Loading...
HomeMy WebLinkAboutNCC204413_ESC Approval Submitted_20201006Planning & Development Department Nathan Pennington Planning Director LETTER OF APPROVAL September 24, 2020 Heather Vale Asheville, LLC Mr. Albert Seale 32 Pine Acre Blvd. Asheville, NC 28801 RE: Project Name: HEATHER VALE SUBDIVISION Acres Approved: 5.0 ACRES Project #: ERO2020-00031 County: BUNCOMBE City: ALEXANDER Address: 93 HORIZON WAY River Basin: FRENCH BROAD Stream Classification: C Date Received by: 8/10/2020 Plan Type: RESIDENTIAL Dear Sir/Madam, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Land Disturbing Permit must be posted at the job site. This approval shall become null and void if you have not made progress on the site within six months after the date of approval. A one-time six month extension can be granted for good cause shown upon receiving a written request from you before the expiration of the approved plan. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form maybe accessed at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, �� - -� wsov.�"" W. Jason Guess Erosion Control Officer Enclosures: Land Disturbing Permit NPDES NCGO1 Fact Sheet ec: Brooks Engineering Associates Office file Planning & Development Department Nathan Pennington Planning Director LAND DISTURBING PERMIT NUMBER: ER02020-00031 NCG01 COC#: PROJECT NAME: HEATHER VALE SUBDIVISION LOCATION: 93 HORIZON WAY RESPONSIBLE PERSON: ALBERT SEALE THIS CERTIFIES THAT A LAND DISTURBING PERMIT HAS BEEN ISSUED FOR THE CONSTRUCTION WORK SET OUT ABOVE. Jdu..ytLOA6, b Erosion Control Officer Erosion and Sedimentation Control Tele: (828) 250-4848 THIS CERTIFICATE MUST BE POSTED AT THE CONSTRUCTION SITE IN A SECURE PLACE FROM THE TIME WORK IS COMMENCED UNTIL EROSION CONTROL INSPECTOR GIVES FINAL APPROVAL. A COPY OF THE EROSION CONTROL PLANS AND APPROVAL LETTER MUST BE AVAILABLE FOR THE INSPECTORS USE AT ALL TIMES. Issued: September 24, 2020 Permit expires: September 24, 2025