HomeMy WebLinkAboutNC0004944_NOV-2020-PC-0394_20200930imp
WATER TREATING, LLC
September 28, 2020
W. Corey Basinger, Regional Supervisor
Water Quality Regional Operations Section
Mooresville Regional Office
Division of Water Resources, NCDEQ
610 East Center Avenue, Suite 301
Mooresville, NC 28115
Subject: Notice of Violation
Tracking Number: NOV-2020-PC-0394
Permit No. NCO004944
Edge Water Treating, LLC
Rowan County
Dear Mr. Basinger,
7401 Statesville Blvd
Salisbury, NC 28147
V1OROS {
Via Certified Mail
Via Email (copy)
NC DEQ conducted a compliance inspection at the Edge Water Treating, LLC facility (NPDES
NC0004944) on August 26, 2020. DEQ documented the inspection findings in a Notice of Violation
(NOV) letter dated August 31, 2020. Included herein is Edge Water Treating's response to the NOV.
The NOV identified violations and the Edge Water Treating responses are as follows:
Operations and Maintenance: Drive motor missingfrom secondary clarifier
The Edge Water Treating facility has three secondary clarifiers. Two of the secondary clarifiers are
operational and one secondary clarifier has been out of service for years. The secondary clarifier that
is out of service is identified as -such by DEQ on page 2 of the NPDES permit and was identified as
out -of -service on the previous owner's (DuraFibers) NPDES permit. The out -of -service secondary
clarifier is not required for hydraulic or contaminant removal capacity to maintain compliance with
effluent limits. Out -of -service equipment is listed in the permit to provide a comprehensive list of the
equipment onsite; however, if DEQ does not desire for out -of -service equipment to be listed on the
NPDES permit, this can be addressed at the next permit renewal in 2022.
o Secondary Clarifier: One of three clarifiers had weeds blocking weirs and in effluent trough. Drive
motor and return sludge pump missing from other clarifiers.
The weeds have been cleaned out of the operational secondary clarifier trough and weirs. Photos of
the clarifier after cleaning are attached.
One of the secondary clarifiers that is operational is above -grade, and return or waste sludge is
discharged by gravity. The second secondary clarifier that is operational does have an operational
NC0004944 NOV-2020-PC-0394 Response, September 28, 2020 page 2
sludge pump. Due to the decreased flow the pump would not have been running during the
inspection. The out -of -service secondary clarifier does not have an operational return sludge pump. In
the event this third secondary clarifier is brought into service in the future a sludge pump would be
installed.
Pumps-RAS-WAS: Return sludge pump not installed and operational
Please see response above regarding sludge pumps.
DEQ also noted during the inspection that Transport Chain of Custody forms did not indicate sample
preservation. Edge Water Treating understands this is required and has worked with Statesville Analytical
to ensure sample preservation condition is marked in the future.
If you should have any questions or require additional information, please contact me at (704) 609-7971
or gcolenaanQaforsiteinc.coni.
Sincerely,
Gre Coleman
General Manager
Salisbury Investments I LLC
5320 Old Pineville Rd.
Charlotte, NC 28217
Attachments
Edge Water Treating, LLC 7401 Statesville Blvd. Salisbury, NC 28147
NC0004944 NOV-2020-PC-0394 Response, September 28, 2020 page 3
Attachments
Photos of Clarifier After Weed Growth Removal
Edge Water Treating, LLC 7401 Statesville Blvd. Salisbury, NC 28147