Loading...
HomeMy WebLinkAboutNCG120107_Tier II Relief Request and Sampling Info Emails_20200928Georgoulias, Bethany From: Misenheimer, Don <dmisenhe@wm.com> Sent: Monday, September 28, 2020 12:00 PM To: Lucas, Annette; Georgoulias, Bethany Cc: Morman, Alaina; McFeeley, Michael Subject: [External] Great Oak Landfill - Tier II Sampling Relief Request- Additional Documentation/Detail Attachments: Great Oak -Tier II Sampling Relief Request_Documentation_092820.pdf External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov The following attachment image007.png,image008.jpg,image009.jpg,image010.jpg,image00l Jpg,great oak _tier ii sampling relief request_ documentation_092820.pdf has timed out, hence bypassing our Attachment Defense System. Only open it up if you are truly expecting this file. Ms. Lucas: Please find the attached letter that provides further explanative detail to supplement out request for retroactive Tier II sampling relief for the Great Oak Landfill facility. Please let me know if I can provide anything additional and thank you again for your consideration in the matter. Best regards - DON M. MISENHEIMER Environmental Protection Manager (North Carolina and South Carolina) dmisenhea-wm.com C: 984.328.0129 From: Lucas, Annette <annette.lucas@ncdenr.gov> Sent: Thursday, September 24, 2020 10:09 AM To: Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov>; Misenheimer, Don <dmisenhe@wm.com> Cc: Morman, Alaina <alaina.morman@ncdenr.gov> Subject: RE: [External] RE: Industrial Stormwater Monitoring Question: Don, Can you please provide a more detailed explanation as to how COVID prevented monthly sampling at your facility? We do have many facilities throughout the state who have been able to conduct sampling in a safe, socially distant manner. Sincerely, Annette Annette Lucas, PE Stormwater Program Supervisor Division of Energy, Mineral and Land Resources North Carolina Department of Environmental Quality Office: (919) 707-3639 Cell: (919) 817-2514 Fax: (919) 715-0999 Email: annette.lucasa-ncdenr.gov Web site: deq.nc.qov/SW Physical Address: 512 North Salisbury Street, Office 640L, Raleigh, NC 27604 Mailing Address: 1612 Mail Service Center, Raleigh, NC 27699-1612 From: Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov> Sent: Thursday, September 24, 2020 8:21 AM To: Misenheimer, Don <dmisenhe@wm.com> Cc: Lucas, Annette <annette.lucas@ncdenr.gov>; Morman, Alaina <alaina.morman@ncdenr.gov> Subject: RE: [External] RE: Industrial Stormwater Monitoring Question: Don, I see the note you put on all those DMRs. I think that's a start, but the suspension will likely need more explanation am deferring to my supervisor and colleague to guide you further. z"our rainfall Chemfal Omen I Fecal Celftrm amount, Demand Cokmies per lOQ rat Inches} aWL ggp low 46S29 00340 3152.6 T Due to 0VID-119 and the safety of ]G rnmat Oak ernployeas and Contractors, t h a monthly Tler II sampling (SIBM] has ,been suspended. Great Oak will continue to assess the available is uidence and will resume sampling en we are able. st beRin with the second r0nsecu[Ive benchrnark extcudance f< Bethany Georgoulias Environmental Engineer Stormwater Program, Division of Energy, Mineral, and Land Resources N.C. Department of Environmental Quality 919 707 3641 office bethany.georgoulias@ncdenr.gov 512 N. Salisbury Street, Raleigh, NC 27604 (location) 1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing) Website: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater DES-" Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Misenheimer, Don [mailto:dmisenhe@wm.com] Sent: Wednesday, September 23, 2020 2:34 PM To: Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov> Subject: [External] RE: Industrial Stormwater Monitoring Question: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Bethany: Thank you for your response- I am out in Georgia today with some bad service. I will be glad to prepare a letter tonight and get to you tomorrow with any additional documentation that I need to provide. Please find the attached zip file with the 2020 DMRs as submitted (the Tier 2 reports have a statement in red). We have resumed monthly monitoring earlier this month. Please let me know if I need to provide anything additional. I need to check with management on how much particulars I can share about the COVID that was present at our site, but I am sure I can provide an overview without difficulty. Thank you again for your time - DON M. MISENHEIMER Environmental Protection Manager (North Carolina and South Carolina) dmisenhea-wm.com C: 984.328.0129 w From: Georgoulias, Bethany <bethany.georgoulias@ncdenr.gov> Sent: Wednesday, September 23, 2020 12:36 PM To: Misenheimer, Don <dmisenhe@wm.com> Cc: Lucas, Annette <annette.lucas@ncdenr.gov>; Morman, Alaina <alaina.morman@ncdenr.gov> Subject: RE: [External] Industrial Stormwater Monitoring Question: Don, The word we have from Division management is that suspensions in monitoring monthly as a result of COVID-19 restrictions may be excused, but the reasons should be clearly explained and documented. This explanation for the monitoring gap (and specifically which periods it impacted) can be sent to us (e-mail is fine), and we will keep it with the permit file. What are the permit numbers that you submitted the DMRs for? I can take a look at what you included on there and let you know if additional explanation is advised. Bethany Bethany Georgoulias Environmental Engineer Stormwater Program, Division of Energy, Mineral, and Land Resources N.C. Department of Environmental Quality 919 707 3641 office bethany.georgoulias@ncdenr.gov 512 N. Salisbury Street, Raleigh, NC 27604 (location) 1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing) Website: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Misenheimer, Don [mailto:dmisenhe@wm.com] Sent: Monday, September 21, 2020 10:15 AM To: Georgoulias, Bethany <bethany.georgoulias@ncdenr.gov> Subject: [External] Industrial Stormwater Monitoring Question: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Bethany : I hope you are well. Would you have time for a quick call to discuss monitoring frequency at one of our facilities during the past few months due to COVID? A brief run down is below: • The site is currently in Tier 2 status (SB2W for Fecal) subsequent to the 1st Semi-annual event of 2020. Due to COVID-19 and for the safety of Great Oak employees and Contractors, the monthly Tier II sampling (SB2W) was suspended through August 2020. When WM travel loosened at the beginning of September 2020, sampling was resumed (September samples have been taken) after EP was able to meet with contractor to discuss new sample location. • Tier 2 Status: The site has cleaned basins, repaired/replaced skimmers, and has recently moved the sample location closer to the property line. Additionally, the site has taken upstream samples (September 2020) for Fecal. Wildlife is abundant in the immediate and surrounding areas; documentation of wildlife activity will begin for a future request for variance of the Fecal threshold. As you can see, I halted our contractors monitoring of our facility in March (scheduling due to the unknowns of COVID, and issues with COVID present in other contractors at our facility). I documented this on DMR forms that were electronically submitted. I just want to discuss any ramifications from your division for us having to do this. Thank you for your time - DON M. MISENHEIMER Environmental Protection Manager (North Carolina and South Carolina) dmisenhea-wm.com C: 984.328.0129 w Recycling is a good thing. Please recycle any printed emails.