q
I ?
1
VJCGDS WOODS
J?i
I ?:I
? I i2 0
1 1
EnID of PAVUA&f -r
5TA, to t51
TYPE B
WOODS
R ?
JO SDI DR. it
l
1
is
I
0.
g? 5BG TYP
?
??vVCr1 v TMJ1J
R
t WOODS
RoNNSE 6VAD
PROP, 40'--16, CMP
WOODS
I'
! 10
I
i
jz
?I
L
•
5 WOODS
I
I
J ? -r?PE B
3
zo - Z 4 cnnfl
REPL C-F- ¢0'X30" C--,P
2.
6 ,
ROGeR G '?RD
i ?
23I
l i?
?JO, I WOODS
i
l i
I i
? I
2 56C TVP,
WOODS q n
v
i?
3
Z. 2 b
0
m
PROP, y0'- )S" CMP
ti
I?
I
I
I: 20
I
STORAGE y
8UIl,DING-?
a'w
5
I?
to
W1-'D t., - [14-&'. Li
I z3216+6
3
PR'P +0 x t8 - cMp
TRoY R. P9TR,G<I NRNEY
rk 111
I
,?/ 2bf?
?
48?
P
183 /!85 ? CM
PROP, SO X
RK
v,>I ERs
R.
'
2
-L- REV EQ, 28 +91
0
\h? i , PRO P. DRIVEWAY ENT1QAm
?
y'81ocK wA?r 6 Q r ,
=
a P I NC
3
?FNI?SCApING
? _
?
?
'• 2 8 150
?
NOu5E
Q I
-L- REV pIN?
` 26 + ZCo
F ExISTING GRAVC DRIVE
D ?j Anj p PA R k i NG
00
pro I
1 r; 7
,
_L REV QIN?
2'SPRING ?I I 1 I -7 + 90
Z
W;:r ^ y
2 p' _ y'' Ply s-?<< d..
Rep. 3o'-IS''_nP i -L REV pINr-
Z-7 + 4-9
S66 •t1rP, l
of
i?
?
-7 5'x48 CMP -L- Rev PING
I //
I ?:
40 X I Z )0'6R DR. l
II
Cr?/>
I ??
R 21 -+- 00
REPL19CE 4-o'X 15 C?7lo ; p wR7?R sPIGt?T
1 /
r
I?
Pots, ER 8Y24 1
I
I1 I I
' -L- REv p?NC
El-P, Zo ZG + 2 5 .
20'- 8" METAq Pi P.%
I,... Rep 'i - is "Cr?P
6 _?o'so?? Dy
SSG TYP.
7 I
a
2G G / 4(0.7
,N of+9o
PRO p, 50 X 19" CAMP
PROP jueN ?qeaulJD ? :,•
19-r Coo
I Ga. DR. lo'GR-DR,
o'
J
DAKLANC CEE BRtRNT sob r t
2-76/531 I {
N.P. 20X IS w J I MI
-? T
? Type B I
3
TROY ?. J NMLA C?AroE ,?
? m I
.I
.I
A v
FALLOW !
h t
ConiCRETE EtESERUDIA I
STORAGE SLOC 4 I
10
t-
R
i_
PRo P, ?O1A la Ctkp
Lo IS D. It GARRCTT HERS
r•
2 2331 Igo
6I
Ii
? I
Io?GR.OR,
I
{
I{
I e!p x \8 CrA
I
0
?0
Q
FALLow
LOIS 0. HERB