HomeMy WebLinkAboutSW3200903_SuppEZ_20201006SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION
1 lProiect Name Proiect ETARC
3 JCoastal Wetland Area ac
4 Surface Water Area ac
5 Is this project High or Low Density? High
6 Does this project use an off -site SCM? No
COMPLIANCE WITH 02H .1003(4)
7
Width of vegetated setbacks provided feet
n/a
8
Will the vegetated setback remain vegetated?
9
If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ?
10
Is streambank stabilization proposed on this project?
NUMBER AND TYPE OF SCMs:
11
Infiltration System
12
Bioretention Cell
13
Wet Pond
1
14
Stormwater Wetland
15
Permeable Pavement
16
ISand Filter
17
Rainwater Harvesting RWH
18
Green Roof
19
Level Spreader -Filter Strip LS-FS
20
Disconnected Impervious Surface DIS
21
Treatment Swale
Dry Pond
StormFilter
Silva Cell
Ba filter
Filterra
22
23
24
25
26
FORMS LOADED
IDESIGNER CERTIFICATION
27
IName and Title:
28
Or anization:
29
Street address:
30
City, State, Zip:
31
Phone number
32
Email:
Carlton Burton, PE
Burton Engineering Associates
5950 Fairview Road, Suite 100
Charlotte, NC 28210
7045538881
cburton0burtonena.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the
information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
Signature of Designer
Seal
Date
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of draina a areas/SCMs
1
3
Does this roiect have low densit areas?
No
4
F5
If so, number of low densitydrainage areas
0
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
WET POND
1 Drainage area number 1
2 Minimum required treatment volume cu ft 141309 cf
GENERAL MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM H:V ?
3:1
6
Does the SCM have retaining walls, gabion walls or other
engineered side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
10- ear storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
desi n volume?
Yes
9
What is the method for dewatering the SCM for maintenance?
Drawdown Orifice
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC 10 ?
N/A
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
161
Does the SCM follow the device specific MDC?
Yes
17
Was the SCM designed by an NC licensedprofessional?
Yes
WET POND
MDC FROM 02H .1053
18
Sizing method used
SA/DA
19
Has a stage/storage table been provided in the calculations?
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl
826.00
21
Elevation of the main pool bottom (top of sediment removal) (fmsl)
827.00
22
Elevation of the bottom of the vegetated shelf (fmsl)
830.00
23
Elevation of the permanent pool (fmsl)
830.50
24
Elevation of the top of the vegetated shelf (fmsl)
831.00
25
Elevation of the temporary pool (fmsl)
830.76
26
Surface area of the main permanent pool (square feet
105894
27
Volume of the main permanent pool (cubic feet)
416434 cf
28
Average de th of the main pool feet
3.90 ft
29
Average depth equation used
Equation 2
30
If usinga uation 3, main pool perimeter (feet)
31
If using equation 3, width of submerged veg. shelf (feet)
32
Volume of the foreba cubic feet
80368 cf
33
Is this 15-20% of the volume in the main pool?
Yes
34
Clean -out depth for foreba inches
12 in
35
Design volume of SCM (cu ft)
282704 cf
361
Is the outlet an orifice or a weir?
Orifice
37
If orifice, orifice diameter (inches)
(2) 8"
38
If weir, weir height inches
39
If weir, weir length (inches)
40
Drawdown time for the temporary pool (days)
3
41
Are the inlet(s) and outlet located in a manner that avoids short-
circuiting?
Yes
42
Are berms or baffles provided to improve the flow path?
Yes
43
Depth of f rebay at entrance inches
66 in
44
Depth of forebay at exit (inches)
54 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the vegetated shelf (feet)
6 ft
47
Slope of vegetated shelf H:V
6:1
48
Does the orifice drawdown from below the top surface of the
ermanentpool?
Yes
49
Does the pond minimize impacts to the receiving channel from the 1-
r, 24-hr storm?
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC 9 is met.
No
51
Is a trash rack or other device provided to protect the outlet system?
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
53
Species of turf that will be used on the dam and embankment
54
Hasa planting plan been provided for the vegetated shelf?
Yes
ADDITIONAL
INFORMATION
55
Please use this space to provide any additional information about
the wet pond(s):
Wet Pond 1 4:00 PM 9/9/2020