Loading...
HomeMy WebLinkAbout20061804 Ver 33_Approval Letter_20201005 October 5, 2020 DWR # 06-1804 v33 Johnston County River Dell Company, Inc. Attn: Ms. Rebecca Flowers 4880 NC 42 East Clayton, NC 27527 Subject: Approval of Individual 401 Water Quality Certification with Additional Conditions – Addendum The Village at Flowers Plantation – Additional Impact #22 (Harris Teeter Fuel) and Special Condition L Modification USACE Action ID. No. SAW-2008-01712 Dear Ms. Flowers: A 401 Water Quality Certification (#3766) for The Village of Flowers Plantation was first issued on November 5, 2008, was reissued on March 15, 2010 and February 22, 2013, and amended on November 10, 2016, December 22, 2016, and July 10, 2017 and November 5, 2019. On August 20, 2020, the Division of Water Resources (Division) received a modification request from Soil & Environmental Consultants, PA dated August 12, 2020. This modification request involves the addition of Impact Area #22 for the Harris Teeter Fuel facility within the “Existing Development” of the project. This addendum is in addition to prior approvals and addendum for this project. By copy of this letter, 401 Water Quality Certification #3766 is modified as described below. 1. The following additional impacts are hereby approved [15A NCAC 02H .0506(b)]: Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary 404/401 Wetlands 0.026 (acres) 0 (acres) DocuSign Envelope ID: 954664D3-8FDB-4DD5-ACC9-B2018CE9778C The Village at Flowers Plantation DWR Project #2006-1804 v33 Individual Certification #WC003766 Page 2 of 2 2. Mitigation must be provided for the proposed impacts as specified in the table below. The Division has received an acceptance letter from the EBX-Neuse sponsored Neu-Con Wetland & Stream Umbrella Mitigation Bank – Hannah Bridge Site to meet this mitigation requirement. Until the EBX- Neuse sponsored Neu-Con Wetland & Stream Umbrella Mitigation Bankl receives and clears your payment, and proof of payment has been provided to this Office, no impacts specified in this Authorization Certificate shall occur. For accounting purposes, this Authorization Certificate authorizes payment to the EBX-Neuse sponsored Neu-Con Wetland & Stream Umbrella Mitigation Bank to meet the following compensatory mitigation requirement [15A NCAC 02H .0506(b)(6)]: Compensatory Mitigation Required River and Sub-basin Number 404/401 Wetlands 0.026 acres Neuse 03020201 All other conditions in the 401 Water Quality Certification #3766 remain unchanged and are in effect. This completes the review of the Division under section 401 of the Clean Water Act and 15A NCAC 02H .0500. Please contact Sue Homewood at 336-776-9693 or Sue.Homewood@ncdenr.gov if you have any questions or concerns. Sincerely, Paul Wojoski, Supervisor 401 and Buffer Permitting Branch cc: Deborah E. Shirley, Soil & Environmental Consultants, PA (via dshirley@sandec.com) Johnston County (via johnstoncountync.com) Chris Hopper, USACE Raleigh Regulatory Field Office (via email) Todd Bowers, EPA (via bowers.todd@epa.gov) DWR 401 & Buffer Permitting Branch file Filename: 061804v33VillageatFlowersPlantation(Johnston)_401_IC_AdditionalImpactAddendum DocuSign Envelope ID: 954664D3-8FDB-4DD5-ACC9-B2018CE9778C