Loading...
HomeMy WebLinkAbout20040055 Ver 1_Complete File_20040212?Ar?RQC. WilliamaG. Ross Jr., Secrdtary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director > Coleen H. Sullins, Deputy Director (j Division of Water Quality February 12, 2004 Watauga County DWQ Project No. 040055 SR 1113 (Pipe No. 2486) APPROVAL of 401 Water Quality Certification with Additional Conditions Mr. Mike Pettyjohn, P.E. Division Engineer WETLANDS 1401 GROUP N C Department of Transportation Post Office Box 250 FEB 2 North Wilkesboro, North Carolina 28659 tt 2004 WATER QUALITY SECTION Dear Mr. Pettyj ohn: You have our approval, in accordance with the attached conditions and those listed below, to impact 40 linear feet of an unnamed tributary to Baird Creek (20 feet of new pipe and 20 feet of riprap and temporary dewatering of 120 linear feet of channel) in order to replace and extend pipe No. 2486 on NCSk 1113 in Watauga County. The project must be constructed in accordance with your application dated January 9, 2004 (received January 13, 2004), including the environmental commitments made in the application letter. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Nos. 3366 and 3376, corresponding to the U.S. Army Corps of Engineers Nationwide Permit Numbers 3 and 33. In addition, you must acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non- Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 Permit unless otherwise specified in the Water Quality Certification. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the DWQ in writing and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface water standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. Any reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 585 Waughton Street Winston-Salem, NC 27107 Telephone: 336/771-4600 Fax: 336/771-4633 Customer Service: 1-877/623-6748 Mr. Mike Pettyjohn, P.E. February 12, 2004 Page Two 2. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Preconstruction Notice Application. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 3. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 4. NCDOT is encouraged to use onsite vegetation and materials for streambank stabilization when practicable. 5. Riparian vegetation must be reestablished within the. construction limits of the project by the end of the growing season following completion of construction. 6. Stormwater should be directed to vegetated buffer areas, grass lined ditches or other means appropriate to the site for the purpose of pre-treating stormwater runoff, and must not be routed directly into streams. Mowing of existing vegetated buffers is strongly discouraged, so that they may be utilized for stormwater sheet flow. 7. Where fish passage is present or where significant aquatic life may be present upstream (and where practicable), culverts should be oversized and buried to prevent perched culverts. If oversized piping cannot restore aquatic life passage by reconnecting the stream ecosystem, riprap installation should be accomplished in a manner to provide or restore water channels downstream to help facilitate aquatic life movement. 8. Where practicable, culverts that are less than 48-inch in diameter should be buried to a depth equal to or greater than 20% of their size to allow for aquatic life passage. Culverts that are 48-inch in diameter or larger should be buried at least 12 inches below the stream bottom to allow natural stream bottom material to become established in the culvert following installation and to provide aquatic life passage during periods of low flow. These measurements must be based on natural thalweg depths. This may require increasing the size of the culvert to meet flow conveyance requirements. If any of the existing pipes are perched, they shall be removed and replaced, and re-installed correctly, unless demonstrated that this is topographically unfeasible. All waters must flow through without freefalling or damming on either end of the culverts during low flow conditions, to maintain aquatic life and/or fish passage. 9. The dimension, pattern and profile of the stream, above and below the crossing, should not be modified by widening the stream channel or reducing the stream depth. Disturbed floodplains and streams should be restored to natural geomorphic conditions. 10. Any riprap used must not interfere with aquatic life passage during low flow conditions. 11. If concrete is used, work must be accomplished so the wet concrete does not contact the stream water. This will lessen the chance of altering the stream's water chemistry and causing a fish kill. 12. Heavy equipment must be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the likelihood of introducing other pollutants into the stream. 13. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 14. The presence of equipment in the channels must be minimized. Under no circumstances must rock, sand or other materials be dredged from the wetted stream channel under authorization of this permit, except in the immediate vicinity of the culverts. 15. All work shall be performed during low flow conditions. 16. Upon completion of the project, the NCDOT shall complete and return the enclosed "Certificate of Completion" form to notify NCDWQ when all work included in the §401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the NC Division of Water Quality upon completion of the project NCDOT is strongly advised to send in photographs upstream and downstream of each structure to document correct installation. r. Mr. Mike Pettyjohn, P.E. February 12, 2004 Page Three If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition,.which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Ms. Cynthia Van Der Wiele at 919.73 3.5 715 or Mr. Mike Parker of the Asheville Regional Office at 828.251.6208. Sincerely, Alan W. Klimek, P.E. Attachment cc: Wilmington District Corps of Engineers Heath Slaughter, Division 11, DEO John Thomas, USACE Raleigh Field Office Wetlands/401 Unit Winston Salem Regional Office Mike Parker, NCDWQ Asheville Regional Office Central Files A ?n!%et.N Ud"W_--1 0 4 0 0 5 5 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY P. 0. Box 25201, Raleigh, NC 27611-5202 LYNDO TIPPETT GOvERNOR PHONE: 919-733-2520 SECRETARY January 9, 2004 Mr. John Thomas U. S. Army Corps of Engineers Raleigh Regulatory Field Office r ,,? p 6508 Falls of the Neuse Rd, Suite 120 W EE-I l--AND, S / 401 GR0 iP Raleigh, NC 27615 JAN 13 2004 Subject: Nationwide Permit 3 and 33 Pipe # 2486 on SR 1113 ; ?. ?, ot.?,,.? ? EIR QU", J I T?, V"E"C ON Watauga County, North Carolina 'V° Project Number: 1111.209514.1 (DWQ permit fee not required) Dear Mr. Thomas: The purpose of this letter is to notify you of the fact that pipe # 2486 carrying an unnamed tributary of Baird Creek (Class: C) on SR 1113 (Watauga County) is scheduled to be replaced by the NC Department of Transportation (see Site Vicinity Map). The location and width of the roadway will not change substantially, but the length of the pipe will be increased from 60 to 80 feet in order to increase road/creek bank stability as well as safety. Therefore, we are requesting that you respond to the attached Pre-construction Notification Form (PCN) and confirm that the proposed activity is permitted under the Nationwide Permitting system. Note because the existing pipe is failing and undermining the roadway, it may be necessary for us to begin work prior to receiving written concurrence from your office. # Station Type of NW Existing Proposed Channel ID Rip Temp. Piping # Impact # Pipe Pipe Rap Impact Impacts (In. ft.) to Ch. (In. ft.) (in. ft. I Pipe # Pipe 3 60'x 60" 80'x 72" UT to Baird 20 20 2486 Creek 2 Pipe # Dewater 33 UT to Baird 120 2486 Creek Total 20 120 20 This project area was surveyed for the presence of threatened and endangered species on January 8, 2004. No federally protected species or critical habitat was identified. The NCDOT Historical Architecture Section has not reviewed this project. If necessary, historic compliance work will be scheduled and concurrence with SHPO will be obtained. The attached construction plan illustrates that the proposed environmental impacts have been minimized to the maximum practical extent allowed by roadway safety standards. By implementing the NC-DOT Best Management P. O. Box 250, N. WILKESBORO, NC 28659 PHONE (336) 667-9111 FAX (336) 667-4549 Mr. John Thomas Pipe # 2486 on SR 1113 (Watauga) Page 2 January 9, 2004 Practices (BMP's) during construction, the potential impacts associated with adverse weather will also be minimized. Furthermore, the completed project will certainly reduce sedimentation and improve roadway safety. One (1) copy has been forwarded to Ron Linville of the NC Wildlife Resource Commission. It is requested that his comments be mailed to our offices concurrently. If you have any questions about the project, please contact me at (336) 903 9223, or by email at (SDRoberts@dot.state.nc.us). Sincerely, OL- f Steve Roberts Division Environmental Specialist Cc: John Thomas, US Army Corps of Engineers (2 copies) Cynthia Van Der Wiele, Division of Water Quality (Raleigh) (2 copies) Mike Pettyjohn, PE, Division Engineer Steve Roberts, Division Environmental Specialist Neil Trivette, Roadside Environmental Field Operations Engineer Dennis Bennett, Bridge Maintenance Engineer Ron Linville, Wildlife Resources Commission ..A Office Use Only: 0 4 0 0 5 5 Form Version April 2001 USACE Action ID No. DWQ No. If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Section 10 Permit ? 401 Water Quality Certification ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: NW 3 and 33 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? H. Applicant Information 1. Owner/Applicant Information Name: North Carolina Department of Transportation Mailing Address: P. O. Box 250, North Wilkesboro, NC 28659 Telephone Number: (336) 903-9223 Fax Number: (336) 903-9239 E-mail Address: sdroberts@dot.state.nc.us 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should Page 3 of 11 include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Pipe # 2486 on SR 1113. 2. T.I.P. Project Number or State Project Number (NCDOT Only): 1113.209514.1 3. Property Identification Number (Tax PIN): N/A 4. Location County: Watauga Nearest Town: Vilas Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): See attached Site Vicinity map. 5. Site coordinates, if available (UTM or Lat/Long): Pipe # 2486. 36 2280670 °N 81.7686328 0 W (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Residential/Agriculture 7. Property size (acres): Approximately 0 1 acre 8. Nearest body of water (stream/river/sound/ocean/lake): Baird Creek (Class: C) 9. River Basin: Watauga (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/mapsl.) 10. Describe the purpose of the proposed work: Pipe replacement 11. List the type of equipment to be used to construct the project: Trackhoe/backhoe, and dump trucks 12. Describe the land use in the vicinity of this project: Residential/Farm Page 4 of 11 IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the. same T.I.P. project, along with construction schedules. V. Future Project Plans Are any additional permit requests anticipated for this project in the future? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Wetland Impacts Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact (acres) Located within 100-year Floodplain** es/no Distance to Nearest Stream linear feet Type of Wetland*** N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at hqp://Aww.fema.gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Page 5 of 11 List the total acreage (estimated) of existing wetlands on the property: NA Total area of wetland impact proposed: NA 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Length of Impact * Average Width of Perennial or Site Number Type of Impact* (linear Stream Name* Stream Before Intermittent? (indicate on map) feet Impact (please specify) Pipe # 2486 Pipe Replacement 40 UT to Baird Creek 3 feet Perennial **Please refer to the cover letter for a more detailed outline of the proposed impacts. * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.usss.gov. Several Internet sites also allow direct download and printing of USGS maps (e.g., www.Igpozone.com, www.manouest.com etc.). Cumulative impacts (linear distance in feet) to all streams on site: 40 In. ft.. 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. Pipe # 2486 Temp. Dewatering 0.008 UT to Baird Creek Stream * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Page 6 of I I Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The-applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. The existing pipe is failing and must be replaced immediately to prevent destabilization of the roadway. By utilizing the erosion control measures illustrated on the attached drawings, adverse impacts to the channel will be minimized: Furthermore, the replacement pipe length has been minimized to the maximum extent allowed by roadway standards. VIII. Mitigation DWQ - In accordance with I5A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9; 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/strmgide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. Page 7 of 11 N/A 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at hqp://h2o.enr.state.nc.us?%-m/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Page 8 of 11 Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ® If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone's Impact (square feet) Multiplier Required Mitigation 1 3 2 1.5 Total 'Lone i extends out M feet perpendicular from near banK of cnannel; Gone i extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0260. XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. Impervious surface area will not chance and all appropriate best management practices for sediment and erosion control will be implemented during construction. XH. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. XIII. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No ? X Uncertain Page 9 of 11 XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). /- 9, -o Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) US Army Corps Of Engineers Field Offices and County Coverage Asheville Regulatory Field Office Alexander Cherokee Iredell Mitchell US Army Corps of Engineers Avery Clay Jackson Polk 151 Patton Avenue Buncombe Cleveland Lincoln Rowan Room 208 Burke Gaston Macon Rutherford Asheville, NC 28801-5006 Cabarrus Graham Madison Stanley Telephone: (828) 271-4854 Caldwell Haywood McDowell Swain Fax: (828) 271-4858 Catawba Henderson Mecklenburg Transylvania Raleigh Regulatory Field Office Alamance Durham Johnston Rockingham US Army Corps Of Engineers Alleghany Edgecombe Lee Stokes 6508 Falls of the Neuse Road Ashe Franklin Nash Surry Suite 120 Caswell Forsyth Northampton Vance Raleigh, NC 27615 Chatham Granville Orange Wake Telephone: (919) 876-8441 Davidson Guilford Person Warren Fax: (919) 876-5283 Davie Halifax Randolph Wilkes Washington Regulatory Field Office Beaufort Currituck Jones US Army Corps Of Engineers Bertie Dare Lenoir Post Office Box 1000 Camden Gates Martin Washington, NC 27889-1000 Carteret* Green Pamlico Telephone: (252) 975-1616 Chowan Hertford Pasquotank Fax: (252) 975-1399 Craven Hyde Perquimans Wilmington Regulatory Field Office Anson Duplin Onslow US Army Corps Of Engineers Bladen Harnett Pender Post Office Box 1890 Brunswick Hoke Richmond Wilmington, NC 28402-1890 Carteret Montgomery Robeson Telephone: (910) 251-4511 Columbus Moore Sampson Fax: (910) 251-4025 Cumberland New Hanover Scotland Pitt Tyrrell Washington Wayne Union Watauga Yancey Wilson Yadkin *Croatan National Forest Only Page 10 of 11 A •1346 ? 1p?? ` \•\ 11363 •••C 1' \ ' -.??? Q f1 \. I ° P l 6. 24-$6 340. 1341\.' 1 \ ='? •?' ,A a> \ \. .9\ y ,3 362 •• . BALD= BALD MTN. •/' ._.•\ Q '. \ i -•/ '3 !` \ 245 '•\ 621 \ _ _ /.. \ ` OE,'EFiELD BALD z 1 1225 14 /•. \ 1340 300 1 1 \ 1243 ?' l 1719: 1231 _ 6 ,1230 /•'1233 , 2 SNAKE M':1'. \ \ 1670' 1226 2 _ `K 4 ELK KNOB / 0- ,EIS KNOB b• 302'\ .55T 1 E4Ev.5555 1 \ .. 4400 '.;>(:.• ., 4 , I .6 1346\ / J 5ra'S' Moba •] y -1 3ee I]t3B. C•' \. 13= ''\ y 1218 1228^ 1306 \".\o+a\ "\ - \ 1340 2.5 \ \ \ \ 1710 .z 6 1303 R Plecso- v.-y Cc..T -: V , • ., • ' '\ ^AY / I 1306 . .•/- 5°_'?-V -' 1399 *ijj!' \ I . _ ` 2 3 0 'a 1219 O 96 0 1369 y2' ? 1 ?\ ?? :t•. ass / ? :t: 6 O 1201 6'" 1305 .' 378 1374 \ 1340. ••••• 1335 1349 1384 T 6761 Conti 1 136 \ 12 3.0 1305 - 3. > 232 121 1233 • 130 °f'____-? \ - I ' Od •, ??? 368 \ •:, .372 T J • 1.3 I 1233 VNt4' Clint 2 1306 S9.-' t: 403\ ?, \ 'T 121 .6 339 1.7 - j. ? / b 3x3 7 1216 1733 J • 21396 ? 3? \ .. \ e r ?. 339 ? \ 396 •r 3349 ,ojc•-" 3a> i \ `2158 O'. ?' .•6. ?( 1 m'335 11 ?'? 121 \ tinannta 1308 e _ \ "1307 o d t;3• . •, 1366 - \ 1 J \ ?.e 1233 0 ? 368 \ 02 ^1 ?_T• 1336 0 y ? 135 tN 11 _1309 j7 1 t1j2/ YYI•C' y'^"' _':6?•`'. 1326 T? -261 3: Y/? '306 '+F" • 1 5 .5.: 1336 ?? \.? ?`'\ 2 1373 ' • x211 F pp ?? • '1 t39S ? 0d 1+591 \ 357 9 :324 1211 S- .8 1325 N 1.91 J t• '353 .?. '\ G+. 321 1.1 1y'' \ ,_,. ?/ 466 1325 14°4 1_-327 ?t i4t' .351 ` ?7 '\ 6 • ? 1 ? 1312 °y,J':fM. i J 333 1359 N ( • \. / ?? '?11317 ... '.c8 ai 1325 • 1 3 e G '313 1305 'MO 13392 354 ?'? !-. , y \ 'Y41m -•3tt -> 3 IIC Its ._?• 6?C Sonm I y dy .-.a ° 9 _ O •FO,? 7?1 tom. o :%'? \ N,:• \ :\•: •313 Ap}®' ..}. t3>y .t0.p?_ 1... II h :165 .6 / ../- la0$ "• O// v h •\ :1? \ 7 .y.. . 9a //Tl c _ 7 b.•11 / bOME 1353 r 1120 7'f ly2? ??.%1 MI t403S _.4.-- •'` _- . N '' 331 ??lT'329 ., '6 X391 - •\P 35] tl _1527 ?. \• 1119 'L ,2 P II] 0? 115 .21 1t m 94 1505 13 1 \ -- - _\/ ll/l o13e9 2 p? • 1115 ? 94 v \• 9,4 ,T n13 \/` \ /- L? --=`'-.-_'v 1508/• 4? ROCKY FACE '?C•I ?e:??: 'Tf \ .O ?e / `may' .1 °' \ ?? ?•?.' •L 1132 tt• val. .??4 \ ? :,569.1 1576_ I " J \ QP t 15- _m h 112 1111 />%_, i..' I- 16 70 1 ^l .%: i .3 I •1708 Y V \9 . * 1122 1.2 1136 N ,?? `1 ' ISIC .9. J' `6}1 T \'•1 Mmbee;'?` 4°/ \ i 7 I w 1751 l /. \ ? ? • • \ ' /?• 17? Tni. •4 •' y C1^58 1136 'T 1112 1181 5M ?: 552 155o r 1 1 O / "5 y SID Ww 1,3'3-'. NATIONAL 3 y52 n _. 15W • .T? • \ ' T 1523 1131 • V ' n 1 _ ' > , 151 /•' ^ , 1549 -..i wi T,51a w t • ''t 'We 526 6 1643 •• 0 4 15.7 1653 2 h j 1!?. / -'\/• / % I 23 °?• ,561 .'O '4`0 ' 1. 11608 '2 1511 1.0 1311 ?'•\ `-'\ 7 \ 9.,wµ7 ? F( Z 1334 ,1 ` i i .a? : 0 •` )22 1581 ;::32t 1_ . 1666 •;\ ISta I578 15-40 /?. ;7j C.: 1 ? \. _• I / \ 1617 1168 / 11780 1647. 1' ' 0 Q ^Y• •? -' 136 y T'J3 y i -,552 .4 - 1571 1714 _ .i- .''? Il•6 \'• TOP MTN. 2 1616.1 Ahe /•'•••• _ v Iwm ` 1631 _:Ev. 4595 ,539 .3- I 1659 -"• o0E^ \ / / KNO9 MTN.l1'N4 ,360 1559 1 27 t.6 !1530 '•??' '+FT Sim /-'i I.-?`: / /'' 1 1658 ' 1 \ • ?•.' " NO•MNG ROCK 1664 -?- j ^ FOREST ,x y ror. ,ms \"? Y ;60] ] - a 3 a: _' 1526 'TTIE \ •l.•^ ?? P ) xs \OG(C. :R N I i'! .LO \.. ` $-M?BON N'\. 4F .?.L.Ov CR MTN. • ? / • :O 6 .1 1' 0?J / \ ` Q SEVEN DEVILS ` `° at ?(• \\ ,529 •, "O EDI. 132 /• 0`v£ / • - erv / 321 1 _ .1656 Cn1.r ` ' • 1396 4 ybl gb • - \ 1326 \ -' i 1 '\ 321 /' •, \ ••v•, 1 ` .Q I.2 ;?.•'-m .9 1553 ` • \ \? (TN. 321 8 t + ,C51' • . 7` 4 f .J }j t r ?J4 -,,'•, y' } ( t l77''11 - ; , ;`.? T•+ :rte-•^`? ,,?f f ?, +??, I __ (•, : j ? '+t ( • , -__?_ •; ??`?? ??>l ? f • in •'^ ,'.?-t```, ?\''11? t `'? i ? - / ? ? %.J-? r• ? :- `?}` ,1 ??? ?? ! I ?? +?t'i ;' ?. _ --??1 •'rq rr ft t f' f- ?Y ?• t i 1 ?.t •1f ak?'?, 5 ti. _ r -i ` ! ± •, f?'? y- (=-? r ,t l/ ?'.y4 r• `r'` I t. `'? jjjj ( 4 + • I ?:..... ?... L Ile . 1 •.-' ? ti ? 1-...? ?.._ ,fir.. Pipe #2486 ,??/rr, ri?.•?..,?1?` f ._fj (, f' J ffr ?-. ;F- . +,y1 '• r. - -- v -%,_-..... b 1 '?-:• - _ t ?, .?ti ? 1?+ . ?? + ` f •r •?l ? 1 ? ?l??r ' .. ?:,. `? ?p * _ - ? . _?-? f 1 •? _ _ 1 '?' ? y? 1 4 f r??? ? ?t+ • 54 , 1-:? ? J k "r f l.~- f -1 ? ??+ ? ? f ? -+,.•?: ---,_,?,J? • - __._.- '_? j-?-•"' ?? 4+' •l ,`•~ yy may' !? ?? -+ -1 t- _.? ?__\ _ ?? - 1-'^' ,?= _,?,??' CULVERT CONSTRUCTION SEQUENCE LPLACE PROPER EROSION CONTROL DEVICES (SILT BASINS, TEMP. DIVERSION, SILT FENCE ECT.) 2.CONSTRUCT IMPERVIOUS DIKE UP STREAM TO CREATE SMALL POOL (DO NOT DIG A HOLE) SO WATER CAN BE PUMPED AROUND CONSTRUCTION AREA DOWN STREAM. (THIS WILL BE CLEAN WATER) ANY UNCLEAN WATER FROM INSIDE CONSTRUCTION AREA WILL BE PUMPED INTO A SILT BAG. 3. TAKE OUT EXISTING PIPE 4.CONSTRUCT PIPE 5.REMOVE IMPERVIOUS DIKE 6.COMPLETE ROADWAY (THIS INCLUDES SEEDING AND MULCHING) O Z ?C W N ww A C. -1 M 0 a w w 0 Q Cr w Q , i C/) 1 CD 1 Q J i m , Q 1 ?? I ' ' z ''la w Q w w w 1 u Z F? W 00 ?N^?U on co) O aC ? O ti mo I o- > ' I ' ? ? I ' a w , U ' Q , X ? m? i i v m U Z O W CL W W > r J U J Z ?- LL- Ln O X o LL O \ _W W J Z v O b-- O(D:C) O ?o U O Q9 X O Qo (Pi kn M A V W Q? U Q LL- Lf) rr, w a \ W 0 J W w m 0 W Q CD W F- Q F- w rr F- N F- a 0 Q J W w w W Of U 'If N O W 0 z W O U W Q W U O 0 3?: oo w ?X ? N W J (PJ Z w w W O J J W LL O ?n Q v m u z O v 0-1 Ln O J J Q O a w LL) W x U z O U li 0 ti Z ti co) ez z 0 ti Hq ? O ?? Q o >0 Q hW? 3 Q " HA ai W U Q W Ln W Q 0 W co Q W' N 3 O J Wco - W Q ? J Q W W 0- cr- IL U) O CO) zap N Q z 114 U U V W