Subject: Request for Additional Information
Stormwater Permit No. SW5200702
Snow Hill Road Pump Station
Durham County
Dear Ms. Wilson:
The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater
Management Permit Application for the subject project on July 13, 2020. A review of that
information has determined that the application is not complete. The following information is
needed to continue the stormwater review:
The Falls Lake Nutrient Strategy requires stormwater systems to be designed to control
and treat at a minimum the runoff generated from all surfaces in the project area by one
inch of rainfall [ 15A NCAC 02B .0277(4)(e)]. The definition of runoff treatment
requires this runoff to be treated in a primary SCM [15A NCAC 02H .1002(43)]. There
is no provision in the Falls Lake Rules that allows for low density developments.
2. Please explain why the nutrient reduction portion of the review was submitted to the
Department but the TSS and peak flow requirements were submitted to the local review
program. The Falls Lake Rules include TSS and peak flow requirements.
3. Please complete the Applicant's Certification section of the SWU-101 Application Form.
4. Please submit a Supplement EZ form for the site. The Supplement EZ form is required
for all developments, including low density. The Supplement EZ form can be found on
the Stormwater Design Manual website.
5. Please submit an Operation and Maintenance Plan and Agreement. The O&M EZ form
has options for both high and low density. The O&M EZ form can be found on the
Stormwater Design Manual website.
D E Qbi�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612
vOry rN Cx:40:.itiA �
o .—Io E�.w��,�.���a�:r� /� 919.707.9200
6. Provide pdfs of all revisions, 2 hardcopies of revised plan sheets, and 1 hardcopy of other
documents. Pdfs must be uploaded using the form at:
https:Hedocs.deq.nc.gov/Forms/SW Project_Submittal
Please note that this request for additional information is in response to a preliminary review.
The requested information should be received by this Office prior to September 10, 2020,
or the application will be returned as incomplete. The return of a project will necessitate
resubmittal of all required items, including the application fee. Please reference the State
assigned project number SW5200702 on all correspondence.
If you need additional time to submit the information, please submit your request for a time
extension to the Division at the contact below. The request must indicate the date by which you
expect to submit the required information. The Division is allowed 90 days from the receipt of
a completed application to issue the permit.
The construction of any impervious surfaces, other than a construction entrance under an
approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject
to enforcement action pursuant to NCGS 143-215.6A.
If you have any questions concerning this matter please feel free to contact me at
Corey.Anen(&,,ncdenr.gov or (919) 707-3649. Please note that due to the ongoing Covid-19
pandemic, I will be teleworking and will be most easily reached by email.
Sincerely,
Corey Anen, PE
Environmental Engineer
Stormwater Program