HomeMy WebLinkAboutNCS000370_Inspection Report_20201005ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Director
NORTH CAROLINA
Environmental Quality
October 5, 2020
Bridgestone Americas Tire Operations LLC
Attn. Tausha Fanslau
3001 Firestone Parkway
Wilson, NC 27893
Subject: Compliance Inspection
Permit No. NCS000370
Bridgestone Americas Tire Operations LLC
Wilson County
Dear Ms. Fanslau:
On September 29, 2020, Lauren Garcia, from the Raleigh Regional Office of the Division of
Energy, Mineral and Land Resources (DEMLR), met with Tausha Fanslau, Environmental
Coordinator, at the facility located at 3001 Firestone Parkway, in Wilson County, to conduct
a compliance inspection. The inspection consisted of reviewing: the Stormwater Pollution
Prevention Plan (SWPPP) and each of its components, the facility's outfalls, and the overall
site conditions. The inspection was conducted to ensure stormwater best management
practices are being followed, and to help fulfill NCDEQ's goal of inspecting all permitted
facilities during each permit period.
Permit:
This facility has Individual Stormwater Permit NCS000370 to discharge stormwater under
the National Pollutant Discharge Elimination System (NPDES). The current permit term
began on September 1, 2010.
Records/Reports:
The facility is required to develop and maintain a SWPPP in accordance with Part II, Section
A of the permit. All qualitative and analytical monitoring records are required to be
maintained with the SWPPP for a minimum of five years.
The facility provided all necessary records.
The facility is required to review and update the SWPPP on an annual basis in accordance
with Part II, Section A, Item, of the permit.
• The facility appeared to update the SWPPP on an annual basis.
EQ - North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Raleigh Regional Office 11628 Mail Service Center 13800 Barrett Drive I Raleigh, North Carolina 27609
rvpRl'H CFWPf. iM4 �
oapmmemmemnmmwnnu�ew+� /"� 919.791.4200
• Overall, the SWPPP was well put together and record keeping was very organized
and ready for NCDEQ to review.
Facility Site Review:
The facility manufactures tires.
All materials, machinery, and tanks were stored/located within proper secondary
containment.
• The site appeared to be very well maintained.
There are two sampled outfalls present at the facility, located to the south and east of the
facility.
There has historically been a seasonal issue with TSS at the south outfall. The outfall
is located in a CSX railway right-of-way and CSZ will not allow Bridgestone
personnel to maintain or improve the outfall. A follow-up inspection will occur in
November to determine if the outfall can be removed from sampling.
Receiving Waters:
Stormwater at the site discharges to Toisnot Swamp, a class C:Sw, NSW stream in the Neuse
River Basin.
Self -Monitoring Program:
The facility is required to provide qualitative and analytical monitoring data twice
annually.
• The facility has monitored twice annually in accordance with the permit.
The facility is considered to be in compliance. The facility provided all necessary records
and has upheld the conditions of the stormwater permit. If you have any questions or need
additional information, please contact Lauren Garcia at 919-791-4213 or
lauren.garcia@ncdenr.gov.
Enclosures: Inspection Report
Sincerely,
LUA�
auren Garcia
Environmental Specialist
DEMLR - Land Quality Section
NcrthCi'AroUlpbrtmrM-of FaSrlrmM"U1Qrf * F DtdsWD(Energy.Mneraland Land Rlaourcra
512North Salisbury Street I t612MaYServlceCenter I BakgggLNorth Carollna27694-r612
9L9.707.9200
Compliance Inspection Report
Permit: NCS000370 Effective: 09/01/10 Expiration: 08/31/15 Owner: Bridgestone Americas Tire Operations LLC
SOC: Effective: Expiration: Facility: Bridgestone Americas Tire Operations, LLC
County: Wilson 3001 Firestone Pkwy
Region: Raleigh
Wilson NC 27893
Contact Person: Tausha Fanslau Title: Phone: 252-246-7485
Directions to Facility:
System Classifications:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 09/29/2020
Primary Inspector: Lauren Garcia
Secondary Inspector(s):
Entry Time 11:OOAM
Reason for Inspection: Routine
Permit Inspection Type: Stormwater Discharge, Individual
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Certification:
Phone:
Exit Time: 01:OOPM
Phone: 919-707-3648
Inspection Type: Compliance Evaluation
Page 1 of 3
Permit: NCS000370 Owner - Facility: Bridgestone Americas Tire Operations LLC
Inspection Date: 09/29/2020 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Met with Tausha Fausla onsite. The original intent of the visit was to inspect three erosion control sites at the facility. The
facility was very well maintained and all records were readily available. There are two outfalls sampled onsite. There is a
seasonal TSS issue at the south outfall. The south outfall lies in a CSX maintained ditch. CSX (railway) will not allow
Bridgestone to make changes to or maintain the ditch. The ditch is eroding and is overgrown. Tasha stated there must be a
legal agreement to disturb area within a certain distance of the railroad. It was stated during the site visit that Thad Valentine
and Lauren Garcia would revisit the site when the WILSO-2019-010 construction project is ready for closeout. A final
determination will be made on whether the south outfall needs to continue to be sampled. The area of the site that drains to
this outfall mostly consists of parking lots.
Page 2 of 3
Permit: NCS000370 Owner - Facility: Bridgestone Americas Tire Operations LLC
Inspection Date: 09/29/2020 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑ ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
❑ ❑ ❑
# Does the Plan include a BMP summary?
❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
❑ ❑ ❑
# Does the facility provide and document Employee Training?
0
❑ ❑ ❑
# Does the Plan include a list of Responsible Party(s)?
0
❑ ❑ ❑
# Is the Plan reviewed and updated annually?
0
❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
0
❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
0
❑ ❑ ❑
Comment: The SWPPP was recently updated prior to the site visit. Records are thorough.
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑
Comment:
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑
Comment:
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑
# Were all outfalls observed during the inspection? 0 ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑
# Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑
Comment:
Page 3 of 3