HomeMy WebLinkAbout20201293 Ver 1_DWR Pre-Filing Meeting Request Form_20201001DWR Pre-Fil ing Meeting Req u est Form
Contact Name *
Contact Email Addre ss *
Proje ct Owne r *
Proje ct Name *
Proje ct County *
Owne r Addre ss:*
Is this a transportation proje ct?*
Type (s) of approv al sought from the DWR:
Doe s this proje ct hav e an e xisting proje ct ID#?*
Do you know the name of the staff me mbe r you would like to re que st a me e ting with?
Ple ase giv e a brie f proje ct de scription be low.*
Yates Allen
ryallen@ncdot.gov
NC Department of Transportation
Bridge 73 over Foster Creek
Madison
City
Asheville
State / Province / Region
NC
Postal / Zip Code
28801
Country
USA
Street Address
55 Orange Street
Address Line 2
Yes No
401 Water Quality Certification -
Regular
401 Water Quality Certification -
Express
Individual Permit Modification
Shoreline Stabilization
Yes No
Kevin Mitchell
Please give a couple of dates you are available for a meeting.
Ple ase attach the docume ntation you would like to hav e the me e ting about.
Signature *
Submittal Date
The project consists of the replacement of bridge 73 on SR 1341 Foster
Creek Road over Foster Creek in Madison County, NC. The bridge
replacement will not result in any impacts to Foster Creek. However, an
existing plastic driveway pipe carrying an unnamed tributary (UT) to Foster
Creek will be/has been extended by 16 linear feet.
I spoke with Kevin by phone yesterday. I sent in the Notification of Work in
Trout Watershed form yesterday believing this project would classify as a
non-notifying project. Kevin responded that it does not because Foster
Creek is classified as Class C, ORW, Tr. We talked on the phone and I
explained that the UT does not show up on the plans and that I found out
about the pipe extension in the last few days and that the contractor was
planning to extend the pipe ASAP to avoid the trout moratorium. I informed
Kevin that the PCN would be 'after-the-fact'. Therefore, I did not have time
to submit this form 30 days before submitting the PCN.
Kevin and I agreed a meeting for this project would not be necessary.
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
· This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
· I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
· I also understand that DWR is not required to respond or grant the meeting request.
Your project’s thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired, and you can submit an
application.
9/29/2020