Re: Stallings Mini -Storage
Project Tracking WID: PC SESC 2020-13
Disturbed Acres: 4
Stallings Mini -Storage
2020 B. Stokes Road
Greenville, NC 27858
Dear Sir:
JAMES F. RHODES, AICP
DIRECTOR
This is to advise you that the Pitt County Technical Review Committee conditionally approved
the soil erosion and sedimentation control plan and stormwater plan for STALLINGS MINI -
STORAGE on September 23, 2020. Conditions and requirements as a part of this approval are
attached below. Copies of the draft minutes from the meeting will be available upon request
prior to the next Technical Review Committee meeting.
As stipulated on the financial responsibility form, you are responsible for ensuring compliance
with all aspects of the approved plan and the Pitt County Soil Erosion and Sedimentation Control
Ordinance. Your primary objectives include, but are not limited to, preventing offsite
sedimentation, preventing sediment from entering watercourses, and establishing vegetation on
all disturbed areas within 7-14 calendar days, following any completion of a phase of grading.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to
the commencement of any land disturbing activity on the above named project. The NOI form
may be accessed at deq.nc.gov/NCGOI. Please direct questions about the NOI form to Annette
Lucas at Annette.lucasamcderingov or Paul Clark at Paul.clark(i4ncderingov. After you submit a
complete and correct NOI Form, a COC will be emailed to you within three business days.
Please be aware that your project will be covered by requirements of the NPDES
Construction Stormwater General Permit NCGO10000. Please become familiar with all the
requirements and conditions of this permit in order to achieve compliance.
Upon discovery of noncompliance by our office, the following actions may be taken:
1. No further permits for building or other construction will be issued.
2. The authority to continue construction, other than for erosion control measures,
will be terminated.
3. Penalties of up to $5000 per day may begin to accrue. Failure to immediately
comply upon notice of noncompliance will result in injunctive and/or criminal
action.
Other Comments:
4. This erosion control plan shall expire three years following the date of approval if
no land disturbing activity has been undertaken.
5. The Division of Water Quality may pursue legal action against you in order to
enforce requirements of the NPDES, Phase II permit.
6. The Pitt County Soil Erosion and Sedimentation Control Ordinance authorizes
County officials to inspect sites to ensure compliance with the Sedimentation
Pollution Control Act.
Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file
at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of
periodic inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, the erosion and sedimentation control plan is inadequate to meet
the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General
Statute 113A-51 through 66), this office may require revisions to the plan and implementation of
the revisions to insure compliance with the Act. Acceptance and approval of this plan is
conditioned upon your compliance with Federal and State water quality laws, regulations, and
rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing
activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form
if there is any change in the information included on the form. Land disturbance shall not
begin until a preconstruction meeting has taken place.
A final Certificate of Occupancy will not be issued until the listed conditions have been
addressed.
Please provide a copy of the certificate of coverage prior to beginning any land disturbance.
If you need further information or assistance, please contact me at (252) 902-3250.
Sincerely,
Thomas Shrader
Planner III
cc: Bryan Fagundus, Ark Consulting Group
CONDITIONS AND REQUIREMENTS
[Planning]
1. Based on the calculations submitted, this development will require the installation of
Best Management Practices (BMP's) to meet the peak flow requirements.
2. A payment to a private mitigation bank or the Environmental Enhancement Program
(EEP) is required to meet the nitrogen and phosphorus loading requirements of the Pitt
County Stormwater Ordinance. This payment must be made prior to the issuance of the
Certificate of Occupancy.
3. All BMP's must meet the requirements of the Pitt County Stormwater Ordinance and
must be designed according the North Carolina BMP Manual.
4. As -built plans are required following the completion of the BMP.
5. The owner will be responsible for maintenance of all stormwater BMP's. A recorded
stormwater maintenance agreement is required.
6. Show stockpile/borrow locations on plan.
7. Show concrete washout location on plan.
8. The conditions listed must be addressed before a final Certificate of Occupancy will be
issued.
[Emergency Management]
9. A fire hydrant is required on the project side of the road within 400' of the parcel.
10. Fire department access will be required (lockbox or key code access).
11. Fire suppression system will be required if any fire area exceeds 12,000 square feet.
12. Need approved fire apparatus turn around or continue fire apparatus road to include
second exit.
[Greenville Utilities Commission]
13. Please show 10' EE on existing UG cable along road/drive going to the old park.
[Pitt County Environmental Health]
• Old septic tanks must be crushed and filled in, with proof provided.
• All lots are required to have been permitted or a soil engineer's report must be on file
with Environmental Health.
• No fill material (including construction spoils) is allowed on any area to be used for a
sewage disposal system or 100% repair area. Any amount of fill found on these areas
will be grounds for disapproval of the proposed lot.
• The location of any proposed berms must be shown on all subsequent maps. The final
dimensions of the completed berm must be shown so that the Environmental Health staff
can verify that no portion of any berms will interfere with the sewage system or 100%
repair locations.
• Locations of any soil stock pilings should be shown on the construction plan. These
stock pilings should be placed in an area not to be utilized for on -site sewage disposal.
• If underground electrical lines or natural gas lines cross the property at any point, they
must be flagged by ULOCCO before the site is evaluated by the Environmental Health
staff.
• The location of any existing or proposed drainage tile must be field located and shown of
a surveyed map provided to Environmental Health staff.
• A backhoe may be required for the site evaluations (15A NCAC 18A .1939(b)).
• Any riparian buffers or floodways must be noted on subsequent maps.
[NCDOT]
• NCDOT has concerns about emergency vehicle accessibility, and withholds further
comment until that is addressed.
[General Comments]
• Soils located on site include Bb, Co, ExA, GoA, and Ly, and possess the
following characteristics:
■ Seasonal high water table (Bb, Co, ExA, GoA, and Ly)
■ Slow Permeability (Co)
■ Flooding or Ponding (Bb)
■ Moderate shrink -swell potential (ExA, Co)
■ Unstable for trenching 4 feet or more (Bb)
■ Hardee Creek Watershed
■ There is no record of sub surface drain tile, but it is possible for some to
be on site.
■ The ditches adjacent to the property should be cleaned out to the original
bottom for better drainage.
• The following agencies have reviewed the Construction & Erosion Control Plan
for STALLINGS MINI -STORAGE and have no comments:
■ Pitt County Engineering
• The following agencies have reviewed the Construction & Erosion Control Plan
for STALLINGS MINI -STORAGE and have not returned comments:
■ Eastern Pines Water