Loading...
HomeMy WebLinkAbout20061790 Ver 1_More Info Letter_20061116 o�OF W ATFRQG Michael F.Easley,Governor William G.Ross Jr.,Secretary rNorth Carolina Department of Environment and Natural Resources .-{ Alan W.Klimek,P.E.Director Division of Water Quality November 16,2006 DWQ Project#06-1790 Rutherford County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Terrence P. Duffy 651 Dalton Road Rutherfordton,North Carolina 28139 Subject Property: Lot 25 Blue Heron Point Water Quality Certification,Impacts ® REQUEST FOR MORE INFORMATION ❑ PERMITTING FEE MISSING/INCORRECT ❑ RETURN OF APPLICATION PACKAGE Dear Mr. Duffy: On November 13,2006,the Division of Water Quality(DWQ)received your application dated November 6,2006 for the above referenced project. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore,unless we receive five copies of the additional information requested below,we will have to move toward denial of your application as required by 15A NCAC 2H .0506 and will place this project on hold as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information Requested: ® Water Quality Certification, See 1.Processing,Item 2. . Please state which Permit(Nationwide, Regional or General)number you intend to use. You may want to contact the U.S. Army Corps of Engineers(USACE)to determine which permit they will allow you to use. ❑ DWQ requires the name of an individual shown as"Owner/Applicant"to set up the project. ❑ The PCN Application failed to contain the Applicant/Agent's Signature and Date. See last page of application. (Agent's signature is valid only if an authorization letter from applicant is provided). ❑ Water Body information not stated. See III Project Information,Item 7. ® Incorrect and/or missing wetland, intermittent-perennial stream and/or buffer impacts. DWQ is unable to review this project without noted or corrected impacts reflected. ❑ Lack of permitting fee. Please note that beginning January 1, 1999,the N.C.General Assembly passed legislation requiring payment of a fee for all 401 applications.The fee for applications is$200 for projects impacting less than an acre of wetland and less than 150 linear feet of streams. For projects impacting one or more acres of wetland or 150 or more feet of streams,the fee is$475. Nye Carolina 401 Oversight/Express Review Permitting Unit "'turQ��l✓ 1650 Mail Service Center,Raleigh,North Carolina 27699-1650 2321 Crabtree Boulevard,Suite 250,Raleigh,North Carolina 27604 Phone: 919-733-1786/FAX 919-733-6893/Internet:http7/ih2o,enr.state.nc.us/ncwetiands An Equal Opportunity/Affirmative Action Employer—50%Recycled/10%Post Consumer Paper ❑ Incorrect permitting fee amount. Please see above item. Your check# for$ is herein enclosed for fee correction. DWQ does not retain any payment unless it is in the correct amount. ❑ A request for a modification of an issued permit requires re-submission of five(5)application sets and appropriate fee. We have herein returned your modification request. ❑ Application was missing pages or sections of information. See Other section below, ® OTHER: DWQ requires a more exact impact figure for the open water area. Your check#3119 for $200 is herein enclosed. The permit fee is based on the amount of impact;since that is currently in question,the check is being returned. You may wish to visit the DENR website address: httn://www.enr.state.nc.us/ Click on: Rules,Policies&Regulations; Scroll down to heading: Wetlands; Click on: Wetland 401 Certification Regulations; Scroll down to heading: Guides;Click on: Lake Area Residence Work Guide;A Lake Dweller's Guide to the 401 Water Quality Certification Process Please contact the DWQ within three weeks of the date of this letter to verify that you have received this letter and that you remain interested in continuing to pursue permitting of your project and will be providing the DWQ the requested information at a later date. Please contact this office in writing and Kevin Barnett of the DWQ Asheville Regional Office. If we do not hear from you within three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized(at this time)by the DWQ. Please call Mr. Ian McMillan or me at 919-733-1786 if you have any questions regarding or would like to set up a meeting to discuss this matter. Sincerely, Cy di Karoly, Supervisor 401 Oversight/Express Review Permitting Unit CBK/jd Enclosure: Check#3119 for$200 cc: Kevin Barnett,DWQ Asheville Regional Office USACE Asheville Regulatory Field Office File Copy+check copy Central Files+check copy Filename: 061 790Lot25 B IueHeronPo int(Rutherford)_Hold_PermitTyp_Impacts w. TERRENCE P DUFFY, BUILDER, INC 3119 651 VS DALTON ROAD RUTHERFORDTON,NC 28139 // 66-1252/531 DATE / ( [D, o«®� xLLR � � �� 11 1 �/O DOLLARS Beck. 1�NC 28722 11'00 3 1 L 91i' 1:0 5 3 L 5 2 LC. L0000 L 9 3881"