Loading...
HomeMy WebLinkAbout20201293 Ver 1_401 Application_20201001 I I DWR Division of Water Resources Pre-Construction Notification (PCN) Form September 1,2020 Ver 3.2 Initial Review Has this project met the requirements for acceptance in to the review process?* ✓ Yes ✓ No Is this project a public transportation project?* 0 Yes r No Change only if needed. BIMS#Assigned* Version#* 20201293 1 Is a payment required for this project?* ✓ No payment required G Fee received Reviewing Office* ✓ Fee needed-send electronic notification Asheville Regional Office-(828)296-4500 Select Project Reviewer* Kevin Mitchell:eads\rkmitchell Information for Initial Review 1a.Name of project: Bridge 560073,SR 1341 Foster Creek Road,UT to Foster Creek 1a.Who is the Primary Contact?* Yates Allen lb.Primary Contact Email:* 1c.Primary Contact Phone:* ryallen@ncdot.gov (828)250-3002 Date Submitted 10/1/2020 Nearest Body of Water Foster Creek Basin French Broad Water Classification Class C;Tr,ORW Site Coordinates Latitude: Longitude: 35.933115 -82.595597 A. Processing Information County(or Counties)where the project is located: Madison Is this a NCDMS Project ✓ Yes G No Is this project a public transportation project?* 6 Yes r No Is this a NCDOT Project?* (7 Yes r No (NCDOT only)T.I.P.or state project number: B-6012 WBS#(7) 48207.3.1 1a.Type(s)of approval sought from the Corps: I7 Section 404 Permit(wetlands,streams and waters,Clean Water Act) r Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) lb.What type(s)of permit(s)do you wish to seek authorization? I7 Nationwide Permit(NWP) r Regional General Permit(RGP) r Standard(IP) 1c.Has the NWP or GP number been verified by the Corps? ✓ Yes r No Nationwide Permit(NWP)Number: 18-Minor Discharges NWP Numbers(for multiple NWPS): Id.Type(s)of approval sought from the DWR: 17 401 Water Quality Certification-Regular r 401 Water Quality Certification-Express I—Non-404 Jurisdictional General Permit r Riparian Buffer Authorization I— Individual Permit le.Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: r Yes ( No For the record only for Corps Permit: r Yes (R No 1f.Is this an after-the-fact permit application?* a Yes r No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? ✓ Yes (zNo 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? ✓ Yes rNo Acceptance Letter Attachment I h.Is the project located in any of NC's twenty coastal counties? ✓ Yes (z No 1j.Is the project located in a designated trout watershed? 6' Yes r No B. Applicant Information Id.Who is applying for the permit? 17 Owner r Applicant(other than owner) le.Is there an Agent/Consultant for this project?* ✓ Yes ( No 2.Owner Information 2a.Name(s)on recorded deed: NC Department of Transportation 2b.Deed book and page no.: 2c.Responsible party: 2d.Address Street Address 55 Orange Street Address Line 2 DIY State/Bovine/Region Asheville NC Postal/Zip Code Country 28801 USA 2e.Telephone Number: 2f.Fax Number: (828)250-3002 (828)251-6394 2g.Email Address:* ryallen@ncdot.gov C. Project Information and Prior Project History 1. Project Information lb.Subdivision name: (if appropriate) 1c.Nearest municipality/town: Mars Hill 2. Project Identification 2a.Property Identification Number: 2b.Property size: 2c.Project Address Street Address Address Line 2 CA, State/Bovine/Fbgion Fbstal/Zip Code Country 3.Surface Waters 3a.Name of the nearest body of water to proposed project:* Foster Creek 3b.Water Resources Classification of nearest receiving water:* Class C;Tr,ORW 3c. What river basin(s)is your project located in?* French Broad 3d.Please provide the 12-digit HUC in which the project is located. 06010105001 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* New cored-slab bridge being constructed to replace old timber bridge on paved SR 1341 over Foster Creek.General land use is scattered residential,agriculture,and forests 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?* r Yes F No r Unknown 4d.Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site.(for DWR) Bridge 73-Madison topo 1-24000.pdf 1.1MB 4e.Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.(for DWR) 4f.List the total estimated acreage of all existing wetlands on the property: 0 4g.List the total estimated linear feet of all existing streams on the property: 650 4h.Explain the purpose of the proposed project:* The purpose of the overall project is to replace the old timber bridge on SR 1341 over Foster Creek with a new cored-slab bridge.The purpose of the permitted project was to extend an existing driveway pipe to provide enough solid ground for guardrail installation to meet safety standards. 4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:* The site was dewatered.The existing 20'by 24"driveway pipe was removed.A 36'by 30"pipe was installed and backfilled.Equipment used included a excavator,a dump truck,and a skid steer loader. 4j.Please upload project drawings for the proposed project. bridge 73 plan sheets.pdf 1.4MB 5.Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* 6 Yes r No r Unknown Comments: delineated by NC DOT personnel;minnows seen in UT 5b.If the Corps made a jurisdictional determination,what type of determination was made?* ✓ Preliminary r Approved r Not Verified r Unknown F N/A Corps AID Number: 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): Yates Allen Agency/Consultant Company: NC DOT Other: 5d1.Jurisdictional determination upload 6. Future Project Plans 6a.Is this a phased project?* ✓ Yes ( No Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary la.Where are the impacts associated with your project?(check all that apply): r Wetlands I-J Streams-tributaries r Buffers r Open Waters r Pond Construction 3.Stream Impacts 3a.Reason for impact(?) 3b.lmpact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type* 3f.Type of 3g.S.width* 3h.Impact (?) Jurisdiction* length* 51 extend pipe Permanent Fill UT to Foster Creek Perennial Both 1 16 Average(feet) (linear feet) S2 extend pipe Temporary Dewatering UT to Foster Creek Perennial Both 1 20 Average(feet) (linear feet) 3i.Total jurisdictional ditch impact in square feet: 0 3i.Total permanent stream impacts: 3i.Total temporary stream impacts: 16 20 3i.Total stream and ditch impacts: 36 3j.Comments: Temporary and permanent impacts located in same footprint E. Impact Justification and Mitigation 1.Avoidance and Minimization 1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Increase in pipe length was minimized to extent practicable to meet safety standards for guardrail installation 1b.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: The site was dewatered.Erosion control measures were installed. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? ✓ Yes 0' No 2b.If this project DOES NOT require Compensatory Mitigation,explain why: F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ✓ Yes a No If no,explain why: 2.Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* 6 Yes r No Comments: G. Supplementary Information L) 1. Environmental Documentation la.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?* ✓ Yes C No lb.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPAISEPA)?* ✓ Yes ( No Comments:* Falls within threshold of State Minimum Criteria Checklist(MCCL) 2.Violations(DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* ✓ Yes RNo 2b Provide an explanation of the violation(s): 3. Cumulative Impacts(DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality?* ✓ Yes ( No 3b.If you answered"no,"provide a short narrative description. 4.Sewage Disposal(DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* ✓ Yes r No s N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* ✓ Yes a No 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* ✓ Yes 6 No 5d.Is another Federal agency involved?* ✓ Yes F No r Unknown 5e.Is this a DOT project located within Division's 1-8? ✓ Yes r No 5f.Will you cut any trees in order to conduct the work in waters of the U.S.? ✓ Yes (- No 5g.Does this project involve bridge maintenance or removal? ✓ Yes r No 5h.Does this project involve the construction/installation of a wind turbine(s)?* ✓ Yes G No 5i.Does this project involve(1)blasting,and/or(2)other percussive activities that will be conducted by machines,such as jackhammers,mechanized pile drivers,etc.? ✓ Yes allo 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Field review,current USFWS county list for T/E species Consultation Documentation Upload 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat?* ✓ Yes RNo 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* current databases 7. Historic or Prehistoric Cultural Resources(Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* ✓ Yes GNo 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* https://nc.maps.arcgis.com/apps/webappviewer/index html?id=79ea671 ebdcc45639f0860257d5f5ed7 7c.Historic or Prehistoric Information Upload 8. Flood Zone Designation(Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-year floodplain?* ✓ Yes GNo 8c.What source(s)did you use to make the floodplain determination?* https://fris.nc.gov/fris/ Miscellaneous L) Comments Miscellaneous attachments not previously requested. Bridge 73 Madison photos.pdf 1.49MB Bridge 73 Madison signed cover letter.pdf 261.99KB DWR Pre-Filing Meeting Request Form.pdf 55.4KB Signature U * I7 By checking the box and signing below,I certify that: • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: Yates Allen Signature eaeolif Date 10/1/2020