Loading...
HomeMy WebLinkAboutNCG060156_Inspection_20200224ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Acting Director Bartlett Milling Company Attention: Simon Buckner 701 S. Center St. Statesville, North Carolina 28677 NORTH CAROLINA Environmental Quality February 24, 2020 Subject: Compliance Evaluation Inspection Bartlett Milling Company NPDES Certificate of Coverage — NCG060156 Iredell County, North Carolina Dear Mr. Buckner, Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Bartlett Milling Company — Statesville facility on February 20, 2020. Please note that in the stormwater inspection report summary we ask that you update your Stormwater Pollution Prevention Plan (SWPPP) and conduct qualitative monitoring. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact me at (704) 663-1699 or by E-mail at james.moore@ncdenr.gov. Enclosure c: Laserfiche Sincerely, JaresMoor�e\ Assistant Regional Engineer RE �uf�o..�F.r��E��c...aFourw ..oyv....m.. atEmkm nw Vu%IIM North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville. North Carolina 28115 704.663.1699 R Permit: NCG060156 SOC: County: Iredell Region: Mooresville Compliance Inspection Report Effective: 11/01/18 Expiration: 05/31/21 owner: Bartlett Milling Company Effective: Expiration: Facility: Bartlett Milling Company 701 S Center St Contact Person: Simon B Buckner Title: Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 02/20/2020 Entry Time: 12:45PM Primary Inspector: Lily C Kay Secondary Inspector(s): Certification: Statesville NC 28677 Phone: 816-753-6500 Phone: Exit Time: 02:30PM Phone: 704-663-1699 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Food/Tobacco/Soaps/Cosmetics/Public Warehousing Stormwater Discharge COC Facility Status: ❑ Compliant in Not Compliant Question Areas: IM Storm Water (See attachment summary) Page 1 of 4 Permit: NCG060156 Owner - Facility: Bartlett Milling Company Inspection Date: 02/20/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: The facility appeared well operated and maintained with some minor issues with storage of barrels, small petroleum spills around the yard, and grain spillage at the loading areas. The SWPPP was missing some components, the map needs to be updated, and the facility needs to conduct qualitative monitoring. These tasks must be completed by April 24, 2020 with written documentation submitted to the Mooresville office to prevent enforcement action from being taken. If you have any questions, please contact me at Lily.Kay@ncdenr.gov or by phone at (704) 235-2137. Page 2 of 4 Permit: NCG060156 Inspection Date: 02/20/2020 Owner - Facility: Bartlett Milling Company Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment: The Stormwater Pollution Prevention Plan (SWPPP) was available but had not been updated since 2007. The SWPPP needs to be annually updated and certified with the correct responsible parties listed. All of the pertinent documentation for spills for release of secondary containment release and a review of alternate practices need to be included in this document The site map also needs to be updated with the drainage flow patterns and the storm system needs to be checked for other property discharges into the storm system since all of the vard inlets drain to one sampling location Qualitative Monitorin Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? El M El El Comment: Qualitative monitoring has not been conducted Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? El 11 El EJ Comment: Analytical monitoring has been conducted and all results were within the benchmark limitations The hold time for pH is 15 minutes so if the samples cannot be checked into the laboratory within that hold time off needs to be taken on -site Fecal coliform and Enterococci parameters are not required because the facility does not process meat Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? El EJ El # If the facility has representative outfall status, is it properly documented by the Division? Page 3 of 4 Permit: NCGO60156 Owner - Facility: Bartlett Milling Company Inspection Date: 02/20/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine # Has the facility evaluated all illicit (non stormwater) discharges? Comment: Only one outfall was observed, because all of the yard inlets drain to one low point. Page 4 of 4