Loading...
HomeMy WebLinkAboutSW5200501_O&M Agreement_20201006Operation & Maiptenance A reement Project Name: Coolwick Warehouse Project Location: Youngs►►ille, NC CgV.er.P!e Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s)- The SCM(s) on this project include (check all that apply & corresponding O&M sheets wil Infiltration Basin Quantity: Infiltration Trench Quantity: Bioretention Cell Quantity: Wet Pond Quantity. Stormwater Wetland Quantity: Permeable Pavement Quantity: Sand Filter Quantity. Rainwater Harvesting Quantity: Green Roof Quantity: Level Spreader - Filter Strip Quantity: Proprietary System Quantity: Treatment Swale Quantity: Dry Pond Quantity: Disconnected Impervious Surface Present: User defined SCM Present. Low Density Present: Location(s): Location(s): Location(s): Location(s): Location(s): Locations): Location(s): Location(s): Location(s): Locations}: Locations): Locations): Locations): Location(s): Location(s): Type: 1 N❑ No No oe aoaea autom ISouthwest Corner of Site I I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. 1 agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Title & Organization: Street address: City, state. zip: Phone number(s): Email: Tim Wicker Owner-Coolwick LLC 186 Wind Chime Court, Suite 200 Raleigh, NC 27615 919-247-6549 Icoole@me.com Signature: pate- �{ 7-1 L2_0 a Notary Public for the State of #J0(.A fz' 1 County of do hereby certify that •Ct _q personally appeared before me this i� SP day of -I and acknowledge the due execution of the Operations 1+A�irtteri�nce Agree ent . My colnmleslgn exPirea 2M2i2022 �U CPA/ seal, = My commission expires 1), / )_), STORM-EZ Version 1.5 O&M Agreement 9i 1612020 Page 1 of 1 € _ t Pond Maiit3anance Requirements (Continued] SCM element: Potential problem: How to remediate the problem: Sediment has accumulated Search for the source of the sediment and remedy the problem if to a depth greater than the possible. Remove the sediment and dispose of it in a location original design sediment where it will not cause impacts to streams or the SCM. storage depth. The main treatment area Algal growth covers over Consult a professional to remove and control the algal growth. 5o% of the area. Cattails, phragmites or other invasive plants cover Remove the plants by wiping them with pesticide (do not spray). 50% of the basin surface. Best professional practices show that pruning is Prune according to best professional practices. needed to maintain optimal plant health. The vegetated shelf Determine the source of the problem soils, hydrology, disease. Plants are dead, diseased etc. Remedy the problem and replace plants. Provide a one - or dying. time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Shrubs have started to Remove shrubs immediately. grow on the embankment. Evidence of muskrat or Consult a professional to remove muskrats or beavers and repair heaver activity is present. any holes or erosion. A tree has started to grow Consult a darn safety specialist to remove the tree. The embankment on the embankment. An annual inspection by an ;appropriate professional shows that the Make all needed repairs immediately. embankment needs repair. Clogging has occurred. gg g Clean out the autlet device and dispose of any sediment to a The outlet device location where it will not cause impacts to streams or the SCM. The outlet device is Repair or replace the outlet device. damaged. Weeds or volunteer trees are growing on the mat. Remove the weeds or trees Floating wetland island The anchor cable is 4� (if applicable) damaged, disconnected or Restore the anchor cable to its design state. missing. ......................... . a Maintenance Requirements (Continue;d) SCM element: Potential problem: How to remediate the problem: Erosion or other signs of damage have occurred at Repair the damage and improve the flow dissipation structure. the outlet. Discharges from the wet The receiving water pond are causing erosion Contact the local NCDE4 Regional Office. or sedimentation in the receiving water. Wa .. on Pond Design Summat]r F- Permanent Pool El.PIX9319166 Permanent Ppal E l: 396 Temporary Paul El: Temporary Paal El' 386.85 Prelreahnen[ other No Clean put Depth 396 clean Out Depth 396 Wet Pend Maintenance Re ulrements Important operation and maintenance procedures: Immediatefy after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed. until the plants become established (commonly six weeks). No portion of the wet pond should be fertilized after the initial fertilization that is required to establish the plants on the vegetated shelf, Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wet pond. If the pond must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain will be minimized as much as possible. At least once annually, a dam safety expert will inspect the embankment. Any problems that are found will be repaired immediately. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. After the wet pond is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance shall be kept in a known set location and shall be available upon request. inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: The entire wet pond Trash/debris is present. Remove the trash/debris- The perimeter of the wet Areas of bare soil andlor Regrade the soil if necessary to remove the gully, plant ground pond erosive gullies have cover and water until it is established. Provide lime and a one - formed. time fertilizer application. The inlet pipe is clogged of Unclog the pipe. Dispose of the sediment off -site. applicable), The inlet pipe is cracked or The inlet device otherwise damaged (if Repair or replace the pipe. applicable). Erosion is occurring in the Regrade the swale if necessary and provide erosion control swala (if applicable). devices such as reinforced turf matting or rip rap to avoid future problems wth erosion. Sediment has accumulated to a depth greater than the Search for the source of the sediment and remedy the problem if original design depth for possible. Remove the sediment and dispose of it in a location sediment storage. where it will not cause impacts to streams or the SCfvl. .The forebay Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used. wipe it on the plants rather than spraying.