Loading...
HomeMy WebLinkAbout20040916 Ver 1_Complete File_20040607 A Gi7 5 O 'C June 14, 2004 Rockingham County DWQ Project No. 04-0916 SR 2181 (Webster Rd) APPROVAL of 401 Water Quality Certification Mr. J.M. Mills, P.E. Division Engineer, Division 7 North Carolina Department of Transportation 1584 Yanceyville Street Greensboro, North Carolina, 27415 Dear Mr. Mills: WETLANDS / 401 GROUP JUN 2 1 2004 WATER QUALI7°Y SECTION You have our approval, in accordance with the attached conditions and those listed below, to incur the following impacts in order to pave, increase lane width and improve traffic safety on SR 2181 (Webster Rd) in Rockingham County. • 36 linear feet of new piping impacts to an unnamed tributary to the Dan River (16 feet of new pipe and 20 feet of rip-rap); • Temporary dewatering impacts of approximately 20 square feet for sandbags and rock silt dam. The project shall be constructed in accordance with your application dated June 4, 2004 (received June 7, 2004). After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Nos. 3404 and 3366, corresponding to the U.S. Army Corps of Engineers Nationwide Permit Numbers 14 and 33. In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 permit, unless otherwise specified in the Water Quality Certification. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the Division of Water Quality (Division) and submit a new application. If the property is sold, the new owner must be given a copy of this approval letter and certifications, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or if total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to remain valid, you must adhere to the conditions listed in the attached certification and any additional conditions listed below. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality Coleen H. Sullins, Deputy Director Division of Water Quality t4CDEP N. C. Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699-1650 (919) 733-1786 Customer Service: 1 800 623-7748 Mr. J.M. Mills, PE June 14, 2004 DWQ#04-0916 Page 2 b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 2. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Preconstruction Notice Application. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 3. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 4. Riparian vegetation must be reestablished within the construction limits of the project by the end of the growing season following completion of construction. 5. Stormwater should be directed to vegetated buffer areas, grass lined ditches or other means appropriate to the site for the purpose of pre-treating stormwater runoff, and must not be routed directly into streams. Mowing of existing vegetated buffers is strongly discouraged, so that they may be utilized for stormwater sheet flow. 6. Where practicable, culverts that are less than 48-inch in diameter should be buried to a depth equal to or greater than 20% of their size to allow for aquatic life passage. Culverts that are 48-inch in diameter or larger should be buried at least 12 inches below the stream bottom to allow natural stream bottom material to become established in the culvert following installation and to provide aquatic life passage during periods of low flow. These measurements must be based on natural thalweg depths. This may require increasing the size of the culvert to meet flow conveyance requirements. If any of the existing pipes are perched, they shall be removed and replaced, and re-installed correctly, unless demonstrated that this is topographically unfeasible. All waters must flow through without freefalling or damming on either end of the culverts during low flow conditions, to maintain aquatic life and/or fish passage. 7. The dimension, pattern and profile of the stream above and below the crossing should not be modified by widening the stream channel or reducing the depth of the stream. 8. Disturbed floodplains and streams should be restored to natural geomorphic conditions. 9. Use of rip-rap for bank stabilization is to be minimized; rather, native vegetation is to be planted when practical. If rip-rap is necessary, it must be limited to the stream bank below the high water mark, and vegetation must be used for stabilization above high water. Any rip-rap used must not interfere with aquatic life passage during low flow conditions. 10. If concrete is used, work must be accomplished so the wet concrete does not contact the stream water. This will lessen the change of altering the stream's water chemistry and causing a fish kill. 11. Heavy equipment must be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the likelihood of introducing other pollutants into the stream. 12. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. Mr. J.M. Mills, PE June 14, 2004 DWQ#04-0916 Page 3 13. The presence of equipment in the channels must be minimized. Under no circumstances must rock, sand or other materials be dredged from the wetted stream channel under authorization of this permit, except in the immediate vicinity of the culverts. 14. Temporary dewatering sites must be restored to preexisting conditions unless more natural geomorphic conditions can be provided. 15. All work shall be performed during low flow conditions. 16. Upon completion of the project, the NCDOT shall complete and return the enclosed "Certification of Completion Form" to notify DWQ when all work included in the 401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the Division of Water Quality upon completion of the project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please contact Sue Homewood at 336-771-4600 extension 252 or at Sue.Homewood@ncmail.net. Sincerely, r Alan W. Klimek, P.E. Attachment cc: Wilmington District Corps of Engineers John Thomas, USACE Raleigh Field Office Jerry Parker, Division 7, Division Environmental Officer Winston Salem Regional Office Central Files Mr. J.M. Mills, PE June 14, 2004 DWQ#04-0916 Page 4 DWQ Project No.: County: Applicant: _ Project Name: Date of Issuance of 401 Water Quality Certification: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Engineer's Certification Partial Final Date: as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date s? d4ytST?L?? STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY GOVERNOR WETLANDS/ 401 GROUP JUN.' 0 7 2004 WATER QUALITY SECnON LYNDO TIPPETT SECRETARY June 4, 2004 Ms. Beth Barnes Wetlands/401 Unit NC DENR Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699 (Seven Copies) Mr. John Thomas 0 4 ®9 1 6 US Army Corps of Engineers 6508 Falls of the Neuse Suite 120 Raleigh, NC 27615-6814 (Two Copies) Subject: Rockingham County, Pipe Replacement on Webster Road (SR 2181) Project Number # 7C.079100 To Whom It May Concern: The North Carolina Department of Transportation (NCDOT) proposes to replace a 24 ft X 24 inch RCP with a 40 ft X 36 inch CMP on Webster Road (SR 2181) in Rockingham County. The work is proposed in order to increase lane width and improve traffic safety. This activity will result in impacts to an unnamed tributary of Dan River. In an effort to obtain the necessary permits for the subject pipe extension, we are providing a pre-construction notification application with supporting documentation. We believe this project can be permitted under the Nationwide Permit Numbers 14 and 33. This application is intended as a request for formal written authorization from the USCOE for NWP 14 and 33. This application is also intended as a request for written authorization from the NC Division of Water Quality for minor road crossing under General Water Quality Certificates #3376 and #3404. The following information is being provided to satisfy conditions of General Water Quality Certification. a?_ f w? P. O. Box 14996 Greensboro, NC 27415-4996 Telephone No. (336) 334-3192 Fax No. (336) 334-3637 PROJECT INFORMATION Road Name SRNumber Project Length miles Classification Webster Road SR 2181 N/A Rural River Basin: DWQ ID Water Quality Designation % Impervious Surface Roanoke 22-(31.5) WS-IV N/A Buffer Rulesa Buffer Rule Conditions where applicable) No Request Exemption Protected Species Present Mapped Historic Properties CAMA AEC Essential Fishery Habitat No No No No PIPE REPLACEMENT INFORMATION Site N/A Stream Type Intermittent Station Existing Pie 24' X 24" RCP Replace 40'X 36" CMP Construction Pump Around Dewatering * N/A Method Device E/C Plan Burial Depth 20% Date Construction As soon as practicable Duration One day Date 16 ft-enclosure; 20 linear ft-rip-rap; 20 sf temporary sandbags and rock silt Impacts (ft.) dam Special Conditions Restoration Within 15 working days of the pipe extension the natural stream contours will Plan be restored and seeded. Temporary silt screens will be cleaned and removed following vegetation establishment. RCP = reinforced concrete pipe; CMP = Corrugated metal pipe; CMPA = Corrugated metal pipe arch; EX = Erosion control. *A less intrusive dewatering device may be used in lieu of the one proposed. P. O. Box 14996 Greensboro, NC 27415-4996 Telephone No. (336) 334-3192 Fax No. (336) 334-3637 e MINIMIZATION INFORMATION Impacts will be minimized by strict enforcement of Best Management Practices for the protection of surface waters and wetlands, restrictions against the staging of equipment in or adjacent to waters of the US, and coordination (including a pre-construction meeting) with the Division Environmental Officer. MITIGATION INFORMATION Stream mitigation is not anticipated, as the impacts to any individual stream do not exceed 150 feet Wetland mitigation is not anticipated, as wetland impacts do not exceed 0.10 acres and do not occur in a unique natural wetland. APPLICATION INFORMATION Enclosed please find the Pre-construction Notification Form and supporting documentation for the above referenced project. If you have any questions or need any additional information, please contact Jerry Parker at (336) 256-2063. Your time and effort are appreciated. Sincerely, WL M4ionE, E. Di r, Division7 Enclosures CC: Barry Harrington, NCDOT H. L. McDowell, III, PE, NCDOT Henry Adkins, NCDOT Sue Homewood, DWQ Jerry Parker, NCDOT P. 0. Box 14996 Greensboro. NC 27415-4996 Telephone No. (336) 334-3192 Fax No. (336) 334-3637 Office Use Only: Form Version May 2002 USAGE Action ID No. DWQ N. 4 ®9 1 6 (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) I. Processing 1. Check all of the approval(s) requested for this project: ? Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: NWP 14 and 33 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete section VIII and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? H. Applicant Information 1. Owner/Applicant Information Name: Mr J M Mills P E Division Engineer - Division 7 Mailing Address: P.O. Box 14996 Greensboro NC Telephone Number: (336) 334-3192 Fax Number: (336) 334-3673 E-mail Address: mmills@dot.state.nc.us 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name• Jerry Parker Company Affiliation: Division Environmental Officer NCDOT Mailing Address:P.O. Box 14996 Greensboro NC 27415 Telephone Number: (336)_256-2063 Fax Number: (336) 334-4149 E-mail Address: Pagel of 8 M. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Webster Road (_SR 2181) 2. T.I.P. Project Number or State Project Number (NCDOT Only): 7C.079100 3. Property Identification Number (Tax PIN): Not Applicable 4. Location County: Rockingham Nearest Town: Mayodan Subdivision name (include phase/lot number): Not Applicable Directions to site (include road numbers, landmarks, etc.): The project is east of Mayodan in Rockingham County. Mayodan is north of Greensboro on Hw,y 220 From Intersection of US 220 Bypass and SR 2153, take SR 2153 west and go approx. 1.8 miles and turn right onto Webster Road. Site is approx. 0.6 miles after turning onto Webster Road 5. Site coordinates, if available (UTM or Lat/Long): See the attached USGS Mu. (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Property size (acres): Not Applicable 7. Nearest body of water (stream/river/sound/ocean/lake): UT to Dan River 8. River Basin: Roanoke (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) Page 2 of 8 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Residential and agricultural 10. Describe the overall project in detail, including the type of equipment to be used: The project will involve paving an unpaved secondary road acid bringing the travel lane, shoulders ditchlines and drainage structures up to current standards. Travel lane widening will be required to bring the road u.,p to current standards. Standard shoulder widths will be 6'-8' with deviations shown on the attached site12lanDitch widths will vary based on site conditions Proposed right-of-way width is illustrated on the attached site elan. Eauipment used will be standard road construction equipment trackhoe grader, backhoe, and bulldozer) 11. Explain the purpose of the proposed work: To upgrade an unpaved secondary road to a paved secondary road Paving and widening are being conducted to reduce future maintenance costs bring the road M to current construction standards, and increase traffic safety IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications- were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. Not Applicable V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. Not Applicable VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream Page 3 of 8 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.) below: Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres Name of Waterbody (if applicable) Type of Waterbody lake, pond, estuary, sound, bay, ocean, etc. N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: nu, excavauon, ureugng, flooding, drainage, bulkheads, etc. 5. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands [I stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Not Applicable Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Not Applicable Size ofwatershed draining to pond: N/A Expected pond surface area: N/A VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Pipe replacement activities are necessar to o increase travel lane and shoulder width to current construction standards Impacts will be minimized by strict enforcement of Best Management Practices for the protection of wetland and surface waters restrictions against the staging of equipment in or adjacent to waters of the US and coordination (including a pre-construction meeting) with the Division Environmental Officer. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Page 5 of 8 USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.eiir.state.nc.us/newetlands/strmgide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. A finding of insignificant impact is anticipated, therefore a mitigation plan is not provided Cumulative impacts are less than 150 feet The maximum amount of impact to a sinsle stream is 36 linear feet No Outstanding Resource Waters federally protected species or their habitats or essential fishery habitats occur in the project area. The project is not located in a High Quality Water. 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at (919) 733-5208 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCWRP, check the NCWRP website at http//h2o enr state.nc.us/)W/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): Not Applicable Amount of buffer mitigation requested (square feet): Not Applicable Amount of Riparian wetland mitigation requested (acres): Not Applicable Amount of Non-riparian wetland mitigation requested (acres): Not Applicable Amount of Coastal wetland mitigation requested (acres): Not Applicable Page 6 of 8 IX. X. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, can the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate.. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ® If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet Multiplier Required Mitigation 1 N/A 3 2 N/A 1.5 Total N/A * Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. Page 7 of 8 If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0260. Not Applicable XI. Stormwater (required by DWQ) Describe impervious acreage (both existing 'and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. In accordance with the Februar?25 1991 delegation agreement one copy of the sediment and erosion control plan will be submitted to DENR - Division of Land Resources and NCDOT Roadside Environmental Prior to construction XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Not Applicable XUL Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No X Is this an after-the-fact permit application? Yes ? No X XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). i AP hcant genvs'Signature hate / (Agent's signature valid only if an authorization letter from the applicant is provided.) Page 8 of 8 May 21, 2004 Site A Construction Sequence and Erosion Control Plan for Replacement of Pipe with Pipe using an On-site Detour - Rockingham County, SR 2181 Work to begin as soon as practicable following authorization. Construction is anticipated to take 4 weeks. 1. Install a rock silt dam (underlain by plastic) downstream of the work area to prevent incidental sediment loss. 2. Install ABC aggregateor a less intrusive dewatering device to allow dewatering of the work area. 3. Install pumps to divert flow around the work area. 4. Place a temporary extension at one end of the existing pipe to allow a travel lane shift. 5. Place a temporary detour over the temporary extension. 6. Opposite the detour, remove existing RC pipe to at least the centerline of the roadway. 7. Excavate to sufficient depth to allow 20% burial of the pipe, place base stone, and sections of 40' long 36" RC pipe. 8. Backfill the new section of pipe and place rip rap only as needed. 9. Place the temporary detour over the new sections of pipe. 10. Remove remaining sections of pipe. 11. Excavate to sufficient depth to allow 20% burial of the pipe, place base stone, and sections of 40' long 36" RC pipe. 12. Backfill the new section of pipe and place rip rap only as needed. 13. Remove the dewatering device and restore the natural stream contours. 14. Place final roadway in desired location. 15. Notify landscape department for final seeding. 16. Silt fences to be placed as site conditions require. 17. A 10' X 15' dirt bag will be used to remove excess water in the hole where the new pipe is being replaced. 18. Site conditions and weather may alter these plans. 19. A method less intrusive than a pump around system may be utilized if site conditions allow. 1516 \R) M t -,?6t1. ,p0 °3 0?\A?\\? o?6°oF?F? ??''¢0?6U0??6•?z'? °C? ?0 ??pp?: ..-?'. i a w-uu'w't -?- ._._.. .. ;:...__.. _....4 $TR11P ctECTRIC FENCE 2 ,QG p ^O + ryti cn C+! H a N -`{ 'Nop ?• a?6?5 5 z - - -- M N 's 2ST RpND ~- C ' _ LECTR?N? I iE FENCp env N ?• x ?. ,.,.,,ram"."""`„"' O. l ?,c'SON" Jop$ Op,. 0,?";z ??9pg3p1, N M ~ O F 4 c% ) O1 U? `„ ?O??oa??3299 A? Jv 193Z, 19 PUMP AROUND FOR UNNAMED TRIBUTARY TO DAN RIVER WEBSTER ROAD - SR 2181 ROCKINGHAM COUNTY NCDOT - DIVISION 7 ---------------- - 1501 1. p y 1368 t? ? 1 / 13-13 ?/ ,,/ ,:+: \.• ?, Ir 1354 N 1 139* :'F? - •a .m 1362 5• I ,s3 rv ,6-.. ? ? . .? 13W 1339 - i - .la.' ll ? f , ?. - ? ? •> 1997 ~ ??.? ,360 '?'? I• 1355 ?.. 1 °? 1376 \ i i _..? 1sn,,xe? ?1 1 .. j t-YM 1x37 ?,• 1346 . J i :1549 1360 13 #? Ltd f~ ' 1 i•'~1514 ni 1 \ 5? , ?33 .e1 ?.• 1361 t I;IW b 1 \ ,, I•• • 13111 )^ 6 •1 ,y 1B 1 , 1616 Z ®I ?tj •?. 1347 I3AS 1362 4 13% t I \.•I ladl :ice • 1• -woo i :}; - 1306 t 1 STONEVBIE I° ?:.?. ra. t.na i ? I ?• ' 1354 I . 1 .a- i i • .: 13431 taob A _ •I f 1378 •\ 1393 1 1367 It •?.,?• . 3' i P 1323 .? 1300111 •TC .'?.? 1340 U - 324 - M. /• 1321 ` /: f .'. /: ?.,`? / I • ??.' a; '•1 133 pAN t 6. 2145 31 V• \ / MA70OAN . wnlol` u.e x•73• lp.7,337 21s1 70 , I e :`? . O 1 \ 3 2178 0 -1-1 - - c ; p 11,77 ? \ / t g-7 \ 2149 • 130+ Y, e1)7) 1 •.P ? t? ..?}130 \ !( /p ,l / 1 1 1.1 66 • P .4 2204 . / 21 q2 A 14'? p1 /rte ?V1• _ ? ?Y??• ter 1116'11 I .'•...?? i 2191 •° ..f? ?? •2239 /? \\ f. , \?\1/°?\ Q B1' Q 2193 c I SI . ! 7f zp = x994 7 R. VER.- 2192 1 Ili 2166 \ 2189 b - o ° P i L 1 -1 • 263-,9 6 a 3 ° 311 A P ' 1 ,/ 1 7 2193 220 88,,)/$S 12, .. 1 1 J f f 740 ( 2311 " 2308 ` n0 n. 2 1196 • neo 3 zo° 230 0 u 1 j2L •J ~ _ ZiBp ?M a: `.J,• i ' i P .i \ ` _. \• 2762 j^ 919 f 1143 ' / IItO ° 2308 N P A > : 1. 2360- 23W 190 •• ' :19U /' • w1.E'o. 2315 !'° i 1 v n ,? . W 2902 1 ° 11 / a 213 ° t 6 m•. 711 Ilal v •\ It n 2317 ° -1 =3 ?b •.oan ., T? 199 1i .3 I -$ . x3 Y 1 2318 .09 /•' n j 2361 •' o ? / 11 A - 'N " n? 1 A •° r?, No 1936 N ?., 'o.lo A ?(6I + ; 1.2; ' 2x1 1 lx 1?2 A I 4 2319 V/ V) ' t l x 1924 n '2474 i , • 2379 a3 36•]0' 1 1136 113 P 1134 It7a4? 1•• 2320 •0 O • • u . YJ 1" 321 2316 2384 2»9 / N 1 '° / a (' n •' -: •. r'. n•? 1 (. l? ?•••, 1137 'J 1 2329 ° •B I 7 ?. 1110 1933 ! t 130 O l;ak 2373°:2378 a .a<Xn x7z O 11161 ?.? ` L.LI6e •j 113z 113,' C•-O 1; 2331 2316 + ? •3 1 1974 33 a n ? L 9 - zi92 / 1 1 ? 2.356 A ~ 1 - 1120 i 1 r . S ? j_37- q i 7 2373 p I 2 lila f' 1? 7 'N I f - 17 a n9x A _''`1? 19oe..1 1121 H_'1 196. 1 336 O MI 2 196• 6P•: I ,906 2806 1 - •?. nl 1916% t' /' lzpe , , • \ilo7 .? w 28M 'ti ?•' ''` -cS°y .3 ?..- n t9 i• 1,09 .131205 r-. 33?3 /.. 2336 1 .3 \ y \ 1 ? +9 244"6 ,.1 I I LL 1 194 la 11 • 1 , 29p4 - 12343 2301 + 1.0 IS6 A4 : O /• 29,8 2917 ?' N W,M?1 Cre1wo41 1 .2900 . / •? / '0 /. ,178' 1129 1103 68 al 11 . S ? Ms, • • ?p 11 •2 "\ 11 1 / 11 23" 23-6 1.1 2319 Y ,113 a '? > • , 292* X30 1110 1197 M Z3.0 234 1 (! [\? is • `t 1900 .. / - z 1 1 ------------ ----- .. ._. _._ /to11z1 J' 2929 _ 29 1 I J •? MI ? FORSYTH 76 -•- _ -•-•_ a p? COUNTY i 4 k / >r----------- INSETtJ wa VA. N. C. 1 1 3 58 IM j •? 1 N ' I } I I 13'56 j 1357 1769 ww i? is }! I.3 S ( itj ? :a:• Z 1.. I 277 1 P i I 13261.1 ? I LS I { I ? V ! ?J 32 3 1 1321 I 36.76' ^ lun ?' •e fi, 1181 / • ? ' 1 ar I II C j 1IB3 1165 .' ^..j I 111 '?' I I ? 11\ 1 ^ 1 ` ? l 11160 ' . ?? 11 I ?• I1? - 1 Corp •.1 • _- I- 1190 113 ,?10 rrWl WA 311 1139 - Q Vf I 1136 1 U-20, I 113 0136 . 9 .. . W L. 1. ? .,?,!/. f%???? ''... f , ,. •->./.'"f //// i--T - ,,? : '- _ 's_.;?.;? n.. , ` t ,. . ,:;i :ry •?J t. r •!4 / " Y n s.• r. / , t.. i J, J ft+j } 1?y / 77 'N Z/V. .?'. r -? I ''\, _I?? i , ' - •.? sail. i ..? J _, ? ?! \ \?? J 0-0 4A f- - 5' ??i. ? I l't !? - ? Wit, ?,ft ? • ?` Cem „ x'l ? - -f /? " f !? _?' / ???0.; t i ? •Y? ?? ? ,? ` I+S I? ? y tlil 21J4,_ _ t ? t ',? J J, 1 / W?bsh Road ?SR#2181 J 1 ` /""111 ? , 1I i ' ?• I fk - /A qi, j =` Jt ... i rf .. -.. ` \ /'r - I'''\ ?•-`III !, ? ^ .. " % I /,, r I ! :,I? j-1 r %; t ... i_ t t (y G.j?! '':.?pi1'- . . I ..? ?1{` 4! ? ? ?' ? ? '''•: ?, f rI?' alt )t!f = l ?,'.!' )r1,1•?. / $. r/..1 r i ! ?? ! r}!// ' t r I') ;J,i+`,??r, .., S_..l/f.?l ??'!"r t`T?Z?/r??lt // t sr / ? j f??-• i r ( , \ /-mar; -'j'/ ,? • \\_ 44, I/P / / ?, fr/ 4 7 '? ?>r,\\ ? r ? „', ?,//? s'ue' r : ! ? /1/, 7' '? '? ,( t/V / ,5 + - 4 '_ ??_'?rl ??,,rr ./ .!!yl i/ f\\` :?y^•„? ?//SC/L?'?'t?' l ?????l_ 1;L1 r4 Bo w Name: MAYODAN Location: 036° 24'20.0" N 079° 53'40.6' W Date: 6/4/2004 Caption: Webster Road (SR 2181) Scale: 1 inch equals 2000 feet Rockingham County Coovriaht (M 1997. LUDtech. Inc.