Loading...
HomeMy WebLinkAbout20041719 Ver 1_Complete File_20041025101 W ?v COST TF,?. r???J?` STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY DIVISION OF HIGHWAYS LYNDO TIPPEN/5' GOVERNOR SECRETARY April 25, 2005 Contract No.: C201183 WBS Element: 33234.3.1(B-3694) F. A. Project: BRZ-1138(14) County : Rockingham Description: Bridge over Belew's Lake Spillway & Approaches on SR 1138(Lindsey Bridge Rd) Subject : Permit Conference Dane Construction, Inc. P. O. Box 5510 Mooresville, NC 28117 Gentlemen: This letter is to advise that in accordance with the permits and the special provisions a Permit Conference for the above referenced project has been scheduled for Tuesday, May 10, 2005, at 10:00 AM on the above referenced Project Site. Sincerely, ; 4 /' , / k1le- "I B. L. Norris, Jr., PE Resident Engineer Cc: J. M. Mills, PE L. L. Puckett, PE V. G. Davis, PE J. A. Parker D. L. Hundley H. L. McDowell Mathew Gant, P. E. (DENR) John Thomas(ACOE) Beth Barnes(DWQ) Sue Homewood (DWQ) Barry Harrington File P. O. Box 1318, Reidsville, NC 27323-1318 Telephone No. (336) 634-5635 Pax No. (336) 634-5638 ;?? ' :d COMMON NAME SCIENTIFIC NAME STATUS Southern hognose snake Heterodon simus FSC Red-cockaded woodpecker Picoides borealis Endangered Carolina gopher frog Rana capito capito FSC Vascular Plants Georgia indigo-bush Amorpha georgiana var. georgiana FSC* Sandhills milkvetch Astragalus michauxii FSC* Venus flytrap Dionaea muscipula FSC Dwarf burhead Echinodorus parvulus FSC Bog spicebush Lindera subcoriacea FSC Carolina bogmint Macbridea caroliniana FSC Awned meadowbeauty Rhexia aristosa FSC Michaux's sumac , Rhus michauxii Endangered ROCKINGHAM COUNTY Vascular Plants Smooth coneflower Echinacea laevigata Endangered Heller's trefoil Lotus helleri FSC ROWAN COUNTY Vertebrates Bald eagle Haliaeetus leucocephalus Threatened Vascular Plants Georgia aster Aster georgianus FSC Schweinitz's sunflower Helianthus schweinitzii Endangered Virginia quillwort Isoetes virginica FSC Heller's trefoil Lotus helleri FSC RUTHERFORD COUNTY Vertebrates Green salamander Aneides aeneus FSC Cerulean warbler Dendroica cerulea FSC Peregrine falcon Falco peregrinus anatum Endangered Eastern small-footed myotis Myotis leibii FSC Indiana bat Myotis sodalis Endangered Southern Appalachian woodrat Neotoma floridana haematoreia FSC Northern pine snake Pituophis melanoleucus melanoleucus FSC Vascular Plants Dwarf-flowered heartleaf Hexastylis naniflora Threatened Butternut Juglans cinerea FSC Sweet pinesap Monotropsis odorata FSC Carolina saxifrage Saxifraga caroliniana FSC Divided-leaf ragwort Senecio millefolium FSC January 15, 1999 Page 39 of 49 oLll-7/7 IECJCK?iy)?Vvqw) STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY GOVERNOR Ms. Cynthia Van der Wiele NCDENR - Division of Water Quality 1621 Mail Service Center Raleigh, North Carolina 27699-1621 May 13, 2003 LYNDo TIPPETT SECRETARY TLANDS1401 ,Rood MAY 2003 Dear Ms. Van der Wiele: SUBJECT: Federal Categorical Exclusion for Rockingham County, Bridge No. 55 on SR 1138 (Lindsey Bridge Road) over Belews Lake Spillway, Federal Aid Project No. BRZ-1138(9), State Project No. 8.2510801, T.I.P. No. B-3694 Attached for your information is a copy of the approved Categorical Exclusion for the subject proposed highway improvement. This report records the determination that implementing the proposed action will not have a significant effect upon the quality of the human environment. J GJT/plr Management Director, PDEA Attachment MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1548 MAIL SERVICE CENTER RALEIGH NC 27699-1548 TELEPHONE: 919-733-3141 FAX: 919-733-9794 WEBSITE. WWW.NCDOT.ORG LOCATION: TRANSPORTATION BUILDING 1 SOUTH WILMINGTON STREET RALEIGH NC r r APPROVED: aup MAY 2 0 2003 Rockingham County Bridge No. 55 on SR 1138 (Lindsey Bridge Road) over Belews Lake Spillway Federal Aid Project No. BRZ-1138 (9) State Project No. 8.2510801 T.I.P. No. B-3694 CATEGORICAL EXCLUSION UNITED STATES DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION AND NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DA E DATE dZ4?? Gregory J. Thldrpe, Ph.D., Environmental Management Director Project Development and Environmental Analysis Branch, NCDOT Donald J. Voelker Acting Division Administrator, FHWA Rockingham County Bridge No. 55 on SR 1138 (Lindsey Bridge Road) over Belews Lake Spillway Federal Aid Project No. BRZ-1138 (9) State Project No. 8.2510801 T.I.P. No. B-3694 CATEGORICAL EXCLUSION April 2003 Documentation Prepared by: TGS Engineers e se.¢ss:??,. 7. K eth Burleson, Pt 1032 j Date J q Project Manager en rVY..1 I.r fi\ .O .? ?dda Cj??/q ?eoo °?'DOA8a74.o5i For the North Carolina Department of Transportation Project Development and Environmental Analysis Branch U(ln t ? ar, Elmo E. Vance Project Manager Consultant Engineering Unit SUMMARY OF ENVIRONMENTAL COM MMENTS 'Rockingham County Bridge No. 55 on SR 1138 (Lindsey Bridge Road) over Belews Lake Spillway Federal Aid Project No. BRZ-1138 (9) State Project No. 8.2510801 T.I.P. No. B-3694 If the implementation of this project involves a disturbance to the waters of Belews Lake Spillway, a Nationwide Section 404 permit and a Section 401 Water Quality permit will be required. If so, any foreseen secondary impacts to water resources from soil disturbance on any downstream systems can be minimized by the-use of best `management practices. No long term impacts are expected as a result of the proposed project. It is concluded that no. serious adverse environmental effects will result from implementation of the project. Division 7: A. No in-water work will be performed from April 1 to May 31. High Quality Sedimentation and Erosion Control Measures will be used. B: A FERC permit is not required. NCDOT will coordinate with Duke Power Company to avoid impacts to their operations at the Belews Lake facility. Categorical Exclusion Green Sheet April 2003 i Rockingham County Bridge No. 55 on SR 1138 (Lindsey Bridge Road) over Belews Lake Spillway Federal Aid Project No. BRZ-1138 (9) State Project No. 8.2510801 T.I.P. No. B-3694 INTRODUCTION: Rockingham County Bridge No. 55 is included in the 2002-2008 North Carolina Department of Transportation (NCDOT) Transportation Improvement Program (TIP) and in the Federal-Aid Bridge Replacement Program. The location is shown in Figure 1. No substantial environmental impacts are anticipated. The project is classified as a Federal "Categorical Exclusion". 1. PURPOSE AND NEED STATEMENT NCDOT Bridge Maintenance Unit records indicate the bridge has a sufficiency rating of 13.4 out of a possible 100 for anew structure. The bridge is considered functionally obsolete. The replacement of this inadequate structure will result in safer and more efficient traffic operations. II. EXISTING CONDITIONS The project is located in the western part of Rockingham County just 0.2 miles (322 meters) east of the Stokes County line (see Figure 1). SR 1138 (Lindsey Bridge Road) is classified as a rural minor collector in the Statewide Functional Classification System. SR 1138 becomes SR 1903 when it enters Stokes County. The primary land use along SR 1138 is agricultural mixed with light residential development (see Figure 2). SR 1138 is undeveloped in the vicinity of Bridge No. 55 and there are currently no major generators of traffic located within the project area. The property adjacent to SR 1138 is owned by Duke Power as part of the Belews Lake reservoir. According to Duke Power officials, Belews Lake is not an FERC (Federal Energy Regulatory Commission) lake (see Appendix). There are currently no plans for proposed development of the area on file with the Rockingham County Planning Department. This area is zoned RA (Residential Agricultural). Rockingham County Bridge No. 55 is a five-span two-lane structure that consists of precast prestressed concrete channels. The end bents and interior bents consist of precast prestressed concrete caps and timber piles. Bent No.1 consists of a steel cap and pile crutch. The existing bridge (see Figure 3) was constructed in 1961 and is in poor condition. The overall length of the structure is 151 feet (46 meters). The clear roadway width is 24.1 feet (7.3 meters). There are no sidewalks on the bridge. The posted weight limit on this bridge is 21 tons for single vehicles and 24 tons for TTST's. This section of SR 1138 is not a part of a designated bicycle route nor is it listed in the TIP as needing incidental bicycle accommodations. In the vicinity of the bridge, SR 1138 has a 19-foot (5.8-meter) pavement width with 6-foot (1.8-meter) grass shoulders (see Figures 3 and 4). The existing bridge is on a tangent with a curve to the east. The roadway is approximately 31 feet (9.4 meters) above the stream bed. The current traffic volume of 1400 vehicles per day (VPD) is expected to increase to 2500 by the year 2025. The projected volume includes 1 percent truck-tractor semi-trailer (TTST) and 2 percent dual-tired vehicles (DT). This route does not contain a posted speed limit. The statutory speed limit is 55 miles per hour. There are no utilities attached to the existing structure. Utility impacts are anticipated to be low. Five accidents were reported in the vicinity of Bridge No. 55 during the period from December 1, 1999 through November 30, 2002. These accidents involved vehicles running off the road to the right along the curve preceding the bridge. Two school buses cross the bridge daily on their morning and afternoon routes. III. ALTERNATIVES A. Project Description The proposed replacement structure will be approximately 167 feet (51 meters) long with a 40-foot (12-meter) clear width. The replacement structure will require a spill- through end bent on each end and the low steel will be no lower than the existing crossing. This structure will provide two 12-foot (3.6-meter) lanes with 8-foot (2.4-meter) shoulders on each side (see Figure 5). The proposed bridge length is based on a preliminary hydraulic analysis. The length of the new structure may be increased or decreased as necessary to accommodate peak flows as determined by further hydrologic studies. The roadway grade of the new structure will need to be raised approximately one- foot at this location. The existing roadway will be widened to a 24-foot (7.2-meter) pavement width to provide two 12-foot (3.6-meter) lanes with 8-foot (2.4-meter) shoulders on each side. Typical sections of the existing and proposed approaches are shown in Figure 4. B. . Build Alternatives The following two alternatives were considered for replacing Bridge No. 55. 2 Alternative 1 involves replacement of the structure along the existing alignment and provides a temporary on-site detour to maintain traffic during the construction period. The new approaches would be approximately 700 feet (213 meters) long. The design speed of this alignment is 45 miles (72 kilometers) per hour. This alternative is not recommended because the estimated cost is higher and the design speed is lower than the preferred alternative. Alternative 2 (Preferred) involves replacement of the structure on a new alignment approximately 50 feet (15.2 meters) upstream (south) of the existing structure (see Figure 2). The approach length is approximately 1440 feet (439 meters) total with approximately 970 feet (296 meters) east of the crossing and 470 feet (143 meters) west of the crossing. The two-lane shoulder section will have a design speed of 50 miles (80 kilometers) per hour. The existing structure and approaches will serve to maintain traffic during the construction period. C. Alternatives Eliminated from Further Study Alternative 3 involves replacement of the structure on a new alignment downstream (north) of the existing structure. This alternative was eliminated from further study when it was determined that over 1800 feet of approach length would be needed to provide a less than desirable 45 miles (72 kilometers) per hour design speed . This alternative would also involve extensive encroachment on the existing floodplain north of the existing crossing. Alternative 4 is similar to Alternative 1 replacing the structure along the existing alignment but using an off-site detour along existing routes to maintain traffic during the construction period. The best available off-site detour route follows SR 1138 northeastward to SR 1194 which connects to US 311, then follows US 311 southwestward to SR 1908 in Stokes County. The route continues south on SR 1908 to SR 1903 which becomes SR 1138 at the Rockingham County line just west of the subject crossing. The total length of this detour route is over 12 miles and is considered inadequate for the fire and rescue services in the area as well as the 1400 vehicles currently using the crossing daily. This alternative was eliminated due to the lack of an adequate detour route for emergency services. The "Do-Nothing" or "No-Build" alternative will eventually necessitate closure of the bridge. Closure of SR 1138 is not desirable due to the lack of an acceptable offsite detour for emergency services. "Rehabilitation" of the existing bridge is not feasible due to its age and deteriorated condition. 3 D. Preferred Alternative Rockingham County Bridge No. 55 is recommended to be replaced approximately 50 feet (15.2 meters) upstream of the existing location as shown by Alternative 2 in Figure 2. This alternative is preferred because it is the least costly and allows on-site traffic maintenance. IV. DESIGN EXCEPTION Since a posted speed limit is not provided along SR 1138, the statutory speed limit is 55 miles (88 kilometers) per hour. The preferred Alternative 2 will provide a better alignment than the existing route and the best alignment considered for this replacement. However, this alignment provides a design speed of 50 miles (80 kilometers) per hour which is less than the standard 60 miles (96 kilometers) per hour normally used for such a route. Therefore, a design exception is anticipated to be required for this alternative. V. ESTIMATED COSTS The estimated costs for the two alternatives, based on current prices, are as follows: Alternative 1 Alternative 2 (Preferred) Structure $434,200 434,200 Roadway Approaches 455,669 425,238 Detour Structure and Approaches 140,280 N/A Structure Removal 37,750 36,360 Misc. & Mob. 480,101 403,212 Eng. & Contingencies 252,000 200,990 :......... . q? Y r::•..' k •%: .'Y ?? ?{? ?'}'?} ?t `? ,j? ::1? ?•:tik{?{:?'v' ;.?;i.}W,.•v ?` ' ` / :i {'{?.?trQ:}{i4y:.• '. } S? ' ? ? ?? ''{rk'. {;: ::;ti:, •.} ` : ? . • ./. t .::.:•?.}: r:2 },:.::.{?.2.;},.; :.,::: r:.} .•g'•4;:+ ... rSY.:..; {:..v{.,a,.• t. ?:.•:.:::.:i•..::::::. •::.{•Y:::... ., ,{.}} .. •; .?. •:•:.•.: '.}:K• :a q..\ ...\........v}:::•}:?:?}•}:{•}::::vi :i.'ti•.; } } }} ?:ti:}: v::: •:: • :::v:: vi } , ,•, .'+ J}.nn +`: . i?. •'•?'+.{.+•:.nv.:r^.+' •. v :' .. :;:5 :• ..:}.: {{i•:•i?:{.}•.: '; i;;w r. . r : • F r: < , , .d •, •• }. u, •••rk;;.'?Y. , . v1.:rv. %+• : 4 J IN . . . .. . . , .,.,.;.; n::w :::::::::.......................................:....n:r.Av, , , n :: „v: .... +: M•:..:•:Y?: h .:v: Y.•}:.v.::i:0.:i4:::.•:{.. . ...v. . ....... :iv:•••••••••••i•:::v:+:w:: /.•r':.......•: Right-of-Way Costs $68,500 $60,500 }}• •} :x ? • + \ : ': $ Yf' +? •.: ::: }y !1gy??? :i{.•::. ..,}, . ;' : • : $: :'•' • r ' .? :?{?:•?.}r x $' • •• ? •. :.} , ;. ; v ; ?i; .:•:• ;{+fi: } ii•: ;•i14• :.. f. .. ...• ,i i1\tir ,•;1.;: r, ^'"'''}' ••..: h •$:titi?? { .v. Y•: x :{5•:'•::?: :: rl : 'i6}}Y'?f:• { : { . . ; ? ; . }6 . v, '. h.. .• .:,.: .:•}:.iiR•. :'•::4} : {Y ++?:'• : }: • ; ; . . .'Y•'\. :??? • : : ' • '? /• r ...... .. .. . . . . .... •Y .}:{:v......:.....k...:.....::.::.....•......:v..Sn•;, ,r,•.•.•:::::.v::....{i•}Yv:: }r: :::v..v.:.... , ;. }......... . ; T . } ; ; :?:•.••: }.•: .•; ..• ., : The estimated cost of the project, shown in the 2002-2008 NCDOT Transportation Improvement Program (TIP), is $725,000, including $55,000 for right-of-way, $550,000 for construction and $120,000 prior years expense. 4 V1. NATURAL RESOURCES A review of the project has been undertaken to evaluate natural resource features likely to be affected by the project. Materials and research data in support of this investigation have been derived from anumber of sources including applicable U.S. Geological Survey (USGS) topographic mapping (Belews Lake, NC 7.5 minute quadrangle, 1994), and U.S. Fish and Wildlife Service (FWS) National Wetlands Inventory (NWI) mapping. A. Methodology A natural resources field investigation was conducted on April 11, 2001. During the site visit, a study corridor was walked and visually investigated for significant features. For purposes of the field investigation and to assure proper area coverage of both alternatives, the study corridor was assumed to be approximately 850 feet (259 meters) in length (approximately 425 feet [129.5 meters] from the bridge to each end), with a width extending approximately 200 feet (61 meters) south of the SR 1138 centerline and 100 feet (30.5 meters) north of the SR 1138 centerline. Plant community impact calculations provided in this report are based on individual corridors centered on each of the two alternatives (Figure 2). Actual impacts will be limited to within construction boundaries and are expected to be less than those shown here for alternative corridors. Special concerns evaluated in the field include 1) potential habitat for protected species and 2) wetlands and water quality protection in Belews Lake Spillway. The study corridor is located approximately 1.25 miles (2.0 kilometers) east of the town of Pine Hall, NC and 5.5 miles (8.8 kilometers) southwest of Madison, NC (Figure 1). The bridge is located along SR 1138 (Lindsey Bridge Road) at Belews Lake Spillway in Rockingham County. The study corridor includes the channel and floodplain adjacent to Belews Lake Spillway. Belews Lake Spillway flows from the Belews Lake Dam, continues north, joins an unnamed tributary, and flows under Bridge No. 55. The stream continues north and joins the Dan River approximately 0.4 mile (0.6 kilometer) to the north. Plant community descriptions are based on a classification system utilized by North Carolina Natural Heritage Program (NHP) (Schafale and Weakley 1990). When appropriate, community classifications were modified to better reflect field observations. Vascular plant names follow nomenclature found in Radford et al. (1968), with adjustments made to reflect more current nomenclature. Jurisdictional areas were evaluated using the three-parameter approach following U. S. Army Corps of Engineers (COE) delineation guidelines (DOA 1987). Jurisdictional areas were characterized according to a classification scheme established by Cowardin et al. (1979). Habitat used by terrestrial wildlife and aquatic organisms, as well as expected population distributions, were determined through field observations, 5 evaluation of available habitat, and supportive documentation (Webster et al. 1985, Potter et al. 1980, Martof et al. 1980, Rohde et al. 1994, Menhinick 1991, Palmer and Braswell 1995). Fish and wildlife nomenclature follow current standards. Water quality information for area streams and tributaries was derived from available sources (DWQ 1996a, 1996b). Quantitative sampling was not undertaken to support existing data. The U.S. Fish and Wildlife Service (FWS) listing of federal-protected species with ranges that extend into Rockingham and Stokes Counties was obtained prior to initiation of the field investigation. In addition, NHP records documenting presence of federally or state listed species were consulted before commencing the field investigation. B. Physiography and Soils Land use within the study corridor includes Piedmont/Mountain Levee Forest, Dry- Mesic Oak-Hickory Forest, and roadside/disturbed land. The study corridor is located in the Biotite Gneiss and Schist geologic formation within the Inner Piedmont physiographic province of North Carolina. This system is characterized by broad, gently sloping uplands, moderately to steeply sloping areas with narrow convex ridges, and steep valley slopes. Soil systems in the Piedmont are determined by the major bedrock type and form in saprolite weathered from bedrock of various composition (Daniels et al. 1999). The study corridor is located within the floodplain and adjacent side slopes of Belews Lake Spillway. Within the study corridor, the floodplain ranges in width from very narrow upstream of the bridge to broadly expansive downstream of the bridge. Elevations rise from approximately 560 feet (171 meters) National Geodetic Vertical Datum (NGVD) at stream side to 640 feet (195 meters) NGVD at the southwest extreme of the study corridor (USGS Belews Lake, NC quadrangle). The Natural Resources Conservation Service (USDA 1992) indicates the following soils are within the study corridor: Chewacla loam (fine-loamy, mixed, thermic Fluvaquentic Dystrochrepts), adjacent to and including the riverbed; Rion sandy loam (15-30 percent slope) (fine-loamy, mixed, thermic Typic Hapludults) on the slopes descending from the dam south ofthe project; and Wickham sandy loam (fine- loamy, mixed, thermic Typic Hapludults) to the west of the river channel. The Chewacla series consists of deep, somewhat poorly drained, moderately permeable soils that formed in alluvium. These soils are on narrow floodplains along smaller streams and in slightly depressed areas on floodplains along major streams. Slopes range from 0 to 2 percent. The Rion series consists of deep, well drained, moderately permeable soils that formed in material weathered from acid, crystalline 6 rocks. These soils are in hilly areas on relatively narrow, gently sloping ridge tops and moderately steep side slopes. Slopes range from 2 to 30 percent. The Wickham series consists of deep, well drained, moderately permeable soils that formed in old alluvium. These soils are on narrow, slightly elevated stream terraces. Slopes range from 1 to 4 percent. Of the predominant soil map units in the study corridor, the Natural Resources Conservation Service lists only the Chewacla series as having hydric inclusions (USDA 1997). The Chewacla series has hydric soil inclusions of Wedhadkee soils in depressions. These hydric soil inclusions are saturated or flooded for very long to substantial periods during the growing season, and support woody vegetation under natural conditions. C. Water Resources 1. Waters Impacted The study corridor is located within sub-basin 03-02-01 (upper reach of the North Carolina portion of the Dan River and tributaries) of the Roanoke River Basin (DWQ 1996b). This area is part of USGS accounting unit 03010103 of the South Atlantic-Gulf Coast Region. The section of Belews Lake Spillway crossed by the project bridge has been assigned Stream Index Number 22-27-(7) by the N.C. Division of Water Quality (DWQ 1996a). 2. Stream Characteristics Belews Lake Spillway (Belews Creek) discharges from the Belews Lake Reservoir approximately 1800 feet (549 meters) upstream of Bridge No. 55. Within the study corridor, the channel of Belews Lake Spillway is highly scoured and composed of an unconsolidated, boulder and gravel substrate. The stream is moderately broad and deep, highly entrenched, exhibiting poor sinuosity, and a poor riffle-and-pool sequence. Width of the stream is approximately 35 feet (10.7 meters) at the point of the bridge crossing. Bridge height above the stream bed is approximately 31 feet (9.4 meters). During the field visit, water depths along the study corridor varied from 1 to 3 feet (0.3 to 0.9 meter), permitting sparsely distributed vegetation to cling to debris pile within the stream channel. Persistent emergent aquatic vegetation was not observed, however high amounts of filamentous algae was present in some of the slower-flowing reaches of the stream. The stream banks are composed of a silty loam textured soil. Evidence of burrowing mammals was observed along the streambanks 5 to 10 feet (1.5 to 3.0 meters) above the water surface. 7 Classifications are assigned to waters of North Carolina based on the existing or contemplated best usage of various streams or segments of streams in the basin. A best usage classification of WS-IV has been assigned to Belews Lake Spillway. The designation WS-IV denotes waters protected as water supplies which are generally in moderately to highly developed watersheds; point source discharges of treated wastewater are permitted; local programs to control non-point source and storm water discharge of pollution are required; suitable for all Class C uses. Class C waters are suitable for aquatic life propagation and protection, agriculture, and secondary recreation. Secondary recreation refers to wading, boating, and other uses not involving human body contact with waters on an organized or frequent basis (DWQ 1996a). No designated Outstanding Resource Waters (ORW), High Quality Waters (HQW), Water Supply I (WS-I), or Water Supply II (WS-II) waters occur within 1.0 mile (1.6 kilometers) of the study corridor. No watershed Critical Areas (CA) occur within 1.0 mile (1.6 kilometers) of the study corridor. The Division of Water Quality (DWQ) (previously known as the Division of Environmental Management, Water Quality Section [DEM]) has initiated a whole-basin approach to water quality management for the 17 river basins within the state. Water quality for the proposed study corridor is summarized in the Roanoke River basin management plan. Water quality samples in the upper reaches of the North Carolina portion of the Dan River sub-basin in 1995 indicated Good water quality based on macroinvertebrate samples, and Good or Good/Excellent ecological health based on fish samples. Fish tissue samples taken in Belews Lake near the mouth of Belews Lake Spillway have resulted in a continuance of a fish consumption advisory for Belews Lake due to elevated selenium levels from Duke Power's ash basin discharge. The Roanoke River watershed has been monitored and sampled at 101 locations and has a use support rating of Fully Supporting in 56 percent of its reaches. An additional 27 percent is rated as Support Threatened, 9 percent as Partially Supporting, and 8 percent of its stream miles were not evaluated. Belews Lake Spillway (Belews Creek) is rated as Partially Supporting. The Roanoke River sub-basin 03-02-01, containing the upper reaches of the North Carolina portion of the Dan River, supports a major point-source discharge from the Duke Power Company non-municipal effluent, with 5.0 million gallons per day (MGD) (19.0 million liters per day [MLD]) permitted flow. The discharge is into the Belews Lake reservoir and upstream of Belews Lake Spillway. There are 28 minor dischargers, eight upstream of the study corridor, with a total permitted flow of 1.15 MGD (4.37 MLD). Non-point source pollution is also a major consideration in the Roanoke River drainage, 8 with sedimentation and erosion the most widespread problem throughout Rockingham County (DWQ 1996b). 3. Anticipated Impacts Both project alternatives include complete bridging of Belews Lake Spillway to maintain the current water quality, aquatic habitat, and flow regime. Alternative 1 involves replacement of the structure along the existing alignment, with a temporary on-site detour provided to maintain traffic during the construction period. The detour structure would be located approximately 45 feet (13.7 meters) to the south (upstream) of the existing structure. Alternative 2 involves replacement of the existing structure on a new alignment approximately 50 feet (15.2 meters) upstream (south). The existing structure and approaches will serve to maintain traffic during the construction period. Temporary construction impacts due to erosion and sedimentation will be minimized through implementation of a stringent erosion control schedule and the use of best management practices. The contractor will follow contract specifications pertaining to erosion control measures as outlined in 23 CFR 650 Subpart B and Article 107-13 entitled "Control of Erosion, Siltation, and Pollution" (NCDOT, Specifications for Roads and Structures). These measures include the use of dikes, berms, silt basins, and other containment measures to control runoff; elimination of construction staging areas in floodplains and adjacent to waterways; re- seeding of herbaceous cover on disturbed sites; management of chemicals (herbicides, pesticides, de-icing compounds) with potential negative impacts on water quality; and avoidance of direct discharges into streams by catch basins and roadside vegetation. Each of the two alternatives will allow for continuation of pre-proj ect stream flows in Belews Lake Spillway, thereby protecting the integrity of this waterway. Long-term impacts resulting from construction are expected to be negligible. In order to minimize impacts to water resources, NCDOT's Best Management Practices (BMPs) for the Protection of Surface Waters will be strictly enforced during the entire life of the project. During removal of the existing bridge, the bridge rails will be removed without dropping them into waters of the United States. There is potential for components of the deck and interior bents to be dropped into waters of the United States, resulting in a temporary fill of approximately 100.84 cubic yards (77.1 cubic meters). NCDOT's BMPs for Bridge Demolition and Removal must be applied for the removal of this bridge. 9' D. Biotic Resources 1. Plant Communities Three distinct plant communities were identified within the study corridor: Piedmont/Mountain Levee Forest, Dry-Mesic Oak-Hickory Forest, and roadside/disturbed land. These plant communities are described below. Piedmont/Mountain Levee Forest - Piedmont/Mountain Levee Forest occurs on the floodplain east and west of Belews Lake Spillway. The levee forest is bordered by an agricultural field northwest of SR 1138, Dry-Mesic Oak-Hickory Forest to the southwest and southeast, and by a shrub assemblage to the northeast. A power line easement, characterized by a disturbed and maintained herbaceous community, bisects the southeast section of the levee forest. This community is described by Schafale and Weakley (1990) as occurring in large floodplains of Piedmont rivers and streams. The Piedmont/Mountain Levee Forest is a mature, structurally complex community, with well-developed canopy, sub-canopy, shrub, and groundcover strata. Predominant canopy species include tulip poplar (Liriodendron tulipifera), river birch (Betula nigra), sycamore (Platanus occidentalis), hackberry (Celtis laevigata), black cherry (Prunus serotina), sweetgum (Liquidambar styracijlua), and boxelder (Acer negundo). The mid-story and shrub layer are well-developed and include redbud (Cercis canadensis), American holly (Ilex opaca), ironwood (Carpinus caroliniana), multiflora rose (Rosa multijora), eastern red cedar (Juniperus virginiana), flowering dogwood (Cornus jlorida), and pawpaw (Asimina triloba). Vines and herbaceous species are sparse to common in more open patches and include muscadine (Vitis rotundifolia), Japanese honeysuckle (Lonicera japonica), cross vine (Anisostichus capreolata), Solomon's seal (Polygonatum bijlorum), and greenbrier (Smilax rotundifolia). Dry-Mesic Oak-Hickory Forest - Dry-Mesic Oak-Hickory Forest occurs mainly in the southwest quadrant of the study corridor and is bordered by roadside/disturbed land to the north along SR 1138 and by Piedmont/Mountain Levee Forest to the east along Belews Lake Spillway. This community is described by Schafale and Weakley (1990) as occurring on dry upland slopes and ridges of the Piedmont. The Dry-Mesic Oak- Hickory Forest is a mature forest, with a closed canopy, well-developed sub- canopy, and sparse shrub and groundcover strata. The canopy contains white oak (Quercus alba), scarlet oak (Quercus coccinea), Virginia pine (Pinus virginiana), northern red oak (Quercus rubrum), and American beech (Fagus grandifolia). The sub-canopy and shrub layer is composed of red maple (Acer rubrum), flowering dogwood, and saplings of dominant canopy 10 species. The herbaceous layer includes Christmas fern (Polystichum acrostichoides) and running cedar (Lycopodium clavatum). 2. Roadside/Disturbed Land - Roadside/disturbed land occurs along the right- of-way of SR 1138, and along a power line easement bisecting the southeast quadrant of each study corridor. The roadside margin is approximately 10 feet (3.0 meters) wide, and the power line right-of-way is approximately 50 feet (15.2 meters) wide. This community is periodically mowed and primarily supports herbaceous species. Common species on roadsides are fescue (Festuca sp.), chickweed (Stellaria sp.), clover (Trifolium sp.), mayapple (Podophyllum peltatum), Carolina cranesbill (Ranunculus carolina), Queen Anne's lace (Daucus carota), and violets (Viola spp.). Within the power line right-of-way, volunteer species include blackberry (Rubus argutus), tulip poplar, goldenrod (Solidago sp.), honeysuckle, and giant cane (Arundinaria gigantea). Plant Community Impacts Plant community impacts are estimated based on the amount of each plant community present within alternative corridors (Figure 2). Alternate 1 involves replacement of the structure along the existing location with a temporary on-site detour. Alternate 2 involves replacement of the structure on a new alignment with the existing structure and approaches serving to maintain traffic during the construction period. A summary of plant community impacts for each alternative is presented in the following table. Plant Community Areas. Plant community areas are given in acres, with hectares in parentheses. Alternative 1 Plant Community Existing Temp. On- Location Site Detour Piedmont/Mtn Levee Forest Dry-Mesic Oak-Hickory Forest Alternative 2 New Total Alignment 0.25 (0.10) 0.31 (0.13) 0.56 (0.23) 0.52 (0.21) 0.0 (0.0) 0.09 (0.04) 0.09 (0.04) 0.12 (0.05) Roadside/ 0.09 (0.04) 0.23 (0.09) 0.32 (0.13) 0.96 (0.39) Disturbed Land TOTAL: 0.34 (0.14) 0.63 (0.26) 0.97 (0.40) 1.60 (0.65) 1I From an ecological perspective, permanent impacts of upgrading existing road facilities are typically minimal relative to upgrades on new alignment. However, both alternatives considered here include either construction on a new alignment or construction of a temporary detour on a new alignment, so impacts are considered more than minimal for both alternatives. Alternative 2 includes approximately one-third more total impacts than Alternative 1 because of a new roadway alignment; however, most of the impact is on land that is already highly disturbed (roadside/maintained land). Both alternatives contain similar amounts of natural plant communities (Piedmont/Mountain Levee Forest and Dry-Mesic Oak-Hickory Forest). No new fragmentation of plant communities will be created for either alternative, as the project will result only in relocation of community boundaries. Roadside-forest ecotones typically serve as vectors for invasive species into local natural communities. An example of an undesirable invasive species utilizing roadsides is kudzu (Pueria montana). The establishment of a hardy groundcover on road shoulders as soon as practicable will limit the availability of construction areas to invasive and undesirable plants. 3. Wildlife No live terrestrial mammal species were identified in the study corridor during the field visit. However, a dead Virginia opossum (Didelphis virginiana) was found. Tracks of raccoon (Procyon lotor), white-tailed deer (Odocoileus virginianus), as well as signs of a mole (most likely eastern mole [Scalopus aquaticus]) were noted within the study corridor. Some characteristic mammals which are expected to frequent small streams and riparian forests in this portion of the Piedmont include red bat (Lasiurus borealis), beaver (Castor canadensis), woodchuck (Marmota monax), eastern cottontail (Sylvilagus floridanus), southern flying squirrel (Glaucomys volans), cotton mouse (Peromyscus gossypinus), and gray fox (Urocyon cinereoargenteus). Bird species identified during the field visit are mourning dove (Zenaida macroura), eastern phoebe (Sayornisphoebe), belted kingfisher (Megaceryle alcyon), northern cardinal (Cardinalis cardinalis), eastern towhee (Pipilo erythrophthalmus), American crow (Corvus brachyrhynchos), Carolina chickadee (Poecile carolinensis), tufted titmouse (Baeolophus bicolor), and downy woodpecker (Picoides pubescens). The stream habitat might be expected to also support wood duck (Aix sponsa), Acadian flycatcher (Empidonax virescens), American woodcock (Scolopax minor), barred owl (Strix varia), white-breasted nuthatch (Sitta carolinensis), American robin (Turdus migratorius), northern parula (Parula americana), white-eyed vireo 12 (Vireo griseus), yellow-rumped warbler (Dendroica coronata), and white- throated sparrow (Zonotrichia albicollis). No terrestrial reptile or amphibian species were observed within the study corridor. Species that might be expected are five-lined skink (Eumeces fasciatus), rough green snake (Opheodrys aestivus), eastern box turtle (Terrapene carolina), marbled salamander (Ambystoma opacum), slimy salamander (Plethodon glutinosus), American toad (Bufo americanus), Fowler's toad (Bufo woodhousei), rat snake (Elaphe obsoleta), and eastern ribbon snake (Thamnophis sauritus). No aquatic amphibian or reptile species were observed during the field visit. Belews Lake Spillway provides suitable habitat for aquatic and semi-aquatic reptiles including snapping turtle (Chelydra serpentina), painted turtle (Chrysemys picta), eastern ribbon snake (Thamnophis sauritus), and northern water snake (Nerodia sipedon). Typical amphibian species for this region include northern dusky salamander (Desmognathus fuscus), three-lined salamander (Eurycea guttolineata), pickerel frog (Rana palustris), and eastern newt (Notophthalmus viridescens). No mollusks or arthropods were observed, with the exception of shells of the invasive Asian clam (Corbicula fluminea). No sampling was undertaken in Belews Lake Spillway to determine fishery potential. Small minnows and crappie (Pomoxis sp.) were seen during visual investigations, but no larger fish were noted. Species which may be present in Belews Lake Spillway include, chain pickerel (Esox niger), gizzard shad (Dorosoma cepedianum), rosyside dace (Clinostomus funduloides), yellow perch (Perca flavescens), eastern mosquitofish (Gambusia holbrooki), pumkinseed (Lepomis gibbosus), redbreast sunfish (Lepomis auritusorone), bluegill (Lepomis macrochirus), silver redhorse (Moxostoma anisurum), largemouth bass (Micropterus salmoides), and fantail darter (Etheostoma flabellare). 4. Impacts to Wildlife Due to the limited extent of infringement on natural communities, the proposed bridge replacement will not result in substantial loss or displacement of known terrestrial animal populations. No substantial habitat fragmentation is expected since most permanent improvements will be restricted to or adjoining existing roadside margins. Construction noise and associated disturbances will have short-term impacts on avifauna and migratory wildlife movement patterns. Long-term impacts are expected to be minimal for both alternatives. After removal of temporary bridge 13' structures and associated fill, the area will be replanted. For both alternatives, potential impacts to down-stream aquatic habitats will be minimized by bridging the stream to maintain regular flow and stream integrity. Short-term impacts associated with turbidity and suspended sediments will affect benthic populations. Temporary impacts to downstream habitats from increased sediment during construction will be minimized by the implementation of stringent erosion control measures. The N.C. Wildlife Resources Commission recommends a moratorium on in-water work from April 1 to May 31 to avoid adverse effects on breeding of the local sunfish population. E. Jurisdictional Issues 1. Waters of the United States Surface waters within the embankments of Belews Lake Spillway are subject to jurisdictional consideration under Section 404 of the Clean Water Act as "waters of the United States" (33 CFR section 328.3). NWI mapping indicates that Belews Lake Spillway exhibits characteristics of a riverine system with an unconsolidated bottom that is permanently flooded (R2UBH; Cowardin et al. 1979). Field investigation indicates that Belews Lake Spillway can be characterized as a perennial stream system with an unconsolidated bottom of boulders, cobble, and gravel. There is potential that components of the existing bridge may be dropped into "waters of the United States" during demolition. The resulting temporary fill is approximately 100.84 cubic yards (77.1 cubic meters). In consideration of surface water impacts, this project can be classified as Case 2, where no in- stream work may occur during the moratorium period of April 1 to May 31, due to the healthy sunfish population as recommended by the N.C. Wildlife Resources Commission. In addition, restrictions outlined in Best Management Practices for Protection of Surface Waters must be followed. NCDOT will coordinate with the various resource agencies during project planning to ensure that all concerns regarding bridge demolition are resolved. 2. Jurisdictional Wetlands Vegetated wetlands are subject to jurisdictional consideration under Section 404 of the Clean Water Act as "waters of the United States" (33 CFR section 328.3). These areas are defined by the presence of three primary criteria: hydric soils, hydrophytic vegetation, and evidence of hydrology at or near the surface for a portion (12.5 percent) of the growing season (DOA 1987). No 14 vegetated wetlands subject to jurisdictional consideration occur within the study corridor. Jurisdictional impacts are avoided by both considered alternatives. 3. Permits Required A Federal permit under Section 404 of the Clean Air Act is required for discharges of dredged or fill material in "Waters of the United States". This project is being processed as a Categorical Exclusion (CE) under Federal Highway Administration (FHWA) guidelines. It is anticipated that this project will fall under Nationwide Permit (NWT) #23 (61 FR 65874,65916; December 13, 1996) for CEs due to expected minimal impact. DWQ has made available a General 401 Water Quality Certification for NWP #23. However, authorization for jurisdictional area impacts through use of this permit will require written notice to DWQ. In the event that NWP #23 will not suffice, minor impacts attributed to bridging and associated approach improvements are expected to qualify under General Bridge Permit 031 issued by the Wilmington COE District. Notification to the Wilmington COE office is required if this general permit is utilized. According to Duke power officials, Belews Lake is not an FERC (Federal Energy Regulatory Commission) lake and a FERC permit will not be required (Appendix). 4. Mitigation Compensatory mitigation is not proposed for this project due to the limited nature of project impacts. However, utilization of BMPs is recommended in an effort to minimize impacts. Fill or alteration of more than 150 linear feet (45.8 meters) of stream may require compensatory mitigation in accordance with 15 NCAC2H.0506(h). A final determination regarding mitigation rests with the COE. F. Protected Species 1. Federal Species Species with the federal classification of Endangered, Threatened, or officially Proposed for such listing, are protected under the Endangered Species Act (ESA) of 1973, as amended (16 U.S.C. 1531 et seq.). The term "Endangered species" is defined as "any species which is in danger of extinction throughout all or a significant portion of its range", and the term "Threatened species" is defined as "any species which is likely to become an 15 Endangered species within the foreseeable future throughout all or a significant portion of its range" (16 U.S.C. 1532). Federally protected species for Rockingham and Stokes County (February 25, 2003 FWS list) are listed in the table below. Federally Protected Species: Species name and status for federally protected species in Rockingham (R) and Stokes (S) County (February 25, 2003 FWS list). Common Name Scientific Name Federal Status fount James spinymussel Pleurobema collina Endangered R/S Smooth coneflower Echinacea laevigata Endangered R Schweinitz's sunflower Helianthus schweinitzii Endangered S Small anthered bittercress Cardamine micranthera Endangered S James Spinymussel - The James spinymussel is a small, sub-rhomboidal mussel, with an obliquely sub-truncated posterior, that grows to approximately 1.5 inches (40 millimeters) in length. The external shell of the juveniles usually bears one to three short spines on each valve. The adult shells usually lack spines. The shell is smooth, straw-colored to brownish- black, with widely spaced concentric striations. Preferred habitat of the spiny mussel includes relatively fast-flowing, well-oxygenated, circum-neutral water over a silt-free, non-compacted, gravel/coarse sand substrate. According to the FWS species recovery plan (FWS 1990), this spinymussel was only known from 10 streams within the James River basin in Virginia and West Virginia. Extensive surveys for mussel fauna have been conducted by NCDOT staff in the Dan River in Stokes and Rockingham Counties. Personnel from the US Fish and Wildlife Service, North Carolina Wildlife Resources Commission and NC State University School of Veterinary Medicine assisted at various times during these survey efforts. The apparent range (@ 30 river-miles) of the spinymussel in the Dan River extends from North Carolina / Virginia border near the first bridge crossing in North Carolina (Flippin Road, SR 1416) in Northwest Stokes County down to the town of Danbury in central Stokes County. The spinymussel has not been found in the Dan River in Rockingham County. The species has been found in the Mayo River in northwest Rockingham County, near the NC / VA border. More surveys are 16 needed to determine the range of this species in the Mayo River. In October 2000, an unidentified spinymussel was found in the Dan River in Stokes County, North Carolina during a survey conducted by personnel of NCDOT, the N.C. Wildlife Resources Commission, and the N.C. Division of Marine Fisheries. Subsequent surveys in the Dan River found several more individuals of spinymussel (personal communication, Tim Savidge, April 4, 2001). Spinymussels had not previously been identified within the Dan River basin. The mussels found in the Dan River have characteristics similar to the James spinymussel and the Tar spinymussel (Elliptio steinstansanna). Specimens of the recently found spinymussel are currently (as of April 2001) undergoing genetic analysis. The finding of this unidentified spinymussel has resulted in the FWS listing James spinymussel in North Carolina counties that include tributaries of the Dan River basin. The subject project is located on the spillway of Belews Lake, which is formed by Belews Creek. Belews Creek then flows into the Dan River less than 1 mile downstream of the project crossing. The confluence of Belews Creek and the Dan River is approximately 16 river-miles downstream of Danbury (furthermost downstream extent of the spinymussel in the Dan River. Belews Lake Spillway is a highly disturbed, well entrenched, perennial stream, characterized by moderate flow. The stream bed is primarily composed of bedrock and cobble with scattered gravel and sand. NCDOT Environmental Specialists Tim Savidge and Mike Wood visited the project site on August 17, 2001. Surveys for mussels were conducted from approximately 400 feet downstream to 100 feet upstream (base of the spillway) of the project crossing. Survey methodology included wading using visual (batiscope and tactile) methods. Water was not being released at the time of the survey, and water depth ranged from 6 inches to 2 feet. There is evidence of extreme high flows(water release) and streambank scour in the creek. No mussels were found in 1 man-hour of survey. The aquatic snail (Helisoma anceps) and the introduced Asian clam (Corbiculafluminea) were present in the stream but nowhere abundant. No spinymussel species were found during this survey. BIOLOGICAL CONCLUSION: NHP records indicate that James River spinymussel has not been documented to occur within 1.0 mile (1.6 kilometers) of the study corridor. Given the survey results, it is apparent that the spinymussel does not occur in the project area. The spinymussel has not been found in the stretch of the Dan River downstream of the project area. It can be concluded that project construction will not impact this species. NO EFFECT. 17' Smooth coneflower - This species is a stiffly erect, rarely branched perennial that grows up to 5 feet (1.5 meters) tall. Basal and stem leaves are large, glabrous, lanceolate to narrowly ovate blades reaching 3 inches (7.6 centimeters) in length. This coneflower blooms from late May to July, producing solitary, heads of small purplish disk flowers with long drooping pink to purplish ray flowers (Kral 1983). This species occurs on calcareous, basic, or circumneutral soils on roadsides, clear-cuts, power line right-of- ways where there is abundant light and little herbaceous competition (Gaddy 1991). Fire-maintained woodlands also appear to provide potential habitat for the coneflower. Within the study corridor, suitable habitat occurs for smooth coneflower along road shoulders and within the power line right-of- way. NHP records have no documentation of this species within 5.0 miles (8.0 kilometers) of the study corridor. BIOLOGICAL CONCLUSION: Within the study corridor, suitable habitat occurs for coneflower along road shoulders and within the power line easement, both of which are kept free of an established canopy. A systematic field survey was conducted within the power line easement and along the road shoulders during the blooming season (late May to July) on July 17, 2001. No individuals of any Echinacea species were documented within the study corridor. Based on the results of field surveys and available information, the proposed project will not affect the smooth coneflower. NO EFFECT. Schweinitz's Sunflower - Schweinitz's sunflower is an erect, unbranched, rhizomatous, perennial herb that grows to approximately 6.0 feet (1.8 meters) in height. The stem may be purple, usually pubescent, but sometimes nearly smooth. Leaves are sessile, opposite on the lower stem but alternate above. Leaf shape is lanceolate and average 5 to 10 times as long as wide. The leaves are rather thick and stiff, with a few small serrations. The upper leaf surface is rough and the lower surface is usually pubescent with soft white hairs. Schweinitz's sunflower blooms from September to frost; the yellow flower heads are about 0.6 inch (1.5 centimeters) in diameter. The current range of this species is within 60 miles of Charlotte, North Carolina, occurring on upland interstream flats or gentle slopes, in soils that are thin or clayey in texture. The species needs open areas protected from shade or excessive competition, reminiscent of Piedmont prairies. Disturbances such as fire maintenance or regular mowing help sustain preferred habitat (FWS 1994). Within the study corridor, suitable habitat occurs for Schweinitz's sunflower along road shoulders and within the power line easement. NHP records have no documentation of this sunflower within 5.0 miles (8.0 kilometers) of the study corridor 18 BIOLOGICAL CONCLUSION: The study corridor contains suitable habitat for Schweinitz's sunflower. No existing populations are known within 5.0 miles (8.0 kilometers) of Bridge No. 52. A survey for this sunflower was conducted during the blooming season (September to frost) on September 19, 2001. This survey consisted of systematically walking all areas of suitable habitat and identifying all Helianthus species. Sunflowers identified included H. microcephalus. No individuals of Schweinitz's sunflower were identified within the study corridor. Based on available information and results of an on-site survey, the proposed project will not affect Schweinitz's sunflower. NO EFFECT. Small anthered bittercress - Small-anthered bittercress is a low, erect, biennial or perennial herb with simple, slender stems. The plant has crenate, lobed basal leaves 0.3 to 0.7 inches (0.8 to 1.8 centimeters) in length, and unlobed, crenate stem leaves that are slightly shorter. The small flowers have white petals to 0.1 inch (3 millimeters) long and bloom in the late spring. This species is only known from Forsyth and Stokes Counties, and has not been observed in Forsyth County within the past 20 years. This species has never been found in Rockingham County and is included in this discussion due to the proximity of the study corridor to the Stokes County line. Typical habitat is seepages, wet rock crevices, stream banks, sandbars, and wet woods along small streams in the Dan River drainage. The study corridor contains a high, relatively dry levee forest which provides poor habitat for the small anthered bittercress, but the stream banks and sandbars within Belews Lake spillway provide suitable habitat for this species. BIOLOGICAL CONCLUSION: NHP records indicate that this species has not been documented within one-mile (1.6 kilometers) of the study corridor. The Piedmont/Mountain Levee Forest provides poor habitat for the small anthered bittercress but the stream banks do provide suitable habitat for this species. A systematic survey of the moist portions of the Piedmont/Mountain Levee Forest, stream banks, and sandbars within the study corridor were conducted during this field investigation. No specimens of small-anthered bittercress were observed during the survey. Based on available information and best professional judgement, the proposed project will not affect small anthered bittercress. NO EFFECT Federal Species of Concern - The February 25, 2003 FWS list also includes a category of species designated as "Federal species of concern" (FSC) in Rockingham and Stokes Counties. A species with this designation is one that may or may not be listed in the future (formerly C2 candidate species or species under consideration for listing for which there is insufficient information to support listing). A list of FSC species occurring in 19 Rockingham (R) and Stokes (S) Counties is given in the following table. Federal Species of Concern (FSC) (Species name, habitat potential within the study corridor, and state status for species federally designated as FSC within Rockingham (R) and Stokes (S) Counties) Potential State County Common Name Scientific Name Haabilaf tai s** Green floater Lasmigona subviridis Yes E R/S Heller's trefoil Lotus helleri Yes C R Orangefin madtom Noturus gilberti Yes E S Rustyside sucker thoburnia hamiltoni Yes E S Diana fritillary butterfly Speyeria diana Yes SR S Butternut Juglans cinerea No W5 S Sweet pinesap Monotropsis odorata No C S **E= Endangered; T= threatened; SC =Special concern; SR= Significantly Rare; C= Candidate; P = Species has been formally proposed for listing as Endangered, Threatened, or Special Concern; W5 = NC Plant Watch List: rare because of severe decline (Amoroso 1999; LeGrand and Hall 1999). The FSC designation provides no federal protection under the ESA for the species listed. NHP records document the occurrence of the Green floater (Lasmigona subviridis) approximately 0.4 mile (0.6 kilometer) north of the study corridor within the main stem of the Dan River. This mussel has a state status of Endangered and a federal status of FSC. The green floater occurs in small to medium-sized streams, prefers quiet pools, and is intolerant of strong currents. The study corridor does provide suitable habitat for this species. Other than the Green floater noted above, NHP files do not document any occurrences of FSC species within one-mile (1.6 kilometers) of the study corridor. 2. State Species Plant and animal species which are on the North Carolina state list as Endangered, Threatened, Special Concern, Candidate, Significantly Rare, or Proposed (Amoroso 1999, LeGrand and Hall 1999) receive limited protection under the North Carolina Endangered Species Act (G. 5.113-331 et seq.) and the North Carolina Plant Protection Act of 1979 (G.S.106-202 et seq. ). NHP records document the occurrence of riverweed darter (Etheostoma podostemone) approximately 1.6 miles (2.5 kilometers) southwest of the 20 study corridor within the Dan River. This fish has a state status of Special Concern. NHP records document a Significant Natural Heritage Area, the Dan River Aquatic Habitat (Rockingham Section), approximately 0.4-miles (0.6-kilometers) north of the study corridor, within the main stem of the Dan River. This area has been designated a natural area significance of "A", which indicates an area that contains examples of natural communities, rare plant or animal populations, or geologic features that are among the highest quality or best of their kind in the nation, or clusters of such elements that are among the best in the nation. IV. CULTURAL RESOURCES A. Compliance Guidelines This project is subject to compliance with Section 106 of the National Historic Preservation Act of 1966, as amended, and implemented by the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106, codified at 36 CFR Part 800. Section 106 requires Federal agencies to take into account the effect of their undertakings (federally-funded, licensed, or permitted) on properties included in or eligible for inclusion in the National Register of Historic Places and to afford the Advisory Council a reasonable opportunity to comment on such undertakings. B. Historic Architecture A field survey of the Area of Potential Effects (APE) was conducted on February 29, 2000. All structures within the APE were photographed, and later reviewed by NCDOT architectural historians and the State Historic Preservation Office (HPO). None of the properties were considered eligible, and in a concurrence form dated June 1, 2000, the State Historic Preservation Officer (SHPO) concurred that there are no historic architectural resources either listed in or eligible for listing in the National Register of Historic Places within the APE. A copy of the concurrence form is included in the Appendix. C. Archaeology This is a federally funded project subject to Section 106 of the National Historic Preservation Act of 1966, which requires consultation with the State Historic Preservation Office (SHPO) on possible effects of the project on historic properties. The Area of Potential Effect (APE) is defined as a 150-foot (45.7-meter) wide area, 21 inclusive of the 100-foot (30.5-meter) wide right-of-way for a project corridor, measuring about 850-feet (259.1-meters) long. The SHPO (ER 01-8190) made a request for an archaeological survey of the project's APE in order to identify the presence and significance of archaeological remains, in regards to Site 31Rk42**, which is located near the project. A visual inspection was conducted within the area of the known archaeological site on September 19, 2001. Subsurface testing occurred only in areas of high potential for locating intact archaeological deposits within the APE. Located on the east side of Belews Creek and outside the APE, Site 31Rk42** could not be relocated. Two shovel test pits (STP's) were positioned at 20-meter intervals on the terrace along the east bank of the creek in order to locate possible remnants of Site 31 Rk42* *, which was supposed to be located upstream from this terrace. Remnants of a previous bridge (i.e. poured concrete abutments) were identified in the area, but were not considered historically significant. Based on the survey, no archaeological deposits eligible for listing on the National Register of Historic Places were identified within the boundaries of the proposed APE. No further archaeological work is recommended prior to construction. In a letter dated December 20, 2001, the SHPO concurred with this recommendation. A copy of the SHPO's letter is included in the Appendix. V. ENVIRONMENTAL EFFECTS The project is expected to have an overall positive impact. Replacement of the inadequate bridge will result in safer traffic operations. The project is considered to be a Federal " Categorical Exclusion " due to its limited scope and lack of substantial environmental consequences. The bridge replacement will not have an adverse effect on the quality of the human or natural environment with the use of the current North Carolina Department of Transportation standards and specifications. The project is not in conflict with any plan, existing land use, or zoning regulation. No change in land use is expected to result from the construction of the project. According to Duke Power officials, Belews Lake is not a Federal Energy Regulatory Commission (FERC) lake and a FERC permit will not be needed for the project. No adverse impact on families or communities is anticipated. Right-of-way acquisition will be limited. No relocatees are expected with implementation of the proposed alternative. 22 In compliance with executive Order 12898 (Federal Actions to Address Environmental Justice in Minority Populations and Low Income Populations) a review was conducted to determine whether minority or low-income populations were receiving disproportionately high and adverse human health or environmental impacts as a result of this project. The investigation determined the project would not disproportionately impact any minority or low income populations. No adverse effect on public facilities or services is anticipated. The project is not expected to adversely affect social, economic, or religious opportunities in the area. The project does not involve any known Section 4(f) properties. There are no publicly-owned parks, recreational facilities, or wildlife and waterfowl refuges of National, State, or local significance in the vicinity of the project. The Farmland Protection Policy Act requires all federal agencies or their representatives to consider the potential impacts to prime, unique or important farmland soils for all land acquisition and construction projects. Prime and important farmland soils are defined by the Natural Resources Conservation Service (MRCS). The proposed project has been coordinated with the US Department of Agriculture and no prime, unique or important farmland will be converted as a result of this bridge replacement project. This project is in conformance with the Farmland Protection Policy Act (FPPA). The replacement of Rockingham County Bridge No. 55 is an air quality "neutral" project, so it is not required to be included in the regional emissions analysis and a project level CO analysis is not required. 40 CFR Part 51 is not applicable because the proposed project is located in an attainment area. If vegetation is disposed of by burning, all burning shall be done in accordance with applicable local laws and regulations of the North Carolina SIP for air quality in compliance with 15 NCAC 2D.0520. The replacement of the existing bridge will not increase or decrease traffic volumes; therefore, the project's impact on noise and air quality will not be significant. The noise levels will increase during the construction period, but will only be temporary. This evaluation completes the assessment requirements for highway traffic noise of Title 23, Code of Federal Regulations (CFR), Part 772 and for air quality (1990 Clean Air Act Amendments and the National Environmental Policy Act) and no additional reports are required. An examination of records at the North Carolina Department of Environment and Natural Resources, Division of Waste Management revealed no leaking underground storage tanks or hazardous waste sites in the project area. This area is not in a FEMA Flood Study, but is in a FEMA Special Flood Hazard Zone A. No base flood elevations have been determined. This section of stream is relatively short, begins at Belews Lake approximately 1800 feet (550 meters) upstream and converges with the Dan River approximately 2000 feet (610 meters) downstream. The Dan River floodplain 23 encroaches up the stream to the subject crossing. The approximate 100-year floodplain in the project area is shown in Figure 6. The amount of floodplain area to be affected is not substantial. The final design of the bridge will be such that the backwater elevation of the stream will not encroach beyond the current 100-year floodplain limits. On the basis of the above discussion, it is concluded that no substantial adverse environmental impacts will result from implementation of this project. VI. AGENCY COMMENTS North Carolina Wildlife Resources Commission Comment: This area supports good numbers of sunfish and may support a tailrace fishery. Therefore, we request that no in-water work be performed from April 1 to May 31. We request that High Quality Sedimentation and Erosion Control Measures be used due to the DWQ water quality classification of WS-IV. Response: Comment noted and project commitment included on Green Sheet. 24 \ 1726 ~ U c ?k?r 1 Sharps /' • 143 1728 ` \ w' C11 ti?°? 101, 1142 • 4 ? - \ ? '1 qa 1139 ? 1141 1725 772 a ' - 1189 1140 / 1723 \ 311 1128 .+ 1722 1138 1135 Ellisboro ~ 1134 ' •'? 1136 &" 1908 1911 / 1137 1129 `• •rr 1912 Pine Hall Bridge No. 55 1133 J LPF GoY 1903 Bel 1110 1915 ?t?e?1ti e< 9afiR?v Lake o , 1176 ?'++ 1( ++ 1132 ? ? I Cer is 1908 ??, ? • 1120 1909 . " Norfolk /?/ , • 1108 N 1600 Meters 1 -J 4 0 Miles 1?0 Priee EJ 5',-1! .-Y- d APPROXIMA TE SCALE North Carolina Department of Transportation Project Development & Environmental Analysis Branch ROCIONGHAM COUNTY Bridge No. 55 on SR 1138 (Lindsey Bridge Road) over Bellews Lake Spillway TIP No. B-3694 April 2003 Figure 1 KUUKIINGnAM UOUNTY BRIDGE NO. 55 ON SR 1138 OVER BELEWS LAKE SPILLWAY B-3694 SIDE VIEW LOOKING NORTH WEST APPROACH LOOKING EAST EAST APPROACH LOOKING WEST FIGURE 3 s I C p ? g € pp :02 0 I +?o y •°p pa a 8 E Q m O W f Z Zgg J d I a -0 ?Z Zm ° m o I I- PA ? A xL^'3 U? c? c3 O A4 O ca w o? ~ " a o °?S N t? o I F o m ? U O U O g$ py h ? N w ? HN ? ?A1 O 0 a o? ? ? o w ? ?z ao U ? e x 0 s o o? P 6 AL i # C op O P 0 p o Z E m d 'g F U ? o A cp 0 CIO Q O U A M !I I! 'E, O ? pp ? d' a U 00 O ZONE X ZONE X :..... ZONE .X: Bridge No, 55 s? EX ZONE X ZONE A FEMA - Floodplain Map of Project Area 0 2000 I FEET I APPROXIMATE SCALE North Carolina Department of Transportation Project Development & Environmental Analysis Branch ROCKINGHAM COUNTY Bridge No. 55 on SR 1138 (Lindsey Bridge Road) over Belews Lake Spillway TIP No. B-3694 Figure 6 1? United States Department of the Interior FISH AND WILDLIFE SERVICE Raleigh Field Office Post Office Box 33726 Raleigh, North Carolina 27636-3726 December 22, 2000 Mr. William D. Gilmore, P.E., Manager NCDOT Project Development and Environmental Analysis Branch 1548 Mail Service Center Raleigh, NC 27699-1548 Dear Mr. Gilmore: Thank you for your November 15, 2000, request for information from the U.S. Fish and Wildlife Service (Service) on the potential environmental impacts of a proposed bridge replacement in Rockingham County, North Carolina. This report provides scoping information and is provided in accordance with provisions of the Fish and Wildlife Coordination Act (FWCA) (16 U.S.C. 661-667d) and Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.S.C. 1531-1543). This report also serves as initial scoping comments to federal and state resource agencies for use in their permitting and/or certification processes for this project. The North Carolina Department of Transportation (NCDOT) proposes to replace the following bridge structure: 1. B-3694 Bridge No. 55 on SR 1138 over Belews Lake Spillway The following recommendations are provided to assist you in your planning process and to facilitate a thorough and timely review of the project. Generally, the Service recommends that wetland impacts be avoided and minimized to the maximum extent practical as outlined in Section 404 (b)(1) of the Clean Water Act Amendments of 1977. In regard to avoidance and minimization of impacts, we recommend that proposed highway projects be aligned along or adjacent to existing roadways, utility corridors, or previously developed areas in order to minimize habitat fragmentation and encroachment. Areas exhibiting high biodiversity or ecological value important to the watershed and region should be avoided. Crossings of streams and associated wetland systems should use existing crossings and/or occur on a structure wherever feasible. Where bridging is not feasible, culvert structures that maintain natural water flows and hydraulic regimes . without scouring, or impeding fish and wildlife passage, should be employed. Highway shoulder and median widths should be reduced through wetland areas. Roadway embankments and fill areas should be stabilized by using appropriate erosion control devices and techniques. Wherever appropriate, construction in sensitive areas should occur outside fish spawning and migratory bird nesting seasons. The National Wetlands Inventory (NWI) map of the Belews Lake 7.5 Minute Quadrangle shows wetland resources in the specific work area. However, while the NWI maps are useful for providing an overview of a given area, they should not be relied upon in lieu of a detailed wetland delineation by trained personnel using an acceptable wetland classification methodology. Therefore, in addition to the above guidance, we recommend that the environmental documentation for this project include the following in . sufficient detail to facilitate a thorough review of the action. 1. The extent and acreage of waters of the U.S., including wetlands, that are to be impacted by filling, dredging, clearing, ditching, or draining. Acres of wetland impact should be differentiated by habitat type based on the wetland classification scheme of the National Wetlands Inventory. Wetland boundaries should be determined by using the 1987 Corps of Engineers Wetlands Delineation Manual and verified by the U.S. Army Corps of Engineers (Corps). 2. If unavoidable wetland impacts are proposed, we recommend that every effort be made to identify compensatory mitigation sites in advance. Project planning should include a detailed compensatory mitigation plan for offsetting unavoidable wetland impacts. Opportunities to protect mitigation areas in perpetuity, preferably via conservation easement, should be explored at the outset. The enclosed list identifies the federally-listed endangered and threatened species, and Federal Species of Concern (FSC) that are known to occur in Rockingham County. The Service recommends that habitat requirements for the listed species be compared with the available habitats at the respective project sites. If suitable habitat is present within the action area of the project, biological surveys for the listed species should be performed. Environmental documentation that includes survey methodologies, results, and NCDOT's recommendations based on those results, should be provided to this office for review and comment. FSC's are those plant and animal species for which the Service remains concerned, but further biological research and field study are needed to resolve the conservation status of these taxa. Although FSC's receive no statutory protection under the ESA, we would encourage the NCDOT to be alert to their potential presence, and to make every reasonable effort to conserve them if found. The North Carolina Natural Heritage Program should be contacted for information on species under state protection. The Service appreciates the opportunity to comment on this project. Please continue to advise us during the progression of the planning process, including your official determination of the impacts of this project. If you have any questions regarding these comments, please contact Tom McCartney at 919-856-4520, ext. 32. Sincerely, at", Dr. Garland B. Pardue Ecological Services Supervisor Enclosure cc: COE, Raleigh, NC (Eric Alsmeyer) NCDWQ, Raleigh, NC (John Hennessy) NCDNR, Northside, NC (David Cox) FWS/R4:TMcCartney:TM:12/22/00:919/856-4520 extension 32:\Ibrdgroc.ham Rockingham County Endangered Species, Threatened Species, and Federal Species of Co... Page 1 of 2 Updated: 02/25/2003 ROCKINGHAM COUNTY Common Name Invertebrates Green floater James spinymussel Vascular Plants Heller's trefoil Smooth coneflower KEY: Status Definition Scientific Name Status Lasmigona subviridis FSC Pleurobema collina Endangered Lotus helleri FSC Echinacea laevigata Endangered Endangered A taxon "in danger of extinction throughout all or a significant portion of its range." Threatened - A taxon "likely to become endangered within the foreseeable future throughout all or a significant portion of its range." Proposed - A taxon proposed for official listing as endangered or threatened. C1 - A taxon under consideration for official listing for which there is sufficient information to support listing. FSC - A Federal species of concern--a species that may or may not be listed in the future (formerly C2 candidate species or species under consideration for listing for which there is insufficient information to support listing). http://nc-es.fws.gov/es/cntylist/rockingham.html 4/28/03 Rockingham County Endangered Species, Threatened Species, and Federal Species of Co... Page 2 of 2 T(S/A) - Threatened due to similarity of appearance (e.g., American alligator )--a species that is threatened due to similarity of appearance with other rare species and is listed for its protection. These species are not biologically endangered or threatened and are not.subject to Section 7 consultation. EXP - A taxon that is listed as experimental (either essential or nonessential). Experimental, nonessential endangered species (e.g., red wolf) are treated as threatened on public land, for consultation purposes, and as species proposed for listing on private land. Species with 1, 2, 3, or 4 asterisks behind them indicate historic, obscure, or incidental records. *Historic record - the species was last observed in the county more than 50 years ago. **Obscure record - the date and/or location of observation is uncertain. * * *Incidental/migrant record - the species was observed outside of its normal range or habitat. ****Historic record - obscure and incidental record. For additional information regarding this Web page, contact Mark Cantrell, in Asheville, NC, at mark_a_cantrell@fws.gov Visit the North Carolina ES Homepage Visit the U.S. Fish and Wildlife Service Home Page Keywords={same keywords listed above - used for search tools} http://nc-es.fws.gov/es/cntylist/rockingham.html 4/28/03 F North Carolina Wildlife Resources Commission 512 N. Salisbury Street, Raleigh, North Carolina 27604-1188, 919-733-3391 Charles R. Fullwood, Executive Director TO: John Conforti Project Engineer, NCDOT FROM: David Cox, Highway Project Co Ziator Habitat Conservation Program DATE: January 2, 2001 SUBJECT: NCDOT Bridge Replacements in Anson, Cabarrus, Catawba, Cleveland, Davie, Forsythe, Gaston, Guilford, Mecklenburg, Randolph, Rockingham, and Stanly counties of North Carolina. TIP Nos. B-3404, B-3421, B-3822, B-3828, B-3637, B-3835, B-3454, B-3839, B-3840, B-3337, B-3652, B-3851, B-3677, B-35093 B- 3694, and B-3700. Biologists with the N. C. Wildlife Resources Commission (NCWRC) have reviewed the information provided and have the following preliminary comments on the subject project. Our comments are provided in accordance with provisions of the National Environmental Policy Act (42 U.S.C. 4332(2)(c)) and the Fish and Wildlife Coordination Act (48 Stat. 401, as amended; 16 U.S.C. 661-667d). . On bridge replacement projects of this scope our standard recommendations are as follows: 1. We generally prefer spanning structures. Spanning structures usually do not require work within the stream and do not require stream channel realignment. The, horizontal and vertical clearances provided by bridges allows for human and wildlife passage beneath the structure, does not block fish passage, and does not block navigation by canoeists and boaters. 2. Bridge deck drains should not discharge directly into the stream. 3. Live concrete should not be allowed to contact the water in or entering into the stream. 4. If possible, bridge supports (bents) should not be placed in the stream. 5. If temporary access roads or detours are constructed, they should be removed back to original ground elevations immediately upon the completion of the project, Disturbed areas should be seeded or mulched to stabilize the soil and native tree species should Bridge Memo 2 January 2, 2001 be planted with a spacing of not more than 10'x10' . If possible, when using temporary structures the area should be cleared but not grubbed. Clearing the area with chain saws, mowers, bush-hogs, or other mechanized equipment and leaving the stumps and root mat intact, allows the area to revegetate naturally and minimizes disturbed soil. 6. A clear bank (riprap free) area of at least 10 feet should remain on each side of the steam underneath the bridge. 7. In trout waters, the N.C. Wildlife Resources Commission reviews all U.S. Army Corps of Engineers nationwide and general `404' permits. We have the option of requesting additional measures to protect trout and trout habitat and we can recommend that the project require an individual `404' permit. 8. In streams that contain threatened or endangered species, NCDOT biologist Mr. Tim Savidge should be notified. Special measures to protect these sensitive species may be required. NCDOT should also contact the U.S. Fish and Wildlife Service for information on requirements of the Endangered Species Act as it relates to the project. 9. In streams that are used by anadromous fish, the NCDOT official policy entitled "Stream Crossing Guidelines for Anadromous Fish Passage (May 12, 1997)" should be followed. 10. In areas with significant fisheries for sunfish, seasonal exclusions may also be recommended. 11. Sedimentation and erosion control measures sufficient to protect aquatic resources must be implemented prior to any ground disturbing activities. Structures should be maintained regularly, especially following rainfall events. 12. Temporary or permanent herbaceous vegetation should be planted on all bare soil within 15 days of ground disturbing activities to provide long-term erosion control. 13. All work in or adjacent to stream waters should be conducted in a dry work area. Sandbags, rock berms, cofferdams, or other diversion structures should be used where possible to prevent excavation in flowing water. 14. Heavy equipment should be operated from the bank rather than in stream channels in order to minimize sedimentation and reduce the likelihood of introducing other pollutants into streams. 15. Only clean, sediment-free rock should be used as temporary fill (causeways), and should be removed without excessive disturbance of the natural stream bottom when construction is completed. 16. During subsurface investigations, equipment should be inspected daily and maintained to prevent contamination of surface waters from leaking fuels, lubricants, hydraulic fluids, or other toxic materials. If corrugated metal pipe arches, reinforced concrete pipes, or concrete box culverts are used: 1. The culvert must be designed to allow for fish passage. Generally, this means that the culvert or pipe invert is buried at least 1 foot below the natural stream bed. If Bridge Memo January 2, 2001 multiple cells are required the second and/or third cells should be placed so that their bottoms are at stream bankful stage (similar to Lyonsfield design). This could be accomplished by constructing a low sill on the upstream end of the other cells that will divert low flows to another cell. This will allow sufficient water depth in the culvert or pipe during normal flows to accommodate fish movements. If culverts are long, notched baffles should be placed in reinforced concrete box culverts at 15 foot intervals to allow for the collection of sediments in the culvert, to reduce flow velocities, and to provide resting places for fish and other aquatic organisms moving through the structure. 2. If multiple pipes or cells are used, at least one pipe or box should be designed to remain dry during normal flows to allow for wildlife passage. 3. Culverts or pipes should be situated so that no channel realignment or widening is required. Widening of the stream channel at the inlet or outlet of structures usually causes a decrease in water velocity causing sediment deposition that will require future maintenance. 4. Riprap should not be placed on the stream bed. In most cases, we prefer the replacement of the existing structure at the same location with road closure. If road closure is not feasible, a temporary detour should be designed and located to avoid wetland impacts, minimize the need for clearing and to avoid destabilizing stream banks. If the structure will be on a new alignment, the old structure should be removed and the approach fills removed from the 100-year floodplain. Approach fills should be removed down to the natural ground elevation. The area should be stabilized with grass and planted with native tree species. If the area that is reclaimed was previously wetlands, NCDOT should restore the area to wetlands. If successful, the site may be used as wetland mitigation for the subject project or other projects in the watershed. Project specific comments: 1. B-3404 - Anson County - Bridge No. 314 over South Fork Jones Creek. We have no specific comments. We are not aware of any threatened of endangered species in the project vicinity. 2. B-3421- Cabamzs County - Bridge No. 266 over Norfolk and Southern Railway. No comment. 3. B-3822 - Catawba County - Bridge No. 8 over unnamed tributary to the Catawba River. We request that High Quality Sedimentation and Erosion Control Measures be used due to the DWQ water quality classification of WS-IV. We are not aware of any threatened of endangered species in the project vicinity. 4. B-3828 - Cleveland County - Bridge No. 233 over Buffalo Creek. We have no specific comments. We are not aware of any threatened of endangered species in the project vicinity. 5. B-3637 _ Davie County - Bridge No. 37 over I-40. No comment. 6. B-3835 - Davie-Forsyth counties -Bridge No. 35 over the Yadkin River. We request that High Quality Sedimentation and Erosion Control Measures be used due to the DWQ water quality classification of WS-IV. We request that the new bridge span the adjacent wetlands Bridge Memo 4 January 2, 2001 entirely. The old fill causeways should then be removed and graded to natural ground level. We are not aware of any threatened of endangered species in the project vicinity. 7. B-3454 - Forsyth County - Bridge No. 260 over Muddy Creek. We have no specific comments. We are not aware of any threatened of endangered species in the project vicinity. 8. B-3839 - Forsyth County - Bridge No.139 over Fishers Branch. We have no specific comments. We are not aware of any threatened of endangered species in the project vicinity. 9. B-3840 - Gaston County - Bridge No. 52 over South Crowders Creek. We have no specific comments. We are not aware of any threatened of endangered species in the project vicinity. 10. B-3337 - Guilford County - Bridge No. 527 over North Buffalo Creek. We have no specific comments. We are not aware of any threatened of endangered species in the project vicinity. 11. B-3652 - Guilford County - Bridge No. 20 over the Deep River. SR 4121 crosses the Deep River just below the dam of High Point City Lake. This area supports good numbers of sunfish and may support a tailrace fishery. Therefore, we request that no in-water work be preformed from April 1 to May 31. We request that High Quality Sedimentation and Erosion Control Measures be used due to the DWQ water quality classification of WS-IV. We are not aware of any threatened of endangered species in the project vicinity. 12. B-3851- Guilford County -Bridge No. 21 over US 29/70. No comment. 13. B-3677 - Mecklenburg County - Bridge No. 36 over Greasy Creek. We have no specific comments. We are not aware of any threatened of endangered species in the project vicinity. 14. B-3506 - Randolph County - Bridge No. 226 over Richland Creek. Richland Creek is a medium sized stream that supports good populations of sunfish. Therefore, we request that no in-water work be preformed from April 1 to May 31. We are not aware of any threatened of endangered species in the project vicinity. 15. B-3694 -Rockingham County - Bridge No. 55 over the Belews Lake Spillway. This bridge appears to be just downstream of the Belews Lake dam. This area supports good numbers of sunfish and may support a tailrace fishery. Therefore, we request that no in-water work be preformed from April 1 to May 31. We request that High Quality Sedimentation and Erosion Control Measures be used due to the DWQ water quality classification of WS-IV. We are not aware of any threatened of endangered species in the project vicinity. 16. B-3700 - Stanly County - Bridge No. 187 over Long Creek. This segment of Long Creek may support the state listed Carolina darter. Therefore, we request that High Quality Sedimentation and Erosion Control Measures be used to minimize project impacts to this species. We request that NCDOT routinely minimize adverse impacts to fish and wildlife resources in the vicinity of bridge replacements. The NCDOT should install and maintain sedimentation control measures throughout the life of the project and prevent wet concrete from contacting water in or entering into these streams. Replacement of bridges with spanning structures of some type, as opposed to pipe or box culverts, is recommended in most cases. Spanning structures allow wildlife passage along streambanks, reducing habitat fragmentation and vehicle related mortality at highway crossings. Bridge Memo 5 January 2, 2001 If you need further assistance or information on NCWRC concerns regarding bridge replacements, please contact me at (919) 528-9886. Thank you for the opportunity to review and comment on these projects. Ken Burleson, From: "John W Harmon Sr" <jwharmon@duke-energy.com> To: <.kburleson@tgsengineers.com> Sent: Tuesday, December 11, 2001 12:42 PM Subject: Project B-3494 Rockingham County Ken, Belews Lake is not a FERC lake. There will be no FERC permit required. n? a? North Carolina Department of Cultural Resources James B. Hunt, Jr., Governor Betty Ray McCain, Secretary January 8, 2001 MEMORANDUM To: William D. Gilmore, PE, Manager Project Development & Environmental Analysis Branch From. David Brook Deputy State HistoriLPreservation Officer Division of Archives and History William S. Price, Jr., Director t?P Re: Request for Comments for Group = Bridge Replacement, Projects, Replace Bridge No. 55 on SR 1138 over Belews Lake Spillway, B-3694, Rockingham County; ER 01-8190 Thank you for your letter of November 15, 2000, concerning the above project. Historic period archaeological site 31RK42** is located approximately 50 yards south of the existing bridge. We recommend that an archaeological survey be undertaken of the area of potential effect (APE) for this project. If site 31RK42** is to be affected by the bridge replacement, sufficient historical research and testing should be undertaken to determine its eligibility for inclusion in the National Register of Historic Places. We have conducted a search of our files and are aware of no structures of historical or architectural importance located within the planning area. The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106 codified at 36 CFR Part 800. Thank you for your cooperation and consideration. If you have questions concerning the above comment, contact Renee Gledhill-Earley, Environmental Review Coordinator, at 919/733-4763. cc: Thomas Padgett, NCDOT Fecierul.4id =BRZ-113 8(9) TIP =6-369-4 Counrr: Rockingham CUNCURRENCE FORM FOR PROPERTIE'S NOT ELIGIBLE FOR THE' IATIONAL REGISTER OF HISTORIC PLACES Project Description: Replace Bridge No. 5f on SR 1 138 over Belews Lake Soillwav On June 1. 2000. representatives of the North Carolina Department of Transportation (NCDOT) l ?1t/Federal Highway Administration (FHWA) North Carolina State Historic Preservation Office (SHPO) Reviewed the subject project at a scoping meeting Q? photograph review session/consultation other All parties present agreed Lam" there are no properties over fifty years old within the project's area of potential effect. there are no properties less than fifty years old which are considered to meet Criterion Consideration G within the project's area of potential effect. there are properties over fifty years old (list attached) within the project's area of potential effect. but based on the historical information available and the photographs of each propem, properties identified as are considered not eligible for the National Resister and no further evaluation of them is necessary. there are no National Register-listed properties located within the project's area of potential effect. Signed: Moo"A Ct C1 Representative. N OT Date FHWA. for the Division Administrator. or other Federal Agency Date Re sentative. SHP Date State Historic Preservation Officer / Date If -.1 sury;\ report is prepared. a final copy of this form and the attached lis; %N ill he included. ,,. SIATEo- STATE OF NORTH CAROLINA DEPARI'1VIENT OF TRANSPORTATION MICHAEL F. EASLEY GovERNoR 04,719 October 19, 2004 US Army Corps of Engineers Regulatory Branch 6508 Falls of the Neuse Road/ Suite 120 Raleigh, NC 27615 ATTENTION: Mr. John T. Thomas, Jr. NCDOT Coordinator Dear Sir: LYNDO TIPPETT SECRETARY Q?U12oe[9 p OCT z s zoos WATER QUALITY WaDSN S TORMWATFR BRANCH Subject: Nationwide 33 Permit Application for the replacement of Bridge No. 55 over Belews Lake Spillway on SR 1138 (Lindsey Bridge Road), Rockingham County. Federal Aid Project No. BRZ-1138 (9), State Project No. 8.2510801, Division 7, TIP No. B-3694, WBS #33234.1.1. Please find enclosed copies of the project planning report, permit drawings, and '/2 size plans for the above referenced project. The document states that Bridge No. 55 was constructed in 1961 over Belews Lake Spillway and will be replaced on a new location. The new structure will placed approximately 50 feet upstream (south) of the existing structure.. The approach length is approximately 1440 feet total with approximately 970 feet east of the crossing and 470 feet west of the crossing. The new structure will be approximately 167 ft long as shown in the permit drawings. During construction, traffic will be maintained on the existing structure. IMPACTS TO WATERS OF THE UNITED STATES GENERAL DESCRIPTION: This project is located in the Roanoke River Basin within USGS hydrologic unit 03010103 (sub-basin 03-02-01). The proposed bridge replacement is located over Belews Lake Spillway (DWQ Index no. 22-27-(7.5), which has been assigned a Division of Water Quality best usage classification of "WS-IV". PERMANENT IMPACTS: No streams or wetlands will be permanently impacted as a result of this project. MAILING ADDRESS: TELEPHONE: 919-733-3141 LOCATION: NC DEPARTMENT OF TRANSPORTATION FAX: 919-733-9794 TRANSPORTATION BUILDING PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1 SOUTH WILMINGTON STREET 1548 MAIL SERVICE CENTER WESSITE: WWW.NCDOT.ORG RALEIGH NC RALEIGH NC 27699-1548 TEMPORARY IMPACTS: Temporary surface water impacts of 0.02 acre are anticipated due to the construction of two temporary work pads. No temporary wetland impacts are anticipated as a result of this project. BRIDGE DEMOLITION: Bridge No. 55 is a five-span two-lane structure.that consists of pre-cast pre-stressed concrete channels. The end bents and interior bents consist of pre- cast pre-stressed concrete caps and timber piles. Bent #1 consists of a steel cap and pile crutch. The overall length of the structure is 151 feet. The clear roadway width is 24'-1". During removal of the existing bridge, the bridge rails will be removed without dropping them into waters of the United States. It is anticipated that the bridge railings and substructure will be removed without dropping components into Waters of the United States. All guidelines for bridge demolition and removal will be followed in addition to Best Management Practices for the Protection of Surface Waters and BMP's for Bridge Demolition and Removal. This project falls under Case 2 of the Best Management Practices for Bridge Demolition and Removal. Case 2 "allows no work at all in the water during moratorium periods associated with fish migration, spawning, and larval recruitment into nursery areas". The moratorium period is in regards to the healthy sunfish population in Belews Lake and extends from April 1 to May 31. UTILITIES: No impacts to utilities are. anticipated as a result of demolition or construction. MITIGATION The Corps of Engineers has adopted, through the Council on Environmental Quality (CEQ), a wetland mitigation policy that embraces the concept of "no net loss of wetlands" and sequencing. The purpose of this policy is to restore and maintain the chemical, biological, and physical integrity of the Waters of the United States. Mitigation of wetland and surface water impacts has been defined by the CEQ to include: avoiding impacts, minimizing impacts, rectifying impacts, reducing impacts over time and compensating for impacts (40 CFR 1508.20). Executive Order 11990 (Protection of Wetlands) and Department of Transportation Order 5660.1A (Preservation of the Nations Wetlands), emphasize protection of the functions and values provided by wetlands. These directives require that new construction in wetlands be avoided as much as possible and that all practicable measures are taken to minimize or mitigate impacts to wetlands. AVOIDANCE AND MINIMIZATION: The NCDOT is committed to incorporating all reasonable and practicable design features to avoid and minimize jurisdictional impacts, and to provide full compensatory mitigation of all remaining, unavoidable jurisdictional impacts. • No in-water work will be performed from April 1 to May 31. • High Quality Sedimentation and Erosion Control Measures will be used. • No bents will be placed in the stream. • Preformed scour holes will be constructed to diffuse stormwater runoff. COMPENSATORY MITIGATION: The Department has avoided and minimized impacts to jurisdictional resources to the greatest extent possible as described above. There are no permanent impacts from this project to streams or wetlands that require mitigation. FEDERALLY-PROTECTED SPECIES Plants and animals with federal classifications of Endangered, Threatened, Proposed Endangered, and Proposed Threatened are protected under provisions of Section 7 and Section 9 of the Endangered Species Act of 1973, as amended. As of February 25, 2003 the Fish and Wildlife Service (FWS) lists four federally protected species for Rockingham and Stokes County (Table 1). Field surveys were conducted for each species by NCDOT staff. On August 17, 2001 a field survey was conducted for James spinymussel 400 feet downstream to 100 feet upstream from the project site with no specimens observed. On July 17, 2001 (the blooming season lasts from late May to July) a systematic field survey was conducted for smooth coneflower within the power line easement and along the road shoulders (considered suitable habitat). No individuals of any Echinacea species were documented within the study corridor. A field survey was conducted for Schweinitz's sunflower on September 19, 2001. The study corridor contains suitable habitat for Schweinitz's sunflower, but no individuals were observed. A systematic field survey (date unknown) was also conducted along the moist portions of the Piedmont/Mountain Levee Forest, stream banks, and sandbars within the study corridor for Small-anthered bittercress. No specimens were observed during the survey. A biological conclusion of "No Effect" has been rendered for James spinymussel, smooth coneflower, small-anthered bittercress, and Schweinitz's sunflower. Table 1- Federally Protected Species of Rockingham and Stokes County Federal County Biological Common Name Scientific Name Status Conclusion James spinymussel Pleurobema collina E R/S No Effect Smooth coneflower Echinacea laevigata E R No Effect Small-anthered Cardamine micranthera E S No Effect bittercress Schweinitz's sunflower Helianthus schweinitzii E S No Effect REGULATORY APPROVALS It is anticipated that the construction of the temporary work pads will be authorized under Section 404 Nationwide Permit 33 (Temporary Construction Access and Dewatering). We are, therefore, requesting the issuance of a Nationwide Permit 33 authorizing construction of the causeway. We anticipate a 401 General Water Quality Certification number 3366 will apply to this project and will adhere to the general conditions of WQC 3366. In accordance with 15A NCAC 2H .0501(a) we are providing two copies of this application to the North Carolina Department of Environment and Natural Resources, Division of Water Quality, for their records. If you have any questions or need additional information, please contact Jon Scott at (919) 715-1340. Sincerely, ,-. '.?r?eThorpe, Ph.D. . Environmental Management Director, PDEA w/attachment Mr. John Hennessy, Division of Water Quality (2 copies) Mr. Travis Wilson, NCWRC Mr. Gary Jordan, USFWS Dr. David Chang, P.E., Hydraulics Mr. Greg Perfetti, P.E., Structure Design Mr. J. M. Mills, P.E. Mr. Jerry Parker, DEO w/o attachment Mr. Jay Bennett, P.E., Roadway Design Mr. Omar Sultan, Programming and TIP Mr. Art McMillan, P.E., Highway Design Mr. Mark Staley, Roadside Environmental Mr. Elmo Vance, PDEA Engineer Mr. David Franklin, USACE, Wilmington Ms. Beth Harmon, EEP 4 7 NORTH CAROLINA N.C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS ROCKINGHAM COUNTY VICINITY MAP PROJECT: 8.2510801 - B-3694 REPLACE BRIDGE NO. 55 OVER BELEWS LAKE SPILLWAY ON SR 1134 (LINDSEY BRIDGE RD.) SHEET I OF 7 APRIL 2004 1 2 3 4 5 10 MILES r;_ _ ????. ?_? :'? g •x,39 • ' .i 4\. ; ...i 71 er.??s •' .: C? C?\ 138 NO. p 1 :, 7' .7 0 2,000 4.000 6,000 SITE MAP N. C. DEFT. OF TRANSPORTATION DIVISION OF HIGHWAYS ROCKINGHAM COUNTY PROJECT: 82510801 - B-3694 BRIDGE X55 OVER BELEWS LADE SPILLWAY O'l SR 11-' (LI DSEY BRIDGE RD.) SHEET 2 OF 7 APRIL 2004; UN, sff YSS T S TIME Y ssss YYffss&sssssssssOGNssssssssssssssss FW?IGryF E Y f s C too 1. 1 y It O W 'I v o '1 • r ? p 2 T coo sma i ? ? $?N o v ° ' -oD = yy y <T . o ; Nmr npa) O yY ?Sn y a I:o no u 00 +? w a ^ 4 ? G N ? 'L- m: Y mi 1. ? R w i N 4 Z S Mill r a m m ? m a om? Ko an ro ?mr Q ? -1 t 2 oma 4 ZR1 n1 DT?nI CEO Rt?O .0 ?Q) m?? ?rn v `0 I:N ? o rno NmlNN Qu . yZZ4Z C ntmo m IU In m UN? N ? o-m - m c' \B9 9 ?) a .S ry ••I --640 • m ?j ULEWS CHEEK _m r - .. A G - p M I ?? 20+00 ?? ?, I S??N?NO1dIM a? ? ? 5 .13?N5 33. p0+02'olS 1- ^y ? v FI a S. 3 - fro ? o m ? Tm 4? 1.. 0 P. 8W Ai G? 3 O GA fi (rs O 9-• 8/17/99 i ?P I££II£SYS Tit. i O? m m i h rn i sssssssssssss . aaA•o Ov ? ? O N ti s o m ?g o T s ? ? _mo :mm ex .. epr i a'•CD ma oS ? A n0 p 0 0 w w m a ? r) mo m ° n ;mom O ?+ N C J' $upin m o =? s y mo N.. p O g 44? _ I 1 / I / o O rim. O .• ???? k /0i w i pig / z I t o 1I y??j 1 ? J / I goo X i I Q F X H 114 y s nl /st`0b c o m =nN , mps o N m ?nCmo 'O yNll•? mN?-A U-p N o -m m i J ' n Ni r ({ CREEk ?i i s SELENS CREEK ?-•••J Nmr m ?€? - ?o r? mo C Do ?o CIO KO m eCD -f a I: 7 +W sNr ?° X33. 3 s ?N? 143J 2 015 °go m?o ?2m ?2m . :?DC)? (n Ln ?tz?O r?I0 Re DD m ? m a?a A Io ? R SS?? $3Ni 3Im, -? eq' gR ? r o t8 a' n ? m iq 0 a .Q - • t Iw v m N n 0 c O n a o m r L r ` Ss n 5 s ?n wry9y P? T C 9 m i TA? rrr pp> m K y a ? N t?ilO???IrpQ? II M b O M? p M Vl O E?iI O ic-?I 0) I ?lJ1??Z'F ?V I M LI IF N? GR D . • ?QH }Y b z ? a ? z ?? y ? ? IMA 0 ? r? ?a ® ® d a a ? PA4 ?- V_ 3 rml t=4 3 D o; i _ m Z; o n N `. ? o pp j '?O T up S Vl ? v T 3 N Q ? ?p .0 y 0 0 0 3. ° 0 0 Q. 0 o O T 77 ccl 3 m C D ?. O Q O m j' O CL (C C N N <Q W W r vJ _ O X ° C c 3 ?C °o. c n 0- m v •, h H i I a;; T ;?Y ? l I l ICI ? ? ? I ?I y I I I ? i -o -? c o o m a, 3 a, ro 3. 3 3 0 °+ = (0 0 (0 S a r) v 0 Q o 04, •Yt? S? C -+ rt Q G Q' n'" O' n Q 3 7 le C ^ lD Q. a O fOD r1i+]; M 0 (A LA 3 3 0 o m s 9 A s 0 W 0 V w Q ' (D r r 0 00 '00 7O• ' O O CA (A fD <D D d 0 II ? 1 °m m m i ^ 0>01 II, D I I ? i i "''"fffl m v g7 A . -p --0 -w --0 --0 A m ° , d O =r C: ' : f 7C 7r _ N T N N 3 O T A `'O 7 O O A m ' O MMMiii c • '0 i • H ? I I L I. ? ® I I ?n I h I I V1 C -i m -1 -40 N m -I Om t- A -1 -0 N N S A -I '9 'O o to- (D cr a 6 Q o 0 Q Q o_ OT co 0 0 0 o c? . Q -,c g! T r3 =F 'WO N N ID W C -Si lD C_ '00 t0 !D W a 0' Np '? 0 '0 Nr H' () Q -7 S 5-0 ° N 0 1A '? 3 cWD < T co m o c (1 ° 0 > > 3' S. 1. 0 0 N a n 7 7 W 0 7 N O 0 -0 O O N 7 O -N - 0 A -0 0 -« " a 'O O O A (A Z' W D -I ° p OD W OS O C S (7 0- m O 7 y N p p 9 C r- a 0 O p O S 0 lD 0° Q ID °' W Q CD 0. 0 O O_ C 0 m W 0 3 (QD C S y p !D O S D fD C p A o p O_ -y O ° O O° O Q q3 O_ S 0- i O' lD N W I 7 Q N Ip k OW H O N lD Q_ O_ S O_ L a: CIO) m n g n S v 3 Q to O N m tr M. O m `D A N a S Q Q_ m 3: 0 Q I Y if ? I ? II z ®t]D QO?mO®Oo®I EO OO+p®CS _ 0- 0 it f T:? o 3?Wo c T:F Tw TTm Ao A0 -0 9: cc 30 p° Sm n m m m m m° c m Q.C3A rZ,4 C o m e r 0 o ° o o-0 m s°D 3 r- co o lC (a D ` y? 7 0' C 0 3 N 7 0 5i 0 0 7 UGC CL 901 W ?D 0- :z: 0 cr o CL c« a o :2 (L 3+ 3 p °c Q. 0 o W o M. ° W o (D co? C 0 H o C to Q j N• Q. Z o Q N = y m m f o o w I Qi iz To,---G I I I ( I m wm r? ? ? w ?nX W I ( I C I I I I I I IIII II. !I ?? I R v y ;u c: v g v v ?; v v N v N n m fn n n n n O N n a n 7 N n I° ra o m o = N to o m N O a o o _ o to o - a a 'c o o ° a 3 0 ° a a ° a o v Q . Q . Q ? Q /o m CL rt m M CL °- u CL CLI o C °- C CL CL o. (D CL C- ° 0 CD CL - ° 0 CL m CL 3: 0 :R L -4 0 -0 :? CL CA CL n 0 31 cr 0 !D /D - fD O '? H O O 0 ?+ pa O p L. 0 r r r 7 G 0 N O N 1 " (D S CD Q , o .0 ' 0 (D o co W m ? W W V ? ° A m "a s c? c g m o m o o 0 A A a. V o A N A cr °o- m ° o p a in ? C m cn - ° co m W A °-r o C !77 n c a in 0 y C ? 0 O. C C <D ? O C 177 m in C to rn I I ? I I I I O O I < < ? I ' i , ? i ? I I ? ? N ? N ( ? I F e 0 I I I I I I b L? n O Z m Z O Z D r CA 3Z DD 0 r CA 5/28/99 N C Fn 11 N C W N C T A. m r z 0 m m m <? 00 sssss??ssss y r'n rrl ? Sul O r~v CD ?Z: "I o rn O NO rno rn" g 2 m c?$ 2?0 22 W ?(n .l x? OO Oy y --o rd Oa? ?oowoc?L4 m?rt,a o C7 ?`N''?Opm-?2o ?o Az o ern ao(4OdA-0? m-+Q?y? O ? rn rn p` N $ A O Qn, N O ?? ?r4 O y O y b y to 00 GO M W b h 5??t o x o h 0 ?. o ? b b ? X 0 0 M C) co O C4 t O 4 O ? n y I O ?. :am.n? ?r.om w+mv ? `n-ni' • ? :yo-zi m mi m4i ? : g • $ • oa? : ? a ? 9?????: m mSNO nn ( nn pp : p S•Nw : 4 01 w? W N.. ? ll d p,, m ? ? • •• • p Q$ ; D an mVm?(11 ZZZ m b ? ? Ww • dm$2: mmam?? ? tyyy1?? yyYY W U N •? NO i ? ? /yy /y? y N i ? V m: Ta.Omm' ~ ' pp ~ (51 hf lR 11JJ S S ? 11II?? NW mNiq : y N a m Z r z anon ono >o N(-nmw N 0z_-- :S1 WV mm y y n_l O O A z O Z m D? y N A m 0 y c (" ?n Z m A Z a >- c ? N C O z n Z 3. z ( ? n O m Z r0 m a O r o N N .o z u+ i O y ; D A y m z P n z 14 o - >o yo S - m m r ° . O a n i n = , O Z 'D 1 A p m c i mm c Z y m m (? M z n -i ~ O GZ-Ir ?o A n O y L n y A ny O= ?y N O ? O ? n m y n D -i D n ?z m 0 z 0 m r m n y A 0 D K mzrz on ?o mm>o Dar-{ -iON R'0> ram-um Nair r O O Z mM ?0 n? 0z z / o Zco nr y N N l -- -917? A? 0 'y bd W k i z 0 y r s34tss'fIiVVI U GN3S$A$ t$$$ $$$$$ 5/14/99 -I C C x N s Om Z? s O w t7 =c,c?DV Dv ODV A -a- 0 Z / z D D i Q) < a 9 ?DaO 9X ODOO GD'7X -I DG10 ?X 0 N L o m m m o D rn ° y y ii m 10V O M -i M w O V) v„ O w m MO c rAD ND r D D D j? 9 Xr 2-? N m wm-a r M m zma m Z. a a Z. a a n w v ad a y a N?-1 -I m •O -1 9 -1 r rn -+ W D w s Z r <w <w p-1 pa pa ^ -1 N rn OF m 0 z =mc o c v o ` o o w w s v c c x, o zo D OD = w to O aa_m m °s"(aii DH n M w x WO-1 -4 G, G)_M op Zrn n .. N v m F m aS M ax MATCHLINE 1 & 2 i-1N TYP. SECT. NO.1 z mm mi -1 O V' X M Q X C cn z• v L ?N a Z M O N MATCHLINE 2 00 CIO c TYP. SECT. NO.1 00 0 -0 00 CA 00 O ??„ W r? 0 r r rn -+ MATCHLINE 1_ H ZZp A & C 0 40 r n m o s : Q m o o m v SEE INSETS 13 ;a 0 ina _u 0 CA CM) zn -n Ul 14 + m? v zZ'00 CEO to OO rn D D = I N °o G ov Gy TO - r rn CA Q° I 0 0 O 7a N 0 O g Z O z o Q GRADE M ° I Z POINT rlA -? Xr o Z v; No l NZ l? N O rn D I N 3 N I 56 +OC 0+ Q M I ° ? rte' ? C I ? r ? NY v M O MATCHLINE 2 3 I Z SEE INSETS z Z c m >> A, & B ????N 0 *w0 ? 00 A 0 Z c yi•yF-yi•. X M + + oQOOz 0 I O OD 01 ;5,0 Q. Z 7" O OUiOOD ( N V 00 Z1Z?O vOv00 = O ?N L 0o N ? o ?I r-? I r- rn 01 I v m 2 -q ?! N I I? ! x r CA +n y. rn O O. I 0u ? ? "'? r W ?• I ?jr?m v 0% N 93 n m I wtZiCmp -4 z 0+ + OD •I? O •a l OD I °°uam _ o ou r+ 11I + v \ n I v °-m 0 1 _11- M I O X c m• _ o -- MATCHLINE 1 I C N m _ _ TYP. SECT. NO. 1 Z 00' 01 0 a + W + M I ° o ov°v + mbrn z o o C z>i =c x 3C ? N 0 N m N m v N v -? n N n -• m x ? co o uivD? z Dv a V -I?f?D ?D•o vDv 1 D 1 ? r i a x O ° a 0 D 0 O D D O 0 ?D 0 - ? c DV Dv z = Dv ? m mG• va <• mz• AO z- mm. v z. i ; m - i z G . ? D< AD DG z DD O D a m n v •+< D <'o HGD <•o m x v 1 m m m . m zm9 Mr- ma 0 x zzm 9a m za?° MW v H m y ; a x<Dm D• m<mm • m• x<mm m• ? s = r o w -? v am-? •a mW vm a -?aa-i ap m y aa1 aw v 1 c w w x z-°D °nD xw ax zma a_ 'ms g w a zma D_ ma p D m < O w • w O co, w O ' D G a p O -I+ x WV Ax mx Tx 0 •nx c •nx C g r + D + m m a ..? 1 m r r r -? m r w•- -? Ar W-a m r w-•-? r m -i -i m w m wA m CON m m a w0 1• o w0 o O -iro O ro O -iro O ro z in m x z DSO z SO xmz Dw0 mz w0 xmz Dw0 mz 0 w ? cl) O ? T _w w m ? m v ?9m 9 m (7 p ' p 9 ' M. ' m z s w z p -i z w z wc w e Om • m Om • m s m a• ? D T D i • v < <A •< v i c i < c r -? ? o v m o m •0 ' v m m x .+ a s a -? o o - i o .. o a }m m ma a me c mi Di- -9i'm mx m mvi Dm'o < M MO-4 Dm< 0-? ?< • a• N T1 m m T-?fm m °O D O ± f0 t0 -1 T ° T m- • 00 o Dx-?Om • rm D• ? m m z D 9? ? m m w Sg55?SE? N _ O ' O - Z3 0 0 0 0 0 m C_ gam r 1 T n 33 4 1 m 1 1 6 pa m z 10+00 Z G1 r r m z m r O -v m m r 15+00 1 X11 `AZ cy \ \ I o? ?o m $ o 6r :b A p C m H RETA/N/NG WALL z o g z £? 2 ?m o x elp C) 10 T U ` s 0 zr goo ' te = .0 A Z 0 b =?N -? . a o--i Wz Z m z o o z'C LA ocmo C) m ti 40 tt?? C, mrNA MM-4_ o-m W o m 1 kPR-20Q4 15:33 \Specia 0etai1s\er-cward\stds\02'Stds to Special Details\english\42210\0422d10.dgn vc.,rard AT OS212260 Q 2 MM Qow Outlet Pad Q 0 Z Q 0 0 U -Std. Pad Std. Dwg. 816.03 o-"-i Iur Std. DWg. 815.03 U. JON Mz X-4 I" -4 > .. OO5)xz O x -4 cc x -n> n M Wingwall H V? o x Zx ¢ H CO 1- w J z O r c7 -j D o Asphalt Paving LAsphalt Paving Z O N wo Z Bridge Rail Bridge G t Rail t Drain \- 11 M A M `„\ ` End Bent , ` t„• N z % J V: LL C \? Bridge Deck ;; m Approach Slab \''' Limits of x = 0 Reinforced Fill U V 11I r \:, Q > '1 --Bridge -` \V, o ` L :? t Skew \:. N M Angle ? Q Q D Limits of Approach Slab m r Reinforced Fill Bridge Deck- \?': tJ-- % A 1A U3 V % 11 A', H Drain;,\ t \:'. = m O G) End Bent - N -n ` "IA ` Bridge Bridge Rail ? V O \ = x L W m / ZASphalt Paving 7 Asphalt Paving 7 LL. h•? ' f 7 Z' o % „ r „ N r t ---------- W N Wingwall Plan View SHEET 1 OF 4 SHEET 1 OF 4 422D10 422D10 v N-a -" l Asphal Ov y Approach c--1 F-B Bridge Rail "00 C Slab ABC Base F.. Q Q O T _q co r YIN. ' -- Roadway -- -+ ._• r- --- •- -- - • V 0 I T1 Hz-q > - -- -- -- •- - - -- - - XXXX - -- - -- XXXXxXXXI -- -- -- - -- - - U. J a O Z x =T ?m Yazd- Pagoo ' zx?oO -t p0H I .1 o of lamm 3 OC C z-y w n z 1> • r F or = - End Bent Girder F ty?:i °f OF- O fc WO"Q 0 OC D ch C Slope _ Protection Slope Protection Dia._ 4% z d M Z C LrB Perforated Pi e eo O G One Layer Each p (See Inset 'A') Se omembrane (See Inset 'A') Select material of Woven Fabric (See Insets A' and 'B') . M M N x -q SECTION A-A W m -q N 0 N L'o i x m (7 f? 4'_0" Bridge Rail (Typ• Approach Slab ABC Base D? _ ? O V D] o m 1L Q M fY D W x Z m utlet Pad it Slc g• fi 12" (Max . F•2 Win wall SIO -? 0" v N Wingwall 815.013 g e , „ d C7 Q -a v D G) r~ 1 -S (Typ•) W 0 H ?M N M v 4" Dia O L E h S l "' Di a 0 . Corrugated ne ayer ac e ect Material End Bent of Woven Fabric 4 a. Corrugated Perforated Pipe (See Inset Impermeable t - w N o H "? Solid Pipe (See Insets A' and 'B') SECTION B-B asomembrene (See Inset 'A') O = z v z M O 0 Bridge Rail = 00 0) 0 M O Approach Slab ABC Sass ? CO) Lij co z U 1 ?x?=x . W ?cc glo Fjjj SIO Cf) r Fib pe Z W a ' N 1 N One Layer Each Select Material of Woven Fabric Limits of Select Material W Qr (See Insets 'A' and SECTION C-C EET 2 OF 4 422D10 SHEET 2 of 4 422D10 050 9 CO) o X-n- M y " em m a o Z or < m vo ?m " .Q 3M P N r Nv? NfN67 m p ..? O Z is o g R1 m m y mn T ?HfMf! r mmm ? = z N Nv A N ° om-4 V ?~ z A N m a)Z Z? O 4?R--20.14 15:39 \..p6-A, 0etai1s\ericw*rd\stds\02'Stds to Special Details\english\42210\042'2di0.dgn --.'1 ?T nCil77F.A C)m o z 0 -0 C +? Approach B Asphalt Bridge Rail Asphalt co -1 4,.0" ABC Base Slab overlay overlay Q '~ Z YIN. - _ , ?HO0 ' FRoadway-\ C_U - ' HZ-4 > 0023=Z _ rn Select Material °^ A End Bent Cored Slab ,la{tac Q U U z I-0 Or -n Ief en 4%-- Protection Slope of p F ~ u2 O Protection 4" Dia: LL J C7 O One Layer Each = O I-4 a -4 Z of Woven Fabric B Corrugated Impermeable O N ° D }' (See Insets and Perforated Pipe Beomembrane Z 1 } ?4 (See Inset A') (see Inset 'A') HH O j C t z O SECTION A-A y M J = M "f1 N- O 4'-0' Z (Typ Bridge Rail Approach Slab With ¢ _ M Wingwall Asphalt Overlay ABC Base Wingwall LL a ~ O Oy?utdle Pad Drain Y H C5 O :Q D 815.03 - R Zj Sjo e C3 M 1 8' O D Sloe One Layer Each Select Material End Bent 4" Dia. (Typ') O Q DO D w Fill 4" Dia. of Woven Fabric Corrugated Impermeable J {N M r Corrugated (See Insets 'A' and 'B') Perforated Pipe Bermbrane H Solid Pipe SECTION B-B (see Inset A') (See Inset `a') a O ?wF0°I? r?"p> pip LO)?? =mUJ Z 4") Bridge Rail Approach Slab H V a -n With Asphalt Overlay ABC Base J W z v ' FBI sjOpa W {L '?i pill glove 17111-1- M r One Layer Each Select Material LLiYiits of Select = r of Woven Fabric {(? (/? - (See Insets A' and 'B') SECTION C-C SHEET 9 OF4 SHEET S OF 4 422D10 422D10 0 vm h Z ?Oy O 9 r- O --(O Hz?=y ?rn Z2 ZN'a -n G7 p O0 H co H N O z 4'-0" End Bent Weep Hole select Material - - - _ _ - Woven --------^----- Fabric 'Impermeable Type 2 Impermeable Engineering Fabri Beomembrene 4% Slope-? Impermeable 478 Stone Oeomembrane " 4 Dia. Corrugated Perforated Pipe; Sloped to Drain M Cored Slab Bridg g N Showing First Lift and Drains Z . 4'-0" O M rn z Cc Select Material - End Bent Weep Hole _ `-- M -------- 0 8„l' Fa --------------- (n Z O M = ° - bric m m r rnn Type 2 Impe rmeable 0 ..? Engineering Fabric . eeomembrane Ay D O m r 4A1 Slope- -, Impermeable 078 Stone S D O - D Beonembrane 4" Dia.Corrugated P f t d i y ?o 0 N er ora e P pe; Sloped to Drain (a Birder Bri ft D Showing First Lift and Drains Cl) o Inset M r r y End Bent End Bent Require 2 Fabric Layers. Length of Bridge End Bent Inside Wingwalls If Bridge Skew is Less Than or Equal to 90": (Roadway Width + T-0") Sin (Bridge Skew Angle Dis. Between Wingwalls ) If Bridge Skew is Greater Than g0": (Roadway Width + 7'-0") = Dis. Between Wingwalls Cos (Bridge Skew Angle - 9o") Height of Number of Backwall Fabric Layers 41-6" - 51-9" 3 5'-10" - 7'-2" 4 T-3" - 8'-8" 5 B'-9" - 10'-1" 6 10'-2" - 11'-8" 7 Note: Cored Slab Structures z o? as HCCWU O OLY 10 = Z uj LA- I-Vp OO N F- tnF-LL_OJ OaCOCC Z ? CC IL W C3 co J J M LL o v LL z?? QQC.? J LU Z aoa W M 1-- an. LU =mz ? H J ? z? w pC O Z M W W 422D10 mom N oo`-t O " M M oy om m mZ or a?j 00 ? m ca m° 0 z ' m iM o 91 "o w cc>N ccr mmm C ..? io Z NOH ? W N ?a ? AM W ^' m roz 9 SI' Typical Fabric Lift and 111ran Showing Second and Above Lifts Inset `B' -MAY-200 130 \ pedal ete s\er i c ward \stds\02' Stds to Special Details\engl2sh\86202\0862d02.dgn ic.+ard AT DS212260 v vm N ? H' Z NOG. $ "n (A G) x? m =000 zT z ":R as ? N zz BUTTON HEAD BOLT (10" LONG) THRU RAIL AND POST WITH NUT AND $TO. WASHER C m rv rv a N * r W v J r Z o z `so 8'-S" I "W" BEAM RAIL END SECTION ASSEMBLY - PLAN PAY LIMITS BUTTON HEAD BOLT (10" LONG) THRU RAIL AND POST WITH NUT AND ANCHOR PLATE "W" BEAM STD. WASHER i CABLE ASSEMBLY GROUND jg10d 0 0 LEVEL a 1 BREAKAWAY TERMINAL I' 0 POST SLEEVE STEEL TUBE " S I e ' i . , EXTENDS 2 ABOVE GRD. LEVEL SOIL PLATE 1 %'W7 t" BOLTS 1 WITH 2 WASHERS STEEL TUBE OTY . 2 END S ECTION ASSEMB LY - ELEVATION C.A.T.-1 S YSTEM z O o g Q `~ V N ooy=z ILu LL NI=--LLOJW z0?y+LL ?H Wc 0 ac z o ? U. M zg z N 0 N Q N . J O S J O W -v vm O r1 m 0 m z 3 STEEL TUBE z O m , " o m - =Co o - y n z"- n ? o 0 -1? . I N M we BEAM RAIL O Z END SECTION ASSEMBLY - PLAN h"x10" BOLT THRU RAIL AND PAY LIMITS POSTS WITH NUT BUTTON HEAD BOLT (10" ' AND STD. WASHER LONG) THRU RAIL:AND POST WITH NUT AND ° "W" BEAM STD. WASHER 12{" RAIL _ C Z ?, 1 -Q -- o- r -mi 4 / SHORT WOOD BREAKAWAY POST 2 x11 M'1 N DIA BREAKAWAY (SEE SHEET 4 OF 7) . LINE POST 2 ft" § d GROUND DIA. - r,. LEVEL V ' ` 1 Z = m ,11/'' 1' ' o ' 1 i1 ?' STEEL TUBE - I END SECTION ASSEMBLY - ELEVATION HEET 2 OF 7 L _1 862DO2 A.T.-1 SYSTEM 0 of IBC/ ` J' , d BREAKAWAY LINE POST gco aaQa M ? ? v OOyxZ FW Q ? N N z°co ~ N CL o NJ OC Z j F O W J H N C J a¢ (0 Z W 2120 MG7H o h m m 2 o 10 0 mro m . 4 m g ? my m B N ?r to o?l m .A NO ID , J -Y1A1-200 13:3 \ ped etas s\ar:awa?d\stds\02'Stds to Spao,al Details\en913sh\66202\0862d02.dgn ' ,ewa AT D6212260 vm v .o mN° M =1?lj m xTno z,.., 8 r -n N o z O m cI r ?_ N Q r M I!1 r ¦= r N C 00 z 862D02 e v e 8 TE '8' VG' STEEL POST WITH ROUTED OFFSET BLOCK PLAN ISOMETRIC VIEWS ROUTED l 8d IL OFFSET BLOCK B" e I""`I e fl 11 STEEL N e POB DRAIL I all WOOD POST WITH '1W BEAN WOOD OFFSET BLOCK GUARDRAIL I 1 ? 1 ? I 1 ? I 1 I I 1 ? 'W8' STEEL POST WITH 8" WOOD POST WITH ROUTED OFFSET BLOCK WOOD OFFSET BLOCK SIDE I , z 0 WOOD } GUARDRAIL POST ?[ Q WOOD OFFSET N U BLOCK LL J a r Z o Cox OW U. 'W' BEAM 00 GUARDRAIL z ; CL I-I LU° ° I , GUARDRAIL POST 1 , „ I , 1 , I , NOTES: A - Oro" DIA. BUTTON HEAD SPLICE BOLT 114" LONG WITH BID. WASHER UNDER NUT (0 REQ. PER SPLICE JOINT). - e - 4b" DIA. BUTTON HEAD BOLT 71¢"/e" LONG WITH NUT FOR BOLTING 8"/8" ROUTED OFFSET BLOCK TO STEEL POSTS OR 4B" DIA. BUTTON HEAD BOLT 18" LONG.WITH STD. WASHER UNDER NUT FOR BOLTING TO WOOD POSTS (1 REQ. PER LOCATION) C - FIELD PUNCHING OF HOLES INTO GUARDRAIL SHALL BE AS DIRECTED.BY THE ENGINEER. TYPICAL GUARDRAIL AND GUARDRAIL POST ALTERNATIVES ?z 0 OF Zg w J ° co Q J ° x w J W to fl N,Z 21-011 ? ~Q M Imi z x D CENTERED 8 I 8 I S " o p d. = Z s ?..4 U ONO" BIDE U r- L a I u. =0000 I , I Q CD O M -l B• BR BR BR DIA. ; ¦? F " DIA. y O O ? W y? ^ f ( Vi ` 1 . '? i 9"? 8• i I iLb^ aQ f I D o I I ° DIA. 1)6" UJ ---- SOIL PLATE PLAN ¦ 14" THICK PLATE I WOOD OFFSET BLOCK (FOR W000 POSTS) 'Q - l,-Gll x 11-811 ' Q 1 ¦ BOIL PLATE I > iii n z A,, 1A? M R I Q G) 21I4 11 IA. U. of* 11 PIJA BLOT ¦ HOLE8 I E ^ `r 44" DIA. s „+ ELM M F- y N "+ 2% 1? co) 1*r 0 J Z H \ I Lak . " CA I ' s TS S Bx 11 ?? e 1 R i r r B!Ix0.1876,1. !I O N TANDARD SHORT WOOD f ( £ ( H Q LINE POST BREAKAWAY POST Z w z Ilea" DIA. $ZDE FROM FRONT BEARING PLATE ROUTED WOOD 4" THICK PLATE OFFSET BLOCK "W6" STEEL POST SHEET 4 OF 7 882D02 SYSTEM PARTS aHEET 4 OF 7 862DO2 VRB m ?9Z m in r me m ? -n .N{ O N M . r $ m SEE NOTE 'B' e 8 ? e a DOUBLE FACE GUARDRAIL I' I I I I I I I I I I I I I I I I i I I I I I I I I I I I I I i I I I 'I I I i I I I I I I I I I I' I I I I I I I I I I I R I I ,I I I I i I I I I I I I I I I I I I I I I i I. I I I I I I i I i I I DOUBLE FACE GUARDRAIL \Specrel3DAN. is\er 6169660ic"ard\stds\02'Stds to Special Details\englrsh\86202\0862dO2.dgn ?cNard AT v -on w c, rfTliz-I 4 -q D Pr -on m .. Z ap XCAC)o ? N Z I . O m z r0 O t-+ m rM D Nr ? v r N r ?o ~ O O ? Z h" THICK END PLATE 24- WITH DIP. HOLE I ? I CENTERED RED IN PLATE. END PLATE TO BE WELDED I , 70 ANCHOR PLATE. 2" I BREAKAWAY TERMINAL o 0 0 0 POST SLEEVE "'I I O O O O HE N T NUT (8 REQUIRED PER ASSEMBLY) MTHICK HEX HEADBOLT WITH WA8HER UNDER ANCHOR PLATE ASSEMBLY HER " DI A. THREADED ROD DETAIL OF STANDARD WASHER 'f 514" 2%11 STANDARD WASHER: TYPICAL USE UNDER NUT WITH WOOD'POST „ e l40,__;_ _VAR TO DIA. (5x18) SALT. CABLE TO BE SWAGED CONNECTED SWAGED CABLE ilea 116" O -w if DETAIL OF STANDARD HEX BOLT AND NUT '4(e" VAR. ?1fe" I 11411 y ty?rr 0 0 0 0 'rR 34 8° © nR 19ge" ,? - _ o 0 0 " THICK OALV." DIA. HOLES " DIA. x 8TEEL PLATE DEEP RECESS ANCHOR PLATE DETAIL OF BUTTON HEAD BOLT AND NUT CABLE ASSEMBLY SYSTEM PARTS Z O N H 5. QQa LL o o m zz Vw lw H .= Lu 0 4d z W C O mz O o ? zg z ~ J ?a o F- J Z c S J Z W v vm M "' O ?o om?!j z 00 -1 =-ngszm ZN'OCrm A G) • ?yD y ~~ z v c z G) r v? 0 N m r? r v' ~ yo rO o o 7d Z 91/d n ilfe" -? ? 1?err r ?S? ?'; I ?%"xlh" SPLICE. BOLT SLOTS RAD. ° a co 56°\ \ `55' c ? `r N ?(9" RAO. = 55, 44"x211" POST BOLT SLOT ?? ?• \ 55° 26< / II ?f %"xh" SPLICE BOLT SLOTS NEUTRAL AXIS SECTION X-X S" 21_3hr, NEUTRAL AXIS B?rr it 9?n - - - ? - - - 1'LAP r -S" fL POST BOLT SL 2' OT _ g'r 414"414 it 4" All 2" " X rr 41 r; 414 " X 21t" POST BOLT SYSTEM PARTS - GENERAL USE IX m ? to o Vxi 4" POST BOLT SLOT :h "x21-$" TERMINAL END SECTION c? r W--1" DIA. HOLES FOR Yg" DIA. BOLTS TYPICAL END SHOE $w. Q o o o 3m m F- W?-LLoJ O Z a W s C O ?a O O O Q z ...i J H O H N Q J O? x Z w 0 mM" N I,nm m i mra fl1 s o MAT B M I8 m \Spec1a13Details\ericwerd\stds\02'Stds to Special Details\english\86202\0862d02.dgn lcward AT DS188660 G? ?Y DIA. HOLE - O ?oM? OO?ySZ. =g ym LUC¢SILL: Como Z?0r- -n Lu J 1S$ F) Azz 11n PpOi ZOH? U) Z W p O 80 ? ? m Z, e O H cH - N _ z H H G r 2W a% 0 y N?i J Z Z r N 4~ W >a? ? r 911 o H M c = Z = BLOTTED HOLES W G1 J HO N ----- ° X1- " o w 4%" DIA. HOLE Co Z 1L O ELEVATION HEEr 7 OF .1 BUFFERED END SECTION SHEET 7 OF 7 862D02 862DO2 oo g m . m? A N ? ? b 0 N gF? -i N oN m i$ m \Special40e a11?\er,oward\stds\02'Stds to Special Details\engl2sh\86203\0862dO3.dgn w"ard AT [5212260 - 0 01m 1-41-0 ~-?v, Hz-R=D G) m =C70 ="_Op_ t ,1) ?Dy ? H N O Z . n x 0 n m m Z ? C H C) A7 -4 CO) x > C v m m a zzr- ? O ? O "M N z C 0 Z m H X N x r7 C m -1 PLAN VIEW ROUTED OFFSET BLOCK Z H C/3 Ll ?Q --- CD N O 1I1 00nxZ WB X 8.5 = ? = W C LL aVOCOC7 " m N 8 I.3*t _ (f) ? LLO" O Jt" SUPPORT R a TOP OF CULVERT Z -j¢ I. Q W p::ga::.•.n' u $t" OR 1" DIA.'•. o . ELEVATION VIEW W. W eV 1?-2" 2 cc BASE It @ SUPPORT ao T= L ° F O cc LL o t Z 7" 77' Z 40 M O I%" " SLOTS (FOR ADJUSTMENTS) PLAN VIEW 3 C N = 0 v NOTES FOR: Q GUARDRAIL POST ANCHORED TO STRUCTURE: " Q -USE FULL LENGTH 14 BUTT WELDS AT ALL LOCATIONS OF CONTACT BETWEEN THE BASE PLATE, SUPPORT PLATES-AND STEEL POST OR STEEL TUBE. USE POST AND POST BASE P ATES CONFORMING T W C L O THE REQUIREMENTS OF A.S.T.M. A-36 AND GALVANIZED AFTER FABRICATION TO CONFORM TO A.S.T.M. A-123. -USE WOOD POSTS WHICH FIT SNUGLY IN THE STEEL TIME WITH A MAXIMUM OF L " CLEARANCE BETWEEN TUBE WALL AND POST W O Ix . $ . Q NEW STRUCTURES: -ATTACH POST TO INSERT ASSEMBLY UNITS (USING ANCHOR BOLTS SUPPLIED WITH INSERTS) WHICH HAVE BEEN CAST INTO THE STRUCTURE DURING CONSTRUCTION. CO EXISTING STRUCTURES: z C -USE CONCRETE ANCHORS CONSISTING OF A STUD BOLT WITH NUT AND WASHER. USE STUDS THREADED ON ONE END AND HAVING AN EXPANDED WEDGE ASSEMBLY POSITIONED " " LL AROUND A TAPERED AREA AT THE OTHER END. USE ANCHORS WHICH PROVIDE A MINIMUM SAFE HOLDING POWER OF 2875 LBS. FOR A % OR 1 DIAMETER BOLT. CALCULATE HOLDING POWER BASED ON 1 THE ACT C LU N 4 UAL HOLDING POWER OF THE AN HOR IN 3500 PSI CONCRETE AS DETERMINED BY AN APPROVED COMMERCIAL TESTING LABORATORY. ? -USE ANCHORS GALVANIZED IN ACCORDANCE WITH A.S.T.M. A-153. SIZE HOLES FOR THE CONCRETE ANCHORS IN ACCORDANCE WITH THE ANCHOR 9 MANUFACTURER'S RECOMMENDATIONS. DRILL HOLES WITH A CARBIDE OR DIAMOND TIPPED NA$ONRY BIT POWERED BY A ROTARY OR ROTARY IMPACT DRILL. O NO OTHER IMPACT TOOLS WILL BE PERMITTED. DRILL HOLES VERTICALLY. FURNISH DOCUMENTATION OF HOLE SIZE RECOMMENDED FOR THE SPECIFIED ANCHOR TO THE ENGINEER x BEFORE DRILLING-HOLES. THOROUGHLY CLEAN HOLES FOR ANCHORS OF ALL CONCRETE CHIPS, DUST, GREASE, OIL, ETC. BEFORE ANCHORS ARE INSTALLED. REPAIR ALL DAMAGE CAUSED BY THIS WORK TO THE SATISFACTION OF THE ENGINEER. a ANCHORAGE FOR GUARDRAIL POST ON BOX CULVERT 862DO3 N Ow --I N ' ZO N T 9 PAY LIMITS STD. 61-3" SPACING TH9RIE BEAM GUARDRAIL 'NESTED' WTR SECTION H Q Q r 0 0-4 M (ONE RAIL INSIDE ANOTHER) - - cc LL J IL 1-4 z 00 = 00 n? ?? _______ 1 2 3 4 5 .6 7 8 gy O LL- E = tAwC Z ? --------- m ?VO C 7 R H p01rt - - _ - - - - _ - 1' ? - - - - - - - - V)11--LL9J 0 cog N O Z FINISH , GHADE ML D FILL FACE G APPROACH SLAB 8" x 4" LIP APPROACH SLAB CURB E VARIES) (SEE STRUCTURE PLANS) . ELEVATION NOTE: ":POST NOT REWIRED FOR SKEW ANGLES GREATER THAN 160° OR LESS THAW 30- UNLESS OTHERWISE DIRECTED BY THE ENGINEER.' O "THE DISTANCE FROM END OF BRIDGE RAIL TO CENTER LINE OF THE FIRST POST SHOULD BE 11%' IF CONCRETE BACKWALL IS NOT PRESENT: -SHOULDER OEM SUTTER MUS B HI R"N x N= N T E INSTALLED WITHIN THE PAY LIMITS IF THE ANCHOR UNIT I8 NOT ADJACENT TO AN APPROACH SLAB. -MEASURE GUARDRAIL HEIGHT FROM THE TOP OF ADJACENT SURFACE (SHWLDER BERN OR GUTTER) H p , , . -USE NO STEEL POSTS WITHIN THE GUARDRAIL ANCHOR UNIT LIMITS. C M"R U7 -LAP JOINTS IN TIRE DIRECTION OF TRAFFIC FLOW: O W OC C T -SEE SHEET 4 FOR POST SECTIO+S t THRIU 9. V- ~ d m xr Cn O ?Z 3 z C x Z ? C3 VAR. NAx . 1'-8 ') 1-1 0 'cc ? 0 m x D VERTICAL PLANE AT THE ATTAOBENi VAR SPAC 8 9 SPACES @ 9'-1Y$" STD. 8'-3" SPACING PO Ni FOR END SHOE ANCHOUIGE, ' " ) C H U O N * -H( SEE STRUCTURE PLANS @ 1 ------------ ----'-'BIKMII.OER BIIEAK POINT_-`------------------ BRIDGE END POST '- -- " " J Z C )"' U"t C C 17 ' 1 ; 8 x 4 LIP CUB GUARDRAIL POST Q O Z f" +; (SEE STR E PLANS H m F, - = ------?__ r - - - -Tr ---- ---- --'--"_--"--- G C ?W z -1 C I BRIO RAIL 10 GA ; i1 2 3 4 5 8 7 8 9 y J= C? -G Z p END SHOE?? THRIE BEAM INSTALL 'Wf BEAM Ol1ARDRAIL GuARORnIL P s N = F m Q v N N WTR SECTION EU( J INT d i W ?. H "a m H ' - BRIDGE DECK ' - , APROlU01 SLAB (LENGTH VARIES) O LL PLAN VIEW MEET 2 OF 4 GUARDRAIL ANCHOR UNIT, TYPE III FOR ATTACHMENT TO RAIL ON BRIDGE SHEET 2 OF 4 862D03 862DO3 naca m° o" y X"n" m -? m m °G m F"a mZ .. m ? N m p p ffMf T N m i ii t O Z o m om s "n "a144 m 62 D M-M N mmm ?1-C Z p ° R °m-`4 . aw N O O • f?/ ,I I I I I I I I I I I I I I I I I I I I I 1 I I I I I I I I I I I I I I I I I I I I I ' t I I I 1 I O 1Lb" x 1%" SL0T9 2 c " '- ° " SUPPORT ' PLATE "BASE T " "x .1 75" PLATE STEEL TUBE 1 A N M ?p z a R-2004 15:48?55 b earl eto6 ,,\Y 60ard\3tds\02'Stds to Special Detetls\englt5h\86203\0862dO3.dgn tc AT v om N ", NE O ?"llm rmiz -I=D sTnm =woo ?,mmM"M1 ? H O Z O m 4 C: >w-1 Z 3aC r Z?0 CO) -? c = C3 o=m v H r r- z= v ? Z " D '?O C G) Z m m D ?O iHy H Cl) E BRIDGE RAIL TRANSITION - PAY LIMITS BRIDGE RAIL, SEE STRUCTURE PLANS THRIE BEAM OUARORAIL 'NESTED' WTR SECTION ,_ xe. (ONE RAIL INSIDE ANOTHER) ----- --------- -----u------_i------------ ---- 1 2 3 4 5 8 7 S -----'---------------- IL------ --- ---------------------- }?- - i . BRIDGE DECK ........ - . ' ' ' T . a . . - .? P U CONCRET BACKMALL FILL FACE (LENGTH VARIES) B" x 4" LIP CURB (SEE S MINIMUM LENGTHAPPROACH SLAB €LEVATION NOTE: **POST NOT REQUIRED FOR SKEW MOLES GREATER THAN 150' OR LESS THAN 30' UNLESS OTHERWISE DIRECTED BY THE ENGINEER. -MEASURE GUARDRAIL HEIGHT FROM THE TOP OF ADJACENT SURFACE (SHOULDER, BERN, OR GUTTER). -USE NO STEEL POSTS WITHIN THE GUARDRAIL ANCHOR UNIT LIMITS. -LAP JOINT'S IN THE DIRECTION OF TRAFFIC. FLOW. -SEE SHEET 4 FOR POST SECTIONS 1 THRU 9. f ----- i 1 ---------------------- - - - - - - - - - - - - - - - - - - - ---- - ---- - ---- - --_t ___rfca....:e:.. --- ---------------------- ------ ' 11 " E! x BRI09? u , N ; u ? Nu _ !! _ . EXP. JOINT i SHOUJ.DEH BilEM POINT --- -- -- - ------- -------- ---------------- rEE;RUCTURE LI CU PNS) - - - - - - - - - - - - - 1 2 3 4 6 "G7 S I9 APPROACH SLAB 1 PLAN VIE>r GUARDRAIL ANCHOR UNIT, TYPE III FOR ATTACHMENT TO RAIL ON APPROACH SLAB z 00 N } Qa CD 00 a. = Z H o o co H i5 = F v 1- u_ q Wj O Z > a N W o O m g Co H OHa U. Z wILDOc Z?Q =z° O V OJ N J In c1c CO ? M W ? Lry ' S wNQ0 ?a LL v vm w? ?N• o .-BEAM H -I D =tz _=OT Dm / ao N Z?=y?o'TI Bn - gDo" mm .: .. O ?. I r r I AMIn CH SLAB Z I hh\ I} ? 'a I C > Co --1 Z SECTION OF THRIE BEAN C 0 POSTS 1 THRU 6 r = s omm ? D ?Zr- C = ch -HI 9 g H „ Co CY ?z? _ m M C m ? N N m N H - THRIE-BEAM SECTION It 8n r all m APPROACH SLAB II _ II _ II _ IJ SECTION OF THRIE SECTION OF WTR SECTION OF 'W' BEAN POST 7 BEAM POST 8 BEAM POST 9 END SHOE NOTE: THE MID POST AND OFFSET BLOCK OF THE WTR SECTION WILL REQUIRE SPECIAL BOLT HOLE DRILLING IN THE THRIE BEAM OFFSET BLOCK AND LINE POST. ' 12n WTR SECTION ELEVATION VIEW 61P at', DIA. THRIE BEAM OFFSET BLOCK 6e Bn r?I n ----- w ? \1 z 00 H } Q Hood ooa)=z Z Pa 0C=.y )- H ?Q1iHJ O °z WW0 c H U. F? a z 0 )- v O J Z a _ O Q U oHH J C z w o N Q C7 mo -1 0-0 m 7l R7 N ~ ooh m m `!?< -o m. m o ao IF mmm s N V q AN m C Z N IM U l C? ? Q 0 w ? ? Z o m ? Q 00 t?i? ? fill y 0 ?i ? g O? ? m y'? T m >a dbWW?7?? 7°i5 t? 2A A ? y. 2 2 b ° °° °° I .?? .br7or7y p ? m ?Nf pQtl?y1 HHHHH A o? O pQ N{? y r9 a V O c mo a? MW tom cy P? i p y ,? H d s m m C7 Fri ['3? m m? O m ? ? O O Qo m M 4 1Q 1 Imz91M in - o r ra ?i A A ? ? ? n 0? 9?b J 10 Glm? V 00 b .7p ?. ?G ?t b °x N.. ? r? In Rf + y? O A ? Z [L'r+J ? H H m •i O m `? c m v m `? • m O . m O z to p o a O ? c ? ? O S C) '? Z ? m Z ? o Z m? n m m ? tll U? O -1 v m 4 c T R' Z Z O° Hi ? m ? o ? ? N p N q) Q m m r 2 Z $ ? C A W W A N r M C O a w OD w O N D V -- '? + p? O O tl? OD V t? W to A ? .O m i l ' 0 6 pp .?, N N Q-p pp. ? V ?. N w? W m b4 p 2 O 3 mm i q y 21 21 21 LOCATION (LT, RT, OR CL)' 0 m v m m -1 -1 1 - A w w N N FROM STRUCTURE NO TO . TOP ELEVATION INVERT ELEVATION ffi?' $e 53 N INVERT ELEVATION SLOPE CRITICAL K $ o g 0 ?3 0 9 5pp ? b p ? y Ol G W O I? C t y 6 ? 0 .01 .664 y AN ? .084 ? .0T9 ? ? g .078 .106 t m i .109 y 1S' SIDE DRAIN PIPE 0 18" SIDE DRAINPIPE 24" SIDE DRAIN PIPE R.C.P. o M a C.S.P. oo ° PER EACH (0' THRU 5.0, OUANITIES FORDRAH4AGE r •v, H F? y 9.0 THRU 10.0 s + STRUCTURES 4TOTAL LF FOR PAY ta! W 10A' AND ABOVE a . QUANTITY SHALL BE COL W+(1.3xCOLE) O C.B. STD. 840.01 OR BID. 640.02 r y y ° MDJ. TYPE "B" STD. 840.18 OR 64027 ? M.DJ.FRAMEWITHTWOORATESSTD.84022 O yyy ? • M.DJ. FWIME wm rw0 (NS.) FLAT ORATm sm.84029 ? -" M.DJ. FRAME WITH TWO (N.S.) BAG ORATES STD. 840.24 I? O TRAFFIC BEAM J.B. STD. 840.34 . M V/ ?D 1 .9 N g N CORR. STEEL ELBOWS NO. S, SIZE CONC. COLLARS Cl- "e" C.Y. STD. 840.72 11,111 millN 'O BS S S3ffi ?ffi?S?DGNS$$S$ $SS 6/14/99 ? C1? m ;a g 'DID 10z£ H ??rC m ?ocmo ?pN i Z mrNam m i ? I zz ? ? i 0 rn r O rn Z O c rn O ? O v ? rn ? rn Z m G? Z n rn O Z m ? REVISIONS BSSES?SS$S?bsaSR Tr D Nm? oV + ?y < CL L rn ROA a H x 1 1 ?tl o AN 0 0 o = _mo m :=1?11 ? .oD ° v °pr m 3 o a.n x? a oo ? ? n u . r D n m I ??v + ? S- n EIH ' .,,r- 0 a mm" o c-'i ? + •y -1 _ my N r + 0 o o a Alai L z 1"12 f .? i 1 1 i 1 i i ? 1 i i a 0 ? 1 I o" I ?. H N O I SID m? 'Tit o is m OF , y H p mbG ?i i ~ y m Kp o m m rni? I ? p? x oz z K Lo a O n ?r 4 t?tfi I 0 j / ,? ,!? r ,? may. g y? va °ms N Of+ E r a ` z?m0 ?'?N wo j ??m m o, ? + p m D N ? NN m? + o -` 000 L M rI P O Da O N 1' O G O ? T - - + 4 M - orr'n ?m rn Nc? Cc ? ? m ?n m n ? I'll py ?O rTl O-b ? rri ?0 CO j $O ?O :z g ? cgs cj :r G) 6 z? ? rn cn ?o I 1 o tI '' G * I? i 0 2 41 m °S I r ?•.... \ C Obi v A f?FY/3 CgFeK JOt P moo ?. R? 9- i A? O m £ A v o I? i0.00 0 Z ? I > wl I m ??? ?'IW _I•LU101.. -In A ?qp ?° I OI `2 ?'gl I I z? 35 3N?NOldW a? ?T 9 ?3NS 3 004-OZ PIS II BEIEWS CREEK 201.00 = 8 ? -ZC °n ono m -i C m ?o.Tmmrrnc ? Ho $o rt ? BI t?ir ? ?l = N ` 0 m 1-6 g 8.N g8° 0 ? a ? S ? A m r- F r- 3 § _ ?*1 N ? . O A S u Z .ZCI Q m r l t F"I°p ?s D s mmm gg lo N r m .- n Om R r r rrr Sr v i sy< d++Qi°+° oA M CJ ONO T 000) ? 9 r A' O - -1 ? • -1 1 g $ <O y N .. 0 -C x mm o p m mmm TAm m`?coO mom NSA TD C- Rnllnu`un? O 0- r y y .-- HNco e3 GR?O X0 IO D A w= ?N m? mw o- 0 T i< 00 0 N g z ? N m z o o 0 xaaassaaaaaaaa o nQji OZ x Q CS rn O? Frizt I O M fn CZ Q C ?a go o rnzo 0 cn N c zo 6 op I 2a+00 REVISIONS Il 11 p 11 11 11 11 U 9 ? xo? i ?i> c wOEM ON Z H-m ma m u -1-p m 14 o - m i S? g iK o z z a z O z z = Ul U1 0 A?Es:?E O N r W r A r a V -il w N O N r rn? i t em y Z C 2 ti 10 O mv? co, L , rn gym ?I ? , R'? o Im ° mm 2 i ?rn rn A I 0 rDI 2 rn rn 2 G1 x0U { (>c wocmz 0 z I.4,4AM wNA W M o-m m I 0 ro ?? P S1 z< I C, zr, Z a y m p ?ro ?o z a = zz 0 N N N N N N N N N N I N N N N -? -? - + ? ? ? ? V + V + O) + W + N r + r + A + A + + W I + J ! + J + ? + y + ? O f + 0 t + 0 + GO + (? W + W. + Q + N + A + A + W + W + N + 1 .. m i tl1 0 O 0 f,1f 0 O 0 OI 0 O X 0 71 o S 0 0 O < 0 71 0 O o CA Q O o W 0 O 0 W 0 O 0 w o O? r ¢ l T o O 0 U1 0 O 0 fT 0 O 0 f71 0 Q C 0 " o r 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ' c o g 0 0 0 0 0 0 0 ' ! S S S S S S S S S S S S S S S S S S S 00 00 0 QO S QO Qo Qo Q0 °_ 0 ?n c Z ! f0 N A A N A W J A rn O m /N0 v cn m $ J V V W V N f0 N O O M O O N V V W A W O N O? O O Q If C r I m fO m y co G N A W 6D W + A J . J ta N O CA N O V N IM V V 07 it O O ? O I ? z ° m 10 7 I I i a? a y Co Q I Z CO I i I ! I I I i I I ! I i I P ? i o I i k i ? j i 3 0 I I? i .i r ' fM. . III{I? xl Y .N Rockingham County Bridge No. 55 on SR 1138 (Lindsey Bridge Road) over Belews Lake Spillway Federal Aid Project No. BRZ-1138 (9) State Project No. 8.2510801 T.I.P. No. B-3694 CATEGORICAL EXCLUSION UNITED STATES DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION AND NORTH CAROLINA DEPARTMENT OF TRANSPORTATION APPROVED: DA Th PhD Env y 2s/73 DATE Gregory J. rpe, uonmental management vzector Project Development and Environmental Analysis Branch, NCDOT n Donald J. Voelker Acting Division Administrator, FHWA Y ~ Rockingham County Bridge No. 55 on SR 1138 (Lindsey Bridge Road) over Belews Lake Spillway Federal Aid Project No. BRZ-1138 (9) State Project No. 8.2510801 - T.I.P. No. B-36.94 CATEGORICAL EXCLUSION April 2003 Documentation Prepared by: TGS Engineers '??1999?8tL'Sq"9rpi:. as 3•,?JAj??°' ^? ?' ?7. K eth Burleson, Ft 1 032 b . w • ° ? Date s Project Manager L q ? ; v For the North Carolina Department of Transportation Project Development and Environmental Analysis Branch Elmo E. Vance Project Manager Consultant Engineering Unit SUMMARY OF ENVIRONMENTAL COM[M TMENTS Rockingham County Bridge No. 55 on SR 1138 (Lindsey Bridge Road) over Belews Lake Spillway Federal Aid Project No. BRZ-1138 (9) State Project No. 8.2510801 T.I.P. No. B-3604 If the implementation of this project involves a disturbance to the waters of Belews Lake Spillway, a Nationwide Section 404 permit and a Section 401 Water Quality permit will be required. If so, any foreseen secondary impacts to water resources from soil disturbance on any downstream systems can be minimized by.the-use of best management practices. No long term impacts are expected as a result of the proposed project. It is concluded that no serious adverse environmental effects will result from implementation of the project. Division 7: A. No in-water work will be performed from April 1 to May 31. High Quality Sedimentation. and Erosion Control Measures will be used. B. A FERC permit is. not required. NCDOT will coordinate with Duke Power Company to .: avoid impacts to their operations at the Belews Lake facility. Categorical Exclusion - Green Sheet April 2003 i Rockingham County Bridge No. 55 on SR 1138 (Lindsey Bridge Road) over Belews Lake Spillway Federal Aid Project No. BRZ-1138 (9) State Project No. 8.2510801 T.I.P. No. B-3694 INTRODUCTION: Rockingham County Bridge No. 55 is included in the 2002-2008 North Carolina Department of Transportation (NCDOT) Transportation Improvement Program (TIP) and in the Federal-Aid Bridge Replacement Program. The location is shown in Figure 1. No substantial environmental impacts are anticipated. The project is classified as a Federal "Categorical Exclusion". I. PURPOSE AND NEED STATEMENT NCDOT Bridge Maintenance Unit records indicate the bridge has a sufficiency rating of 13.4 out of a possible 100 for anew structure. The bridge is considered functionally obsolete. The replacement of this inadequate structure will result in safer and more efficient traffic operations. II. EXISTING CONDITIONS The project is located in the western part of Rockingham County just 0.2 miles (322 meters) east of the Stokes County line (see Figure 1). SR 1138 (Lindsey Bridge Road) is classified as a rural minor collector in the Statewide Functional Classification System. SR 1138 becomes SR 1903 when it enters Stokes County. The primary land use along SR 1138 is agricultural mixed with light residential development (see Figure 2). SR 1138 is undeveloped in the vicinity of Bridge No. 55 and there are currently no major generators of traffic located within the project area. The property adjacent to SR 1138 is owned by Duke Power as part of the Belews Lake reservoir. According to Duke Power officials, Belews Lake is not an FERC (Federal Energy Regulatory Commission) lake (see Appendix). There are currently no plans for proposed development of the area on. file with the Rockingham County Planning Department. This area is zoned RA (Residential Agricultural). Rockingham County Bridge No.. 55 is a five-span two-.lane structure that consists of precast prestressed concrete channels. The end bents and interior bents consist of precast prestressed concrete caps and timber piles. Bent No.1 consists of a steel cap and pile crutch. The existing bridge (see Figure 3) was constructed in 1961 and is in poor condition. The overall length of the structure is 151 feet (46 meters). The clear roadway width is 24.1 feet (7.3 meters). There are no sidewalks on the bridge. The posted weight limit on this bridge is 21 tons for single vehicles and 24 tons for TTST's. This section of SR 1138 is not a part of a designated bicycle route nor is it listed in the TIP as needing incidental bicycle accommodations. Alternative 1 involves replacement of the structure along the existing alignment and provides a temporary on-site detour to maintain traffic during the construction period. The new approaches would be approximately 700-feet (213 meters) long. The design speed of this alignment is 45 miles (72 kilometers) per hour. This alternative is not recommended because the estimated cost is higher and the design speed is lower than the preferred alternative. Alternative 2 (Preferred) involves replacement of the structure on a new alignment approximately 50 feet (15.2 meters) upstream (south) of the existing structure (see Figure 2). The approach length is approximately 1440-feet (439 meters) total with approximately 970 feet (296 meters) east of the crossing and 470 feet (143 meters) west of the crossing. The two-lane shoulder section will have a design speed of 50 miles (80 kilometers) per hour. The existing structure and approaches will serve to maintain traffic during the construction period. C. Alternatives Eliminated from Further Study Alternative 3 involves replacement of the structure on a new alignment downstream (north) of the existing structure. This alternative was eliminated from further study when it was determined that over 1800 feet of approach length would be needed to provide a less than desirable 45 miles (72 kilometers) per hour design speed. This alternative would also involve extensive encroachment on the existing floodplain north of the existing crossing. Alternative 4 is similar to Alternative 1 replacing the structure along the existing alignment but using an off-site detour along existing routes to maintain traffic during the construction period. The best available off-site detour route follows' SR 1138 northeastward to SR 1194 which connects to US 31.1 then follows US 311 southwestward to SR 1908 in Stokes County. The route continues south on SR 1908 to SR 1903 which becomes SRI 13 8 at the Rockingham County line just west of the subject crossing. The total length of this detour route : is over 12 miles and is considered inadequate for the fire and rescue services in the area as well as the 1400 vehicles currently using the crossing daily. This alternative was eliminated due to the lack, of an adequate detour route for emergency services. The "Do-Nothing" or "No-Build" alternative will eventually necessitate closure of the bridge. Closure of SR 1138 is not desirable due to the lack of an acceptable offsite detour for emergency services. "Rehabilitation" of the existing bridge Is not feasible due to its age and deteriorated condition. VI. NATURAL RESOURCES A review of the project has-been undertaken to evaluate natural resource features likely to be affected by the project. Materials and research data in support of this investigation have been derived froma number of sources including applicable U. S. Geological Survey (USGS) topographic mapping (Belews Lake, NC 7.5 minute quadrangle, 1994), and U.S. Fish and Wildlife Service (FWS) National Wetlands Inventory (NWI) mapping. A. Methodology A natural resources.field investigation was conducted on April 11, 2001. During the site visit, a study corridor was walked and visually investigated for significant features. For purposes of the field investigation and to assure proper area coverage of both alternatives, the study corridor was assumed to be approximately 850 feet (259 meters) in length (approximately 425 feet [129.5 meters] from the bridge to each end), with a width extending approximately 200 feet (61 meters) south of the SR 1138 centerline and 100 f e e t (30.5 meters) north ofthe S R I 138 centerline. Plant community impact calculations provided in this report are based on individual corridors centered on each of the two alternatives (Figure 2). Actual impacts will be limited to within construction boundaries and are expected to be less than those shown here for alternative corridors. Special concerns evaluated in the field include 1) potential habitat for protected species and 2) wetlands and water quality protection in Belews Lake Spillway. The study corridor is located approximately 1.25 miles (2.0 kilometers) east of the town of Pine Hall, NC and 5.5 miles (8:8 kilometers) southwest of Madison, NC (Figure 1). The bridge is located along SR 1138 (Lindsey Bridge Road) at Belews Lake Spillway in Rockingham County. The study corridor includes the channel and floodplain adjacent to Belews Lake Spillway. Belews Lake Spillway flows from the Belews Lake Dam, continues north, joins an unnamed tributary, and flows under Bridge No. 55. The stream continues north and joins the Dan River approximately 0.4 mile (0.6 kilometer) to the north. Plant community descriptions are based on a classification system utilized by North Carolina Natural Heritage Program (NHP) (Schafale and Weakley 1990). When appropriate, community classifications were modified to better reflect field observations. Vascular plant names follow nomenclature found in Radford et al. (1968), with adjustments made to reflect more current nomenclature. Jurisdictional areas were evaluated using the three-parameter approach following U. S. Army Corps of Engineers (COE) delineation guidelines (DOA 1987). Jurisdictional areas were characterized according to a classification scheme established by Cowardin et al. (1979). Habitat used by terrestrial wildlife and aquatic organisms, as well as expected population distributions, were determined through field observations, 5 rocks. These soils are in hilly areas on relatively narrow, gently sloping ridge tops and moderately steep side slopes. Slopes range from 2 to 30 percent. The Wickham series consists of deep, well drained, moderately permeable soils that formed in old alluvium. These soils are on narrow, slightly elevated stream terraces. Slopes range from 1 to 4 percent. Of the predominant soil map units in the study corridor, the Natural Resources Conservation Service lists only the Chewacla series as having hydric inclusions (USDA 1997); The Chewacla series has hydric soil inclusions of Wedhadkee soils in depressions. These hydric soil inclusions are saturated or flooded for very long to substantial periods during the growing season, and support woody vegetation under natural conditions. C. Water Resources 1. Waters Impacted . . The study corridor is located within sub-basin 03-02-01 (upper reach of the North Carolina portion of the Dan River and tributaries) of the Roanoke River Basin (DWQ 1996b). This area is part of USGS accounting unit 03010103 of the South Atlantic-Gulf Coast Region. The section of Belews Lake Spillway crossed bythe project bridge has been assigned Stream Index Number 22-27-(7) by the N.C. Division of Water Quality (DWQ 1996a). 2. Stream Characteristics Belews Lake Spillway (Belews Creek) discharges from the Belews Lake Reservoir approximately 1800 feet (549 meters) upstream of Bridge No. 55. Within the study corridor, the channel of Belews Lake Spillway is highly scoured and composed of an unconsolidated, boulder and gravel substrate. The stream is moderately broad and deep, highly entrenched, exhibiting poor sinuosity, and a poor riffle-and-pool sequence. Width of the stream is approximately 35 feet (10.7 meters) at the point of the bridge crossing. Bridge height above the stream bed is approximately 31 feet (9.4 meters). During the field visit, water depths along the study corridor varied from 1 to 3 feet (0.3 to 0.9 meter), permitting sparsely distributed vegetation to cling to debris pile within the stream channel. Persistent emergent aquatic vegetation was not observed, however high amounts of filamentous algae was present in some of the slower-flowing reaches of the stream. The stream banks are composed of a silty loam textured soil. Evidence of burrowing mammals was observed along the streambanks 5 to 10 feet (1.5 to 3.0 meters) above the water surface. 7 with sedimentation and erosion the most widespread problem throughout Rockingham County (DWQ 1996b). 3. Anticipated Impacts Bothproject alternatives include complete bridging ofBelews Lake Spillway to maintain the current water quality, aquatic habitat, and flow regime. Alternative 1 involves replacement of the structure along the existing alignment, with a temporary on-site detour provided to maintain traffic during the construction period. The detour structure would be located approximately 45 feet (13.7 meters) to the south (upstream) of the existing structure. Alternative 2 involves replacement of the existing structure on a new alignment approximately 50 feet (15.2 meters) upstream (south). The existing structure and approaches will serve to maintain traffic during the construction period. Temporary construction impacts due to erosion and sedimentation will be minimized through implementation of a stringent erosion control schedule and the use of best management practices. The contractor will. follow contract specifications pertaining to erosion control measures as outlined in 23 CFR 650 Subpart B and Article 107-13 entitled "Control of Erosion, Siltation, and Pollution" (NCDOT, Specifications for Roads and Structures). These measures include the use of dikes, berms, silt .basins; and other containment measures to control runoff, elimination of construction staging areas in floodplains and adjacent to waterways; re- seeding of herbaceous cover on disturbed sites; management of chemicals (herbicides, pesticides, de-icing compounds) with potential negative impacts on water quality; and avoidance of direct discharges into streams by catch basins and roadside vegetation. Each of the two alternatives will allow for continuation of pre-project stream flows in Belews Lake Spillway, thereby protecting the integrity of this waterway. Long-term impacts resulting from construction are expected to be negligible. In order to minimize impacts to water.resources, NCDOT's Best Management Practices (BMPs) for the Protection of Surface Waters will be strictly enforced.during the entire life of the project. During removal of the existing bridge, the bridge rails will be removed without dropping them into waters of the United States. There is potential for components of the deck and interior bents to be dropped into waters of the United States, resulting in a temporary fill of approximately 100.84 cubic yards (77.1 cubic meters). NCDOT's BMPs for Bridge Demolition and Removal must be applied for the removal of this bridge. 9 species. The herbaceous layer includes Christmas fern (Polystichum acrostichoides) and running cedar (Lycopodium clavatum). 2. Roadside/Disturbed Land - Roadside/disturbed land occurs along the right- of-way of SR 1138, and along a power line easement bisecting the southeast quadrant of each study corridor. The roadside margin is approximately 10 feet (3.0 meters) wide, and the power line right-of-way is approximately 50 feet (15.2 meters) wide. This community is periodically mowed and primarily supports herbaceous species. Common species on roadsides are fescue (Festuca sp.), chickweed (Stellaria sp.), clover (Trifolium sp.), mayapple (Podophyllum peltatum), Carolina cranesbill (Ranunculus carolina), Queen Anne's lace (Daucus carota), and violets (Viola spp.). Within the power line right-of-way, volunteer species include blackberry (Rubus argutus), tulip poplar, goldenrod (Solidago sp.), honeysuckle, and giant cane (Arundinaria gigantea). Plant Community Impacts Plant community impacts are estimated based on the amount of each plant community present within alternative corridors (Figure 2). Alternate 1 involves replacement of the structure along the existing location with a temporary on-site detour. Alternate 2 involves replacement of the structure on a new alignment with the existing structure and approaches serving to maintain traffic during the construction period. A summary of plant community impacts for each alternative is presented in the following table. Plant Community Areas. Plant community areas are given in acres, with hectares in Alternative 1 Plant Community Existing Temp:On- Location Site Detour Piedmont/Mtn Levee Forest Dry-Mesic Oak-Hickory Forest Alternative 2 New Total Alignment 0.25 (0.10) 0.31 (0.13) 0:56 (0.23) 0.52 (0.21) 0.0(0.0) 0.09 (0.04) 0.09 (0.04) 0.12 (0.05) Roadside/ - 0.09 (0.04) 0.23 (0.09) 0.32 (0.13) 0.96 (0.39) Disturbed Land TOTAL: 0.34 (0.14) 0.63 (0.26) 0.97 (0.40) 1.60 (0.65) 11 (Vireo griseus), yellow-romped warbler (Dendroica coronata), and white- throated sparrow (Zonotrichia albicollis). No terrestrial reptile or amphibian species were observed within the study corridor. Species that might be expected are five-lined skink (Eumeces fasciatus), rough green snake (Opheodrys aestivus), eastern box turtle (Terrapene carolina), marbled salamander (Ambystoma opacum), slimy salamander. (Plethodon glutinosus), American toad (Bufo americanus), Fowler's toad (Bufo woodhousei), rat snake (Elaphe obsoleta), and eastern ribbon snake (Thamnophis sauritus). No aquatic amphibian or reptile species were observed during the field visit. Belews Lake Spillway provides suitable habitat for aquatic and semi-aquatic reptiles including snapping turtle (Chelydra serpentina), painted turtle (Chrysemys picta), eastern ribbon snake (Thamnophis sauritus), and northern water snake (Nerodia sipedon). Typical amphibian species for this region include northern dusky salamander (Desmognathus fuscus), three-lined salamander (Eurycea guttolineata), pickerel frog .(Rana palustris), and eastern newt (Notophthalmus viridescens). No mollusks or arthropods were observed, with the exception of shells of the invasive Asian clam (Corbicula fluminea). No sampling was undertaken in Belews Lake Spillway to determine fishery potential. Small minnows and crappie (Pomoxis sp.) were seen during visual investigations, but no larger fish were noted. Species which may be present in Belews Lake Spillway include, chain pickerel (Esox niger), gizzard shad (Dorosoma cepedianum), rosyside dace (Clinostomus funduloides), yellow perch (Perca flavescens), eastern mosquitofish (Gambusia holbrooki), pumkinseed (Lepomis gibbosus), redbreast sunfish (Lepomis auritusorone), bluegill .. (Lepomis macrochirus), silver redhorse (Moxostoma anisurum), largemouth bass (Micropterus salmoides), and fantail darter (Etheostoma flabellare). 4. Impacts to Wildlife Due to the limited extent of infringement on natural communities, the proposed bridge replacement will not result in substantial loss or displacement of known terrestrial animal populations. No substantial habitat fragmentation is expected since most permanent improvements will be restricted to or adjoining existing roadside margins. Construction noise and associated disturbances will have short-term impacts on avifauna and migratory wildlife movement patterns. Long-term impacts are expected to be minimal for both alternatives. After removal of temporary bridge 13 vegetated wetlands subject to jurisdictional consideration occur within the study corridor. Jurisdictional impacts are avoided by both considered alternatives. 3. Permits Required A Federal permit under Section 404 of the Clean Air Act is required for discharges of dredged or fill material in "Waters of the United States". This project is being processed as, Categorical Exclusion (CE) under Federal Highway Administration (FHWA) guidelines. It is anticipated that this project will fall under Nationwide Permit (NWP) #23 (61 FR 65874,65916; December 13, 1996) for CEs due to expected minimal impact. DWQ has made available a General 401 Water Quality Certification for NWP #23. However, authorization for jurisdictional area impacts through use of this permit will require written notice to DWQ. In the event that NWP #23 will not suffice, minor impacts attributed to bridging and associated approach improvements are expected to qualify under General Bridge Permit 031 issued by the Wilmington COE District. Notification to the Wilmington COE office is required. if this general. permit is utilized. According to Duke power officials, Belews Lake is not an FERC (Federal Energy Regulatory Commission) lake and' a FERC permit will not be required (Appendix). 4. Mitigation Compensatory mitigation is not proposed for this project due to the limited nature of project impacts. However, utilization of BMPs is recommended in an effort to minimize impacts. Fill or alteration of more than 150 linear feet (45.8 meters) of stream may require compensatory mitigation in accordance with 15 NCAC2H.0506(h). A final determination regarding mitigation rests with the COE. F. Protected Species 1. Federal Species Species with the federal classification of Endangered, Threatened, or officially Proposed for such listing; are protected under the Endangered Species Act (ESA) of 1973, as amended (16 U.S.C. 1531 et seq.). The term "Endangered species" is defined as "any species which is in danger of extinction throughout all or a significant portion of its range", and the term "Threatened species" is defined as "any species which is likely to become an 15 needed to determine the range of this species in the Mayo River. In October 2000, an unidentified spinymussel was found in the Dan River in Stokes County, North Carolina during a survey conducted by personnel of NCDOT, the N.C. Wildlife Resources Commission, and the N.C. Division of Marine Fisheries. Subsequent surveys in the Dan River found several more individuals of spinymussel (personal communication, Tim Savidge, April 4, 2001). S.pinymussels had not previously been identified within the Dan River basin. The mussels found in the Dan River have characteristics similar to the James spinymussel and the Tar spinymussel (Elliptio steinstansanna). Specimens of the recently found spinymussel are currently (as of April 2001) undergoing genetic analysis. The finding of this unidentified spinymussel has resulted in the FWS listing James spinymussel in North Carolina counties that include tributaries of the Dan River basin. The. subject project is located on the spillway of Belews Lake, which is formed by Belews Creek. Belews Creek then flows into the Dan River less than 1 mile downstream of the project crossing. The confluence of Belews Creek and the Dan River is approximately 16 river-miles downstream of Danbury (furthermost downstream extent of the spinymussel in the Dan River. Belews Lake Spillway is ahighly disturbed, well entrenched, perennial stream, characterized by moderate flow. The stream bed is primarily composed of bedrock and cobble with scattered gravel and sand. NCDOT Environmental Specialists Tim Savidge and Mike Wood visited the project site on August 17, 2001. Surveys for mussels were conducted from approximately 400 feet downstream to 100 feet upstream (base of the spillway) of the prof ect crossing. Survey methodology included wading using visual (batiscope and tactile) methods. Water was not being released at the time of the survey, and water depth ranged from 6 inches to 2 feet. There is evidence of extreme high flows(water release) and streambank scour in the creek. No mussels were found in 1 man-hour of survey. The aquatic snail (Helisoma anceps) and the introduced Asian clam (Corbiculafluminea) were present in the stream but nowhere abundant. No spinymussel species were found during this survey. BIOLOGICAL CONCLUSION: NHP records indicate that James River spinymussel has not been documented to occur within 1.0 mile (1.6 kilometers) of the study corridor. Given the survey results, it is apparent that the spinymussel does not occur. in the project area. The spinymussel has not been found in the stretch of the Dan River downstream of the project area. It can be concluded that project construction will not impact this species. NO EFFECT. 17' BIOLOGICAL CONCLUSION: The study corridor contains suitable habitat for Schweinitz's sunflower. No existing populations are known within 5.0 miles (8:0 kilometers) of Bridge No. 52. A survey for this sunflower was conducted during the. blooming season (September to frost) on September 19, 2001. This survey consisted of systematically walking all areas of suitable habitat and identifying all Helianthus species. Sunflowers identified included H. microcephalus. No individuals of Schweinitz's sunflower were identified within the study corridor. Based on available information and results of an on-site survey, the proposed project will not affect Schweinitz's sunflower. NO EFFECT. Small anthered bittercress Small-anthered bittercress is a low, erect, biennial or perennial herb with simple, slender stems. The plant has crenate; lobed basal leaves 0.3 to 0:7 inches (0.8 to 1.8 centimeters) in length, and unlobed, crenate stem leaves that are slightly shorter. The small flowers have white petals to 0.1 inch (3 millimeters) long and bloom in the late spring. This species is only known from Forsyth and Stokes Counties, and has not been observed in Forsyth County within the past 20 years. This species has never been found in Rockingham County and is included in this discussion due to the proximity of the study corridor to the Stokes County line. Typical habitat is seepages, wet rock crevices, stream banks, sandbars, and wet woods along small streams in the Dan River drainage. The study corridor contains a high, relatively dry levee forest which provides poor habitat for the small anthered bittercress, but the stream banks and sandbars within Belews Lake spillway provide suitable habitat for this species. BIOLOGICAL CONCLUSION: NBF records indicate that this species has not been documented within one-mile (1.6 kilometers) of the study corridor. The Piedmont/Mountain Levee Forest provides poor habitat for the small anthered bittercress but the stream banks do provide suitable habitat for this species. A systematic survey of the moist portions of the Piedmont/Mountain Levee :Forest, stream banks, and sandbars within the study corridor were conducted during. this field investigation. No specimens of small-anthered bittercress were observed during the survey. Based on available information and best professional judgement, the proposed project will not affect small anthered bittercress. NO EFFECT Federal Species of Concern - The February 25, 2003 FWS list also includes a category of species designated as "Federal species of concern" (FSC) in Rockingham and Stokes Counties. A species with this designation is one that may or may not be listed in the future (formerly C2 candidate species or species under consideration for listing for which there is insufficient information to support listing). A list of FSC species occurring in 19 study corridor within the Dan River. This fish has a state status of Special Concern. NHP records document a Significant Natural Heritage Area, the Dan River Aquatic Habitat (Rockingham Section), approximately 0.4-miles (0.6-kilometers) north of the study corridor, within the main stem of the Dan Rivera This area has been designated a natural area significance of "A", which indicates an area that contains examples of natural. communities, rare plant or animal populations, or geologic features that are among the highest quality or best of their kind in the nation, or clusters of such elements that are among the best in the nation. IV. CULTURAL RESOURCES A. Compliance Guidelines This project is subject to compliance with Section 106 of the National Historic Preservation Act of 1966, as amended, and implemented by the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106, codified at 36 CFR Part 800. Section 106 requires Federal agencies to take into account the effect of their undertakings (federally-funded, licensed, or permitted) on properties included in or eligible for inclusion in the National Register of Historic Places and to afford the Advisory Council a reasonable opportunity to comment on such undertakings. B. Historic Architecture A field survey of the Area of Potential Effects (APE) was conducted on February 29, 2000. All structures within the APE were photographed, and later reviewed by NCDOT architectural historians and the State Historic Preservation Office (HPO). None` of the properties were considered eligible, and in a concurrence form dated June 1, 2000, the State Historic Preservation Officer (SHPO) concurred that there. are no historic architectural resources either listed in or eligible for listing in the National Register of Historic Places within the APE. A copy of the concurrence form is included in the Appendix. C. Archaeology This is a federally funded project subject to Section 106 of the National Historic Preservation Act of 1966, which requires consultation with the State Historic Preservation Office (SHPO) on possible effects of the project on historic properties. The Area of Potential Effect (APE) is defined as a 150-foot (45.7-meter) wide area, 21 In compliance with executive Order 12898 (Federal Actions to Address Environmental Justice in Minority. Populations and Low Income Populations) a review was conducted to determine whether minority or low-income populations were receiving disproportionately high and adverse human health or environmental impacts as a result of this project. The investigation determined the project would not disproportionately impact any minority or low income populations. No adverse effect on public facilities or services is anticipated. The project is not expected to adversely affect social, economic, or religious opportunities in the area. The project does not involve any known Section 4(f) properties. There are no publicly-owned parks, recreational facilities, or wildlife and waterfowl refuges of National, State, or local significance in the vicinity of the project. The Farmland Protection Policy Act requires all federal agencies or their representatives to consider the potential impacts to prune, unique or important farmland soils for all land acquisition and construction projects. Prime and important farmland soils are defined by the Natural Resources Conservation Service (NRCS). The proposed project has been coordinated with the US Department of Agriculture and no prime, unique or important farmland will be converted as a result.of this bridge replacement project. This project is in conformance with the Farmland Protection Policy Act (FPPA). The replacement of Rockingham County Bridge No. 55 is an air quality "neutral" project, so it is not required to be included in the regional emissions analysis and a project level CO analysis is not required. 40 CFR Part 51 is not applicable because the proposed project is located in an attainment area. If vegetation is disposed of by burning, all burning shall be done in accordance with applicable local laws and regulations of the North Carolina SIP for air quality in compliance with 15 NCAC 2D.0520. The replacement of the existing bridge will not increase or decrease traffic volumes; therefore, the project's impact on noise and air quality will not be significant. The noise levels will increase during the construction period, but will only be temporary. This evaluation completes the assessment requirements for highway traffic noise of Title 23, Code of Federal Regulations (CFR), Part 772 and for air quality (1990 Clean Air Act Amendments and the National Environmental Policy Act) and no additional reports are required. An examination of records at the North Carolina Department of Environment and Natural Resources, Division of Waste Management revealed no leaking underground storage tanks or hazardous waste sites in the project area. This area is not in a FEMA Flood Study, but is in a FEMA Special Flood Hazard Zone A. No base flood elevations have been determined. This section of stream is relatively short, begins at Belews Lake approximately 1800 feet (550 meters) upstream and converges with the Dan River approximately 2000 feet (610 meters) downstream. The Dan River floodplain 23 \ 1726 • ' U Sharps r ' 143 ; ` 1728 , \ ' '•? . awo `°? a 1142 ? '? qtr 1139 1141 1725 772 0. \ ' ' \ 1189 1140 r 1723 \ 311 1128 : ; ? 1722 1138 1135 Ellisboro •-? 1136 1134 1908 \ • , 1911 . 1137 1129 1912 da,,? Pine Ball Bridge No. 55 1133 .00 t °Pr 1903 ?OY Bel 1110 , .0- 1915 Orit?elri t 9gLVe Lake . 1176 f f ? 1132 C is 1908 ti ?} •/ 1 09 1120 . ' Nor folk ?? , • 11os N 1600 I Meters I Miles 1.0 PrK ?e bdQ E '. ' yfield• APPROXIMATE SCALE 9 $ 2 do S evill I3 d7 Y 14 to 3 H ID s ue K I . nlc s North Carolina Department of Transportation Project Development & Environmental Analysis Branch ROCKINGHAM COUNTY Bridge No. 55 on SR 1138 (Lindsey Bridge Road) over Bellews Lake Spillway TIP No. B-3694 April 2003 Figure i I KvcmfNum,klvl COUNTY BRIDGE NO. 55 ON SR 1138 OVER BELEWS LAKE SPILLWAY B-3694 SIDE VIEW LOOKING NORTH WEST APPROACH LOOKING EAST EAST APPROACH LOOKING WEST FIGURE 3 e e a o OF e? _? .ate ? a0 ? ° Z ? P ? ggZ? am IL d• ?c a ? z a °p?? ° a •a ? e o ? Z o. ec "; C's O z m m f= U OO ?o 0. ?? 2 Cl; N O O C:, h W x? vo ?W O U O ?o tl ?i h o°?i N E-i c ti CO O w A e s LL L O C in 4q m C " a z U O ^ H 10 S p o rt i ?E ? z Zug B d E o Vf y 0 W ;z c ? ?'O L O D z m O m d F- Y 0 ? ? O O h t? A 04 0 chi 0 w ?N nu 0 N 0 H w AMEX ZGNE •X Hi DNE X T i ZONE X ZONE A -; s* Bridge No. 55 FEMA - Floodplain Map of Project Area 0 2000 1 FEET I APPROXIMATE SCALE North Carolina Department of Transportation Project Development & Environmental Analysis Branch ROCS INGHAM COUNTY . Bridge No. 55 on SR 1138 (Lindsey Bridge Road) over Belews Lake Spillway TIP No. B-3694 Figure 6 ZONE X S i United States Department of the Interior FISH AND WILDLIFE SERVICE Raleigh Field Office Post Office Box 33726 Raleigh, North Carolina 27636-3726 December 22, 2000 Mr. William D. Gilmore, P.E., Manager NCDOT Project Development and Environmental Analysis Branch 1548 Mail Service Center Raleigh, NC 27699-1548 Dear Mr. Gilmore: Thank you for your November 15, 2000, request for information from the U.S. Fish andVildlife Service (Service) on the potential environmental impacts of a proposed bridge replacement in Rockingham County, North Carolina. This report provides scoping information and is provided in accordance with provisions of the Fish and Wildlife Coordination Act (FWCA) (16 U.S.C. 661-667d) and Section 7 of the Endangered Species Act (ESA) of 1973, as amended (16 U.S.C. 1531-1543). This report also serves as initial scoping comments to federal and state resource agencies for use in their permitting and/or certification processes for this project. The North Carolina Department of Transportation (NCDOT) proposes to replace the following bridge structure: 1. B-3694 Bridge No. 55 on SR I138.over Belews Lake Spillway The following recommendations are provided to assist you in your planning process and to facilitate a thorough and timely review of the project. Generally, the Service recommends that wetland impacts be avoided and minimized to the maximum extent practical as outlined in Section 404 (b)(1) of the Clean Water Act Amendments of 1977. In regard to avoidance and minimization of impacts, we recommend that proposed highway projects be.aligned along or adjacent to existing roadways, utility corridors, or previously developed areas in order to minimize habitat fragmentation and encroachment. Areas exhibiting high biodiversity or ecological value important to the watershed and region should be avoided. Crossings of streams and associated wetland systems should use existing crossings and/or occur on a structure wherever feasible. Where bridging is not feasible, culvert structures that maintain natural water flows and hydraulic regimes without scouring, or impeding fish and wildlife passage, should be employed. Highway shoulder and median widths should be reduced through wetland areas. Roadway embankments. and fill areas should be stabilized by using appropriate erosion control devices and techniques.. Wherever appropriate, construction in sensitive areas should occur outside fish spawning and migratory bird nesting seasons. The National Wetlands Inventory (NWI) map of the Belews Lake 7.5 Minute Quadrangle shows wetland resources in the specific work area. However, while the NWI maps are useful for providing an overview of a given area, they should not be relied upon in lieu of a detailed wetland delineation by trained personnel using an acceptable wetland classification methodology. Therefore, in addition to the above. guidance, we recommend that the environmental documentation for this project include the following in . sufficient detail to facilitate a thorough review of the action. 1. The extent and acreage of waters of the U.S., including wetlands, that are to be impacted by filling, dredging, clearing, ditching, or draining. Acres of wetland impact should be differentiated by habitat type based on the wetland classification scheme of the National Wetlands Inventory. Wetland boundaries should be determined by using the 1987 Corps of Engineers Wetlands Delineation Manual and verified by the U.S. Army Corps of Engineers (Corps). 2. If unavoidablewetland impacts are proposed, we recommend that every effort be made to.identify compensatory mitigation sites in advance. Project planning should include a detailed compensatory mitigation plan for offsetting unavoidable wetland impacts. Opportunities to protect mitigation areas in perpetuity, preferably via conservation easement, should be explored at the outset. The enclosed list identifies the federally-listed endangered and threatened species, and Federal Species of Concern (FSC) that are known to occur in Rockingham County. The Service recommends that habitat requirements for the listed species be compared with the available habitats at the respective project sites. If suitable habitat is present within the action area of the project, biological surveys for the listed species should be performed. Environmental documentation that includes survey methodologies, results, and NCDOT's recommendations based on those results, should be provided to this, office for review and comment. FSC's are those plant and animal species for which the Service remains concerned, but further biological research and field study are needed to resolve the conservation status of these taxa. Although FSC's receive no statutory protection under the ESA, we would encourage the NCDOT to be alert to their potential presence, and to make every reasonable effort to conserve them if found. The North Carolina Natural Heritage Program should be contacted for information on species under state protection. The Service appreciates the opportunity to comment on this project. Please continue to advise us during the progression of the planning process, including your official determination of the impacts of this project. If you have any questions regarding these comments, please contact Tom McCartney at 919-856-4520, ext. 32. Sincerely, Dr. Garland B. Pardue ,._ Ecological Services Supervisor Enclosure cc: COE, Raleigh, NC (Eric Alsmeyer) NCDWQ, Raleigh, NC (John Hennessy) NCDNR, Northside, NC (David Cox) FWS/R4:TMcCartney:TM:12/22/00:919/856-4520 extension 32:\lbrdgroe.ham e -1 . Rockingham County Endangered Species, Threatened Species, and Federal Species of Co... Page 1 of 2 Updated: 02/25/2003 US, Fish & Wildlife Service - ROCKINGHAM COUNTY Common Name Scientific Name Status Invertebrates Green floater James spinymussel Vascular Plants Heller's trefoil Smooth coneflower KEY: Status Definition Lasmigona subviridis Pleurobema collina Lotus helleri Echinacea laevigata FSC Endangered FSC Endangered Endangered A taxon "in danger of extinction throughout all or a significant portion of its range. Threatened - A taxon "likely to become endangered within the foreseeable future throughout all or a significant portion of its range." Proposed - A taxon proposed for official listing as endangered or threatened. C1- A taxon under consideration for official listing for which there is sufficient information to support .listing. FSC - A Federal species of concern--a species that may or may not be listed in the future (formerly C2 candidate species or species under consideration for listing for which there is insufficient information to support listing). http://nc-es.fws.gov/es/entylist/rockingham.html 4/28/03 I- Rockingham County Endangered Species, Threatened Species, and Federal Species of Co... Page 2 of 2 T(S/A) - Threatened due to similarity of appearance (e.g., American alligator )--a species that is threatened due to similarity of appearance with other rare. species and is listed for its protection. These species 'are not biologically endangered or threatened and are not subject to Section 7 consultation. EXP - A taxon that is listed as experimental (either essential or nonessential). Experimental, nonessential endangered species (e.g., red wolf) are treated as threatened on public.land, for consultation purposes, and as species proposed for listing on private land. Species with 1, 2, 3, or 4 asterisks behind them indicate historic, obscure, or incidental records. *Historic record - the species was last observed in the county more than 50, years ago. **Obscure record - the date and/or location of observation is uncertain. ***Incidental/migrant record - the species was observed outside of its normal range or habitat. ****Historic record - obscure and incidental record. For additional information regarding this Web page, contact Mark Cantrell, in Asheville, NC, at mark-a-cantrell@fws.gov Visit the North Carolina ES Homepage Visit the U.S. Fish and Wildlife Service Home Page Keywords {same keywords listed above - used for search tools} httn_//nc-es.fws.gov/es/cntvlist/rockingham.html 4/2R/01 x? ® North Carolina Wildlife Resources Commission 512 N. Salisbury Street, Raleigh, North Carolina 276041188, 919-733-3391 Charles R. Fullwood, Executive Director TO: John Conforti Project Engineer, NCDOT FROM: David Cox, Highway Project Co ator Habitat Conservation Program DATE:. January 2, 2001 SUBJECT: NCDOT Bridge Replacements in Anson, Cabarras, Catawba, Cleveland, Davie, Forsythe, Gaston, Guilford, Mecklenburg, Randolph, Rockingham, and Stanly counties of North Carolina. TIP Nos. B-3404, B-3421, B-3822, B-3828, B-3637, B-3835, B-3454, B-3839, B-3840, B-3337, B-3652, B-3851, B-3677, B-350 B- 3694, and B-3700. . Biologists with the N. C. Wildlife Resources Commission (NCWRC) have reviewed the information provided and have the following preliminary comments on the subject project. Our comments are provided in accordance with provisions of the National Environmental Policy Act (42 U.S.C. 4332(2)(c)) and the Fish and Wildlife Coordination Act (48 Stat: 401, as amended; 16 U.S.C. 661-667d). On bridge replacement projects of this scope our standard recommendations are as follows: 1. We generally prefer spanning structures. Spanning structures usually do not require work within the stream and do not require stream channel realignment. The; horizontal and vertical clearances provided by bridges allows for human and wildlife passage beneath the structure, does not block fish passage, and does not block navigation by canoeists and boaters. 2. Bridge deck drains should not discharge directly into the stream. 3 . Live concrete should not be allowed to contact the water in or entering into the stream. 4. If possible, bridge supports (bents) should not be placed in the stream. 5. If temporary access roads or detours are constructed, they should be removed back to original ground elevations immediately upon the completion of the project. Disturbed areas should be seeded or mulched to stabilize the soil and native tree species should f Bridge Memo 2 January 2, 2001 be planted with a spacing of not more than 10'x10' . If possible, when using temporary structures the area should be cleared but not grubbed. Clearing the area with chain saws, mowers, bush-hogs, or other mechanized equipment and leaving the stumps and root mat intact, allows the area to revegetate naturally and minimizes disturbed soil. 6. A clear bank (riprap free) area of at least 10 feet should remain on each side of the steam underneath the bridge. 7. In trout waters, the N.C. Wildlife Resources Commission reviews all U.S. Army Corps of Engineers nationwide and general `404' permits. We have the option of requesting additional measures to protect trout and trout habitat and we can recommend that the project require an individual `404' permit. 8. In streams that contain threatened or endangered species, NCDOT biologist Mr. Tim Savidge should be notified. Special measures to protect these sensitive species may be required. NCDOT should also contact the U.S. Fish and Wildlife Service for information on requirements.of the Endangered Species Act as it relates to the project. 9. In streams that are used by anadromous fish, the NCDOT official policy entitled "Stream Crossing Guidelines for Anadromous Fish Passage (May 12, 1997)" should be followed. . 10. In areas with significant fisheries for sunfish, seasonal exclusions may also be recommended. 11. Sedimentation and erosion control measures sufficient to protect aquatic resources must be implemented prior to any ground disturbing activities. Structures should be maintained regularly, especially following rainfall events. 12. Temporary or permanent herbaceous vegetation should be planted on all bare soil within 15 days of ground disturbing activities to provide long-term erosion control. 13. All work in.or adjacent to stream waters should be conducted in a dry work area. Sandbags, rock berms, cofferdams, or other diversion structures should be used where possible to prevent excavation in flowing water. 14. Heavy equipment should be operated from the bank rather than in stream channels in order to minimize sedimentation and reduce the likelihood of introducing other pollutants into streams. 15. Only clean, sediment-free rock should be used as temporary fill (causeways), and should be removed. without excessive disturbance of the natural stream bottom when construction is completed. 16. During subsurface investigations, equipment should be inspected daily and maintained to prevent contamination of surface waters from leaking fuels, lubricants, hydraulic fluids, or other toxic materials. If corrugated metal pipe arches, reinforced concrete pipes, or concrete box culverts are used: 1. The culvert must be designed to allow for fish passage. Generally, this means that the culvert or pipe invert is buried at least 1 foot below the natural stream bed. If Bridge Memo 3 January 2, 2001 multiple cells are required the second and/or third cells should be placed so that their bottoms are at stream bankful stage (similar to Lyonsfield design). This could be accomplished by constructing a low sill on the upstream end of the other cells that will divert low flows to another cell. This will allow sufficient water depth in the culvert or pipe during normal flows to accommodate fish movements. If culverts are long, notched baffles should be placed in reinforced concrete box culverts at 15 foot intervals to allow for the collection of sediments in the culvert, to reduce flow velocities, and to provide resting places for fish and other aquatic organisms moving through the structure. 2. If multiple pipes or cells are used, at least one pipe or box should be designed to remain dry during normal flows to allow for wildlife passage. 3.. Culverts or pipes should be situated so that no channel realignment or widening is required. Widening of the stream channel at the inlet or outlet of structures usually causes a decrease in water velocity causing sediment deposition that will require future maintenance. 4. Riprap should not be placed on the stream bed. In most cases, we prefer the replacement of the existing structure at the same location with road closure. If road closure is not feasible, a temporary detour should be designed and located to avoid wetland impacts, m;nm:ze the need for clearing and to avoid destabilizing stream banks. If the structure will be on a new alignment, the old structure should be removed and the approach fills removed from the 100-year floodplain. Approach fills should be removed down to the natural ground elevation. The area should be stabilized with grass and planted with native tree species. If the area that is reclaimed was previously wetlands. NCDOT should restore the area to wetlands. If successful, the site may be used as wetland mitigation for the subject project or other projects in the watershed. Project specific comments: 1. B-3404 -Anson County -Bridge No. 314 over South Fork Jones Creek. We have no specific comments. We are.not aware of any threatened of endangered species in the project vicinity. 2. B-3421- Cabarrus County - Bridge No. 266 over Norfolk and Southern Railway. No comment. 3. B-3 822 - Catawba County - Bridge No. 8 over unnamed tributary to the Catawba River. We request that High Quality Sedimentation and Erosion Control Measures be used due to the DWQ water quality classification of WS-IV. We are-not aware of any threatened of endangered species in the project vicinity. 4. B-3828 -Cleveland County -Bridge No. 233 over Buffalo Creek. We have no specific comments. We are not aware of any threatened of endangered species in the project vicinity. 5. B-3637 _ Davie County - Bridge No. 37 over I-40. No comment. 6. B-3835 - Davie-Forsyth counties -Bridge No. 35 over the Yadkin River. We request that High Quality Sedimentation and Erosion Control Measures be used due to the DWQ water quality classification of WS-IV. We request that the new bridge span the adjacent wetlands f Bridge Memo 4 January 2, 2001 entirely. The old fill causeways should then be removed and graded to natural ground level* We are not aware of any threatened of endangered species in the project vicinity. 7. B-3454 - Forsyth County - Bridge No. 260 over Muddy Creek. We have no specific comments. We are not aware of any threatened of endangered species in the project vicinity. 8. B=3 839 - Forsyth County - Bridge No.139 over Fishers Branch. We have no specific comments. We are not aware of any threatened of endangered species in the project vicinity, 9. B-3 840 - Gaston County - Bridge No. 52 over South Crowders Creek. We have no specific comments. We are not aware of any threatened of endangered species in the project vicinity. 10. B-3337 - Guilford County - Bridge No. 527 over North Buffalo Creek. We have no specific comments. We are not aware of any threatened of endangered species in the project vicinity. 11. B-3 652 - Guilford County - Bridge No. 20 over the Deep River. SR 4121 crosses the Deep River just below the dam of High Point City Lake. This area supports good numbers of sunfish and may support a tailrace fishery: Therefore, we request that no in-water work be preformed from April 1 to May 31. We request that High Quality Sedimentation and Erosion Control Measures be used due to the DWQ water quality classification of WS-IV. We are not aware of any threatened of endangered species in the project vicinity. 12. B-3 8 51- Guilford County - Bridge No. 21 over US 29/70. No comment. 13. B 3 677 - Mecklenburg County - Bridge No. 36 over. Greasy Creek. We have no specific comments. We are not aware of any threatened of endangered species in the project vicinity. 14. B-3 506 - Randolph County - Bridge No. 226 over Richland Creek. Richland Creek is a medium sized stream that supports good populations- of sunfish. Therefore, we request that no in-water work be preformed from April 1 to May 31. We are not aware of any threatened of endangered species in the project vicinity. 15. B-3694 -Rockingham County - Bridge No. 55 over the Belews Lake Spillway. This bridge appears to be just downstream of the Belews Lake dam. This area supports good numbers of sunfish and may support a tailrace fishery. Therefore, we request that no in-water work be preformed from April 1 to May 31. We request that High Quality Sedimentation and Erosion Control Measures be used due to the DWQ water quality classification of WS-IV. We are not aware of any threatened of endangered species in the project vicinity. 16. B-3700 Stanly County - Bridge No. 187 over Long Creek. This segment of Long Creek may support the state listed Carolina darter. Therefore, we request that High Quality Sedimentation and Erosion Control Measures be used to minimize project impacts to this species. We request that NCDOT routinely minimize adverse impacts to fish and wildlife resources in the vicinity of bridge replacements. The NCDOT should install and maintain sedimentation control measures throughout the life of the project and prevent wet concrete from contacting water in or entering into these streams. Replacement of bridges with spanning structures of some type, as opposed to pipe or box culverts, is recommended in most cases. . Spanning structures allow wildlife passage along streambanks, reducing habitat fragmentation and vehicle related mortality at highway crossings. Bridge Memo 5 January 2, 2001 If you need further assistance or information on NCWRC concerns regarding bridge replacements, please contact me at (919) 528-9886. Thank you for the opportunity to review and comment on these projects. Ken Burleson From: "7ohn.W Harmon Sr" <jwharmon@duke-energy.com> To: <Id=1eson@tgsengineers.com> Sent: Tuesday, December 11, 2001 12:42 PM Subject: Project B-3494 Rockingham County Ken, Belews Lake is not a FERC lake. There will be no rEERC permit required. L&Idz/'?- a?srn,?4 a«M North Carolina Department of Cultural Resources James B. Hunt, Jr., Governor Division of Archives and History Betty Ray McCain, Secretary William S. Price, Jr., Director January 8, 2001 MEMORANDUM s . J4fif To: William D. Gilmore, PE, Manager Project Development & Environmental Analysis Branch From: David Brook j Deputy State HistatiG'reservation Officer i',w 4 Re: Request for Comments for Group X? Bridge Replacement, Projects, Replace Bridge No. 55 on SR 1138 over Belews Lake Spillway, B-3694; Rockingham County; ER 01-8190 Thank you for your letter of November 15, 2000, concerning the above project Historic period archaeological site 31RK42** is located approximately 50 yards south of the existing bridge. We recommend that an archaeological survey be undertaken of the area of potential effect (APE) for this project If site 31RK42** is to be affected by the bridge replacement, sufficient historical research and testing should be undertaken to determine its eligibility for inclusion in the National Register of Historic Places. We have conducted a search of our files and are aware of no structures of historical or architectural importance located within the planning area. The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106 codified at 36 CFR Part 800. Thank you for your cooperation and consideration. If you have questions concerning the above comment, contact Renee Gledhill-Earley, Environmental Review Coordinator, at 919/733-4763- cc: Thomas- Padgett, NCDOT f'e erul.•Iid =BRZ-1133(9) TIP =B-369-1 Cuunn•: Ruckim_ham CONCURRENCE FORNI FOR PROPERTIES NOT ELIGIBLE FOP, TFI%'?:;TIO\.=?L REGISTER OF HISTORIC PLACES Project Description: Replace Brid=e No. ;f, on SR 1 133 over Belews Lake Soillxk•av On June 1. 2000. representatives. of the ?: Q/ North Carolina Department of Transportation (NCDOT) ederal Highway Administration (FHWA) North Carolina State Historic Preservation Office (SHPO) Reviewed the subject project at ? a scoping meeting ?? photograph review session/consultation ? other All parties present agreed there are no properties over fifty years old within the project's area of potential effect: there are no properties less than fifty years old which are considered to meet Criterion Consideration G within the project's area of potential effect. ? there. are properties over fifty years old (list attached) within the project's area of potential effect. but based on the historical information available and the photographs of each property. properties identified as are considered not eligible for the National Register and no further evaluation of them is necessary. there are no National Register-listed properties located within the project's area of potential effect. Signed: ?C, ? _G 0 Representative, N OT Date FHWA. for the Division Administrator. or other Federal Agency Date I jiztoz Re sentative. SHP Date A.- State Historic Preservation Officer Date If'a survey report is prepared. a final copy ofthis tbnn and the attached list %%ill he in.:iuded.