Loading...
HomeMy WebLinkAbout20201392 Ver 1_Meeting Request Review_20201005ID#* 20201392 Version* 1 Regional Office* Central Office - (919) 707-9000 Reviewer List* Rick Trone Pre -Filing Meeting Request submitted 10/5/2020 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Eric Kulz eric.kulz@tovvnofcary.org Heater Park Streambank Repair Town of Cary Wake Street Address Town of Cary Address Line 2 P.O. Box 8005 aty Cary Fbstal / Zip Code 27512-8005 Is this a transportation project? * r Yes r No State / Frovince / Fegion NC Country USA Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit F Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? No particular preference Please give a brief project description below. Heater Park is a small linear urban park located at 400 S. West Street in an older residential section of Cary. The stream that flows through the park from east to west has several areas of streambank erosion. The upstream area (Area A on attached map) is experiencing lateral migration that is threatening to undermine a sidewalk along the south side of the park. Our proposed plan is to relocate the channel to the north approximately four feet, re -grade the streambank at a 2:1 ratio, and then stabilize the streambank down to the new toe of slope with a combination of riprap (lower slope) and coir matting and seeding (upper slope). The downstream area (Area B) is located immediately upstream of a culvert and headwall system which conveys the stream to the west beneath Heater Drive. The stream path has a tortuous meander before making the final approach to the culvert, and storm flow is eroding behind the headwall. Similar to upstream, the proposed plan is to shift the channel approx. four feet to the north, eliminating a portion of a stable bar which causes a pinch point in the channel before entering the culvert. The streambank adjacent to the headwall will be regarded at a 1.5:1 slope and stabilized with riprap. The cut slope of the bar will be stabilized with coir and seeded. Specific design plans are being finalized. Please give a couple of dates you are available for a meeting. 10/19/2020 10/20/2020 10/21 /2020 Please attach the documentation you would like to have the meeting about. Heater Pk Erosion Work Areas.pdf 89.5KB Streambank Erosion Photos.pdf 1.08MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 10/5/2020 Reviewer Meeting Request Decision Has a meeting been scheduled?* r Yes r No jkk / .• .30 At 4 Al.16, L { • ., a ,ramM.PAL.� • • r 4 y V - it US Area A Streambank Erosion US Area A Streambank Erosion (adjacent to photo above) DS Area B Steambank Erosion DS Area B Streambank Erosion