HomeMy WebLinkAbout20041598 Ver 1_Complete File_20040921
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY
GOVERNOR
September 17, 2004
Mr. John Thomas
US Army Corps of Engineers
6508 Falls of the Neuse Suite 120
Raleigh, NC 27615-6814
(Two Copies) Q
Ms. Beth Barnes
Wetlands/401 Unit
NC DENR Division of Water Quality
1650 Mail Service Center
Raleigh, NC 27699
(Two Courtesy Copies)
LYNDO TIPPETT
SECRETARY
WETLANDS 1401 GROUP
SEP 2 1 2004
WATER QUALITY SECTION
Subject: Orange County, Construction of headwall on UT of Booker Creek on Dobbins Drive (SR
1740) in order to decrease future maintenance and improve traffic safety. Project Number 30708
To Whom It May Concern:
The North Carolina Department of Transportation (NCDOT) proposes to construct a fifteen foot
headwall (across the stream) with eight foot wingwalls on Dobbins Drive in order to decrease futute
maintenance costs and improve traffic safety. This activity will result in impacts to an Unnamed
Tributary of Booker Creek. The NCDOT anticipates that the headwall construction can be
authorized under Nationwide Permit (NWP) 3 and the dewatering operation can be authorized under
NWP 33. This application is intended as a request for formal written authorization from the USCOE
for NWP 3 and NWP 33. This application is also intended as a courtesy notification to the NC
Division of Water Quality as prescribed under General Water Quality Certificates #3376 and #3366.
FEDERALLY-PROTECTED SPECIES
Plants and animals with federal classifications of Endangered, Threatened, Proposed Endangered
and Proposed Threatened are protected under provisions of Section 7 and Section 9 of the
Endangered Species Act of 1973, as amended. According to surveys conducted by the Project
Development and Environmental Analysis branch of the NC Department of Transportation on April
24, 2003, no federally protected species occur in the project area.
P. O. Box 14996 Greensboro, NC 27415-4996 Telephone No. (336) 334-3192 Fax No. (336) 334-3637
PROJECT INFORMATION
Road Name SR Number Project Length
miles Classification
Dobbins Drive SR 1740 N/A Suburban
River Basin: DWQ
ID Water Quality
Designation % Impervious
Surface
Cape Fear 16-14-1-15-2-(l) B; NSW N/A
Buffer Rulesa Buffer Rule Conditions where applicable)
No Request Exemption
Protected Species
Present Mapped Historic
Properties CAMA
AEC Essential Fishery
Habitat
No No No No
HEADWALL CONSTRUCTION INFORMATION
Site N/A Stream Type Perennial
Station
Dobbins Headwall 15' across the stream
Drive with 8' win walls
Construction
Pump Around Dewatering
Sandbags
Method Device*
E/C Plan
Burial Depth N/A Date
Construction As soon as practicable Duration One week
Date
Impacts ft. 0 ft enclosure; 8 linear ft-headwall and win alls; 50 sf-temporary sandbags
Special
Conditions
Restoration Within 15 working days of the headwall construction, natural stream contours
Plan will be restored and seeded. Temporary silt screens will be cleaned and
removed following vegetation establishment.
RCP = reinforced concrete pipe; CMP = Corrugated metal pipe; CMPA = Corrugated metal pipe arch; E/C = Erosion
control. *A less intrusive dewatering device may be used in lieu of the one proposed.
MINIMALIZATION INFORMATION
Impacts will be minimized by strict enforcement of Best Management Practices for the
protection of surface waters and wetlands, restrictions against the staging of equipment in or
adjacent to waters of the US, and coordination (including a pre-construction meeting) with the
Division Environmental Officer.
P. O. Box 14996 Greensboro, NC 27415-4996 Telephone No. (336) 334-3192 Fax No. (336) 334-3637
MITIGATION INFORMATION
Stream mitigation is not anticipated, as the impacts to any individual stream do not exceed 150
linear feet. Total stream impacts from the project are calculated to be 148 linear feet. The project
was purposely designed to impact less than 150 linear feet of streams in order to avoid mitigation
and facilitate expediency in the issuance of permits. Wetland mitigation is not anticipated, as
wetland impacts do not exceed 0.10 acres and there is no occurrence of a unique natural wetland.
APPLICATION INFORMATION
Enclosed please find the Pre-Construction Notification Form and supporting documentation for
the above referenced project. If you have any questions, comments or need additional information
after reviewing this material, please contact Jerry Parker at (336) 256-2063. Thank you for your
attention to this matter.
Sincerely,
J. . Mills
1vision Engineer
Enclosures
CC: Barry Harrington, NCDOT
Chuck Edwards,NCDOT
B.J. Howell, NCDOT
Jerry Parker, NCDOT
Sue Homewood
P. O. Box 14996 Greensboro, NC 27415-4996 Telephone No. (336) 334-3192 Fax No. (336) 334-3637
Office Use Only' Form Version April 2001
USACE Action ID No. DWQ N00
If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than
leaving the space blank.
1. Processing
1. Check all of the approval(s) requested for this project:
? Section 404 Permit
? Section 10 Permit
® 401 Water Quality Certification
? Riparian or Watershed Buffer Rules
2. Nationwide, Regional or General Permit Number(s) Requested: 3 and 33
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: X
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (see section VIII - Mitigation), check here: ?
H. Applicant Information
1. Owner/Applicant Information
Name: NC Department of Transportation - Division 7
Mailing Address: P.O. Box 14996.
Greensboro, NC 27415
Telephone Number: 336-256-2063 Fax Number: 336-334-4149
E-mail Address:
2. Agent Information (A signed and dated copy of the Agent Authorization letter must be
attached if the Agent has signatory authority for the owner/applicant.)
Name: Jerry A Parker DEO
Company Affiliation: NCDOT - Division 7
Mailing Address: P.O. Box 14996
Greensboro, NC 27415
Telephone Number: 336-256-2063 Fax Number: 336-334-4149
E-mail Address: JParker@a dot state nc.us
Page 1 of 9
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Dobbins Drive SR 1740
2. T.I.P. Project Number (NCDOT Only): 30708
3. Property Identification Number (Tax PIN): N/A
4. Location
County: Orange Nearest Town: Chapel Hill
Subdivision name (include phase/lot number): N/A
Directions to site (include road numbers, landmarks, etc.): Take I-40 to 151501 (Exit 270)
and proceed west on 151501 approx 1.2 miles turn right on Erwin Rd (SR 1734). Dobbins
Drive (SR1740) is the very next intersection (approximatley 50 feet). Dobbins Drive serves
as a service road to the northside of 151501.
5. Site coordinates, if available (UTM or Lat/Long): See attached USGS map
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Describe the existing land use or condition of the site at the time of this application: Forested
Urban
7. Property size (acres): N/A
8. Nearest body of water (stream/river/sound/ocean/lake): Unnamed Trib. To Booker Creek
9. River Basin: Cape Fear
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at littp:Hh2o enr.state.nc.us/admin/maps/.)
Page 2 of 9
10. Describe the purpose of the proposed work: To construct headwall onto existing pipe at
Dobbins Drive in order to decrease maintenance and improve traffic safety.
11. List the type of equipment to be used to construct the project: Standard road construction
equipment including a backhoe trackhoe and dump trucks
12. Describe the land use in the vicinity of this project: Urban business
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
V. Future Project Plans
Are any additional permit requests anticipated for this project in the future? If so, describe the
anticipated work, and provide justification for the exclusion of this work from the current
application: N/A
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
Page 3 of 9
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )9
Yes ? No ® If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
s uare feet Multiplier Required
Mitigation
1 3
2 1.5
Total
* Zone 1 extends out 3U leet perpenaieuiar trom near oanx of cnannc , tumu z cxLciiuz ? l
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or .0260.
N/A
XI. Stormwater (DWQ Only)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
N/A
XH. Sewage Disposal (DWQ Only)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
N/A
Page 8 of 9
XIII. Violations (DWQ Only)
Is this site in violation of DWQ Wetland Rules (15A NCAC 211.0500) or any Buffer Rules?
Yes ? No
Is this an after-the-fact permit application?
Yes ® No ?
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
Signature
Page 9 of 9
N.C. D.O.T.
BRIDGE MAINT. DEPT.
EROSION CONTROL SEQUENCE
COUNTY Orange
S.R. No. SR 1740 Dobbins Dr.
BRIDGE NO N/A
PROJECT No. 30708
DESCRIPTION: REMOVE CLASS 1 RIP RAP & FILL MATERIAL from OUTLET end
of CM PIPE & REPLACE with CONCRETE HEADWALLS
Note:
All Erosion Control devices & proper installation plus maintenance of erosion control will be performed
by using - NCDOT Best Management Practices for Construction and Maintenance Activites Manual
1 INLET END - SANDBAG in FRONT of PIPE
2 OUTLET END - SANDBAG BELOW OUTLET end of PIPE
3 INLET END - PUMP CLEAN WATER AROUND & BACK into STREAM
4 PUMP WATER from CONSTRUCTION AREA into SILTBAG
5 PLACE SILT FENCE AS NEEDED
6 REMOVE FILL MATERIAL for FOOTINGS
7 FORM FOOTING POUR CONCRETE
8 FORM HEADWALL POUR CONCRETE
9 REMOVE all EROSION CONTROL DEVICES (SANDBAGS)
10 SEED AREA AS NEEDED
11 REMOVE ALL EROSION CONTROL DEVICES AFTER VEGETATION is ESTABLISHED
APPROXIMATE PROJECT START DATE OCT. 2 Do LA
PREPARED BY TRANSPORTATION SUPV. DATE
I L=
APPROVAL DIV. BRIDGE ENG.
DATE R l3• Dy
jcomell
266- DUKE 07
ubt _ , 1? i
` M FOREST' De o ?? `7p 22u 2777 - -.23.1 s
?4 323i jjj .37 LA ens n
* 7 ° 1
.I .le .17 x]7e 259 ' 0 of ll]S 1LL 77 :?
n1 3331!
1
6 1130 711 ° CO
Lul
Eubonka ?10 _1E.A7 \ ?133' /
• LL,!
a
_ y ts2t p ' 7 sz/
c rG N?F3 :.1 a°/ ?
L 6"
.O.r i122?1170 01
17)] IBS
a w.° a RD. a
q Feu ?t
1
! 1231 Rd \A?„
f / 25 v
4
C v 1 ??? EtDy /
?U I
I ' lr3s ?. -?-
uae.
?a - -.17 _. 1111 "1
1777 fAU
f j - .S] f l ?7]] ?( ??
v
86
E ld?. j - L
.
1816
?I 4 f?'1 Sl°.r 114 A
d SP I ' 1133 'o IY3 .O7.sS wnwm
% • ?0 ll31
1Lt
i
I 7
l )-1
1740
I ,
41
-1 _----------- / y'
°. low
tt: FAU F,#,,
°y r ICIO ?G
U / 1750 1'3o r
f Horace Williams n
Fu
I, Airport : f % o
?? 4 Rio 111] 7.1) 741
/ C78
f F aJ G t 733 '?` \ \? ? ?,? I
/ ? f ? , 'Jer i 1
C249 f 15 C58 a I
?f y t01o
31
86
X 301 >' I
` r
? ?% q
J I It
d IM J CHAPEL e?
o f0 HILL LM J ,
t? ss D// POP. 32,421 ?? 17?E clap
° FJ
/i
IMBOR0
POP. 7,336 € ?? r 1
(ow+ee co. 7:.o?e1
` J
n ll13 4 ,,:: .22 .5? !A DURHAM CO: 703 1010 s1 a 1111 0 ,? ° 7 60
F?Q, M°'ut $1. ? U ? s aFt°^°Ge :.? . --"' S..M 7^,1 F, t; 1
?? J7 ?? B6 FFV 0.51
', G 5 y1? ROOO
2Ni
? ?F. ` `,U v?) I
Q ?"R°?3 o r o UNIVERSITY N.C. '2wa o 'oa.
j 7 \ ey f,D LUZ 1Yi3 ll \ ??
r®?.: ; p ( a 86 ss
e MOnn, ss Jr Isar 1
COUNTY Orange
S.R. No. SR 1740 Dobbins Dr.
BRIDGE NC NIA
SEQUENCE1
1 INLET END - SANDBAG in FRONT of PIPE
2 OUTLET END - SANDBAG BELOW OUTLET end of PIPE
3 INLET END - PUMP CLEAN WATER AROUND & BACK into STREAM
4 PUMP WATER from CONSTRUCTION AREA into SILTBAG
6 PLACE SILT FENCE AS NEEDED
6 REMOVE FILL MATERIAL for FOOTINGS
7 FORM FOOTING POUR CONCRETE
8 FORM HEADWALL POUR CONCRETE-?-j
SR 1740
VAT
SILT FENCE
AS NEEDED
E ,.
PIPE
SILT
BAG
SANDBAGS
SILT FENCE
AS NEEDED
CONSTRUCTION
AREA
SR 1740
2ivt
0
PUMP e}------ STREAM FLOW
1
LEGENDS
0 o SANDBAGS
y TREES
Established
VEGETATION AREA
jcomell
COUNTY Orange
S.R. No. SR 1740 Dobbins Dr.
BRIDGE NC N/A
SEQUENCE2
7 FORM FOOTING POUR CONCRETE
a FORM HEADWALL POUR CONCRETE
9 REMOVE all EROSION CONTROL DEVICES (SANDBAGS)
10 SEED AREA AS NEEDED
11 REMOVE ALL EROSION CONTROL DEVICES AFTER VEGETATION Is ESTABLISHED
SILT FENCE
'e, I
AS NEEDED „8' 0"
150011
a
PUMR
SILT
I -I / ? " 81, 01,
SANDBAG
CONCRETE
SILT FENCE HEADWALL
AS NEEDED
SR 1740
PIPE
SR 1740
04-
>m"?I---- STREAM FLOW
liyit
LEGENDS
O O SANDBAGS
? TREES
Established
VEGETATION AREA
DBAGS
jcomell
COUNTY Orange
S.R. No. SR 1740 Dobbins Dr.
BRIDGE NC NIA
SEQUENCE3
7 FORM FOOTING POUR CONCRETE
8 FORM HEADWALL POUR CONCRETE
9 REMOVE all EROSION CONTROL DEVICES (SANDBAGS)
10 SEED AREA AS NEEDED
11 REMOVE ALL EROSION CONTROL DEVICES AFTER VEGETATION is ESTABLISHED
LOW
jcomell
VEGETATION AREA I
I ? 1.,Q? III i ``.\\ ;?7 ii'.. .` ?? 1 1 ./_, ?.` •??r...i 7!'
` t / ? ?, nrt ? O?/ ??/ 1'f ? / F ~ V w' _ ? •` t ` t ?•? •S1bSt $' t'•?l_??
IT I
a Iws• '?' l••? I
•'`asa?c?_.;i'\? \ p ? ?1? .f ? _w '(_ •..? ? aa• `? /f?`?/^-.' a, -it? -? j: ??v' II1.,??\? ?? i???,\.
r,? f ?.?:.: .?.' `. jti '? ? ? ti .? ?'r! I I ... , •/ YI /• ? ' ??r/"• :f ? l ,. ?1 O CCdif I ? ? 51)?! .?.?,/!
I•?? n`?• )!i 1-.. \ti ( } ,`'' ?' l/??? J?', it ! U '.t., I C ?^` ?'-:`?T<1s1?? ? ? l? i ) - ?i
I `..! ??l Com ilt 1( % ?? , , r - ?. J ! •? / \ f _ `e'+ t'ar `. G" ? ;: ! ?) _„ •\,
y; ???.? A .l' ) / S96 ` ? :1 ? i?? r/i/ `? QO?t? J,.. {. 111/ 1 ? ??
'..C .? ;. S `.r,. / ,.. ?•;'???' 1571.1 • ???, , •1
77 -
? •o?a * jam..°? 'i >f. ?. j'?-? -•1. •' \ l .{. ?1 /? n.`-•=_.?W? ? - `,{ .Q•• ?L'/,•. \•.??+.
N 4o
rr? ( +,?%•' :'! 3? ?? r?^? ti •??? Q, + ' ?' / ";?'? f ? ?i?? ?ilaV ' • ?jr? ?J ,r•• ?1 ;II?? t'._a'-;?'I
14L ? . 1 f`.N ?/?( r( (. \4, • • , ' _,` ? i ? ?r • Ri n y • 11 •v • ? yY \ ?.?/C?1??• ? ? ? ? ? ( \? ?:'•-?.I
>+ ? ?' ? • ? -..? ! t'{Jj+ t. i ?`•v. \?`3?, r r l 1+?„i ?.?,,1n?,Ul?l?+e _ .?• •p• U?\`' , \ I I f , ? t• / ?_J/
? ? ..oa // ?, '? ;p /?1,? ,•.. I { v ??? ha pal Htl I? 1 •.", I w1/11 /? ???ir ?``?\
A j(?? ` ?. MemCe
aS ? i v ! ' 1, ? r (r _ • ? ',Ramtev ? ? ? t' /,, r ? r I ? ???,/ * " \"x'y? ?-,-il 1 .r•j...
..310 70wcr5l
ti ?` ('l \1 ,• ` YKCHL)-
RIl i -?? r ? V,r :'\ ` t? / I I • ?$ ? : ?„? li ? ? ? ? J•* ? - J ?? ; i •?? I ? / ? I '?./ f` •• r:.«.--. ...
4
174
w
r) f `I t • r 4, • •I ? S 1' " ? ? ?. Ephc us woad ? w ' 1 .?' /?/ ) a?%•
`?t t<? \ ?" -:. _ /?s j:• • tl' I 'o• ??/. I? Sc6 ?.•, x;14 1 if/ ?i r? 1 Ir ( iCt l?
C) Y° . _,? j j? ? ,`f ? ?.. ? ? \I ' ,? Pz,
?,??f . f r r _ I ? , , •' ??j h /? r_
.(??4?"? rt. ti?i ??. ??e •% • sl'? - 1rll!1 ?t ?t- r?.. I w?? r .i 0a ara l..' __` `J,.._? //,??/?I?+'-- %
%
4, k,
t y"? t` I j
Ilso l / +: B arch
~? ,? .'?? • .!. tm r. _, _ 1
` s'?:.L•.? `, • S' ,\ , O f!I( 1 (• j '` N C.OUI$C Ir?• I /Q ! • ?? `? \r
g 1 II
t IT t
??f lJ:+1 ??7!/O\i ?;
?> ?/. '/ ?.,;' •v.ia +; l 1 tiassasa. ?:: c?', `, ry
l 1 l } ?J `I, t t?^I.\41`1 11-I1r?"
Q I '? - rl
Name: CHAPEL HILL Location: 035° 56'36.7" N 079° 01'03.9" W
Date: 9117/2004 Caption: Dobbins Drive (SR1740)
Scale: 1 inch equals 2000 feet Orange County
Copyright (C) 1997, Maptech, Inc.
{
F:
t 1
f
f
t
i ?. ,
?
1
f
F
i
'.
I
j
1?
S,
?'
F.
i
i
1i